60 CHARLTON STREET
MANHATTAN · BIN 1009749
💬 Discuss this project
1925Year Built
12Stories
RBBuilding Class
M1-6Zoning
73,891 sfGross Floor Area
2Units
LL97 Covered0 Active Violations
Condo, office space · Owner of record: 60 Charlton · 7,500 sf lot · 9.85 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofApf 60 Charlton Owner LP9p · 2 filings · 17 docs
Floor 1212th floor fire protection modification29p · 4 filings · 20 docs
Floor 11
Floor 10Flock SafetyUnder Construction25p · 1 filing · 20 docs
Floor 9Flock Safety, K&LGroupUnder Construction65p · 12 filings · 20 docs
Floor 8
Floor 7Sprinkler system modifications26p · 4 filings · 13 docs
Floor 6Apf Properties45p · 8 filings · 20 docs
Floor 5
Floor 4Plumbing modifications, 4th and 5th floors66p · 4 filings · 20 docs
Floor 3Arcade Village48p · 1 filing · 20 docs
Floor 2Arcade Village61p · 1 filing · 20 docs
Floor 1Wonder41p · 4 filings · 20 docs
CellarWonder47p · 4 filings · 20 docs
Site & exteriorWonder32p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Apf 60 Charlton Owner8809/13/2026
Apf Properties2307/08/2026
Lorel 163 Varick1103/21/2026
60 Charlton503/22/2026
Bigman Brothers103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMA Consulting Engineers510/01/2026
MG Engineering2706/10/2026
DPM Architecture806/10/2026
Nelson and Pope303/14/2025
Bka Architects209/19/2024
Studio Huji207/29/2024
Frank Joseph Campione106/12/2024
Kendall Engineering305/23/2024
Lawrence Group104/16/2024
Silman104/16/2024
KZ Engineering305/28/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Signs Cad403/21/2026
Codegreen2003/21/2026
Milrose Consultants803/21/2026
Beam Living503/21/2026
Synergy Building Consultants303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Arsenal ScaffoldScaffold2207/08/2026
DK Construction OneGeneral Contractor1007/08/2026
J.A. JenningsGeneral Contractor907/08/2026
Wesbuilt Construction ManGeneral Contractor707/08/2026
Buch ConstructionGeneral Contractor607/08/2026
Dependable MechanicalFire Protection607/08/2026
A&H Express Plumbing & HeatingPlumbing407/14/2026
A + SprinklerFire Protection307/08/2026
Casino MechanicalPlumbing307/08/2026
Signs CadSign hanger207/08/2026
Heso ElectricalElectrical203/22/2026
Nash Electric ServicesElectrical203/22/2026
Denko MechanicalFire Protection207/08/2026
Cooper WorksGeneral Contractor207/08/2026
A&A PlumbingPlumbing207/08/2026
Shaw MechanicalPlumbing106/28/2026
Ampere Electrical ServicesElectrical103/21/2026
Amko Electric Construction & Maintenance IElectrical103/21/2026
Metropolis ElectricElectrical103/22/2026
Roz-A-Lite Electrical Contg IElectrical103/22/2026
R.A. Phillips Electrical ContElectrical103/21/2026
Accurate MechanicalPlumbing107/08/2026
Accurate MechanicalFire Protection107/08/2026
DNA Plumbing ContractorsPlumbing107/08/2026
Full Capacity FireFire Protection107/08/2026
Mill Brook Fire ProtectionFire Protection106/28/2026
Par Fire ProtectionFire Protection107/08/2026
P.S.I. MechanicalPlumbing107/08/2026
Bigman BrothersElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Codegreen5103910/01/2026
Milrose Consultants2003303/14/2025
Metrospec Sia6420305/23/2024
Atlas ATC Engineering8011104/16/2024
Building Lifecycle
All (284)Filed (56)Permit Issued (68)Signed Off (34)Violation (60)Inspection (36)Special Inspection (30)
10/20/2026
Permit issued — Sprinklers
M01400160-S3-EW-SP
10/01/2026
Filed — Alteration
Structural modifications to the 2nd-floor (Arcade Village) as per plans filed herewith. No change in use, egress, or occupancy.
M01010187-P2
09/23/2026
Signed off — Alteration
Structural modifications to the 2nd-floor (Arcade Village) as per plans filed herewith. No change in use, egress, or occupancy.
M01010187-S1
09/23/2026
Special inspection requirement — Post-installed Anchors
James Sullivan Jr
09/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Sullivan Jr
09/16/2026
Filed — Alteration
Structural modifications to the 2nd-floor (Arcade Village) as per plans filed herewith. No change in use, egress, or occupancy.
M01010187-P1
09/02/2026
Signed off — Alteration
Structural modifications to the 2nd-floor (Arcade Village) as per plans filed herewith. No change in use, egress, or occupancy.
M01010187-S4
07/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/13/2026
Permit issued — Plumbing
M01400160-S2-PL
06/26/2026
Permit issued — Sprinklers
M01400160-S3-EW-SP
06/12/2026
Permit issued — Mechanical Systems
M01400160-S1-MS
06/12/2026
Permit issued — General Construction
M01400160-I1-GC
06/10/2026
Filed — Alteration
General construction modifications taking place on the 10th fl Construction/ 11th fl marketing as per plans filed herewith. No change in use, egress or occupancy
M01400160-S3
06/10/2026
Filed — Alteration
General construction modifications taking place on the 10th fl Construction/ 11th fl marketing as per plans filed herewith. No change in use, egress or occupancy
M01400160-I1
06/10/2026
Filed — Alteration
General construction modifications taking place on the 10th fl Construction/ 11th fl marketing as per plans filed herewith. No change in use, egress or occupancy
M01400160-S2
06/10/2026
Filed — Alteration
General construction modifications taking place on the 10th fl Construction/ 11th fl marketing as per plans filed herewith. No change in use, egress or occupancy
M01400160-S1
06/09/2026
Special inspection requirement — Post-installed Anchors
James Sullivan Jr
06/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Sullivan Jr
06/09/2026
Special inspection requirement — Sprinkler Systems
James Sullivan Jr
05/14/2026
Special inspection requirement — Post-installed Anchors
James Sullivan Jr
05/11/2026
Special inspection requirement — Final
Stephen DiGiuseppi
05/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Sullivan Jr
05/11/2026
Special inspection requirement — Mechanical Systems
James Sullivan Jr
05/11/2026
Special inspection requirement — Interior lighting power
James Sullivan Jr
05/11/2026
Special inspection requirement — Duct leakage testing, insulation and design
James Sullivan Jr
05/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
James Sullivan Jr
05/11/2026
Special inspection requirement — Post-installed Anchors
James Sullivan Jr
05/11/2026
Special inspection requirement — Lighting controls
James Sullivan Jr
05/11/2026
Special inspection requirement — Final
James Sullivan Jr
05/11/2026
Special inspection requirement — Sprinkler Systems
James Sullivan Jr
12/19/2025
Signed off — Alteration
M01032310-I1
12/19/2025
Signed off — Alteration
M01147611-I1
12/19/2025
Signed off — Alteration
Sprinkler modifications taking place on the 7th & 9th Fl construction/ 8th & 10th Fl marketing floors as per plans filed herewith. No change in use, egress or occupancy
M01147646-I1
12/04/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/04/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/02/2025
Signed off — Alteration
M01147624-I1
12/02/2025
Signed off — Alteration
Mechanical modifications taking place on the 6th Fl construction/ 7th Fl marketing floor as per plans filed herewith. No change in use, egress or occupancy
M01032311-I1
12/02/2025
Signed off — Alteration
plumbing modifications taking place on the 6th Fl construction/ 7th Fl marketing floor as per plans filed herewith. No change in use, egress or occupancy
M01032320-I1
12/02/2025
Signed off — Alteration
plumbing modifications taking place on the 7th & 9th Fl construction/ 8th & 10th Fl marketing floors as per plans filed herewith. No change in use, egress or occupancy
M01147629-I1
11/13/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/12/2025
Signed off — Alteration
plumbing modifications taking place on the 4th Fl construction/ 5th Fl marketing floor as per plans filed herewith. No change in use, egress or occupancy
M00939896-I1
11/12/2025
Signed off — Alteration
Mechanical modifications taking place on the 4th Fl construction/ 5th Fl marketing floor as per plans filed herewith. No change in use, egress or occupancy
M00939891-I1
07/21/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/16/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/15/2025
Permit issued — Sprinklers
M01010187-S3-EW-SP
05/22/2025
Permit issued — Sprinklers
M01032325-I1-EW-SP
05/22/2025
Permit issued — Sprinklers
M01147646-I1-EW-SP
05/14/2025
Permit issued — General Construction
M01010187-I1-GC
05/14/2025
Permit issued — Plumbing
M01010187-S2-PL
04/11/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/26/2025
Signed off — Alteration
PRIMARY SCOPE OF WORK UNDER THIS APPLICATION IS THE INTERIOR ALTERATIONOF A CORPORATE OFFICE ON THE 9TH FLOOR OF THE BUILDING. THIS WORKCONSISTS OF NEW NON-LOADING PARTITIONS, HUNG CEILINGS, FINISHES ANDDOORS. P
M01083114-I1
03/19/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/19/2025
Special inspection requirement — Sprinkler Systems
Christopher Drutjons
03/14/2025
Filed — Alteration
PRIMARY SCOPE OF WORK UNDER THIS APPLICATION IS THE INTERIOR ALTERATIONOF A CORPORATE OFFICE ON THE 9TH FLOOR OF THE BUILDING. THIS WORKCONSISTS OF NEW NON-LOADING PARTITIONS, HUNG CEILINGS, FINISHES ANDDOORS. P
M01083114-P1
03/05/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/05/2025
Special inspection requirement — Sprinkler Systems
Christopher Drutjons
01/30/2025
Signed off — Alteration
The primary scope of work under this application is the Interior Alteration of a Corporate office located on the 9th Floor of 60 Charlton Street. The work consists of new non-bearing partitions, hung ceilings, finishes, and doors.
M01054866-I1
01/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/17/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/14/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
Latest 60 of 284 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedDependable Mechanical10/20/2026
DOB NOWPlumbingPermit IssuedA&H Express Plumbing & Heating07/13/2026
DOB NOWSprinklersPermit IssuedDependable Mechanical06/26/2026
DOB NOWMechanical SystemsPermit IssuedDK Construction One06/12/2026
DOB NOWGeneral ConstructionPermit IssuedDK Construction One06/12/2026
DOB NOWSprinklersSigned-offLeguci Piping & Heating07/15/2025
DOB NOWSprinklersSigned-offDependable Mechanical05/22/2025
DOB NOWSprinklersSigned-offDependable Mechanical05/22/2025
DOB NOWGeneral ConstructionPermit IssuedWesbuilt Construction Man05/14/2025
DOB NOWPlumbingPermit IssuedJames Cruz05/14/2025
DOB NOWPlumbingSigned-offA&H Express Plumbing & Heating01/09/2025
DOB NOWSprinklersSigned-offDependable Mechanical01/09/2025
DOB NOWMechanical SystemsSigned-offDK Construction One12/23/2024
DOB NOWGeneral ConstructionSigned-offDK Construction One12/23/2024
DOB NOWSprinklersSigned-offFull Capacity Fire08/16/2024
DOB NOWPlumbingPermit IssuedDNA Plumbing Contractors08/01/2024
DOB NOWSprinklersSigned-offLawrence J. Levine07/31/2024
DOB NOWSignSigned-offSigns Cad07/30/2024
DOB NOWSignSigned-offSigns Cad07/30/2024
DOB NOWGeneral ConstructionSigned-offBuch Construction07/09/2024
DOB NOWGeneral ConstructionSigned-offBuch Construction07/09/2024
DOB NOWGeneral ConstructionSigned-offBuch Construction06/26/2024
DOB NOWGeneral ConstructionSigned-offBuch Construction06/20/2024
DOB NOWPlumbingSigned-offA&H Express Plumbing & Heating06/20/2024
DOB NOWSprinklersSigned-offAccurate Mechanical05/29/2024
DOB NOWMechanical SystemsSigned-offCooper Works05/28/2024
DOB NOWPlumbingSigned-offAnthony Disabato05/28/2024
DOB NOWPlumbingSigned-offA&H Express Plumbing & Heating05/21/2024
DOB NOWGeneral ConstructionSigned-offDK Construction One05/17/2024
DOB NOWMechanical SystemsSigned-offDK Construction One05/17/2024
DOB NOWSprinklersSigned-offDependable Mechanical05/16/2024
DOB NOWGeneral ConstructionSigned-offCooper Works05/15/2024
DOB NOWStructuralSigned-offWesbuilt Construction Man05/06/2024
DOB NOWMechanical SystemsSigned-offWesbuilt Construction Man05/03/2024
DOB NOWGeneral ConstructionPermit IssuedWesbuilt Construction Man05/02/2024
DOB NOWMechanical SystemsSigned-offDK Construction One11/08/2023
DOB NOWSprinklersSigned-offDependable Mechanical11/06/2023
DOB NOWPlumbingSigned-offP.S.I. Mechanical11/03/2023
DOB NOWGeneral ConstructionSigned-offDK Construction One11/01/2023
DOB NOWSprinklersSigned-offS. Tieger Plumbing Co02/02/2023
+ 56 more permits on file
4 projects · most recent 10/01/2026
Sprinkler System
FiledStatusContractorScope
10/01/2026Signed-offLeguci Piping & HeatingSprinkler System
06/10/2026Permit IssuedA&H Express Plumbing & HeatingSprinkler System
03/04/2024Signed-offA&H Express Plumbing & Heating—
07/14/2022Signed-offA + Sprinkler72 heads
2 projects · most recent 10/01/2026
Water/Sanitary
FiledStatusContractorScope
10/01/2026Permit IssuedShaw MechanicalWater/Sanitary
06/10/2026Permit IssuedDependable MechanicalWater/Sanitary
17 projects · most recent 07/01/2026
General Wiring
FiledStatusContractorScope
07/01/2026Permit IssuedTitan Electrical & Elev ContractingGeneral Wiring
04/07/2026Permit IssuedFallon ElectricGeneral Wiring
03/04/2026Permit IssuedRoz-A-Lite Electrical Contg IGeneral Wiring
09/23/2024CompleteHeso ElectricalGeneral Wiring
09/09/2024CompleteSigns Cad—
09/09/2024CompleteSigns Cad—
08/14/2024Permit IssuedTikvah Electric CoGeneral Wiring
07/02/2024CompleteBigman BrothersGeneral Wiring
03/11/2024CompleteWarren Elevator Service CoGeneral Wiring
10/17/2022CompleteMetropolis ElectricGeneral Wiring
05/16/2022CompleteMetropolis ElectricGeneral Wiring
09/24/2021CompleteMetropolis ElectricGeneral Wiring
05/19/2019CompleteJam Electrical—
01/16/2019CompleteNash Electric Services—
10/19/2018CompleteRoz-A-Lite Electrical Contg I1 meters, 1 new_meters
1 project · most recent 10/01/2026
Steel
FiledStatusContractorScope
10/01/2026Signed-offMill Brook Fire ProtectionSteel
▾Field Inspections (DOB CAP) — 36
DateTypeResultReport
07/30/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/04/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/04/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/13/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/21/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/16/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/19/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/17/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/14/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/24/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/15/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/11/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/26/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/21/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/02/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/12/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/07/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/02/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/05/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/24/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/09/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
Latest 25 of 36.
▾Special Inspection Requirements (DOB NOW) — 115
DateRequirementInspectorRole
09/23/2026Fire-Resistant Penetrations and JointsJames Sullivan Jrspecial
09/23/2026Post-installed AnchorsJames Sullivan Jrspecial
06/09/2026Fire-Resistant Penetrations and JointsJames Sullivan Jrspecial
06/09/2026Post-installed AnchorsJames Sullivan Jrspecial
06/09/2026Sprinkler SystemsJames Sullivan Jrspecial
05/14/2026Post-installed AnchorsJames Sullivan Jrspecial
05/11/2026FinalJames Sullivan Jrprogress
05/11/2026Fire-Resistant Penetrations and JointsJames Sullivan Jrspecial
05/11/2026FinalStephen DiGiuseppiprogress
05/11/2026Mechanical SystemsJames Sullivan Jrspecial
05/11/2026Post-installed AnchorsJames Sullivan Jrspecial
05/11/2026Sprinkler SystemsJames Sullivan Jrspecial
05/11/2026HVAC-R and service water piping design and insulationJames Sullivan Jrenergy_progress
05/11/2026Lighting controlsJames Sullivan Jrenergy_progress
05/11/2026Duct leakage testing, insulation and designJames Sullivan Jrenergy_progress
05/11/2026Interior lighting powerJames Sullivan Jrenergy_progress
03/19/2025Sprinkler SystemsChristopher Drutjonsspecial
02/05/2025Sprinkler SystemsChristopher Drutjonsspecial
11/25/2024Post-installed AnchorsHATIM ELSAIDspecial
09/19/2024FinalMichael Risbergsprogress
09/19/2024Fire-Resistance Rated ConstructionMichael Risbergsprogress
09/19/2024Interior lighting powerMichael Risbergsenergy_progress
09/06/2024FinalMichael Risbergsprogress
09/06/2024Interior lighting powerMichael Risbergsenergy_progress
09/06/2024Fire-Resistance Rated ConstructionMichael Risbergsprogress
Latest 25 of 115.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Flock SafetyOfficeFloors 9, 10
Project M01400160 Alteration · Permit Entire · 06/10/2026
WonderRestaurant / Food ServiceCellar, Floor 1
Project M01054413 Alteration · LOC Issued · 07/29/2024
Project M01038545 Alteration · LOC Issued · 05/15/2024
Project M01038547 Alteration · LOC Issued · 05/15/2024
Project M01038519 Alteration · LOC Issued · 05/13/2024
Arcade VillageOfficeFloors 2, 3
Project M01010187 Alteration · Permit Entire · 04/16/2024
K&LGroupOfficeFloor 9
Project M00582496 Alteration · LOC Issued · 09/16/2021
Project M00584669 Alteration · LOC Issued · 09/16/2021
Project M00585490 Alteration · LOC Issued · 09/16/2021
Project M00585519 Alteration · LOC Issued · 09/16/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 820 on file (BIS + DOB NOW)
▸Plans & Drawings59
▸DOB NOWPlans/Sketch55
09/06/2026M00053883-I1Request digital key ↗
09/04/2026M00056744-I1Request digital key ↗
09/03/2026M00584669-I1Request digital key ↗
Showing 3 of 55 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/04/2026M00056744-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/04/2026M00056744-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸Applications & Permits134
▸BISPLAN / WORK APPROVAL APPLICATION74
12/08/2025123249181Open ↗
07/01/2024123524711Open ↗
06/25/2024102903342Open ↗
Showing 3 of 74 on file for this type
▸BISWORK PERMIT APPLICATION39
06/21/2021123337004Open ↗
Showing 1 of 39 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION17
12/07/2021123914158Open ↗
12/07/2021123914158Open ↗
12/07/2021123914158Open ↗
Showing 3 of 17 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
04/26/2024123390623Open ↗
04/02/2021123390623Open ↗
Showing 2 of 3 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/13/2021123337004Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
04/30/2024123337004Open ↗
▸BISZONING DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications196
▸DOB NOWDPL-1: Design Professional Seal & Signature57
09/27/2026M01010187-P2Open ↗
09/04/2026M00056744-I1Open ↗
09/03/2026M00584669-I1Open ↗
Showing 3 of 57 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION39
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 39 on file for this type
▸DOB NOWProgress Inspector Seal & Signature34
10/06/2026M00939891-I1Open ↗
10/06/2026M00939891-I1Open ↗
09/30/2026M00053883-I1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature34
10/06/2026M00939891-I1Open ↗
09/27/2026M01010187-P1Open ↗
09/27/2026M01010187-P1Open ↗
Showing 3 of 34 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
01/22/2021140997562Open ↗
Showing 1 of 10 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
01/22/2021140997562Open ↗
Showing 1 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
01/22/2021140997562Open ↗
Showing 1 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Trade Schedules & Equipment56
▸BISEQUIPMENT USE PERMITS22
07/22/2021123337004Open ↗
07/22/2021123337004Open ↗
07/22/2021123337004Open ↗
Showing 3 of 22 on file for this type
▸BISSCHEDULE B - PLUMBING13
02/11/2021123337004Open ↗
02/08/2021123337004Open ↗
01/07/2021123442649Open ↗
Showing 3 of 13 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
07/22/2021123337004Open ↗
07/22/2021123337004Open ↗
07/22/2021123337004Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
02/24/2021123889765Open ↗
01/05/2021123889765Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
10/14/2022123442630Open ↗
05/26/2022123463411Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection5
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos108
▸DOB NOWDEP ACP-5: Asbestos Assessment Report54
09/27/2026M01010187-P2Open ↗
09/03/2026M00584669-I1Open ↗
09/03/2026M00582496-I1Open ↗
Showing 3 of 54 on file for this type
▸DOB NOWOER: Notice to Proceed14
09/04/2026M00056744-I1Open ↗
09/03/2026M00582496-I1Open ↗
09/03/2026M00585519-P2Open ↗
Showing 3 of 14 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION11
04/08/2024123390623Open ↗
04/01/2024123442630Open ↗
06/06/2022123463411Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWOER: Notice of Satisfaction11
09/03/2026M00582496-I1Open ↗
09/03/2026M00619728-I1Open ↗
09/03/2026M00619712-I1Open ↗
Showing 3 of 11 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED7
01/22/2021140997562Open ↗
Showing 1 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance24
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
05/26/2021123337004Open ↗
05/26/2021123889765Open ↗
05/26/2021123889765Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
09/28/2021123524711Open ↗
05/21/2021123889765Open ↗
03/18/2021123489171Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
09/03/2026M00619712-I1Open ↗
Showing 1 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports38
▸BISTECHNICAL REPORT: RESPONSIBILITY21
01/08/2026123735896Open ↗
10/29/2024123337004Open ↗
02/09/2023140876238Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER6
06/10/2021123337004Open ↗
06/10/2021123337004Open ↗
06/10/2021123337004Open ↗
Showing 3 of 6 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
07/02/2024123337004Open ↗
▸Approvals, Objections & Sign-offs44
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
01/12/2026123735896Open ↗
07/03/2024123524711Open ↗
04/05/2024123442630Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE10
07/07/2021123337004Open ↗
07/01/2021123337004Open ↗
01/19/2021123337004Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFINAL2
01/09/2026123735896Open ↗
01/09/2026123735896Open ↗
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership45
▸BISCOST AFFIDAVIT33
12/10/2025123735896Open ↗
12/05/2025123735896Open ↗
06/02/2022123463411Open ↗
Showing 3 of 33 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW35
12/16/2025123735896Open ↗
03/29/2024123442630Open ↗
02/09/2023140876238Open ↗
Showing 3 of 5 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
06/21/2021123337004Open ↗
Showing 1 of 4 on file for this type
▸BISDEPT OF FINANCE VERIFICATION3
12/20/2021123914158Open ↗
12/07/2021123914158Open ↗
12/07/2021123914158Open ↗
▸Filing & Intake Forms79
▸BISADDITIONAL INFORMATION39
02/10/2023140876238Open ↗
01/11/2022123914158Open ↗
12/20/2021123914158Open ↗
Showing 3 of 39 on file for this type
▸BISEFILING COVER SHEET25
12/07/2021123914158Open ↗
12/07/2021123914158Open ↗
Showing 2 of 25 on file for this type
▸BISBOROUGH INTAKE FORM10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
01/22/2021140997562Open ↗
Showing 1 of 5 on file for this type
▸Other Documents16
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
12/07/2021123914158Open ↗
Showing 1 of 9 on file for this type
▸BISTCO - Supporting Documents3
05/26/2021123337004Open ↗
05/26/2021123337004Open ↗
05/26/2021123337004Open ↗
▸BISPLOT DIAGRAM3
01/11/2022123914158Open ↗
Showing 1 of 3 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type