Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsCbre, INC.2 filings
Install new gas service, booster and gas piping from street to Cogeneration Units on the 8th Flr (CO)/ 12th Flr (Mkt); Install new CW piping and (2) new secondary back flow preventers on the 8th Flr (CO) as per plans (Absorbers and Cogeneration Units.)
On file for this project
12 documents
INSTALLATION OF NEW SPRINKLER HEADS TO COMPLY WITH LOCAL LAW26. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents
RoofCBRE / Asset Services 575 Fifth Avenue New York, NY 100173p · 2 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Structural
Structural Modifications: Steel Lintel replacement, scrape and paint steel on the Facade and Roof as per plans (FISP 9C Facade Repairs.) No change to use, egress or occupancy.
On file for this project
11 documents · 1 drawing sheet
Installation of (3) new cogeneration units, (30) ton absorption chillers and associated piping, pumps, controls and accessories as per plans. No change to use, egress or occupancy.
On file for this project
10 documents · 2 drawing sheets
Floor 39Sovereign PartnersUnder Construction1 filing · 4 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Sprinklers
INTERIOR ALTERATIONS TO INCLUDE NON-LOAD BEARING DEMOLITION. NO CHANGE TO USE, OCCUPANCY OR EGRESS
On file for this project
4 documents
Floor 38
Floor 37
Floor 36
Floor 35Northwood, Marketing floor 407p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Remove existing temporary loop and (13) temporary heads; Install (96) new permanent heads on the 35th Floor (CO)/ 40th Floor (Mktg) as per plans (Northwood Renovations.) No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Installation of new interior partitions, doors, suspended ceilings, flooring ad finishes on the 35th Floor (CO)/ 40th Floor (Marketing) as per plans (Northwood Renovations.) No change to use, egress or occupancy.
On file for this project
14 documents · 3 drawing sheets
Install NEW: (3) HWH, (2) sinks, (1) drinking fountains, (1) Funnel drain, (1) Lavatory, (1) WC, (1) Chiller, (1) Dishwasher (2) drainage pump ( 1 ) coffee machine (1) water Machine ( and asso CW/Sanitary Piping on the 35th Floor (CO)/ 40th Floor (Mktg)
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 34
Floor 33Cbre, INC.4p · 3 filings · 16 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Modifications to the Sprinkler System: Install (103) new heads on the 32nd Flr (CO)/37th Flr (Mktg) and Install (114) new sprinkler heads and piping on the 33rd Flr (CO)/38th Flr (Mktg) as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Modifications to the existing HVAC System on the 32 & 33 (CO Floors)/ 37 & 38 (Marketing Floors) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Install NEW on 32 (CO)/ 37 (M): (2) Sink, (1) Funnel Drain, (1) Drinking Fountain, (1) Dishwasher, (1) WC and (1) Lav; 33 (CO)/ 38 (M): (7) WC, (8) Lav, (2) UR, (1) Drinking Fountain, (1) sink, (1) HWH and piping; 31 (CO)/ 36 (M): (1) drain and piping.
On file for this project
3 documents · 2 drawing sheets
Floor 32Marketing floor 375p · 4 filings · 19 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe
Removal of (1) existing Fire Hose Rack and Piping back to riser, Install one (1) new valve w/ tamper switch at riser on the 32nd Floor (CO)/ 37th Floor (Marketing) as per plans (LL Work.) No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Modifications to the Sprinkler System: Install (103) new heads on the 32nd Flr (CO)/37th Flr (Mktg) and Install (114) new sprinkler heads and piping on the 33rd Flr (CO)/38th Flr (Mktg) as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Modifications to the existing HVAC System on the 32 & 33 (CO Floors)/ 37 & 38 (Marketing Floors) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 31Charlesbank, Marketing floor 364p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Install NEW PL Fixtures: (2) Sinks, (1) Funnel Drain, (1) Dishwasher, (1) Chller w. Ice, (1) CM, (7) HWH and associated CW/San Piping; RELOCATE: (6) Lavs, (6) WC and (2) UR on the 31st Fl (CO)/ 36th Fl (Mktg). No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 31st Floor (CO)/ 36th Floor (Marketing) as per plans (Charlesbank - Turnkey Renovation.) No change to use, egress or occupancy.
On file for this project
5 documents
Modifications to the existing Sprinkler System: Install (114) new sprinkler heads and associated sprinkler piping on the 31st Floor (CO)/ 36th Floor (Marketing) as per plans (Charlesbank - Turnkey Renovation.) No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 30Urban Outfitters, D. E. Shaw Renewable Investments (DESRI), Under Construction7p · 9 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modifications to the existing HVAC System; Installation of new supplemental unit and ductwork on the Cellar & 1st Floor as per plans (Retail Space - Renovations.) No change to use, egress or occupancy.
On file for this project
3 documents
Install new plumbing fixtures: (1) pantry sink, (1) funnel drain, (1) dishwasher, (1) HWH, (1) ejector pump and associated CW/sanitary piping on the 30th Floor (CO)/ 35th Floor (Mktg) as per plans (Russell Investments.)
On file for this project
3 documents · 1 drawing sheet
Modifications to the existing Sprinkler System: Relocate (5) sprinkler heads and remove (9) existing sprinkler heads and associated piping on the 30th Floor (CO)/ 35th Floor (Mktg) as per plans (Russell Investments) No change to use, egress or occupancy.
On file for this project
5 documents
Latest 3 of 9 filings on this floor.
Floor 29Elmwood, Marketing floor 344p · 4 filings · 16 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modifications to the existing Sprinkler System: Installation of (109) new sprinkler heads and associated sprinkler piping on the 29th Floor (CO)/ 34th Floor (Mktg) - (Elmwood Interior Renovations.) No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 29th Floor (CO)/ 34th Floor (Marketing) as per plans (Elmwood.) No change to use, egress or occupancy.
On file for this project
3 documents
Modifications to the existing HVAC System: Relocation and Installation of new ductwork, VAVs and controls on the 29th Floor (CO)/ 34th Floor (Mktg) as per plans (Elmwood.) No change to use, egress or occupancy.
On file for this project
7 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 28UBA United Bank for Africa, Danske6p · 10 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modifications to the existing Sprinkler System: Installation of (87) new sprinkler heads and associated piping on the 28th Floor/33rd Floor (Mkg) as per plans (UBA Renovations.) No change to use, egress or occupancy.
On file for this project
10 documents
Modifications to the existing Sprinkler System: Installation of fifty-nine (59) new sprinkler heads and associated piping on the 28th Floor (CO)/ 33rd Floor (Marketing) as per plans (LL Work - New Office.) No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Install new (1) pantry sink, (1) funnel drain, (1) CM, (1) ADA Water Closet, (2) HWH, (1) ADA Lavatory, (1) dishwasher, (1) refrigerator w/ Ice Maker and associated CW/sanitary piping on the 28th Floor (CO)/ 33rd Floor (Mktg.)
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 10 filings on this floor.
Floor 27UBA United Bank for Africa, Marketing floor 326p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Remove (12) existing temporary heads and loop and Install (110) new sprinkler heads and associated piping on the 27th Floor (CO)/ 32nd Floor (Mktg) as per plans (LL Work.) No change to use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Minor interior demolition, removal of glass wall. Installation of new partitions, doors, floor finishes and suspended ceilings on the 27-28th Flrs (CO)/ 32-33rd Flrs (Mktg) as per plans (UBA - Renovations.) No change to use, egress or occupancy.
On file for this project
5 documents
Modifications to the existing HVAC System: Install transfer ducts and relocate ductwork and controls, and install AC unit on the 27-28th Flrs (CO)/ 32-33rd Flrs (Mktg) as per plans (UBA - Renovation.) No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 26Magid2p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Installation of NEW Plumbing Fixtures: (1) sink, (1) Funnel Drain, (1) Dishwasher, (1) Chiller w/ Ice Maker, (1) HWH, (1) ejector pump, (1) water dispenser and associated CW/Sanitary piping on the 26th Floor (CO)/ 31st Floor (Mktg) as per plans (MAGID.)
On file for this project
3 documents · 1 drawing sheet
Remove existing temp loop, install (58) new sprinkler heads and piping, and relocate (4) existing head and associated sprinkler piping on the 26th Floor (CO)/ 31st Floor (Mktg) as per plans (MAGID - Tenant Reno.) No change to use, egress or occupancy
On file for this project
5 documents
Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 26th Floor (CO)/ 31st Floor (Mktg) as per plans (MAGID - Tenant Renovation.) No change to use, egress or occupancy.
On file for this project
3 documents
Latest 3 of 5 filings on this floor.
Floor 25Marketing floor 305p · 3 filings · 16 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Installation of NEW FIXTURES: (3) HWH, (3) sinks, (3) funnel drains, (3) chillers w/ ice maker, (3) dishwasher, (1) ice maker, (1) espresso and associated piping as per plans (LL Work - One Main.) No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Modifications to the existing HVAC system and installation of ductwork for tenant spaces as per plans (LL Work - One Main.) No change to use, egress or occupancy.
On file for this project
8 documents · 2 drawing sheets
Remove (20) sprinkler heads and Installation of (168) new sprinkler heads and associated piping on the 25th Floor (CO)/ 30th Floor (Marketing) as per plans (LL Work - One Main.) No change to use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Floor 24Cbre, INC.5p · 3 filings · 17 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Modifications to the existing HVAC system and installation of new 4 ton AC unit on the 24th Floor (CO)/29th Floor (Marketing) as per plans (Forter - New Offices.) No change to use, egress or occupancy.
On file for this project
9 documents · 2 drawing sheets
Remove (16) existing Temporary Sprinkler Heads and Loop and Install (127) New sprinkler heads on the 24th Floor (CO)/ 29th Floor (Marketing) as per plans (Forter New Offices.) No change to use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Install NEW: (1) Dishwasher, (1) pantry sink, (1) funnel drain, (1) Hot Water Heater (1) chiller w/ IM, (1) Ice Maker and (1) drinking fountain and associated piping on the 24th Flr (CO)/29th Flr (Mktg) as per plans. No change to Use, Egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Floor 23Cbre, INC.3p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Removal of sixteen (16) temporary sprinkler heads and installation of one hundred and forty five (145) permanent sprinkler heads and associated piping on the 23rd Floor (CO)/ 28th Flr (Mktg) as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Install two (2) sinks, two (2) funnel drains, two (2) dishwashers, two (2) chillers w/ ice makers, two (2) coffee makers and two (2) hot water heaters and associated piping on the 23 fl (CO)/ 28 fl (mkt) as per plans. No change to use, egress or occupancy
On file for this project
3 documents · 1 drawing sheet
Modifications to the existing HVAC system on the 23rd Flr (CO)/ 28th Flr (Marketing) as per plans. No change to use, egress or occupancy.
On file for this project
14 documents
Floor 22Cbre, INC.4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modifications to the existing Sprinkler System: Relocate (38) heads, Remove (11) existing heads, Install (3) new heads and associated piping on the 22nd Floor (CO)/ 27th Floor (Mktg) as per plans (Onemain Financial) No change to use, egress or occupancy.
On file for this project
10 documents
Relocate (1) sink, (1) refrigerator, (1) DW, (1) CM; Install new: (1) sink, (1) HWH, (1) ejector pump, (2) FDs, (1) domestic HW circulation pump associated CW/sanitary piping on the 22nd Floor (CO)/ 27th Floor (Mktg) as per plans (Onemain Financial.)
On file for this project
4 documents
Modifications to the existing HVAC System: Install new ductwork and ceiling registers and associated controls and piping on the 22nd Floor (CO)/ 27th Floor (Mktg) as per plans (Onemain Financial.)
On file for this project
12 documents
Latest 3 of 4 filings on this floor.
Floor 21
Floor 20
Floor 19D. E. Shaw Renewable Investments (DESRI)1p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Install (103) new sprinkler heads and associated piping on the 18th Flr (CO)/23rd Flr (Mktg) and install (117) new sprinkler heads and piping on the 19th Flr (CO)/ 24th Flr (Mktg) as per plans (DESRI - New Offices.) No change to use, egress or occupancy.
On file for this project
5 documents
Install new fixtures: (1) sink, (1) FD, (1) DW, (1) Chiller, (1) IM, (1) HWH on the 18th Flr (CO)/23rd Flr (Mktg) and (2) sink, (1) FD, (2) HWH, (1) DW and (1) Chiller on the 19th Flr (CO)/24th Flr (Mktg) and associate CW/sanitary piping as per plans.
On file for this project
3 documents · 1 drawing sheet
Structural Modifications: Install new stair opening and new stair design between the 18-19th Floors (CO)/ 23-24th Flrs (Mktg) as per plans (DESRI - New Offices. ) No change to use, egress or occupancy.
On file for this project
5 documents
Latest 3 of 5 filings on this floor.
Floor 18D. E. Shaw Renewable Investments (DESRI)2p · 5 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Install (103) new sprinkler heads and associated piping on the 18th Flr (CO)/23rd Flr (Mktg) and install (117) new sprinkler heads and piping on the 19th Flr (CO)/ 24th Flr (Mktg) as per plans (DESRI - New Offices.) No change to use, egress or occupancy.
On file for this project
5 documents
Install new fixtures: (1) sink, (1) FD, (1) DW, (1) Chiller, (1) IM, (1) HWH on the 18th Flr (CO)/23rd Flr (Mktg) and (2) sink, (1) FD, (2) HWH, (1) DW and (1) Chiller on the 19th Flr (CO)/24th Flr (Mktg) and associate CW/sanitary piping as per plans.
On file for this project
3 documents · 1 drawing sheet
Structural Modifications: Install new stair opening and new stair design between the 18-19th Floors (CO)/ 23-24th Flrs (Mktg) as per plans (DESRI - New Offices. ) No change to use, egress or occupancy.
On file for this project
5 documents
Latest 3 of 5 filings on this floor.
Floor 17D. E. Shaw Renewable Investments (DESRI), Lime Rock, Marketi9p · 9 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modifications to the existing Sprinkler System: Install thirty-nine (39) new sprinkler heads and associated sprinkler piping on the 17th Floor (CO)/ 22nd Floor (Mktg) as per plans (Suite #22200 - Office Buildout.) No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Installation of new partitions, doors, suspended ceilings, flooring and finishes on the 17th Flr (CO)/ 22nd Flr (Mktg) as per plans (Lime Rock Renovation.) No change to use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 17th Floor (CO)/ 22nd Floor (Mktg) as per plans (Suite #22200 - Office Buildout.) No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 9 filings on this floor.
Floor 16Cbre, INC.2p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modifications to the existing Sprinkler System: Install (153) new sprinkler heads on the 16th Floor (CO)/ 21st Floor (Mktg) as per plans (Beacon Capital.) No change to use, egress or occupancy.
On file for this project
5 documents
Removal of waste and vent piping and Install new fixtures: (3) dishwashers, (4) sinks, (4) funnel drains, (4) ejector pumps, (4) HWH and associated CW/sanitary piping 16th Floor (CO)/ 21st Floor (Mktg) as per plans (Beacon Capital.)
On file for this project
4 documents · 2 drawing sheets
Installation of new partitions, doors, suspended ceilings, flooring and finishes on the 16th Floor (CO)/ 21st Floor (Mktg) as per plans (Beacon Capital.) No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 5 filings on this floor.
Floor 15
Floor 14Interior demolition and finishes, 13-19th floors1p · 3 filings · 13 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Minor interior demolition. Installation of new partitions, doors, suspended ceilings, flooring and finishes on the 13-14th Flr (CO)/ 18-19th Flr (Mktg) as per plans (18th Flr Demo/ 19th Flr NE Suite Modification.) No change to use, egress or occupancy.
On file for this project
5 documents
Modifications to the existing Sprinkler System: Install (11) new heads on the 13th (CO)/18th (Mktg) and Relocate (10) existing heads and Install (2) new on the 14th (CO)/ 19th Floor (Mktg) and associated sprinkler piping as per plans (Demo/NE Suite.)
On file for this project
5 documents
Modifications to the existing HVAC System: Relocate and redistribute ductwork on the 13-14th Floors (CO)/ 18-19th Floors (Mktg) as per plans (18th: Demo/ 19th: NE Suite Modification.) No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Floor 13Interior demolition and finishes, 13-19th floors2p · 3 filings · 13 docs
ArchitectureDMFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Minor interior demolition. Installation of new partitions, doors, suspended ceilings, flooring and finishes on the 13-14th Flr (CO)/ 18-19th Flr (Mktg) as per plans (18th Flr Demo/ 19th Flr NE Suite Modification.) No change to use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Modifications to the existing Sprinkler System: Install (11) new heads on the 13th (CO)/18th (Mktg) and Relocate (10) existing heads and Install (2) new on the 14th (CO)/ 19th Floor (Mktg) and associated sprinkler piping as per plans (Demo/NE Suite.)
On file for this project
5 documents
Modifications to the existing HVAC System: Relocate and redistribute ductwork on the 13-14th Floors (CO)/ 18-19th Floors (Mktg) as per plans (18th: Demo/ 19th: NE Suite Modification.) No change to use, egress or occupancy.
On file for this project
3 documents
Floor 12
Floor 11Sovereign PartnersUnder Construction3p · 1 filing · 16 docs
ArchitectureFire ProtectionGeneralMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
MODIFICATIONS TO EXISTING PLUMBING AND SPRINKLER SYSTEMS IN 11TH FLOOR OFFICE SPACE. NO CHANGE TO USE, OCCUPANCY OR EGRESS
On file for this project
16 documents · 3 drawing sheets
Floor 10
Floor 9Cbre, INC.1p · 1 filing · 10 docs
Fire ProtectionMechanical
Issued Permit Scope
Mechanical Systems · Sprinklers
Installation of (3) new cogeneration units, (30) ton absorption chillers and associated piping, pumps, controls and accessories as per plans. No change to use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Floor 8Cbre, INC.5p · 2 filings · 13 docs
ArchitectureGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Installation of (3) new cogeneration units, (30) ton absorption chillers and associated piping, pumps, controls and accessories as per plans. No change to use, egress or occupancy.
On file for this project
10 documents · 3 drawing sheets
Minor interior demolition; Installation of double access door and single doors, ladder & service platform, repair shaft wall and replace gypsum ceiling studs, grid and tiles as per plans (Cogeneration and Absorbers.) No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Floor 7CBRE Group, Marketing floor 1110p · 9 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Removal of plumbing fixtures and cap associated piping on the 5-7th Floors (CO)/ 9-11th Floors (Marketing) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Installation of new plumbing fixtures: (7) Lavatories, (8) WCs, (3) UR, (1) HWH, (2) sinks, (1) refrigerator with Ice machine, (1) dishwasher, (1) funnel drain and associated CW/sanitary piping on the 7th Floor (CO)/ 11th Floor (Mktg).
On file for this project
3 documents · 1 drawing sheet
Modifications to the existing Sprinkler System: Installation of (183) new sprinkler heads on the 7th floor (CO)/ 11th Floor (Mktg) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents
Latest 3 of 9 filings on this floor.
Floor 6Firstservice Offices, Marketing floor 102p · 7 filings · 12 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Removal of plumbing fixtures and cap associated piping on the 5-7th Floors (CO)/ 9-11th Floors (Marketing) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 5th & 6th Flrs (CO)/ 9th & 10th Flrs (Mktg) as per plans (First Service Offices.) No change to use, egress or occupancy.
On file for this project
3 documents
Modifications to the existing HVAC System: Installation of new AC Units and associated ductwork and equipment on the 5 & 6th (CO)/ 9 & 10th Flrs (Mktg) as per plans (First Service Offices.) No change to use, egress or occupancy.
On file for this project
3 documents
Latest 3 of 7 filings on this floor.
Floor 5Firstservice Offices, Marketing floor 92p · 7 filings · 12 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Removal of plumbing fixtures and cap associated piping on the 5-7th Floors (CO)/ 9-11th Floors (Marketing) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 5th & 6th Flrs (CO)/ 9th & 10th Flrs (Mktg) as per plans (First Service Offices.) No change to use, egress or occupancy.
On file for this project
3 documents
Modifications to the existing HVAC System: Installation of new AC Units and associated ductwork and equipment on the 5 & 6th (CO)/ 9 & 10th Flrs (Mktg) as per plans (First Service Offices.) No change to use, egress or occupancy.
On file for this project
3 documents
Latest 3 of 7 filings on this floor.
Floor 4Sovereign PartnersUnder Construction1 filing · 20 docs
PlumbingStructural
Issued Permit Scope
Plumbing · Structural
MODIFICATIONS TO EXISTING STRUCTURAL SYSTEMS. STRUCTURAL STABILITY UNAFFECTED BY THIS WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS
On file for this project
26 documents
Floor 3LacosteUnder Construction34p · 8 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
MODIFICATIONS TO EXISTING STRUCTURAL SYSTEMS. STRUCTURAL STABILITY UNAFFECTED BY THIS WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS
On file for this project
26 documents · 4 drawing sheets
HEREBY FILING FOR THE REMOVAL, INSTALLATION AND RELOCATION OF SPRINKLER HEADS. NO CHANGE TO USE OCCUPANCY OR EGRESS.
On file for this project
3 documents · 1 drawing sheet
APPLICATION FILED FOR STRUCTURAL MODIFICATIONS/ADDITIONS ON THE 1ST, 2ND, & 3RD FLOOR (LACOSTE) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
24 documents · 20 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 2LacosteUnder Construction42p · 12 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
MODIFICATIONS TO EXISTING STRUCTURAL SYSTEMS. STRUCTURAL STABILITY UNAFFECTED BY THIS WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS
On file for this project
26 documents · 5 drawing sheets
INSTALLATION OF TEMPORARY WORK PLATFROM E AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK PLATFORM ABOVE THE ESCALATOR ON THE 2ND FLOOR.
On file for this project
24 documents
HEREBY FILING FOR THE REMOVAL, INSTALLATION AND RELOCATION OF SPRINKLER HEADS. NO CHANGE TO USE OCCUPANCY OR EGRESS.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 12 filings on this floor.
Floor 1Urban Outfitters, MetLife +2Under Construction53p · 24 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · General Construction · Mechanical Systems · Plumbing · Sign · Sprinklers · Structural
MODIFICATIONS TO EXISTING STRUCTURAL SYSTEMS. STRUCTURAL STABILITY UNAFFECTED BY THIS WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS
On file for this project
26 documents · 5 drawing sheets
Modifications to the existing Sprinkler System: Installation of (10) new sprinkler heads on the Cellar and (22) heads on the 1st Floor and associated piping as per plans (Retail Space.) No change to use, egress or occupancy.
On file for this project
5 documents
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the Cellar & Ground Floors as per plans (CBRE Retail Space.) No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 24 filings on this floor.
CellarUrban Outfitters, MetLife +2Under Construction12p · 15 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modifications to the existing Sprinkler System: Installation of (10) new sprinkler heads on the Cellar and (22) heads on the 1st Floor and associated piping as per plans (Retail Space.) No change to use, egress or occupancy.
On file for this project
5 documents
Install new plumbing fixtures: (1) WC, (1) Lavatory, (3) HWHs, (2) sinks, (3) Funnel drains, (1) drinking fountain, (1) ejector pump and associated CW/sanitary piping on the Cellar Level as per plans (Retail) No change to use, egress or occupancy.
On file for this project
9 documents · 2 drawing sheets
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the Cellar & Ground Floors as per plans (CBRE Retail Space.) No change to use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 15 filings on this floor.
Site & exteriorAll Saints8 filings · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · General Construction · Protection and Mechanical Methods · Sidewalk Shed · Sign · Structural
APPLICATION FILED FOR AN ILLUMINATED BUSINESS SIGN LOGO ON WALL (EAST 47TH STREET SIDE). NOT WITHIN VIEW OF AN ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE EGRESS OR OCCUPANCY
On file for this project
4 documents · 6 drawing sheets
APPLICATION FILED FOR AN ILLUMINATED BUSINESS SIGN LOGO ON WALL (5TH AVENUE SIDE). NOT WITHIN VIEW OF AN ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE EGRESS OR OCCUPANCY
On file for this project
4 documents · 6 drawing sheets
INSTALLATION OF TEMPORARY WORK PLATFROM E AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. WORK PLATFORM ABOVE THE ESCALATOR ON THE 2ND FLOOR.
On file for this project
24 documents · 12 drawing sheets
Latest 3 of 8 filings on this floor.