← Back
Three families
537 RALPH AVENUE
BROOKLYN · BIN 3348327
💬 Discuss this project
1992Year Built
3Stories
C0Building Class
R6Zoning
1,800 sfGross Floor Area
3Units
Rent Stabilized13 Open Violations ▸FDNY Report ↗
Three families · Owner of record: NYC PACT PRESERVATION PARTNERS LLC · 6,500 sf lot · 0.28 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingOther
Roof4p · 4 filings · 20 docs
Floor 37p · 2 filings · 20 docs
Floor 28p · 2 filings · 20 docs
Floor 110p · 2 filings · 20 docs
Cellar6p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC PACT PRESERVATION PARTNERS709/22/2026
PARSONS CONSTRUCTION503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SLM ARCHITECTURE, P.C.309/16/2026
AKRF, INC.204/21/2026
DAGHER ENGINEERING PLLC709/25/2025
SOCOTEC, INC.205/13/2024
AP PROFESSIONAL ENGINEERING PLLC104/27/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC1803/21/2026
CONVERSANO ASSOCIATES, INC.103/21/2026
RYBAK DEVELOPMENT203/21/2026
SANDEEP KAUR103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FSC D&C LLCGeneral Contractor507/08/2026
DUAL FUEL COMPANY LLCGeneral Contractor407/08/2026
PARSONS CONSTRUCTION INCGeneral Contractor303/21/2026
LIBERTY NY RESTORATION INGeneral Contractor203/21/2026
LET IT GROW, INCORPORATEDGeneral Contractor209/07/2026
DUAL FUEL PLUBING & HTINGPlumbing205/15/2026
PYRAMID ETC COMPANIES, LLGeneral Contractor104/09/2026
A & E PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS18031409/16/2026
Building Lifecycle
All (67)Filed (16)Permit Issued (13)Signed Off (5)Violation (1)Inspection (2)Special Inspection (30)
09/16/2026
Filed — Alteration
WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES.
B00918897-P2
08/03/2026
Permit issued — Earth Work
B01386715-S2-EA
07/24/2026
Permit issued — General Construction
B01386715-I1-GC
05/19/2026
Signed off — Alteration
Installation of plumbing fixtures along with related piping.
B00925907-I1
05/11/2026
Signed off — Alteration
MECHANICAL WORK INCLUDES INSTALLATION OF NEW GAS VENT DUCT IN BOILER ROOM EXISTING CHIMNEY
B00926298-I1
04/21/2026
Filed — Alteration
LANDSCAPING AS PER PLANS. PAVING OF PATHWAYS & AMENITY SPACES, PLANTING OF TREES, SHRUBS, PERENNIALS & LAWN, FURNISHING OF SEATING, LITTER RECEPTACLES, FITNESS+PLAY EQUIPMENT. REPAIRED&REPLACED FENCING & GATES AS NEEDED NO CHANGE TO USE,EGRESS,OCCUPANCY
B01386715-S1
04/21/2026
Filed — Alteration
LANDSCAPING AS PER PLANS. PAVING OF PATHWAYS & AMENITY SPACES, PLANTING OF TREES, SHRUBS, PERENNIALS & LAWN, FURNISHING OF SEATING, LITTER RECEPTACLES, FITNESS+PLAY EQUIPMENT. REPAIRED&REPLACED FENCING & GATES AS NEEDED NO CHANGE TO USE,EGRESS,OCCUPANCY
B01386715-S2
04/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
04/16/2026
Filed — Alteration
LANDSCAPING AS PER PLANS. PAVING OF PATHWAYS & AMENITY SPACES, PLANTING OF TREES, SHRUBS, PERENNIALS & LAWN, FURNISHING OF SEATING, LITTER RECEPTACLES, FITNESS+PLAY EQUIPMENT. REPAIRED&REPLACED FENCING & GATES AS NEEDED NO CHANGE TO USE,EGRESS,OCCUPANCY
B01386715-I1
04/13/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Lighting in dwelling units
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Exterior lighting power
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Fenestration air leakage
SAMI HAJJAR P.E
03/31/2026
Signed off — Alteration
Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as needed.
B00923917-I1
03/19/2026
Signed off — Alteration
Installation of plumbing fixtures along with related piping.
B00978841-I1
03/17/2026
Permit issued — General Construction
B00918897-I1-GC
01/16/2026
Signed off — Alteration
Facade repairs. No change in egress, use or occupancy.
B00931228-I1
01/13/2026
Permit issued — Plumbing
B00925907-I1-PL
11/21/2025
Permit issued — General Construction
B00918897-I1-GC
09/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
09/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
09/26/2025
Special inspection requirement — Electrical motors and elevators
SAMI HAJJAR P.E
09/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
09/26/2025
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
09/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
09/25/2025
Filed — Alteration
Installation of plumbing fixtures along with related piping.
B00925907-P2
09/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
09/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/17/2025
Special inspection requirement — Electrical motors and elevators
SAMI HAJJAR P.E
09/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
09/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
09/17/2025
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
08/12/2025
Permit issued — Mechanical Systems
B00926298-I1-MS
07/23/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/18/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/20/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
03/20/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
03/20/2025
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
03/20/2025
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
03/17/2025
Filed — Alteration
MECHANICAL WORK INCLUDES INSTALLATION OF NEW GAS VENT DUCT IN BOILER ROOM EXISTING CHIMNEY
B00926298-P1
03/17/2025
Filed — Alteration
Installation of plumbing fixtures along with related piping.
B00925907-P1
01/03/2025
Permit issued — Plumbing
B00978841-I1-PL
01/02/2025
Permit issued — Mechanical Systems
B00923917-I1-MS
12/17/2024
Filed — Alteration
Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as needed.
B00923917-I1
12/17/2024
Filed — Alteration
Installation of plumbing fixtures along with related piping.
B00978841-I1
11/22/2024
Permit issued — General Construction
B00918897-I1-GC
11/21/2024
Filed — Alteration
WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES.
B00918897-P1
11/13/2024
Filed — Alteration
WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES.
B00918897-I1
08/12/2024
Permit issued — Mechanical Systems
B00926298-I1-MS
08/08/2024
Permit issued — Plumbing
B00925907-I1-PL
08/02/2024
Filed — Alteration
Installation of plumbing fixtures along with related piping.
B00925907-I1
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWEarth WorkPermit IssuedLET IT GROW, INCORPORATED08/03/2026
DOB NOWGeneral ConstructionPermit IssuedLET IT GROW, INCORPORATED07/24/2026
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC03/17/2026
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING01/13/2026
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC11/21/2025
DOB NOWMechanical SystemsSigned-offDUAL FUEL COMPANY LLC08/12/2025
DOB NOWPlumbingSigned-offA & E PLUMBING CORP01/03/2025
DOB NOWMechanical SystemsSigned-offPYRAMID ETC COMPANIES, LL01/02/2025
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC11/22/2024
DOB NOWMechanical SystemsSigned-offDUAL FUEL COMPANY LLC08/12/2024
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING08/08/2024
DOB NOWGeneral ConstructionSigned-offLIBERTY NY RESTORATION IN07/15/2024
DOB NOWSidewalk ShedPermit IssuedPARSONS CONSTRUCTION INC04/28/2022
BISPLISSUEDDANICA PLBG & HTG CORP06/16/1992
BISPLISSUEDDANICA PLBG & HTG CORP06/16/1992
BIS—ISSUEDHALMAR BUILDERS06/08/1992
BIS—ISSUEDHALMAR BUILDERS06/08/1992
1 project · most recent 04/21/2026
Storm
FiledStatusContractorScope
04/21/2026——Storm
1 project · most recent 05/01/2022
FiledStatusContractorScope
05/01/2022Permit IssuedBDS ELECTRIC CORP.—
1 project · most recent 04/27/2022
Sidewalk Shed
FiledStatusContractorScope
04/27/2022Permit IssuedPARSONS CONSTRUCTION INCSidewalk Shed
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 64
DateRequirementInspectorRole
04/20/2026Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
04/13/2026FinalSAMI HAJJAR P.Eprogress
04/12/2026Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
04/12/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
04/12/2026FinalSAMI HAJJAR P.Eprogress
04/12/2026Fire-Resistance Rated ConstructionSAMI HAJJAR P.Eprogress
04/12/2026Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
04/12/2026Interior lighting powerSAMI HAJJAR P.Eenergy_progress
04/12/2026Exterior lighting powerSAMI HAJJAR P.Eenergy_progress
04/12/2026Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
04/12/2026Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
04/12/2026Lighting controlsSAMI HAJJAR P.Eenergy_progress
04/12/2026Fenestration air leakageSAMI HAJJAR P.Eenergy_progress
04/12/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
09/26/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
09/26/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
09/26/2025Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
09/26/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
09/26/2025Maintenance informationSAMI HAJJAR P.Eenergy_progress
09/26/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
09/17/2025Maintenance informationSAMI HAJJAR P.Eenergy_progress
09/17/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
09/17/2025Tenant Protection Plan Compliance—special
09/17/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
09/17/2025Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
Latest 25 of 64.
▾Documents — 75 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/29/2026B00726956-I1Request digital key ↗
08/25/2026B00931228-I1Request digital key ↗
08/25/2026B00931228-P1Request digital key ↗
Showing 3 of 17 on file for this type
▸Seals & Professional Certifications31
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/29/2026B00726956-I1Open ↗
08/25/2026B00931228-I1Open ↗
08/24/2026B00926298-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026B00918897-I1Open ↗
09/02/2026B00918897-I1Open ↗
09/01/2026B00926298-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026B00918897-I1Open ↗
09/01/2026B00926298-I1Open ↗
09/01/2026B00926298-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/25/2026B00931228-I1Open ↗
08/25/2026B00931228-P1Open ↗
08/23/2026B00918897-I1Open ↗
Showing 3 of 9 on file for this type
▸Approvals, Objections & Sign-offs17
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter17
08/25/2026B00931228-I1Open ↗
08/25/2026B00931228-I1Open ↗
08/25/2026B00931228-P1Open ↗
Showing 3 of 17 on file for this type
▸Other Documents1
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
08/13/2026B01386715-S1Open ↗