Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projects545 8th Avenue Associates, LLC3 filings
TEMPORARY INSTALLATION OF PIPE SCAFFOLD AS PER DRAWINGS DURING GENERAL CONSTRUCTION WORK . NO CHANGE IN USE, EGRESS, AND OCCUPANCY. PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2014.
On file for this project
8 documents
Exterior Rear Facade and Balcony Repair
On file for this project
27 documents
AT FLOORS 2 THROUGH 23, EXSITING DETERIORATED WIREGLASS WINDOWS TO BE REPLACED WITH TEMPERED GLASS AS PER PLANS FILED HEREWITH. THERE IS NO CHANGE IN USE EGRESS OR OCCUPANCY.
On file for this project
10 documents · 4 drawing sheets
Roof545 8th Avenue Associates9p · 3 filings · 13 docs
ArchitectureEquipmentGeneralMechanicalStructural
Issued Permit Scope
Sidewalk Shed
REPAIRS AT EAST FACADE AND LOW ROOF SETBACKS AT 18TH FLOORTHROUGH ROOF LEVEL. AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
On file for this project
8 documents · 7 drawing sheets
Outrigger Suspended Scaffold for exterior works and inspections
On file for this project
5 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
5 documents · 11 drawing sheets
Floor 2424th floor partitions and doors installation1p · 1 filing · 4 docs
ArchitectureEquipmentGeneralMechanicalStructural
Issued Permit Scope
General Construction · Structural · Supported Scaffold
AT 24TH FLOOR, INSTALLATION OF 2-HOUR RATED PARTITIONS,INTERIOR NON BEARING PARTITIONS, AND DOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
On file for this project
4 documents · 1 drawing sheet
Floor 23545 8th Avenue Associates, LLC13p · 5 filings
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
AT 23RD FLOOR SUITE 2315 & SUITE 2325, REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND DOORS, NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents
AT FLOORS 7, 8, 16, 17, 23, MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents · 2 drawing sheets
AT FLOORS 7, 8, 16, 17, 23, REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 22545 8th Avenue Associates5 filings · 6 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural · Supported Scaffold
AT 22ND FLOOR HALLWAY AND SUITE 2250, REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND DOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
On file for this project
6 documents
AT 22ND FLOOR, REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND DOORS, NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
9 documents
AT 22ND FLOOR, MODIFICATIONS TO EXISTING PLUMBING SYSTEM AND RELOCATION OF PLUMBING FIXTURES AND PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
On file for this project
5 documents
Latest 3 of 5 filings on this floor.
Floor 21
Floor 20545 8th Avenue Associates, LLC1 filing · 8 docs
ArchitectureEquipmentGeneralMechanicalStructural
Issued Permit Scope
General Construction · Structural · Supported Scaffold
AT 20TH FLOOR TENANT SPACE, REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND DOORS, NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents
Floor 19
Floor 18545 8th Avenue Associates, LLC1 filing · 7 docs
ArchitectureEquipmentGeneralMechanicalStructural
Issued Permit Scope
General Construction · Structural · Supported Scaffold
AT 18TH FLOOR TENANT SPACE #1810, INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND DOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
On file for this project
7 documents
Floor 17545 8th Avenue Associates, LLC12p · 4 filings
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
AT FLOORS 7, 8, 16, 17, 23, MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents · 2 drawing sheets
AT FLOORS 7, 8, 16, 17, 23, REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents · 2 drawing sheets
AT FLOORS 7, 8, 16, 17, 23, MODIFICATIONS TO EXISTING PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 16545 8th Avenue Associates, LLC11p · 4 filings
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
AT FLOORS 7, 8, 16, 17, 23, MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents · 2 drawing sheets
AT FLOORS 7, 8, 16, 17, 23, REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents · 2 drawing sheets
AT FLOORS 7, 8, 16, 17, 23, MODIFICATIONS TO EXISTING PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 15
Floor 14545 Eight Avenue Associates2 filings · 15 docs
ArchitectureEquipmentGeneralMechanicalStructural
Issued Permit Scope
General Construction · Structural · Supported Scaffold
AT TENANT SUITE #1450, REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND DOORS, NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents
AT TENANT SUITE #1450, REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND DOORS, NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 4 drawing sheets
Floor 13
Floor 12
Floor 11Global Holdings8p · 5 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
AT 11TH FLOOR TENANT SPACE, MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS.
On file for this project
16 documents · 2 drawing sheets
AT 11TH FLOOR TENANT SPACE, MODIFICATIONS TO EXISTING PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS.
On file for this project
6 documents · 2 drawing sheets
AT 11TH FLOOR TENANT SPACE, MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS.
On file for this project
5 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 10545 8th Avenue Associates2 filings
ArchitectureEquipmentGeneralMechanicalStructural
Issued Permit Scope
General Construction · Structural · Supported Scaffold
AT TENANT SUITE #1015, REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND DOORS, NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
9 documents
AT TENANT SUITE #1015, REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND DOORS, NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
22 documents
Floor 9545 8th Avenue Associates2 filings
ArchitectureEquipmentGeneralMechanicalStructural
Issued Permit Scope
General Construction · Structural · Supported Scaffold
AT 9TH FLOOR SUITE 910 AND BATHROOM, REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND DOORS, NO CHANGE TO USE, EGRESS, OR OCCUPANCY
On file for this project
7 documents
AT 9TH FLOOR SUITE 910 BATHROOM, MODIFICATIONS TO EXISTING PLUMBING SYSTEM AND RELOCATION OF PLUMBING FIXTURES AND PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
On file for this project
6 documents
Floor 8545 8th Avenue Associates, LLC15p · 4 filings
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
AT FLOORS 7, 8, 16, 17, 23, MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents · 2 drawing sheets
AT FLOORS 7, 8, 16, 17, 23, REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents · 5 drawing sheets
AT FLOORS 7, 8, 16, 17, 23, MODIFICATIONS TO EXISTING PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 7545 8th Avenue Associates, LLC18p · 4 filings
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
AT FLOORS 7, 8, 16, 17, 23, MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents · 2 drawing sheets
AT FLOORS 7, 8, 16, 17, 23, REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents · 5 drawing sheets
AT FLOORS 7, 8, 16, 17, 23, MODIFICATIONS TO EXISTING PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Subway1p · 2 filings · 12 docs
MechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing
IT IS PROPOSED TO RENOVATE EXISTING 1st FLOOR & MEZZANINE STORE FOR A NEW SUBWAY SANDWICH STORE. INSTALL PLUMBING FIXTURES IN JUNCTION WITH DOB NOW APPLICATION#: M00628110. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents
IT IS PROPOSED TO RENOVATE EXISTING 1st FLOOR & MEZZANINE STORE FOR A NEW SUBWAY SANDWICH STORE. INSTALL INTERIOR NON LOAD-BEARING PARTITIONS, FINISHES, HUNG CEILING, HVAC DUCT WORK & REPLACE EXISTING STOREFRONT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
MezzanineSubway6p · 2 filings · 12 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing
IT IS PROPOSED TO RENOVATE EXISTING 1st FLOOR & MEZZANINE STORE FOR A NEW SUBWAY SANDWICH STORE. INSTALL PLUMBING FIXTURES IN JUNCTION WITH DOB NOW APPLICATION#: M00628110. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
IT IS PROPOSED TO RENOVATE EXISTING 1st FLOOR & MEZZANINE STORE FOR A NEW SUBWAY SANDWICH STORE. INSTALL INTERIOR NON LOAD-BEARING PARTITIONS, FINISHES, HUNG CEILING, HVAC DUCT WORK & REPLACE EXISTING STOREFRONT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents · 6 drawing sheets
CellarGlobal Holdings1p · 2 filings · 12 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
REMOVE 3000 GALLON FUEL OIL TANK.
On file for this project
6 documents
AT CELLAR, MODIFICATIONS TO EXISTING PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS
On file for this project
6 documents · 1 drawing sheet
Site & exterior545 8th Avenue Associates4 filings · 15 docs
ArchitectureElectricalMechanicalStructural
Issued Permit Scope
Construction Fence · General Construction · Sidewalk Shed · Structural
REPAIRS AT EAST FACADE AND LOW ROOF SETBACKS AT 18TH FLOORTHROUGH ROOF LEVEL. AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
On file for this project
8 documents · 12 drawing sheets
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH FACADE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33
On file for this project
3 documents · 2 drawing sheets
install 12'-0 high temporary construction fence @ 3'-0 from building line in conjunction with job#: M00628110. No change in use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Filed — no permit issuedSubway1 filing · 3 docs
ArchitectureStructural
ERECT ILLUMINATED ACCESSORY BUSINESS LED CHANNEL LETTER WALL SIGN WITH BACK LIT ALUMINUM PANEL, NO CHANGE TO USE, EGRESS OR OCCUPATION
On file for this project
3 documents · 2 drawing sheets