← Back
BuildNYC
Office, 20+ stories, with or without commercial
The Suites at 546 Fifth Avenue
546 5TH AVENUE · BIN 1082895
💬 Discuss this project
1989Year Built
22Stories
O4Building Class
C5-3Zoning
180,524 sfGross Floor Area
1Units
LL97 Covered4 Active Violations 2 unresolved · 2 paperwork only 7 likely answered 10 old, status unconfirmed ▸FISP: No Report Filed
Office, 20+ stories, with or without commercial · Owner of record: 546 Fifth Owner · 10,575 sf lot · 17.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSprint7p · 2 filings · 4 docs
Floor 22Temporary Core Fire Sprinkler Protection7p · 1 filing · 3 docs
Floor 21Stephanie Gottlieb27p · 3 filings · 15 docs
Floor 20
Floor 19Nagase18p · 1 filing · 10 docs
Floor 18Esquire Management CORP.7p · 1 filing · 6 docs
Floor 17Esquire Management CORP.5p · 1 filing · 7 docs
Floor 16Temporary Core Fire Sprinkler Protection39p · 3 filings · 20 docs
Floor 15
Floor 14Esquire Management CORP.5p · 1 filing · 7 docs
Floor 13
Floor 12Temporary Core Fire Sprinkler Protection8p · 1 filing · 3 docs
Floor 11Dolce & Gabbana29p · 4 filings · 20 docs
Floor 10Dolce & Gabbana29p · 4 filings · 20 docs
Floor 9
Floor 8
Floor 7
Floor 6West 45th Street1p · 1 filing · 5 docs
Floor 5Belluck Law4p · 1 filing · 4 docs
Floor 4Esquire Management CORP.5p · 1 filing · 7 docs
Floor 3
Floor 2
Floor 1
Site & exteriorJsre Management8p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NW 5th & 45th Realty6603/21/2026
J Safra Real Estate5003/21/2026
546 Fifth Owner4403/22/2026
550 Fifth Owner LLC-Esqrmgrcorp1603/21/2026
U.S. Realty & Investment Co1103/21/2026
N W 5th1103/21/2026
Jrse1003/21/2026
Jsre Acquisitions603/22/2026
Galbreath 546 5th Avenue603/21/2026
550 5th Avenue203/21/2026
Merzon203/21/2026
Jsre103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Yona Love Consulting Services1803/21/2026
Stitcht503/21/2026
Milrose Consultants203/21/2026
Smep Design & Consultation203/21/2026
Outsorce Consultants603/21/2026
CCM Services Group103/21/2026
Rigid Structural Design203/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Avc General ContractingGeneral Contractor1107/08/2026
Nucor ConstructionGeneral Contractor507/08/2026
Metflow Fire ControlFire Protection307/08/2026
Metropolitan Plumbing and HeatingPlumbing307/08/2026
Eagle Scaffolding ServicesScaffold307/08/2026
Mega PlumbingFire Protection307/08/2026
Gotham CommunicationsGeneral Contractor303/21/2026
MichilliGeneral Contractor203/21/2026
Copper PlumbingPlumbing207/08/2026
A&A PlumbingPlumbing107/08/2026
MJH Energy ConsultingFire Protection107/08/2026
PSI PartnersFire Protection107/08/2026
Accu-Glo Electric of N.y.incElectrical103/21/2026
Ralph Caramante P, H, MechanicalFire Protection107/08/2026
M.C. Electrical NYElectrical103/21/2026
Commercial Electric ContElectrical103/21/2026
Centennial Elevator IndustriesElectrical103/21/2026
Adco ElectricalElectrical103/21/2026
Jorob Contracting & Electrical CoElectrical103/21/2026
Idk CoolingGeneral Contractor107/08/2026
Unispace of BostonGeneral Contractor104/09/2026
Intersystems Installation S&SScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Rosini Engineering3282603/01/2026
Wavic Engineering1733112/16/2025
City-Wide Testing416311/16/2022
HT Engineering6274203/13/2020
Steel Core Engineering PL1098302/21/2020
Building Lifecycle
All (178)Filed (26)Permit Issued (34)Signed Off (13)Facade (FISP) (9)Violation (60)Inspection (6)Special Inspection (30)
06/17/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
M01265220-I1
03/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
David Rosini
03/02/2026
Special inspection requirement — Mechanical Systems
David Rosini
03/02/2026
Special inspection requirement — Final
David Rosini
03/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
David Rosini
03/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
David Rosini
03/02/2026
Special inspection requirement — Duct leakage testing, insulation and design
David Rosini
03/02/2026
Special inspection requirement — Shutoff dampers
David Rosini
03/01/2026
Filed — Alteration
mechanical units piping and duct work including corporate kitchen range hood ventilation system for single-tenant office space for Safra National Bank on the 16th floor
M00702533-P1
01/02/2026
Permit issued — Sprinklers
M01326754-I1-EW-SP
12/16/2025
Signed off — Alteration
replace window on sixth floor setback terrace with a door for access to the terrace.
M01323721-I1
12/16/2025
Filed — Alteration
M01326754-I1
12/01/2025
Special inspection requirement — Sprinkler Systems
DARIUSZ LUCZAK
11/26/2025
Permit issued — General Construction
M01323721-I1-GC
11/24/2025
Filed — Alteration
replace window on sixth floor setback terrace with a door for access to the terrace.
M01323721-I1
11/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
JOSEPH LOMBARDI
11/24/2025
Special inspection requirement — Final
JOSEPH LOMBARDI
11/24/2025
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH LOMBARDI
10/10/2025
Permit issued — General Construction
M01274840-I1-GC
09/25/2025
Filed — Alteration
MINOR INTERIOR RENOVATION TO EXISTINGTENANT FLOOR 5 PRIVATE OFFICES IN BUILDING. NO CHANGE IN OCCUPANTLOAD NUMBER, USE OR EGRESS. NO RENOVATION TO EXTERIOR ENVELOP.
M01274840-I1
09/23/2025
Signed off — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01253599-I1
09/11/2025
Filed — Alteration
Replace Window with door for mechanical roof terrace at the sixth floor. No change of use, egress or occupancy. Work is limited to the replacement of one window panel with one door panel in kind materials.
M01266389-I1
09/10/2025
Special inspection requirement — Air barrier - visual inspection
JOSEPH LOMBARDI
09/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
JOSEPH LOMBARDI
09/10/2025
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH LOMBARDI
09/09/2025
Permit issued — Suspended Scaffold
M01265220-I1-SC
09/03/2025
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
M01265220-I1
08/20/2025
Special inspection requirement — Final
DAMIAN BESCULIDES
08/04/2025
Special inspection requirement — Final
JOSEPH LOMBARDI
07/15/2025
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01253599-I1
07/15/2025
Permit issued — Supported Scaffold
M01253599-I1-SF
04/08/2025
Violation issued (ECB, open)
Local Law
01/14/2025
Signed off — Alteration
mechanical units piping and duct work including corporate kitchen range hood ventilation system for single-tenant office space for Safra National Bank on the 16th floor
M00702533-I1
10/09/2024
Permit issued — Mechanical Systems
M00236456-S1-MS
09/19/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/09/2024
Filed — Alteration
Plumbing work for single tenant office space.
M00706650-P1
07/22/2024
Permit issued — Mechanical Systems
M00702533-S3-MS
05/20/2024
Permit issued — Sprinklers
M00702533-S2-EW-SP
05/06/2024
Permit issued — Plumbing
M00706650-I1-PL
05/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/12/2024
Signed off — Alteration
General Construction work for interior build-out on the 21st Floor
M00766963-I1
04/12/2024
Signed off — Alteration
M00767033-I1
03/28/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/28/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/26/2024
Signed off — Alteration
Mechanical work for interior build-out on the 21st Floor
M00767026-I1
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/23/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/15/2023
Permit issued — General Construction
M00702533-I1-GC
09/05/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/22/2023
Permit issued — Mechanical Systems
M00702533-S3-MS
06/21/2023
Filed — Alteration
mechanical units piping and duct work including corporate kitchen range hood ventilation system for single-tenant office space for Safra National Bank on the 16th floor
M00702533-S3
06/16/2023
Permit issued — Sprinklers
M00702533-S2-EW-SP
06/15/2023
Filed — Alteration
mechanical units piping and duct work including corporate kitchen range hood ventilation system for single-tenant office space for Safra National Bank on the 16th floor
M00702533-S2
05/23/2023
Special inspection requirement — Sprinkler Systems
David Rosini
05/18/2023
Permit issued — Plumbing
M00706650-I1-PL
04/06/2023
Permit issued — Mechanical Systems
M00767026-I1-MS
04/06/2023
Permit issued — General Construction
M00766963-I1-GC
02/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/24/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/27/2022
Signed off — Alteration
Sprinkler modifications as per plans. No change in use, egress or occupancy.
M00327614-I1
Latest 60 of 178 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedRalph Caramante P, H, Mechanical01/02/2026
DOB NOWGeneral ConstructionSigned-offAvc General Contracting11/26/2025
DOB NOWGeneral ConstructionPermit IssuedUnispace of Boston10/10/2025
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System09/09/2025
DOB NOWSupported ScaffoldSigned-offIntersystems Installation S&S07/15/2025
DOB NOWMechanical SystemsPermit IssuedAvc General Contracting10/09/2024
DOB NOWMechanical SystemsPermit IssuedAvc General Contracting07/22/2024
DOB NOWSprinklersPermit IssuedMetflow Fire Control05/20/2024
DOB NOWPlumbingPermit IssuedMetropolitan Plumbing and Heating05/06/2024
DOB NOWGeneral ConstructionSigned-offAvc General Contracting12/15/2023
DOB NOWMechanical SystemsPermit IssuedAvc General Contracting06/22/2023
DOB NOWSprinklersPermit IssuedMetflow Fire Control06/16/2023
DOB NOWPlumbingPermit IssuedMetropolitan Plumbing and Heating05/18/2023
DOB NOWMechanical SystemsSigned-offNucor Construction04/06/2023
DOB NOWGeneral ConstructionSigned-offNucor Construction04/06/2023
DOB NOWSprinklersSigned-offReal Plumbing12/06/2022
DOB NOWPlumbingSigned-offA&A Plumbing11/30/2022
DOB NOWSprinklersSigned-offMora Fire Protection11/23/2022
DOB NOWMechanical SystemsSigned-offNucor Construction11/22/2022
DOB NOWGeneral ConstructionSigned-offNucor Construction11/17/2022
DOB NOWGeneral ConstructionSigned-offAvc General Contracting11/16/2022
DOB NOWAntennaSigned-offGotham Communications07/16/2022
DOB NOWSprinklersSigned-offReal Plumbing03/31/2022
DOB NOWPlumbingSigned-offCopper Mechanical07/02/2021
DOB NOWMechanical SystemsSigned-offIdk Cooling11/02/2020
DOB NOWSidewalk ShedSigned-offEagle Scaffolding Services04/07/2020
DOB NOWPlumbingSigned-offCopper Mechanical03/26/2020
DOB NOWMechanical SystemsSigned-offMichilli03/25/2020
DOB NOWSprinklersSigned-offReal Plumbing03/16/2020
DOB NOWSidewalk ShedSigned-offEagle Scaffolding Services01/03/2020
DOB NOWMechanical SystemsPermit IssuedAvc General Contracting11/06/2019
DOB NOWSprinklersPermit IssuedMetflow Fire Control10/30/2019
DOB NOWPlumbingPermit IssuedMetropolitan Plumbing and Heating10/29/2019
DOB NOWSprinklersPermit IssuedMJH Energy Consulting09/19/2019
BIS—ISSUEDAvc General Contracting08/12/2025
BIS—ISSUEDAvc General Contracting11/06/2024
BISSPISSUEDMercury Fire Supp03/30/2021
BISOTISSUEDMichilli06/29/2020
BISOTISSUEDAvc General Contracting06/16/2020
BISOTISSUEDMichilli03/02/2020
+ 44 more permits on file
2 projects · most recent 03/01/2026
Associated Ducts and Piping Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/01/2026Permit IssuedAvc General ContractingAssociated Ducts and Piping, Heating and Air Conditioning Systems
Heat / Cool
Hitachi HIDM012B22S 12,000 BTU · Vrf Indoor ×6
TIWM030B22S 30,000 BTU · Vrf Indoor ×6
HIDM015B22S 15,000 BTU · Vrf Outdoor ×4
HIDM018B22S 18,000 BTU · Vrf Indoor ×4
HIDM048B22S 48,000 BTU · Vrf Indoor ×4
HIDM054B22s 54,000 BTU · Vrf Outdoor ×2
HVWHP096B42S 96,000 BTU · Vrf Outdoor ×2
HVWHP264B32S 264,000 BTU · Vrf Outdoor ×2
Ducts & Piping
__Junk__ None 1 CFM · Ductwork ×2
02/21/2020Permit IssuedAvc General ContractingAssociated Ducts and Piping—
2 projects · most recent 02/21/2020
FiledStatusContractorScope
02/21/2020Permit IssuedMetflow Fire Control120 heads
02/18/2020Permit IssuedMJH Energy Consulting18 heads
2 projects · most recent 09/09/2024
Water/Sanitary
FiledStatusContractorScope
09/09/2024Permit IssuedMetropolitan Plumbing and HeatingWater/Sanitary
02/21/2020Permit IssuedMetropolitan Plumbing and HeatingWater/Sanitary
8 projects · most recent 08/22/2025
General Wiring
FiledStatusContractorScope
08/22/2025CompleteDaven Electric—
12/05/2022CompleteM&T ElectricalGeneral Wiring
03/12/2020CompleteLive Wire Electric 1General Wiring
12/24/2019CompleteStar-Delta Electric—
05/17/2019Permit IssuedH. & L. ElectricGeneral Wiring
10/11/2018Permit IssuedAntonio Ceriello ElectricGeneral Wiring
10/05/2018Permit IssuedCentennial Elevator IndustriesGeneral Wiring
05/10/2018Permit IssuedVerde ElectricGeneral Wiring
1 project · most recent 09/03/2025
Suspended Scaffold
FiledStatusContractorScope
09/03/2025Signed-offStructural Preservation SystemSuspended Scaffold
1 project · most recent 09/03/2025
FiledStatusContractorScope
09/03/2025Signed-offStructural Preservation System—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/28/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/28/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/23/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/05/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
03/02/2026HVAC-R and service water piping design and insulationDavid Rosinienergy_progress
03/02/2026Mechanical SystemsDavid Rosinispecial
03/02/2026FinalDavid Rosiniprogress
03/02/2026HVAC-R and service water heating system controlsDavid Rosinienergy_progress
03/02/2026HVAC-R and service water heating equipmentDavid Rosinienergy_progress
03/02/2026Duct leakage testing, insulation and designDavid Rosinienergy_progress
03/02/2026Shutoff dampersDavid Rosinienergy_progress
12/01/2025Sprinkler SystemsDARIUSZ LUCZAKspecial
11/24/2025Fire-Resistance Rated ConstructionJOSEPH LOMBARDIprogress
11/24/2025FinalJOSEPH LOMBARDIprogress
11/24/2025Energy Code Compliance InspectionsJOSEPH LOMBARDIprogress
09/10/2025Air barrier - visual inspectionJOSEPH LOMBARDIenergy_progress
09/10/2025Fire-Resistance Rated ConstructionJOSEPH LOMBARDIprogress
09/10/2025Energy Code Compliance InspectionsJOSEPH LOMBARDIprogress
08/20/2025FinalDAMIAN BESCULIDESprogress
08/04/2025FinalJOSEPH LOMBARDIprogress
05/23/2023Sprinkler SystemsDavid Rosinispecial
11/16/2022HVAC-R and service water heating system controlsELIAS RASABIenergy_progress
11/16/2022Duct leakage testing, insulation and designELIAS RASABIenergy_progress
11/16/2022Shutoff dampersELIAS RASABIenergy_progress
11/16/2022HVAC-R and service water heating equipmentELIAS RASABIenergy_progress
11/07/2022Lighting controlsJOSEPH LOMBARDIenergy_progress
11/07/2022Interior lighting powerJOSEPH LOMBARDIenergy_progress
06/29/2022Lighting controlsELIAS RASABIenergy_progress
06/29/2022Mechanical SystemsELIAS RASABIspecial
Latest 25 of 48.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Belluck LawOfficeFloor 5
Project M01274840 Alteration · Permit Entire · 09/25/2025
Stephanie GottliebOfficeFloor 21
Project M00767026 Alteration · LOC Issued · 11/16/2022
Project M00767033 Alteration · LOC Issued · 11/16/2022
SprintTelecom siteRoof
Project M00727728 Alteration · LOC Issued · 05/17/2022
Dolce & GabbanaRetailFloors 10, 11
Project M00327689 Alteration · LOC Issued · 03/13/2020
Project M00327614 Alteration · LOC Issued · 03/11/2020
Project M00327923 Alteration · LOC Issued · 03/11/2020
NagaseOfficeFloor 19
Project M00236456 Alteration · Permit Entire · 10/25/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,062 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch17
09/02/2026M00727728-I1Request digital key ↗
09/01/2026M00766963-I1Request digital key ↗
09/01/2026M00706650-P1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
09/05/2026M00228781-I1Request digital key ↗
09/05/2026M00236456-I1Request digital key ↗
09/05/2026M00327614-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/05/2026M00236456-S1Request digital key ↗
09/05/2026M00327689-I1Request digital key ↗
09/04/2026M00406562-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00236456-I1Request digital key ↗
09/05/2026M00327923-I1Request digital key ↗
08/15/2026M00236456-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00287237-I1Request digital key ↗
▸Applications & Permits233
▸BISWORK PERMIT APPLICATION120
11/06/2024121527240Open ↗
03/31/2021121746343Open ↗
03/05/2020123854668Open ↗
Showing 3 of 120 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION112
11/06/2024121527240Open ↗
08/11/2022121527240Open ↗
05/26/2022121527240Open ↗
Showing 3 of 112 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION2
12/22/2022121527240Open ↗
12/22/2022121527240Open ↗
▸Seals & Professional Certifications274
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION115
03/04/2020123854668Open ↗
03/04/2020123854668Open ↗
01/27/2020123250490Open ↗
Showing 3 of 115 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST32
03/04/2020123854668Open ↗
10/24/2019123694671Open ↗
10/09/2019123678573Open ↗
Showing 3 of 32 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT32
10/24/2019123694671Open ↗
Showing 1 of 32 on file for this type
▸DOB NOWProgress Inspector Seal & Signature29
09/26/2026M00767026-I1Open ↗
09/26/2026M00767026-I1Open ↗
09/01/2026M00327689-I1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature26
09/05/2026M00236456-I1Open ↗
09/05/2026M00327923-I1Open ↗
09/02/2026M00727728-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/26/2026M00767026-I1Open ↗
09/02/2026M00236456-P1Open ↗
09/01/2026M00702533-S2Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISPC FULL REPORT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Trade Schedules & Equipment67
▸BISSELF-CERT PLUMBING NOTICE22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE17
07/17/2019123497117Open ↗
Showing 1 of 17 on file for this type
▸BISSCHEDULE B - PLUMBING14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA8
03/06/2023123155290Open ↗
08/23/2021123155307Open ↗
10/22/2019121527240Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE PERMITS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBOROUGH COMMISSIONER TO ADDRESS OPEN FIRE ALARM APPLICATION FOR FLOORS BEING REQUESTED1
12/22/2022121527240Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos62
▸BISASBESTOS: CERTIFICATION (DEP ACP5)24
04/20/2022121527240Open ↗
Showing 1 of 24 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
09/05/2026M00327923-I1Open ↗
09/01/2026M00766963-I1Open ↗
09/01/2026M00706650-I1Open ↗
Showing 3 of 14 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance65
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS44
03/05/2020123854668Open ↗
03/04/2020123854668Open ↗
12/09/2019123678573Open ↗
Showing 3 of 44 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
03/01/2022123854668Open ↗
09/23/2020123156574Open ↗
12/09/2019123678573Open ↗
Showing 3 of 12 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/01/2022123854668Open ↗
09/23/2020123156574Open ↗
▸BISINTERIOR LIGHTING POWER1
03/02/2022123854668Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/02/2022123854668Open ↗
▸BISLIGHTING CONTROLS1
03/02/2022123854668Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/02/2022123854668Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00406562-I1Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY11
03/01/2022123854668Open ↗
03/01/2022123854668Open ↗
04/28/2021121746343Open ↗
Showing 3 of 11 on file for this type
▸Approvals, Objections & Sign-offs83
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST50
03/07/2023123155290Open ↗
03/03/2022123854668Open ↗
09/21/2021123155307Open ↗
Showing 3 of 50 on file for this type
▸BISADMINISTRATIVE OBJECTIONS19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
05/26/2022121527240Open ↗
05/11/2022121527240Open ↗
04/20/2022121527240Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER4
03/31/2021121746343Open ↗
10/30/2019121527240Open ↗
Showing 2 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFINAL1
03/02/2022123854668Open ↗
▸BISLETTERS - APPRVD FAB CERT-INTENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership96
▸BISCOST AFFIDAVIT91
03/01/2022123854668Open ↗
09/21/2021123155307Open ↗
09/23/2020123156574Open ↗
Showing 3 of 91 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
08/10/2022123155290Open ↗
03/02/2022123854668Open ↗
05/04/2021121746343Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
11/06/2024121527240Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms133
▸BISEFILING COVER SHEET62
03/04/2020123854668Open ↗
10/24/2019123694671Open ↗
Showing 2 of 62 on file for this type
▸BISBOROUGH INTAKE FORM54
11/06/2024121527240Open ↗
08/28/2024121527240Open ↗
03/31/2021121746343Open ↗
Showing 3 of 54 on file for this type
▸BISADDITIONAL INFORMATION11
12/22/2022121527240Open ↗
12/22/2022121527240Open ↗
Showing 2 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Other Documents4
▸BISUnknown2
03/04/2020123854668Open ↗
03/04/2020123854668Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
08/13/2026M01265220-I1Open ↗