Office, 20+ stories, with or without commercial
600 MADISON AVENUE
MANHATTAN · BIN 1036076
💬 Discuss this project
1965Year Built
25Stories
O4Building Class
C5-3Zoning
315,918 sfGross Floor Area
46Units
LL97 Covered4 Open Violations ▸FISP: SWARMP
Office, 20+ stories, with or without commercial · Owner of record: 600 FEE, LLC · 18,075 sf lot · 17.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction5p · 4 filings · 20 docs
Floor 2313p · 6 filings · 20 docs
Floor 228p · 3 filings · 20 docs
Floor 211p · 1 filing · 15 docs
Floor 201 filing · 6 docs
Floor 198p · 4 filings · 20 docs
Floor 181 filing · 6 docs
Floor 171 filing · 6 docs
Floor 161 filing · 6 docs
Floor 151 filing · 6 docs
Floor 147p · 5 filings · 20 docs
Floor 131 filing · 6 docs
Floor 12Under Construction10p · 4 filings · 20 docs
Floor 11Under Construction9p · 4 filings · 20 docs
Floor 10Under Construction33p · 10 filings · 20 docs
Floor 9Under Construction29p · 9 filings · 20 docs
Floor 8Under Construction28p · 10 filings · 20 docs
Floor 7Under Construction27p · 8 filings · 20 docs
Floor 6Under Construction26p · 8 filings · 20 docs
Floor 5Under Construction25p · 8 filings · 20 docs
Floor 4Under Construction7p · 2 filings · 15 docs
Floor 3Under Construction11p · 5 filings · 20 docs
Floor 22p · 2 filings · 20 docs
Floor 125p · 14 filings · 20 docs
Mezzanine1p · 1 filing · 9 docs
Cellar31p · 13 filings · 20 docs
Sub-Cellar1p · 1 filing · 9 docs
Basement2p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
600 PARTNERS89709/25/2026
RUBEN COMPANIES10207/08/2026
1700 LH, LLC703/22/2026
600 FEE, LLC303/22/2026
SAFWAY ATLATIC LLC803/22/2026
LAWRENCE RUBEN COMPANY2503/22/2026
ROSE ASSOCIATES103/22/2026
RIALTO CAPITAL MANAGEMENT103/22/2026
1700 BROADWAY COMPANY1103/21/2026
PLAZA TOWERS2203/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIZZO GROUP8203/21/2026
UNITED SAFETY CONSULTANTS303/21/2026
LOUIS STRIAR403/21/2026
METROPOLIS GROUP INC203/21/2026
ALL IN PERMIT CONSULTANTS203/21/2026
NEW YORK DESIGN ARCHITECTS403/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARCHSTONE BUILDERS LLCGeneral Contractor2207/08/2026
PETRETTI & ASSOCIATES LLCGeneral Contractor2007/08/2026
CAPITAL IMPROVEMENT SERVICESGeneral Contractor1407/08/2026
CONSOLIDATED SCAFFOLDINGGeneral Contractor1107/08/2026
JT MAGEN & COMPANY INCGeneral Contractor1007/08/2026
CLUNE CONSTRUCTION CO LPGeneral Contractor907/08/2026
PAR FIRE PROTECTION LLCFire Protection707/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor608/05/2026
ASHLAND PLUMBING CORPPlumbing507/08/2026
TRI-STAR CONSTRUCTION CORPGeneral Contractor507/08/2026
MAC FELDER INCPlumbing407/08/2026
SIRINA FIRE PROT CORPFire Protection307/08/2026
PAR PLUMBING CO., INCPlumbing307/08/2026
ATLAS-ACON ELEC. SERVICEElectrical303/22/2026
A.W. & S. CONSTRUCTION COGeneral Contractor303/21/2026
WATSON, ROHANElectrical203/21/2026
SPINDELL, DAVIDElectrical203/21/2026
CAMPBELL & DAWES LTD ELECElectrical203/22/2026
SPRING SCAFFOLDING LLCGeneral Contractor207/08/2026
GEOFFREY A. LAGAS & ASSOCPlumbing207/08/2026
MILL BROOK FIRE PROTECTIONFire Protection207/08/2026
MID-STATE CONSTRUCTION CGeneral Contractor207/08/2026
LEVINE, GEORGEFire Protection203/21/2026
CARLOS DE ARMASElectrical203/21/2026
EVEREST SCAFFOLDING INCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEP INSPECTIONS, INC11022506/15/2026
CROSSCHECK INSPECTION SER544905/09/2025
CODEGREEN510705/08/2024
NSE ASSOCIATES8590308/09/2023
PROJECT TACTICAL SOLUTION5859411/07/2022
NICHOLAS STRAMANDI ENGINE3226609/08/2022
AKS ARCHITECTURAL & ENGIN1957108/04/2022
AK ENGINEERING PC678802/11/2021
GOLDMAN COPELAND ASSOCIAT2826302/03/2021
NAPACH ARCHITECTU2945411/16/2020
Building Lifecycle
All (300)Filed (78)Permit Issued (80)Signed Off (49)Facade (FISP) (3)Violation (14)Inspection (38)Objection (8)Special Inspection (30)
09/24/2026
Permit issued — General Construction
M01400364-I1-GC
08/13/2026
Permit issued — General Construction
M01400244-I1-GC
08/13/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/13/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/04/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
M01439660-I1
08/04/2026
Permit issued — Protection and Mechanical Methods
M01439660-I1-PMM
07/29/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01437189-I1
07/29/2026
Permit issued — Sidewalk Shed
M01437189-I1-SH
07/22/2026
Signed off — Alteration
ERECT NON-ILLUMINATED ACCESSORY BUSINESS WALL SIGN FOR MCQUEEN ON MADISON AVE ELEVATION.
M01141300-I1
07/22/2026
Signed off — Alteration
M01141284-I1
07/20/2026
Signed off — Alteration
M01006923-I1
07/20/2026
Signed off — Alteration
Modifications to the existing HVAC system on the cellar & 1st floor - Alexander McQueen as per plans. No change to use, egress or occupancy.
M01006820-I1
07/02/2026
Permit issued — Sprinklers
M01411596-I1-EW-SP
06/23/2026
Permit issued — Plumbing
M01411574-I1-PL
06/17/2026
Permit issued — Mechanical Systems
M01411507-I1-MS
06/17/2026
Permit issued — General Construction
M01411468-I1-GC
06/15/2026
Filed — Alteration
M01411596-I1
06/15/2026
Filed — Alteration
Removal of plumbing fixtures on the 5th thru 10th floors as per plans. No change to use, egress or occupancy.
M01411574-I1
06/15/2026
Filed — Alteration
Minor demolition of the HVAC system on the 5th thru 10th floors as per plans. No change to use, egress or occupancy.
M01411507-I1
06/15/2026
Filed — Alteration
Removal of partitions, doors, ceilings and interior finishes on the ground, 5th thru 10th floors as per plans. No change to use. egress or occupancy.
M01411468-I1
06/08/2026
Special inspection requirement — Energy Code Compliance Inspections
Nicolas Crosetto
06/03/2026
Special inspection requirement — Interior lighting power
Nicolas Crosetto
06/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Crosetto
06/03/2026
Special inspection requirement — Lighting controls
Nicolas Crosetto
06/03/2026
Special inspection requirement — Mechanical Systems
Nicolas Crosetto
06/03/2026
Special inspection requirement — Final
barry ludlow
06/03/2026
Special inspection requirement — Final
Nicolas Crosetto
05/27/2026
Filed — Alteration
Existing windows to be replaced with new windows on the 5th through 11th floors as per plans. No change to use, egress, or occupancy.
M01400364-I1
05/22/2026
Filed — Alteration
REPLACE EXISTING WINDOWS WITH NEW,THERMALLY BROKEN ALUMINUM WINDOWS ON THE 3RD THRU 12TH FLOORS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01400244-I1
05/20/2026
Special inspection requirement — Air barrier - visual inspection
Jennifer Sze
05/11/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Jennifer Sze
05/11/2026
Special inspection requirement — Fenestration air leakage
Jennifer Sze
05/11/2026
Special inspection requirement — Final
Jennifer Sze
05/11/2026
Special inspection requirement — Fenestration areas
Jennifer Sze
05/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Jennifer Sze
12/26/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/17/2025
Signed off — Alteration
LL11 facade and fire tower balcony repairs as per plans. No change to use, egress or occupancy.
M00890654-I1
11/19/2025
Signed off — Alteration
Modifications to the existing sprinkler system on the Cellar and 1st floor - Alexander McQueen as per plans. No change to use, egress or occupancy.
M01006976-I1
11/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/21/2025
Permit issued — Plumbing
M01006923-I1-PL
09/23/2025
Signed off — Alteration
M01006522-I1
08/27/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/22/2025
Signed off — Alteration
Structural modifications for 1st and 2nd floors - Alexander McQueen as per plans. No change to use, egress or occupancy.
M01007131-I1
08/20/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01050131-I1
08/14/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/05/2025
Permit issued — Supported Scaffold
M00928344-I1-SF
07/14/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/14/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/18/2025
Permit issued — Sign
M01141300-I1-SG
06/18/2025
Permit issued — Sign
M01141284-I1-SG
06/12/2025
Filed — Alteration
ERECT NON-ILLUMINATED ACCESSORY BUSINESS WALL SIGN FOR MCQUEEN ON MADISON AVE ELEVATION.
M01141300-I1
06/12/2025
Filed — Alteration
M01141284-I1
05/29/2025
Signed off — Alteration
Modifications to the existing HVAC system on the 12th floor (Engineer's Gate)as per plans. No change to use, egress or occupancy.
M01042537-I1
05/28/2025
Signed off — Alteration
Modifications to the existing sprinkler system on the 12th floor (Engineer's Gate) as per plans. No change to use, egress or occupancy
M01042553-I1
05/14/2025
Permit issued — Sprinklers
M01006976-I1-EW-SP
05/13/2025
Permit issued — Structural
M01007131-I1-ST
05/13/2025
Special inspection requirement — Fenestration areas
EUGENE BIFULCO
05/13/2025
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
EUGENE BIFULCO
05/13/2025
Special inspection requirement — Insulation placement and R values
EUGENE BIFULCO
05/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSKYLINE WINDOWS LLC09/24/2026
DOB NOWGeneral ConstructionPermit IssuedSKYLINE WINDOWS LLC08/13/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedANDAMIO SCAFFOLDING LLC08/04/2026
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC07/29/2026
DOB NOWSprinklersPermit IssuedARCO PLBG AND HTG INC07/02/2026
DOB NOWPlumbingPermit IssuedCARA PLUMBING GROUP INC06/23/2026
DOB NOWMechanical SystemsPermit IssuedARCHSTONE BUILDERS LLC06/17/2026
DOB NOWGeneral ConstructionPermit IssuedARCHSTONE BUILDERS LLC06/17/2026
DOB NOWPlumbingSigned-offGEOFFREY A. LAGAS & ASSOC10/21/2025
DOB NOWSupported ScaffoldPermit IssuedCONSOLIDATED SCAFFOLDING08/05/2025
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC06/18/2025
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC06/18/2025
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP05/14/2025
DOB NOWStructuralSigned-offCLUNE CONSTRUCTION CO LP05/13/2025
DOB NOWConstruction FenceSigned-offSPRING SCAFFOLDING LLC05/12/2025
DOB NOWGeneral ConstructionSigned-offCLUNE CONSTRUCTION CO LP04/14/2025
DOB NOWMechanical SystemsSigned-offCLUNE CONSTRUCTION CO LP04/14/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedCONSOLIDATED SCAFFOLDING01/08/2025
DOB NOWStructuralSigned-offMID-STATE CONSTRUCTION C12/17/2024
DOB NOWPlumbingSigned-offZEREGA CONTRACTING CORP10/31/2024
DOB NOWSprinklersSigned-offLEGUCI PIPING&HEATING LLC10/30/2024
DOB NOWGeneral ConstructionSigned-offARCHSTONE BUILDERS LLC10/21/2024
DOB NOWMechanical SystemsSigned-offARCHSTONE BUILDERS LLC10/21/2024
DOB NOWSupported ScaffoldPermit IssuedCONSOLIDATED SCAFFOLDING08/26/2024
DOB NOWSprinklersSigned-offAGGRESSIVE FIRE PROT LLC06/18/2024
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP05/17/2024
DOB NOWPlumbingSigned-offGEOFFREY A. LAGAS & ASSOC05/16/2024
DOB NOWMechanical SystemsSigned-offJT MAGEN & COMPANY INC05/14/2024
DOB NOWGeneral ConstructionSigned-offCLUNE CONSTRUCTION CO LP05/13/2024
DOB NOWConstruction FenceSigned-offSPRING SCAFFOLDING LLC05/13/2024
DOB NOWMechanical SystemsSigned-offCLUNE CONSTRUCTION CO LP05/13/2024
DOB NOWGeneral ConstructionSigned-offJT MAGEN & COMPANY INC05/09/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedCONSOLIDATED SCAFFOLDING01/09/2024
DOB NOWStructuralSigned-offMID-STATE CONSTRUCTION C12/12/2023
DOB NOWSupported ScaffoldPermit IssuedCONSOLIDATED SCAFFOLDING09/01/2023
DOB NOWSprinklersSigned-offLEGUCI PIPING&HEATING LLC08/24/2023
DOB NOWPlumbingSigned-offJAMES CRUZ08/11/2023
DOB NOWMechanical SystemsSigned-offARCHSTONE BUILDERS LLC08/04/2023
DOB NOWStructuralSigned-offARCHSTONE BUILDERS LLC08/04/2023
DOB NOWGeneral ConstructionSigned-offARCHSTONE BUILDERS LLC08/04/2023
+ 60 more permits on file
1 project · most recent 05/08/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/08/2024Signed-offCLUNE CONSTRUCTION CO LPHeating and Air Conditioning Systems
Heat / Cool
Johnson Controls JCH012AGDA02SPB 450 CFM · Wshp ×2
JCH015AGDA02SPB 600 CFM · Wshp ×2
JCH096AHDAA2LBB 3,000 CFM · Wshp ×2
JCH009AGDA02SPB 300 CFM · Wshp ×1
JCH024AHDA02SPB 1,000 CFM · Wshp ×1
JCH036AHDA02SPB 1,100 CFM · Wshp ×1
1 project · most recent 09/21/2021
FiledStatusContractorScope
09/21/2021———
1 project · most recent 06/15/2026
Water/Sanitary
FiledStatusContractorScope
06/15/2026Permit IssuedCARA PLUMBING GROUP INCWater/Sanitary
24 projects · most recent 07/28/2026
General Wiring
FiledStatusContractorScope
07/28/2026Permit IssuedBOROWIDE ELECT'L CONTR'S—
06/15/2026Permit IssuedM.C. ELECTRICAL NY INCGeneral Wiring
07/21/2025CompleteFLAG ELECTRIC INCGeneral Wiring
11/04/2024Permit IssuedM.C. ELECTRICAL NY INCGeneral Wiring
06/21/2024CompleteROBERT B SAMUELS, INCGeneral Wiring
06/06/2024CancelledALLSTATE ELEC'L CONT INCGeneral Wiring
08/20/2023CompleteCROSSWIRE ELECTRICAL INC—
08/02/2022CompleteLEADER ELECTRIC CO., INCGeneral Wiring
04/27/2022CompleteCROSSWIRE ELECTRICAL INC—
04/18/2022CompleteATLAS-ACON ELEC. SERVICE1 meters
02/24/2022CompleteBOROWIDE ELECT'L CONTR'S—
05/03/2021CompleteATLAS-ACON ELEC. SERVICEGeneral Wiring
03/18/2021CompleteUNITY ELECTRIC CO INC—
10/29/2020CompleteROBERT B. SAMUELS, INC.—
09/16/2020CompleteUNITY ELECTRIC CO INCGeneral Wiring
2 projects · most recent 07/29/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
07/29/2026Permit IssuedANDAMIO SCAFFOLDING LLCSidewalk Shed
01/11/2024Permit IssuedCONSOLIDATED SCAFFOLDINGScaffold
▾Field Inspections (DOB CAP) — 38
DateTypeResultReport
08/13/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/13/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/26/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/27/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/14/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/14/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/14/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/20/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/16/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/16/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/16/2024Certified Sprinkler - SP - RoughingCertifiedView ↗
12/10/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/22/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/27/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/26/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/20/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/21/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/21/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/21/2024Certified Sprinkler - SP - RoughingCertifiedView ↗
04/18/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/01/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/31/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
Latest 25 of 38.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
06/08/2026Energy Code Compliance InspectionsNicolas Crosettoprogress
06/03/2026Fire-Resistant Penetrations and JointsNicolas Crosettospecial
06/03/2026Interior lighting powerNicolas Crosettoenergy_progress
06/03/2026Lighting controlsNicolas Crosettoenergy_progress
06/03/2026FinalNicolas Crosettoprogress
06/03/2026Mechanical SystemsNicolas Crosettospecial
06/03/2026Finalbarry ludlowprogress
05/20/2026Air barrier - visual inspectionJennifer Szeenergy_progress
05/11/2026Fenestration areasJennifer Szeenergy_progress
05/11/2026Fenestration and door U-factor and product ratingsJennifer Szeenergy_progress
05/11/2026Fenestration air leakageJennifer Szeenergy_progress
05/11/2026Energy Code Compliance InspectionsJennifer Szeprogress
05/11/2026FinalJennifer Szeprogress
05/13/2025Fenestration and door U-factor and product ratingsEUGENE BIFULCOenergy_progress
05/13/2025Air barrier - visual inspectionEUGENE BIFULCOenergy_progress
05/13/2025Energy Code Compliance InspectionsEUGENE BIFULCOprogress
05/13/2025Air barrier — testing EUGENE BIFULCOenergy_progress
05/13/2025VestibulesEUGENE BIFULCOenergy_progress
05/13/2025Fenestration air leakageEUGENE BIFULCOenergy_progress
05/13/2025Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
05/13/2025FinalThomas Hughesprogress
05/13/2025Sprayed fire-resistant materialsEUGENE BIFULCOspecial
05/13/2025Mastic and Intumescent Fire-resistant CoatingsEUGENE BIFULCOspecial
05/13/2025Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
05/13/2025FinalEUGENE BIFULCOprogress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
26 North Partners/ HRSOfficeFloor 11
Project M01115914 Alteration · LOC Issued · 10/25/2024
Project M01115922 Alteration · LOC Issued · 10/25/2024
Alexander McQueenRetailCellar, Floors 1, 2
Project M01006820 Alteration · LOC Issued · 05/08/2024
Project M01006923 Alteration · LOC Issued · 05/08/2024
Project M01006976 Alteration · LOC Issued · 05/08/2024
Project M01006522 Alteration · LOC Issued · 05/07/2024
Project M01007131 Alteration · LOC Issued · 05/07/2024
Engineers GateOfficeFloor 12
Project M01042537 Alteration · LOC Issued · 05/08/2024
Project M01042553 Alteration · LOC Issued · 05/08/2024
Project M01042506 Alteration · LOC Issued · 05/06/2024
CanaliRetailCellar, Ground, Floors 1–5
Project M07999545 Alteration · LOC Issued · 09/13/2022
Project M00747892 Alteration · LOC Issued · 07/07/2022
Project M00709726 Alteration · LOC Issued · 04/21/2022
Project M00709731 Alteration · LOC Issued · 04/21/2022
Project M00709720 Alteration · LOC Issued · 04/12/2022
Project M00695664 Alteration · LOC Issued · 03/14/2022
Project M00667766 Alteration · LOC Issued · 02/01/2022
Reza InternationalOfficeFloor 23
Project M00336702 Alteration · LOC Issued · 07/23/2020
Project M00336731 Alteration · LOC Issued · 07/23/2020
Project M00336745 Alteration · LOC Issued · 07/23/2020
Alvarez & MarsalOfficeFloors 3, 5–10
Project M00222256 Alteration · LOC Issued · 09/16/2019
Project M00222270 Alteration · LOC Issued · 09/16/2019
Project M00222366 Alteration · LOC Issued · 09/16/2019
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 3,711 on file (BIS + DOB NOW)
▸Plans & Drawings107
▸DOB NOWPlans/Sketch74
09/06/2026M00002959-I1Request digital key ↗
09/03/2026M00518377-I1Request digital key ↗
09/03/2026M00586499-I1Request digital key ↗
Showing 3 of 74 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler14
09/05/2026M00222504-I1Request digital key ↗
09/05/2026M00222310-I1Request digital key ↗
09/05/2026M00249926-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Plumbing10
09/05/2026M00222270-I1Request digital key ↗
09/05/2026M00249911-I1Request digital key ↗
09/05/2026M00283507-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems8
09/05/2026M00222256-I1Request digital key ↗
09/05/2026M00222366-I1Request digital key ↗
09/05/2026M00230603-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00191376-I1Request digital key ↗
▸Applications & Permits591
▸BISPLAN / WORK APPROVAL APPLICATION352
08/06/2021123729037Open ↗
09/01/2020123823354Open ↗
08/21/2020140942559Open ↗
Showing 3 of 352 on file for this type
▸BISWORK PERMIT APPLICATION237
09/10/2020140932533Open ↗
09/10/2020140929618Open ↗
08/28/2020140942559Open ↗
Showing 3 of 237 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications1,105
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION518
04/13/2020123744724Open ↗
04/13/2020123744724Open ↗
03/13/2020123823354Open ↗
Showing 3 of 518 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST140
01/24/2020123866432Open ↗
10/30/2019123696937Open ↗
09/26/2019123748481Open ↗
Showing 3 of 140 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature107
09/05/2026M00191376-I1Open ↗
09/05/2026M00222256-I1Open ↗
09/05/2026M00222504-I1Open ↗
Showing 3 of 107 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM87
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 87 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT85
08/21/2020140942559Open ↗
07/29/2020140932533Open ↗
07/24/2020140929618Open ↗
Showing 3 of 85 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature79
09/29/2026M00908492-P1Open ↗
09/29/2026M00908492-P1Open ↗
09/27/2026M00890654-I1Open ↗
Showing 3 of 79 on file for this type
▸DOB NOWProgress Inspector Seal & Signature75
09/29/2026M00908492-P1Open ↗
09/27/2026M00336702-I1Open ↗
09/27/2026M00336702-I1Open ↗
Showing 3 of 75 on file for this type
▸BISPC FULL REPORT8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
08/21/2020140942559Open ↗
07/29/2020140932533Open ↗
07/24/2020140929618Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
08/21/2020140942559Open ↗
07/29/2020140932533Open ↗
07/24/2020140929618Open ↗
▸Trade Schedules & Equipment403
▸BISSELF-CERT PLUMBING NOTICE128
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 128 on file for this type
▸BISSCHEDULE B - PLUMBING80
09/01/2020123823354Open ↗
08/03/2020123823354Open ↗
Showing 2 of 80 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA48
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 48 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE47
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 47 on file for this type
▸BISEQUIPMENT USE PERMITS39
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 39 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT31
09/03/2020123823336Open ↗
Showing 1 of 31 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8525
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSTANDPIPE INSP REPORT : FP-842
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos315
▸BISASBESTOS: CERTIFICATION (DEP ACP5)111
08/21/2020140942559Open ↗
07/29/2020140932533Open ↗
07/24/2020140929618Open ↗
Showing 3 of 111 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'101
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 101 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report92
09/05/2026M00222256-I1Open ↗
09/05/2026M00222504-I1Open ↗
09/05/2026M00222310-I1Open ↗
Showing 3 of 92 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/05/2026M00191376-I1Open ↗
▸Energy Compliance165
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS83
04/13/2020123744724Open ↗
01/24/2020123866432Open ↗
01/24/2020123866432Open ↗
Showing 3 of 83 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS39
05/21/2021140942559Open ↗
02/26/2021123866432Open ↗
02/16/2021140932533Open ↗
Showing 3 of 39 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY13
05/21/2021140942559Open ↗
02/26/2021123866432Open ↗
02/16/2021140932533Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISTR8: Energy Code Progress Inspections8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
09/10/2020140929618Open ↗
08/28/2020140942559Open ↗
▸BISINTERIOR LIGHTING POWER2
09/10/2020140929618Open ↗
08/28/2020140942559Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
08/21/2020140942559Open ↗
07/24/2020140929618Open ↗
▸BISLIGHTING CONTROLS2
09/10/2020140929618Open ↗
08/28/2020140942559Open ↗
▸BISENERGY CODE 2ND REVIEW2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis2
09/02/2026M00727975-I1Open ↗
Showing 1 of 2 on file for this type
▸BISNYCECC ANALYSIS1
07/29/2020140932533Open ↗
▸Inspections & Test Reports32
▸BISTECHNICAL REPORT: RESPONSIBILITY20
05/21/2021140942559Open ↗
05/21/2021140942559Open ↗
02/26/2021123866432Open ↗
Showing 3 of 20 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)3
09/10/2020140932533Open ↗
09/10/2020140929618Open ↗
08/28/2020140942559Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCertificate of Inspection Construct Manhole or Catch Basin and Basin Connection2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
09/10/2020140929618Open ↗
08/28/2020140942559Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTRUCTURAL STEEL - WELDING1
09/10/2020140932533Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
09/10/2020140932533Open ↗
▸Approvals, Objections & Sign-offs264
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST153
05/21/2021140942559Open ↗
02/26/2021123866432Open ↗
02/16/2021140932533Open ↗
Showing 3 of 153 on file for this type
▸BISADMINISTRATIVE OBJECTIONS97
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 97 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISFINAL3
09/10/2020140932533Open ↗
09/10/2020140929618Open ↗
08/28/2020140942559Open ↗
▸BISCONSTRUCTION CODE DETERMINATION2
11/25/2019123823336Open ↗
11/25/2019123823336Open ↗
▸BISThird Party Electrical Signoff Compliance Report1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP Variance (V5) letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership421
▸BISCOST AFFIDAVIT421
05/21/2021140942559Open ↗
02/26/2021123866432Open ↗
02/16/2021140932533Open ↗
Showing 3 of 421 on file for this type
▸Filing & Intake Forms286
▸BISEFILING COVER SHEET196
01/24/2020123866432Open ↗
10/30/2019123696937Open ↗
Showing 2 of 196 on file for this type
▸BISADDITIONAL INFORMATION47
09/01/2020123823354Open ↗
07/20/2020123744724Open ↗
07/20/2020123744724Open ↗
Showing 3 of 47 on file for this type
▸BISBOROUGH INTAKE FORM37
04/13/2020123744724Open ↗
03/27/2020123380821Open ↗
11/20/2019123535237Open ↗
Showing 3 of 37 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
08/21/2020140942559Open ↗
07/29/2020140932533Open ↗
07/24/2020140929618Open ↗
Showing 3 of 6 on file for this type
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
11/25/2019123823336Open ↗
11/25/2019123823336Open ↗
Showing 2 of 9 on file for this type