554 8TH AVENUE
MANHATTAN · BIN 1014469
💬 Discuss this project
1924Year Built
21Stories
F9Building Class
M1-9AZoning
255,696 sfGross Floor Area
67Units
LL97 Covered2 Active Violations 23 likely answered 32 old, status unconfirmed ▸FISP: SWARMP
Factory, industrial, miscellaneous · Owner of record: 270 Realty · 13,166 sf lot · 19.42 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projects270 Reach LLC1 filing
Roof270 Realty LLC1 filing · 6 docs
Floor 20The Expansion Group INC1p · 1 filing · 7 docs
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5The Expansion Group INC1 filing · 4 docs
Floor 4The Expansion Group INC1 filing · 4 docs
Floor 3270 Reach LLC2 filings · 15 docs
Floor 2270 Reach LLC2p · 3 filings · 15 docs
Floor 1270 Reach LLC3p · 4 filings · 15 docs
Mezzanine270 Reach LLC2p · 1 filing · 15 docs
Cellar270 Reach LLC4p · 3 filings · 15 docs
Site & exteriorThe Expansion Group INC7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
The Expansion Group13507/08/2026
270 Realty10003/22/2026
Melohn Properties1103/21/2026
Jovil203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Silman603/31/2023
Mohammad Ahead, PE109/20/2022
Cataldo Properties106/10/2022
MG Engineering1604/06/2022
Tohfaz Uddin PE112/08/2021
The Eipel Engineering Group212/03/2021
KZ Engineering508/13/2021
Cpengineering212/17/2019
Baileys Engineering111/21/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Metropolis Group4403/21/2026
Synergy Building Consultants603/21/2026
Louis Striar203/21/2026
Municipal Building Consultants103/21/2026
AE Design Solution203/21/2026
Arra Architecture403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Colgate EnterpriseScaffold1507/08/2026
Hydronic Concepts NY PlumbingFire Protection1107/08/2026
Central InteriorsGeneral Contractor1007/08/2026
Central InteriorsScaffold907/08/2026
Ebro Dique GroupScaffold707/08/2026
P.S. Marcato Elev. CoElectrical403/21/2026
ProbuilderoGeneral Contractor407/08/2026
Hydronic Concepts NY P&HPlumbing207/08/2026
Titan Electrical & Elev ContractingElectrical103/22/2026
Signs CadSign hanger107/08/2026
Star Electrical ContractorsElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons1061503/31/2023
Cataldo Engineering2174106/10/2022
The Eipel Engineering Group2714212/03/2021
Special Testing & Consulting1688107/29/2019
Building Lifecycle
All (194)Filed (32)Permit Issued (43)Signed Off (11)Facade (FISP) (14)Violation (60)Objection (4)Special Inspection (30)
04/21/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE.
M00197711-I1
09/27/2024
Signed off — Alteration
INSTALLATION OF A TEMPORARY STANDPIPE /PRESSURIZATION ALARM SYSTEM AS PER PLANS.
M00270284-I1
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/06/2024
Signed off — Alteration
Standpipe and Sprinkler modifications as shown on drawings.
M00191533-I1
07/12/2024
Permit issued — Standpipe
M00270284-I1-EW-SD
07/11/2024
Signed off — Alteration
Structural work associated with new elevators, stairs, ramp, entrance canopy, lowered lobby floor and stair infills on floors Cel, 1-2. No change in use, egress or occupancy.
M00197769-I1
07/02/2024
Permit issued — Sprinklers
M00191533-I1-EW-SP
06/12/2024
Permit issued — Sprinklers
M00192014-I1-EW-SP
06/06/2024
Permit issued — Boiler Equipment
M00277840-I1-BE
01/09/2024
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00247678-I1
01/08/2024
Signed off — Alteration
Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00247684-I1
01/08/2024
Signed off — Alteration
M00637077-I1
11/20/2023
Signed off — Alteration
The steam boiler has been converted from No. 2 Fuel Oil to Natural Gas. The burner and associated controls have been replaced with new. A new chimney liner has been installed up to the roof inside of the existing brick chimney.
M00333406-I1
08/17/2023
Signed off — Alteration
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00751482-I1
08/16/2023
Cycle 9 facade report signed — SWARMP
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/27/2023
Cycle 9 facade report submitted
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/17/2023
Violation issued (ECB, closed)
Construction
06/16/2023
Signed off — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - 554. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M00791722-I1
06/16/2023
Violation issued (ECB, closed)
Construction
06/13/2023
Cycle 9 facade inspection completed
06/05/2023
Permit issued — Construction Fence
M00247684-I1-FN
06/02/2023
Permit issued — Sidewalk Shed
M00247678-I1-SH
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 194 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipeSigned-offBent Mechanical07/12/2024
DOB NOWSprinklersSigned-offBent Mechanical07/02/2024
DOB NOWSprinklersPermit IssuedBent Mechanical06/12/2024
DOB NOWBoiler EquipmentPermit IssuedEast Coast Petroleum06/06/2024
DOB NOWConstruction FenceSigned-offColgate Enterprise06/05/2023
DOB NOWSidewalk ShedSigned-offColgate Enterprise06/02/2023
DOB NOWGeneral ConstructionSigned-offProbuildero01/30/2023
DOB NOWGeneral ConstructionSigned-offProbuildero12/13/2022
DOB NOWConstruction FenceSigned-offCentral Interiors10/11/2022
DOB NOWStructuralSigned-offCentral Interiors10/06/2022
DOB NOWSignSigned-offSigns Cad09/27/2022
DOB NOWConstruction FenceSigned-offColgate Enterprise06/15/2022
DOB NOWSupported ScaffoldSigned-offColgate Enterprise06/15/2022
DOB NOWSidewalk ShedSigned-offColgate Enterprise06/13/2022
DOB NOWConstruction FenceSigned-offCentral Interiors04/18/2022
DOB NOWStructuralSigned-offCentral Interiors04/18/2022
DOB NOWStandpipeSigned-offBent Mechanical01/22/2022
DOB NOWSprinklersSigned-offBent Mechanical01/06/2022
DOB NOWBoiler EquipmentSigned-offHydronic Concepts NY P&H01/05/2022
DOB NOWStructuralSigned-offCentral Interiors12/23/2021
DOB NOWSupported ScaffoldSigned-offColgate Enterprise12/08/2021
DOB NOWSprinklersSigned-offBent Mechanical11/18/2021
DOB NOWConstruction FenceSigned-offCentral Interiors09/29/2021
DOB NOWStructuralSigned-offCentral Interiors09/28/2021
DOB NOWSidewalk ShedSigned-offColgate Enterprise06/30/2021
DOB NOWConstruction FenceSigned-offColgate Enterprise06/29/2021
DOB NOWSprinklersSigned-offBent Mechanical06/10/2021
DOB NOWBoiler EquipmentPermit IssuedEast Coast Petroleum12/07/2020
DOB NOWStructuralSigned-offCentral Interiors10/21/2020
DOB NOWConstruction FenceSigned-offCentral Interiors10/08/2020
DOB NOWConstruction FenceSigned-offColgate Enterprise07/08/2020
DOB NOWSidewalk ShedSigned-offColgate Enterprise07/08/2020
DOB NOWStandpipeSigned-offBent Mechanical06/24/2020
DOB NOWSprinklersSigned-offBent Mechanical06/23/2020
DOB NOWBoiler EquipmentSigned-offHydronic Concepts NY P&H05/21/2020
DOB NOWStandpipeSigned-offBent Mechanical01/13/2020
DOB NOWStructuralSigned-offCentral Interiors12/20/2019
DOB NOWSprinklersPermit IssuedBent Mechanical11/01/2019
DOB NOWConstruction FenceSigned-offCentral Interiors10/25/2019
DOB NOWSupported ScaffoldPermit IssuedEbro Dique Group09/06/2019
+ 53 more permits on file
1 project · most recent 04/07/2021
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/07/2021——Air Conditioning Systems
Cooling
Lg ARUM144BTE5 162,000 BTU · Vrf Outdoor ×4
ARUM121BTE5 135,000 BTU · Vrf Outdoor ×3
2 projects · most recent 01/08/2020
FiledStatusContractorScope
01/08/2020——576 heads
08/14/2019Permit IssuedBent Mechanical—
8 projects · most recent 12/21/2023
General Wiring Lighting Boiler Controls
FiledStatusContractorScope
12/21/2023Permit IssuedCaputek Electrical Services—
02/03/2022Permit IssuedStar Electrical Contractors—
01/15/2021Permit IssuedTitan Electrical & Elev Contracting—
12/16/2019Permit IssuedWebsite ElectricGeneral Wiring, Lighting
11/15/2019Permit IssuedWebsite ElectricBoiler Controls
09/20/2019Permit IssuedCore Electric & CommunicationGeneral Wiring, Lighting
09/16/2019CompleteNash Electric Services—
05/08/2019Permit IssuedNas ElectricGeneral Wiring, Lighting
▾Special Inspection Requirements (DOB NOW) — 78
DateRequirementInspectorRole
04/03/2023Structural Cold-Formed SteelEDUARDO LIEVANOspecial
04/03/2023Structural Steel - WeldingEDUARDO LIEVANOspecial
04/03/2023Structural Steel - DetailsGEORGE GHEBRYALspecial
04/03/2023FinalGEORGE GHEBRYALprogress
04/03/2023Structural Steel - High Strength BoltingEDUARDO LIEVANOspecial
04/03/2023Post-installed AnchorsEDUARDO LIEVANOspecial
04/03/2023Concrete - Cast-In-PlaceEDUARDO LIEVANOspecial
03/30/2023Structural Steel - WeldingEDUARDO LIEVANOspecial
03/30/2023Structural Cold-Formed SteelEDUARDO LIEVANOspecial
03/30/2023Post-installed AnchorsEDUARDO LIEVANOspecial
03/30/2023FinalGEORGE GHEBRYALprogress
03/30/2023Structural Steel - High Strength BoltingEDUARDO LIEVANOspecial
03/30/2023Concrete - Cast-In-PlaceEDUARDO LIEVANOspecial
03/30/2023Structural Steel - DetailsGEORGE GHEBRYALspecial
09/20/2022FinalMOHAMMAD AHEADprogress
06/06/2022FinalThomas Cataldoprogress
06/06/2022Structural Stability – Alterations of existing buildingsThomas Cataldospecial
03/17/2022HVAC and service water heating system controls EDUARDO LIEVANOenergy_progress
03/17/2022HVAC and service water heating equipment EDUARDO LIEVANOenergy_progress
03/17/2022Maintenance informationEDUARDO LIEVANOenergy_progress
03/17/2022Heating SystemsEDUARDO LIEVANOspecial
03/16/2022FinalGEORGE GHEBRYALprogress
03/16/2022Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
03/16/2022Post-installed AnchorsGEORGE GHEBRYALspecial
03/16/2022Subgrade InspectionsGEORGE GHEBRYALspecial
Latest 25 of 78.
▾Documents — 945 on file (BIS + DOB NOW)
▸Plans & Drawings40
▸DOB NOWPlans/Sketch8
09/06/2026M00001755-I1Request digital key ↗
09/03/2026M00493190-I1Request digital key ↗
09/03/2026M00493200-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler7
09/06/2026M00277011-I1Request digital key ↗
09/04/2026M00191533-I1Request digital key ↗
09/04/2026M00191533-P3Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Structural6
09/02/2026M00197769-I1Request digital key ↗
09/02/2026M00197769-P4Request digital key ↗
09/02/2026M00197769-P5Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Standpipe6
09/06/2026M00277011-I1Request digital key ↗
09/05/2026M00270284-I1Request digital key ↗
09/04/2026M00191533-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence4
09/05/2026M00197711-I1Request digital key ↗
09/04/2026M00247684-P1Request digital key ↗
09/04/2026M00247684-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment4
09/05/2026M00277838-I1Request digital key ↗
09/02/2026M00333406-I1Request digital key ↗
09/02/2026M00333406-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/04/2026M00247678-I1Request digital key ↗
08/15/2026M00247678-P1Request digital key ↗
08/15/2026M00247678-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/06/2026M00277006-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/06/2026M00277052-I1Request digital key ↗
▸Applications & Permits170
▸BISPLAN / WORK APPROVAL APPLICATION93
07/30/2024123045622Open ↗
07/23/2024123360237Open ↗
05/10/2024123045622Open ↗
Showing 3 of 93 on file for this type
▸BISWORK PERMIT APPLICATION75
06/28/2024123045622Open ↗
03/19/2024123045622Open ↗
03/19/2024123045622Open ↗
Showing 3 of 75 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/25/2024123045622Open ↗
▸DOB NOWHPD Certification Letter or CPC Special Permit1
08/13/2026M00493200-I1Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISZONING RESOLUTION DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications218
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION56
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 56 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature50
09/23/2026M00333406-I1Open ↗
09/23/2026M00277840-I1Open ↗
09/02/2026M00192014-I1Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature35
09/05/2026M00192014-I1Open ↗
09/04/2026M00247684-P1Open ↗
09/04/2026M00247684-I1Open ↗
Showing 3 of 35 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST24
06/22/2021123849620Open ↗
Showing 1 of 24 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT16
06/04/2021141002894Open ↗
Showing 1 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/23/2026M00333406-I1Open ↗
09/23/2026M00333406-I1Open ↗
09/23/2026M00333406-I1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
06/04/2021141002894Open ↗
Showing 1 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
06/04/2021141002894Open ↗
Showing 1 of 5 on file for this type
▸Trade Schedules & Equipment87
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISSCHEDULE B - PLUMBING22
08/11/2023123045622Open ↗
08/10/2023123045622Open ↗
06/21/2023123360255Open ↗
Showing 3 of 22 on file for this type
▸BISSELF-CERT PLUMBING NOTICE15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸DOB NOWFDNY: Letter of No Objection1
08/13/2026M00288947-I1Open ↗
▸Safety & Tenant Protection37
▸DOB NOWHPD-1: Anti-Harassment Area Checklist34
09/04/2026M00247684-I1Open ↗
09/04/2026M00247684-P1Open ↗
09/04/2026M00247678-P1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWCertificate of No Harassment2
08/13/2026M00493200-I1Open ↗
08/13/2026M00751482-I1Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
08/10/2022123410638Open ↗
▸Environmental & Asbestos50
▸DOB NOWDEP ACP-5: Asbestos Assessment Report23
09/05/2026M00192014-I1Open ↗
09/03/2026M00493190-I1Open ↗
09/03/2026M00621223-I1Open ↗
Showing 3 of 23 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISDEP FORM V5 - ASBESTOS VARIANCE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance54
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
10/06/2021123128757Open ↗
10/04/2021123128757Open ↗
08/30/2021123856229Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
07/25/2024123045622Open ↗
07/25/2024123045622Open ↗
07/11/2024123045622Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS3
10/22/2024123128757Open ↗
07/11/2024123045622Open ↗
08/10/2022123360255Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
08/25/2022123128757Open ↗
08/10/2022123360255Open ↗
▸BISLIGHTING CONTROLS2
07/11/2024123045622Open ↗
08/11/2022123360255Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISELECTRIC MOTORS1
07/11/2024123045622Open ↗
▸BIS* HVAC INSULATION AND SEALING1
07/11/2024123045622Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
09/02/2026M00333406-I1Open ↗
▸Inspections & Test Reports51
▸BISTECHNICAL REPORT: RESPONSIBILITY20
07/25/2024123045622Open ↗
07/23/2024123045622Open ↗
07/11/2024123045622Open ↗
Showing 3 of 20 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION3
07/11/2024123045622Open ↗
08/10/2022123128757Open ↗
08/10/2022123360255Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)3
07/23/2024123045622Open ↗
08/10/2022123128757Open ↗
08/10/2022123360255Open ↗
▸BISCONCRETE - CAST-IN-PLACE3
05/26/2023123045622Open ↗
08/10/2022123128757Open ↗
08/10/2022123360255Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISMECHANICAL SYSTEMS2
07/11/2024123045622Open ↗
08/10/2022123360255Open ↗
▸BISSTRUCTURAL STEEL - DETAILS2
08/10/2022123128757Open ↗
08/10/2022123410638Open ↗
▸BISSTRUCTURAL STEEL - WELDING2
08/10/2022123128757Open ↗
08/10/2022123410638Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP2
07/11/2024123045622Open ↗
08/10/2022123128757Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS2
08/10/2022123128757Open ↗
08/10/2022123410638Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT2
11/13/2024123128757Open ↗
07/25/2024123045622Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY2
08/10/2022123128757Open ↗
08/10/2022123410638Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSPRAYED FIRE-RESISTANT MATERIALS2
05/26/2023123045622Open ↗
08/10/2022123128757Open ↗
▸BISMASTIC AND INTUMESCENT FIRE-RESISTANT COATINGS1
03/14/2022123045622Open ↗
▸Approvals, Objections & Sign-offs56
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST17
12/02/2024123128757Open ↗
08/14/2024123360237Open ↗
08/09/2023123360255Open ↗
Showing 3 of 17 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
07/30/2024123045622Open ↗
04/29/2024123045622Open ↗
04/26/2024123045622Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
03/19/2024123045622Open ↗
Showing 1 of 8 on file for this type
▸BISFINAL4
10/22/2024123128757Open ↗
07/26/2024123360237Open ↗
08/10/2022123360255Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER4
03/19/2024123045622Open ↗
Showing 1 of 4 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership48
▸BISCOST AFFIDAVIT42
11/23/2021123128757Open ↗
08/30/2021123856229Open ↗
08/20/2021123570135Open ↗
Showing 3 of 42 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW36
08/08/2023123360255Open ↗
06/16/2023123410638Open ↗
06/16/2023123360237Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms100
▸BISADDITIONAL INFORMATION41
09/06/2024123045622Open ↗
05/14/2024123045622Open ↗
04/23/2024124039860Open ↗
Showing 3 of 41 on file for this type
▸BISEFILING COVER SHEET32
02/29/2024124039860Open ↗
Showing 1 of 32 on file for this type
▸BISBOROUGH INTAKE FORM19
06/28/2024123045622Open ↗
03/19/2024123045622Open ↗
03/19/2024123045622Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
06/04/2021141002894Open ↗
Showing 1 of 6 on file for this type
▸DOB NOWAI1 Form (from plan PDF)2
08/16/2026M00333406-I1Open ↗
08/16/2026M00333406-P1Open ↗
▸Other Documents8
▸BISSupporting Document: Fee Exempt6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
04/02/2024124039860Open ↗
Showing 1 of 2 on file for this type