| Owner | Filings | Most Recent |
|---|---|---|
| Scholastic 557 Broadway | 131 | 03/22/2026 |
| Ise Hiyoko | 61 | 03/21/2026 |
| Ise America | 36 | 03/21/2026 |
| Esrt | 26 | 10/14/2026 |
| CB Richard Ellis | 13 | 03/21/2026 |
| Ise 555 Broadway | 10 | 03/21/2026 |
| 547 Broadway Realty | 6 | 03/21/2026 |
| Ise 555 BR | 2 | 03/21/2026 |
| Sephora | 1 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 02/28/2014 | $255.0M | — | ISE 555 BROADWAY, LLC → SCHOLASTIC 557 BROADWAY, LLC | $1,047/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| G3 Architecture Interiors Planning | 3 | 08/27/2026 |
| Goldman Copeland Associates | 23 | 08/25/2026 |
| P&G Design Group | 2 | 08/25/2026 |
| Emad Bouless | 4 | 08/19/2026 |
| Gilsanz Murray Steficek | 3 | 05/22/2026 |
| Highland Associates | 5 | 05/05/2026 |
| John F. Giuseffi, Architect | 1 | 03/21/2026 |
| Robert Silman Associates Structural Engineering | 2 | 09/30/2025 |
| Design Republic | 1 | 09/29/2025 |
| Murdoch Engineering | 1 | 04/18/2025 |
| M-Engineering New York | 7 | 03/25/2025 |
| Silman | 5 | 03/05/2025 |
| Rosini Engineering | 3 | 02/26/2025 |
| Leveratto Architecture Group | 1 | 02/26/2025 |
| Hoffmann Architects | 3 | 12/13/2024 |
| Tohfaz Uddin PE | 7 | 11/05/2024 |
| Abco-Peerless Engineering | 2 | 10/02/2024 |
| Urban Integrations | 6 | 09/17/2024 |
| Dxa Studio | 3 | 01/23/2024 |
| Wellworth Consulting | 1 | 08/23/2023 |
| Representative | Filings | Most Recent |
|---|---|---|
| Beam Living | 6 | 03/21/2026 |
| CCA Construction Consulting Associates | 29 | 03/21/2026 |
| Metropolis Group | 14 | 03/21/2026 |
| Spring Scaffolding | 8 | 03/21/2026 |
| A&A Construction Services | 4 | 03/21/2026 |
| Codegreen | 6 | 03/21/2026 |
| United Safety Consultants | 7 | 03/21/2026 |
| All in Permit Consultants | 1 | 03/21/2026 |
| Direct Access Expediting | 6 | 03/21/2026 |
| Abco-Peerless Sprinkler | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| JT Magen & Company | General Contractor | 26 | 07/08/2026 |
| Spring Scaffolding | Scaffold | 17 | 07/08/2026 |
| HVAC Construction | General Contractor | 9 | 08/01/2026 |
| Sirina Fire Protection | Fire Protection | 8 | 07/08/2026 |
| James E Fitzgerald | General Contractor | 6 | 08/30/2026 |
| Abco-Peerless Sprinkler | Fire Protection | 6 | 09/16/2026 |
| Ashland Plumbing | Plumbing | 5 | 07/08/2026 |
| King Hoist & Scaffolding | Scaffold | 4 | 07/08/2026 |
| John Gallin & Son | General Contractor | 3 | 07/08/2026 |
| J.A. Jennings | General Contractor | 3 | 07/08/2026 |
| Malatesta Paladino | General Contractor | 2 | 03/21/2026 |
| Pawley Interior Contracting | General Contractor | 2 | 03/21/2026 |
| Dependable Mechanical | Fire Protection | 2 | 10/14/2026 |
| Amr Mechanical | Fire Protection | 2 | 07/08/2026 |
| Tema Builders Group | General Contractor | 2 | 09/07/2026 |
| Amr Mechanical | Plumbing | 1 | 07/08/2026 |
| Lab Plumbing & Heating Co | Plumbing | 1 | 08/30/2026 |
| Maccarone Plumbing | Plumbing | 1 | 07/08/2026 |
| Mac Felder | Plumbing | 1 | 07/08/2026 |
| Par Plumbing Co | Plumbing | 1 | 06/28/2026 |
| Preferred Sprinkler and Mechanical | Fire Protection | 1 | 06/28/2026 |
| PSI Partners | Fire Protection | 1 | 07/08/2026 |
| The Grenadier | General Contractor | 1 | 07/08/2026 |
| Tuxedo Electrical Contracting | Electrical | 1 | 03/21/2026 |
| Armar Electrical Contractors | Electrical | 1 | 03/21/2026 |
| Nash Electric Services | Electrical | 1 | 03/22/2026 |
| P.S. Marcato Elev. Co | Electrical | 1 | 03/21/2026 |
| Robert B. Samuels | Electrical | 1 | 03/22/2026 |
| Vanguard Maintenance | Electrical | 1 | 03/21/2026 |
| A.J. Electric | Electrical | 1 | 03/21/2026 |
| Par Plumbing Co., Inc.o | Fire Protection | 1 | 03/21/2026 |
| Moma Construction Group | General Contractor | 1 | 07/08/2026 |
| Judd Electric | Electrical | 1 | 03/21/2026 |
| Neptune Signs & Awnings | Sign hanger | 1 | 07/08/2026 |
| A&A Plumbing | Plumbing | 1 | 07/08/2026 |
| Amok | Fire Protection | 1 | 09/03/2026 |
| Amok | Plumbing | 1 | 09/03/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Codegreen | 510 | 17 | 08/27/2026 |
| Milrose Consultants | 2003 | 3 | 08/25/2026 |
| Gilsanz Murray Steficek | 240 | 1 | 05/22/2026 |
| AK Engineering | 678 | 12 | 05/05/2026 |
| Shahrish Shuvo Engineering | 8524 | 1 | 12/02/2025 |
| Skyline Engineering | 267 | 14 | 03/05/2025 |
| Cole Technologies/Control | 1290 | 2 | 12/13/2024 |
| Goldman Copeland Associates | 2826 | 1 | 05/01/2023 |
| CFS Engineering | 615 | 2 | 06/13/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sprinklers | Permit Issued | Dependable Mechanical | 10/13/2026 |
| DOB NOW | Sprinklers | Permit Issued | Abco-Peerless Sprinkler | 09/15/2026 |
| DOB NOW | General Construction | Permit Issued | Tema Builders Group | 09/03/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Tema Builders Group | 09/03/2026 |
| DOB NOW | Plumbing | Permit Issued | Amok | 09/02/2026 |
| DOB NOW | Sprinklers | Permit Issued | Amok | 09/02/2026 |
| DOB NOW | Plumbing | Permit Issued | Lab Plumbing & Heating Co | 08/28/2026 |
| DOB NOW | General Construction | Permit Issued | James E Fitzgerald | 08/27/2026 |
| DOB NOW | Sprinklers | Permit Issued | Dependable Mechanical | 08/26/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | James E Fitzgerald | 08/25/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | HVAC Construction | 07/31/2026 |
| DOB NOW | Structural | Permit Issued | J.A. Jennings | 05/29/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | HVAC Construction | 04/10/2026 |
| DOB NOW | Sprinklers | Permit Issued | Mora Fire Protection | 04/07/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A Plumbing | 04/01/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | J.A. Jennings | 03/24/2026 |
| DOB NOW | General Construction | Permit Issued | J.A. Jennings | 03/24/2026 |
| DOB NOW | Standpipe | Signed-off | Abco-Peerless Sprinkler | 02/05/2026 |
| DOB NOW | Mechanical Systems | Signed-off | HVAC Construction | 12/05/2025 |
| DOB NOW | Mechanical Systems | Signed-off | John Gallin Son | 10/08/2025 |
| DOB NOW | Plumbing | Signed-off | Mac Felder | 10/07/2025 |
| DOB NOW | Sprinklers | Signed-off | Abco-Peerless Sprinkler | 10/07/2025 |
| DOB NOW | Structural | Signed-off | John Gallin Son | 10/06/2025 |
| DOB NOW | General Construction | Signed-off | John Gallin Son | 10/03/2025 |
| DOB NOW | Plumbing | Signed-off | Ashland Plumbing | 09/18/2025 |
| DOB NOW | General Construction | Signed-off | James E Fitzgerald | 08/22/2025 |
| DOB NOW | Sprinklers | Permit Issued | Preferred Sprinkler and Mechanical | 04/24/2025 |
| DOB NOW | Sign | Permit Issued | Desthers, Joseph | 04/21/2025 |
| DOB NOW | Plumbing | Signed-off | Par Plumbing Co | 03/21/2025 |
| DOB NOW | General Construction | Permit Issued | Moma Construction Group | 03/07/2025 |
| DOB NOW | Structural | Signed-off | James E Fitzgerald | 03/07/2025 |
| DOB NOW | Sprinklers | Signed-off | Sirina Fire Protection | 01/15/2025 |
| DOB NOW | General Construction | Permit Issued | JT Magen & Company | 12/20/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | JT Magen & Company | 12/20/2024 |
| DOB NOW | Structural | Permit Issued | JT Magen & Company | 12/20/2024 |
| DOB NOW | Plumbing | Signed-off | Ashland Plumbing | 10/17/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | Spring Scaffolding | 10/03/2024 |
| DOB NOW | Standpipe | Signed-off | Abco-Peerless Sprinkler | 10/03/2024 |
| DOB NOW | Supported Scaffold | Signed-off | Spring Scaffolding | 10/03/2024 |
| DOB NOW | General Construction | Signed-off | The Grenadier | 09/25/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/25/2026 | Permit Issued | James E Fitzgerald | Others | Other __Junk__ ×1 |
| 08/25/2026 | Permit Issued | Tema Builders Group | Heating and Air Conditioning Systems, Ventilation Systems | |
| 05/05/2026 | Signed-off | John Gallin & Son | Air Conditioning Systems, Ventilation Systems | |
| 12/02/2025 | Signed-off | HVAC Construction | Heating and Air Conditioning Systems | Heat / Cool Bosch VVW-513-GXST 50 tons · Wshp ×1 |
| 02/07/2024 | Permit Issued | JT Magen & Company | Air Conditioning Systems, Heating and Air Conditioning Systems | Cooling Climatemaster TC-036 1,217 CFM · Wshp ×1 Heat / Cool Mitsubishi Electric MXZ-SM60NAM 66,000 BTU · Condensing Unit ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2026 | Permit Issued | Abco-Peerless Sprinkler | 2 heads |
| 08/25/2026 | Permit Issued | Amok | 81 heads |
| 03/19/2026 | Permit Issued | A&H Express Plumbing & Heating | 482 heads |
| 02/26/2025 | Permit Issued | Preferred Sprinkler and Mechanical | Sprinkler System |
| 02/07/2024 | Signed-off | Sirina Fire Protection | Sprinkler System |
| 06/13/2022 | Permit Issued | Amr Mechanical | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2026 | — | — | — |
| 08/25/2026 | Permit Issued | Lab Plumbing & Heating Co | Water/Sanitary |
| 08/25/2026 | Permit Issued | Amok | Water/Sanitary |
| 03/19/2026 | Permit Issued | A&A Plumbing | Water/Sanitary |
| 03/19/2026 | — | — | — |
| 02/26/2025 | Signed-off | Par Plumbing Co | Water/Sanitary |
| 02/07/2024 | Signed-off | Ashland Plumbing | Water/Sanitary |
| 06/13/2022 | Permit Issued | Amr Mechanical | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/08/2026 | Permit Issued | Tuxedo Electrical Contracting | — |
| 10/02/2026 | Permit Issued | Robert B Samuels | General Wiring |
| 09/07/2026 | Permit Issued | Twintech Electric | General Wiring |
| 08/19/2026 | Permit Issued | Trinity Electric Group | General Wiring |
| 04/10/2026 | Complete | Riverdale Electric | — |
| 01/27/2026 | Complete | Robert B Samuels | General Wiring |
| 10/08/2025 | Complete | Matros Automated Electrical | General Wiring |
| 08/21/2025 | Permit Issued | Proff Electrical | — |
| 08/21/2025 | Permit Issued | Proff Electrical | — |
| 08/21/2025 | Permit Issued | Proff Electrical | — |
| 03/21/2025 | Complete | Dal Electrical | General Wiring |
| 10/07/2024 | Permit Issued | Robert B Samuels | General Wiring |
| 10/02/2024 | Complete | Top Shelf Electric | — |
| 07/17/2024 | Complete | Tuxedo Electrical Contracting | — |
| 04/25/2024 | Complete | Robert B Samuels | General Wiring, Lighting |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/22/2026 | Permit Issued | J.A. Jennings | Steel, Concrete |
| 03/05/2025 | Permit Issued | JT Magen & Company | Steel |
| 02/26/2025 | Permit Issued | Preferred Sprinkler and Mechanical | Steel |
| 02/07/2024 | Signed-off | Sirina Fire Protection | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/25/2020 | Permit Issued | King Hoist & Scaffolding | Sidewalk Shed |
| 11/06/2020 | Permit Issued | King Hoist & Scaffolding | Scaffold |
| Date | Type | Result | Report |
|---|---|---|---|
| 03/30/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/30/2026 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 03/11/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/11/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/11/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/11/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 03/11/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/06/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/12/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/02/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/30/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/30/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/29/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/24/2025 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 07/22/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/10/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/17/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/05/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/05/2025 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 02/24/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/20/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/20/2025 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 02/06/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/04/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/04/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/13/2026 | Fire-Resistant Penetrations and Joints | Benjamin Plotnick | special |
| 06/25/2026 | Air barrier - visual inspection | James Sullivan Jr | energy_progress |
| 06/25/2026 | Insulation placement and R values | James Sullivan Jr | energy_progress |
| 06/25/2026 | Fire-Resistance Rated Construction | James Sullivan Jr | progress |
| 06/25/2026 | Energy Code Compliance Inspections | James Sullivan Jr | progress |
| 06/25/2026 | Final | James Sullivan Jr | progress |
| 06/25/2026 | Fire-Resistant Penetrations and Joints | James Sullivan Jr | special |
| 06/25/2026 | Fire-Resistant Penetrations and Joints | James Sullivan Jr | special |
| 06/25/2026 | Sprinkler Systems | James Sullivan Jr | special |
| 06/25/2026 | Fire-Resistant Penetrations and Joints | James Sullivan Jr | special |
| 06/25/2026 | Maintenance information | James Sullivan Jr | energy_progress |
| 06/25/2026 | HVAC-R and service water heating equipment | James Sullivan Jr | energy_progress |
| 06/25/2026 | Ventilation and air distribution system | James Sullivan Jr | energy_progress |
| 06/25/2026 | Electrical motors and elevators | James Sullivan Jr | energy_progress |
| 06/25/2026 | HVAC-R and service water piping design and insulation | James Sullivan Jr | energy_progress |
| 06/25/2026 | Shutoff dampers | James Sullivan Jr | energy_progress |
| 06/25/2026 | Duct leakage testing, insulation and design | James Sullivan Jr | energy_progress |
| 06/25/2026 | Final | James Sullivan Jr | progress |
| 06/25/2026 | Energy Code Compliance Inspections | James Sullivan Jr | progress |
| 06/25/2026 | Mechanical Systems | James Sullivan Jr | special |
| 06/25/2026 | Interior lighting power | James Sullivan Jr | energy_progress |
| 06/25/2026 | HVAC-R and service water heating system controls | James Sullivan Jr | energy_progress |
| 06/24/2026 | Sprinkler Systems | Benjamin Plotnick | special |
| 06/24/2026 | Final | Benjamin Plotnick | progress |
| 05/06/2026 | Ventilation and air distribution system | Ari Kamo | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Scholastic | Office | Sub-cellar, Cellar, Floors 1–11 | Project M01422320 Project M01422369 Project M01422407 Project M01422424 Project M01058237 Project M00938590 Project M00873220 Project M00850565 Project M00850580 Project M00850600 Project M00846633 Project M00850396 |
| Capital One | Bank / Financial branch | Cellar, Floors 1, 2 | Project M01421725 Project M01194252 Project M01113881 Project M01091420 Project M01043944 |
| Convene Scholastic | Office | Floor 2 | Project M01347395 Project M01314584 Project M01265714 Project M01265699 Project M01265702 Project M01265706 Project M01265708 |
| Monos | Retail | Cellar, Floor 1 | Project M01152317 |