Floor 192p · 1 filing · 10 docs
Fire Protection
SPRINKLER MODIFICATIONS TO COMPLY WITH LOCAL LAW 26 OF 2004. WORK TO INCLUDE RELOCATION OF EXISTING HEADS AND INSTALLATIONS OF NEW PIPING AND HEADS IN EQUIPMENT ROOMS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
10 documents · 2 drawing sheets
Floor 18
Floor 173p · 2 filings · 12 docs
Architecture
No filed description on record for this project.
On file for this project
8 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
4 documents · 2 drawing sheets
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 112p · 2 filings · 19 docs
DMMechanical
HVAC modifications on the 11th floor (Plastic Surgery Institute) as per plans. No change to use, egress or occupancy.
On file for this project
15 documents · 1 drawing sheet
Removal and disposal of interior partitions, doors, suspended ceilings and finishes on the 11th floor as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Floor 1013p · 4 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
FILING FOR RENOVATION OF EXISTING OFFICE SPACE TO BE CONVERTED TO MECHANICAL SPACE ALLOWING FOR F.A.R. TO BE MOVED TO CREATE A MEZZANINE ON THE FIRST FLOOR. WORK TO INCLUDE INSULTATION OF WALLS, CEILING AND FLOOR. FILING FOR CONJUNECTION WITH ALT-1.
On file for this project
20 documents · 6 drawing sheets
Modifications to the existing sprinkler system on the 10th floor as per plans. No change to use, egress or occupancy.
On file for this project
7 documents · 4 drawing sheets
Modifications to the existing HVAC system on the 10th floor as per plans. No change to use, egress or occupancy.
On file for this project
10 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 24p · 2 filings · 14 docs
Fire Protection
Issued Permit Scope
Sprinklers
APPLICATION FILED FOR SPRINKLER WORK (ADDITIONS/MODIFICATION) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
4 documents
SPRINKLER MODIFICATIONS TO COMPLY WITH LOCAL LAW 26 OF 2004. WORK TO INCLUDE RELOCATION OF EXISTING HEADS AND INSTALLATIONS OF NEW PIPING AND HEADS IN EQUIPMENT ROOMS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
10 documents · 2 drawing sheets
Floor 111p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanical
Issued Permit Scope
Mechanical Systems
MECHANICAL SYSTEM FOR A PROPOSED RETAIL SPACE
On file for this project
42 documents · 6 drawing sheets
#8678 - Removal of non-bearing partitions. No change in egress, use or occupancy.
On file for this project
3 documents · 1 drawing sheet
Mechanical modifications to an existing commercial space located on the 1 st floor and Cellar
On file for this project
3 documents
Latest 3 of 5 filings on this floor.
Mezzanine7p · 1 filing · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
MECHANICAL SYSTEM FOR A PROPOSED RETAIL SPACE
On file for this project
42 documents · 7 drawing sheets
Cellar2p · 4 filings · 16 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing
Project M51486649Permit Issued · 01/10/2020
Plumbing Modifications on the Cellar of existing commercial space.
Mechanical modifications to an existing commercial space located on the 1 st floor and Cellar
On file for this project
3 documents
Plumbing Modifications on the Cellar of existing commercial space.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.