← Back
BuildNYC
Office with commercial, 7-19 stories
608 5TH AVENUE
MANHATTAN · BIN 1034508
💬 Discuss this project
1932Year Built
11Stories
O6Building Class
C5-3Zoning
127,558 sfGross Floor Area
55Units
LL97 Covered0 Active Violations 2 old, status unconfirmed ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: 608 Company · 13,150 sf lot · 9.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof608 Company, LLC / CBRE9p · 3 filings · 20 docs
BulkheadOutrigger beam applicationUnder Construction1p · 1 filing · 13 docs
Floor 13Supported scaffold installation1p · 1 filing · 2 docs
Floor 12Supported scaffold installation1p · 1 filing · 2 docs
Floor 11Cosmea, Nanka30p · 9 filings · 20 docs
Floor 10
Floor 9B+H Timepiece, Forever Diamonds45p · 8 filings · 20 docs
Floor 8Avroc International, Reginald Miller +150p · 15 filings · 20 docs
Floor 7Gubelin Gemological Lab37p · 9 filings · 20 docs
Floor 6American GemUnder Construction23p · 4 filings · 20 docs
Floor 5Madison Square GardenUnder Construction36p · 8 filings · 20 docs
Floor 4
Floor 3Lauren B, Omnispective Management97p · 14 filings · 20 docs
Floor 2Aritzia, Omnispective Management157p · 12 filings · 20 docs
Floor 1Aritzia, Omnispective Management150p · 15 filings · 20 docs
MezzanineAritzia63p · 5 filings · 20 docs
CellarAritzia94p · 6 filings · 20 docs
Site & exteriorAritzia34p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Vornado Realty Trust13403/21/2026
608 Company13107/08/2026
Omnispective12810/15/2026
Swiss Center Inc 608 Fifth Ave4203/21/2026
757 Third Avenue Partners2903/21/2026
Tmo 11403/21/2026
RFR Realty1303/21/2026
RFR Realty LLC, As Agent1203/21/2026
345 Park A603/21/2026
The Galbreath Co603/21/2026
Bit Holdings Thirty-Eight403/21/2026
1025 5th Avenue403/21/2026
521 5th Ave Part303/21/2026
518 Fifth Ave C/O RFR Realty203/21/2026
608 Co LL203/21/2026
RFR Holding103/21/2026
608 5th Ave103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Archetype Consultants13003/21/2026
Spring Scaffolding2003/21/2026
KD Designs103/21/2026
Gillman Consulting1803/21/2026
VSA303/21/2026
Municipal Building Consultants103/21/2026
EA Design Group803/21/2026
Conapac Services Dba303/21/2026
Patuxent Engineering203/21/2026
United Safety Consultants103/21/2026
Eurocelt Expediting203/21/2026
Conapac Services303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spring ScaffoldingScaffold2107/08/2026
Clune Construction CoGeneral Contractor2007/08/2026
Ambassador ConstructionGeneral Contractor1907/08/2026
LhotseGeneral Contractor1007/08/2026
Green Earth Buildings ConGeneral Contractor707/08/2026
James E FitzgeraldGeneral Contractor707/08/2026
Aggressive Fire ProtectionFire Protection607/08/2026
JRM Construction ManagementGeneral Contractor607/08/2026
LhotseScaffold507/08/2026
Geoffrey A. Lagas & AssociatesPlumbing507/08/2026
Wharton Smith Constructi*General Contractor404/09/2026
Mega PlumbingFire Protection407/08/2026
Tri-Star ConstructionGeneral Contractor408/27/2026
Manhattan D EnterprisesScaffold303/21/2026
Sirina Fire ProtectionFire Protection307/08/2026
Par Plumbing CoPlumbing307/08/2026
Legacy Construction NYScaffold303/21/2026
Platform SolutionsScaffold303/21/2026
Tristate Plumbing ServicesFire Protection207/08/2026
Arena Event ServicesGeneral Contractor207/08/2026
Tristate Plumbing ServicesPlumbing207/08/2026
Wharton Smith Construction NY *General Contractor107/29/2026
Bedrock Plumbing & HeatingPlumbing108/27/2026
Full Capacity FireFire Protection108/26/2026
SPK/Lewis ConstructionGeneral Contractor107/08/2026
Grushinsky Pipng & HeatingFire Protection108/26/2026
Panko MCGeneral Contractor107/08/2026
Mega PlumbingPlumbing107/08/2026
Orbit Plumbing & HeatingPlumbing107/08/2026
Orbit SprinklerFire Protection107/03/2026
Mohammed HossainGeneral Contractor103/21/2026
PFL MechanicalPlumbing108/26/2026
PSI PartnersFire Protection107/08/2026
JDP Mechanicalspecialty_contractor104/09/2026
Premier ElectricElectrical103/22/2026
Addison Plumbing and HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Hansen Engineering81744910/14/2026
Asda Architecture + Desig2015605/28/2026
Alan D Marcus, PE1761903/07/2025
PCS Engineering3745310/29/2024
AK Engineering678604/22/2024
The Vsa Group1767202/14/2023
Becker Engineering633609/14/2022
Stratford Engineering997111/08/2021
Twig Special Inspections885209/20/2021
Building Lifecycle
All (300)Filed (75)Permit Issued (78)Signed Off (44)Facade (FISP) (15)Violation (5)Inspection (53)Special Inspection (30)
10/14/2026
Filed — Alteration
American Gem (Suite 601) - Plumbing work on the 6th floor as indicated on drawings.
M01435677-P1
10/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
10/09/2026
Special inspection requirement — Post-installed Anchors
Ryan Hansen
09/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
Ryan Hansen
09/02/2026
Special inspection requirement — Final
Ryan Hansen
09/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
09/01/2026
Filed — Alteration
American Gem (Suite 601) - Construction work on the 6th floor as indicated on drawings.
M01435663-P1
08/31/2026
Signed off — Alteration
Plumbing changes on the 9th floor as indicated on drawings.
M01260259-I1
08/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
08/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
Ryan Hansen
08/27/2026
Special inspection requirement — Final
Ryan Hansen
08/26/2026
Permit issued — Mechanical Systems
M01435668-I1-MS
08/26/2026
Permit issued — General Construction
M01435663-I1-GC
08/26/2026
Permit issued — Plumbing
M01435677-I1-PL
08/25/2026
Permit issued — Sprinklers
M01435689-I1-EW-SP
08/24/2026
Filed — Alteration
American Gem (Suite 601) - Plumbing work on the 6th floor as indicated on drawings.
M01435677-I1
08/24/2026
Filed — Alteration
American Gem (Suite 601) - Mechanical work on the 6th floor as indicated on drawings.
M01435668-I1
08/24/2026
Signed off — Alteration
HVAC Replacement - Mechanical work on the 5th & 8th floors as indicated on drawings.
M00864966-I1
08/24/2026
Filed — Alteration
American Gem (Suite 601) - Sprinkler work on the 6th floor as indicated on drawings.
M01435689-I1
08/21/2026
Filed — Alteration
American Gem (Suite 601) - Construction work on the 6th floor as indicated on drawings.
M01435663-I1
08/19/2026
Filed — Alteration
Plumbing changes on the 9th floor as indicated on drawings.
M01260259-P1
08/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Ryan Hansen
08/11/2026
Special inspection requirement — Lighting controls
Ryan Hansen
08/11/2026
Special inspection requirement — Interior lighting power
Ryan Hansen
08/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
08/06/2026
Special inspection requirement — Post-installed Anchors
Ryan Hansen
08/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
08/06/2026
Special inspection requirement — Post-installed Anchors
Ryan Hansen
08/03/2026
Permit issued — Sprinklers
M01408595-I1-EW-SP
08/03/2026
Permit issued — Plumbing
M01408579-I1-PL
07/28/2026
Permit issued — General Construction
M01408559-I1-GC
07/27/2026
Filed — Alteration
Plumbing changes on the 5th floor as indicated on drawings.
M01408579-I1
07/27/2026
Filed — Alteration
Mechanical changes on the 5th floor as indicated on drawings.
M01408566-I1
07/27/2026
Filed — Alteration
Sprinkler changes on the 5th floor as indicated on drawings.
M01408595-I1
07/24/2026
Filed — Alteration
Architectural changes on the 5th floor as indicated on drawings.
M01408559-I1
07/23/2026
Special inspection requirement — Mechanical Systems
Ryan Hansen
07/23/2026
Special inspection requirement — Final
Ryan Hansen
07/23/2026
Special inspection requirement — Sprinkler Systems
Ryan Hansen
07/20/2026
Signed off — Alteration
Minor construction work in regards of AC unit replacement on the 5th floor (Suite 503) as indicated on drawings.
M01262626-I1
07/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
07/08/2026
Special inspection requirement — Duct leakage testing, insulation and design
Ryan Hansen
07/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Ryan Hansen
07/08/2026
Special inspection requirement — Interior lighting power
Ryan Hansen
07/08/2026
Special inspection requirement — Lighting controls
Ryan Hansen
07/08/2026
Special inspection requirement — Post-installed Anchors
Ryan Hansen
07/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
Ryan Hansen
07/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
07/08/2026
Special inspection requirement — Maintenance information
Ryan Hansen
07/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
Ryan Hansen
07/08/2026
Special inspection requirement — Shutoff dampers
Ryan Hansen
07/01/2026
Special inspection requirement — Post-installed Anchors
Ryan Hansen
06/30/2026
Filed — Alteration
Sprinkler changes on the 9th floor as indicated on drawings.
M01260262-P1
06/18/2026
Signed off — Alteration
Construction work on the 3rd floor (Core & Shell) as indicated on drawings
M00751879-I1
06/11/2026
Permit issued — Mechanical Systems
M01262630-I1-MS
06/10/2026
Signed off — Alteration
MODIFICATION TO EXISTING SPRINKLER & STANDPIPE SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ARITZIA PHASE 2
M01033010-I1
05/29/2026
Permit issued — General Construction
M01262626-I1-GC
05/28/2026
Filed — Alteration
Mechanical work to replace AC unit on the 5th floor (Suite 503) as indicated on drawings.
M01262630-I1
05/15/2026
Signed off — Alteration
REMOVAL OF INTERIOR NON LOAD BEARING WALLS FOR EXISTING RETAIL SPACE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00977328-I1
05/13/2026
Filed — Alteration
Minor construction work in regards of AC unit replacement on the 5th floor (Suite 503) as indicated on drawings.
M01262626-I1
03/23/2026
Filed — Alteration
HVAC Replacement - Mechanical work on the 5th & 8th floors as indicated on drawings.
M00864966-P1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedTri-Star Construction08/26/2026
DOB NOWPlumbingPermit IssuedBedrock Plumbing & Heating08/26/2026
DOB NOWGeneral ConstructionPermit IssuedTri-Star Construction08/26/2026
DOB NOWSprinklersPermit IssuedFull Capacity Fire08/25/2026
DOB NOWSprinklersPermit IssuedGrushinsky Pipng & Heating08/03/2026
DOB NOWPlumbingPermit IssuedPFL Mechanical08/03/2026
DOB NOWGeneral ConstructionPermit IssuedWharton Smith Construction NY *07/28/2026
DOB NOWMechanical SystemsPermit IssuedPanko MC06/11/2026
DOB NOWGeneral ConstructionSigned-offSPK/Lewis Construction05/29/2026
DOB NOWConstruction FencePermit IssuedLegacy Construction NY10/23/2025
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating10/03/2025
DOB NOWSprinklersPermit IssuedOrbit Sprinkler10/03/2025
DOB NOWMechanical SystemsPermit IssuedWharton Smith Constructi*08/08/2025
DOB NOWGeneral ConstructionPermit IssuedWharton Smith Constructi*08/05/2025
DOB NOWSidewalk ShedSigned-offSpring Scaffolding06/06/2025
DOB NOWSprinklersSigned-offReal Plumbing05/27/2025
DOB NOWStandpipeSigned-offReal Plumbing05/01/2025
DOB NOWSuspended ScaffoldPermit IssuedLhotse11/08/2024
DOB NOWSuspended ScaffoldPermit IssuedLhotse10/24/2024
DOB NOWGeneral ConstructionSigned-offLhotse09/23/2024
DOB NOWSidewalk ShedSigned-offSpring Scaffolding07/01/2024
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding06/18/2024
DOB NOWConstruction FenceSigned-offSpring Scaffolding06/18/2024
DOB NOWGeneral ConstructionSigned-offLhotse06/06/2024
DOB NOWGeneral ConstructionSigned-offTri-Star Construction06/06/2024
DOB NOWSupported ScaffoldSigned-offLhotse05/28/2024
DOB NOWSprinklersSigned-offReal Plumbing04/25/2024
DOB NOWStandpipeSigned-offReal Plumbing04/25/2024
DOB NOWGeneral ConstructionSigned-offJRM Construction Management04/24/2024
DOB NOWPlumbingSigned-offMega Plumbing04/24/2024
DOB NOWStructuralSigned-offJRM Construction Management04/23/2024
DOB NOWMechanical SystemsSigned-offJRM Construction Management04/23/2024
DOB NOWSuspended ScaffoldSigned-offLhotse04/10/2024
DOB NOWStructuralSigned-offJRM Construction Management02/28/2024
DOB NOWGeneral ConstructionSigned-offJRM Construction Management01/04/2024
DOB NOWSprinklersSigned-offSirina Fire Protection10/13/2023
DOB NOWGeneral ConstructionSigned-offJames E Fitzgerald09/22/2023
DOB NOWMechanical SystemsSigned-offJames E Fitzgerald09/22/2023
DOB NOWSprinklersSigned-offAggressive Fire Protection09/18/2023
DOB NOWMechanical SystemsSigned-offJDP Mechanical09/15/2023
+ 60 more permits on file
3 projects · most recent 05/28/2026
Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/28/2026Permit IssuedPanko MCAir Conditioning Systems
Cooling
Lg ZRUM060GSS0 4,238 CFM · Vrf Outdoor ×1
03/23/2026Signed-offJDP MechanicalAir Conditioning Systems
Cooling
Lg ARUM192BTE5 15 tons · Vrf Outdoor ×2
04/19/2024Signed-offJRM Construction ManagementHeating and Air Conditioning Systems
Heat / Cool
Trane GEHG060 58,690 BTU · Wshp ×6
GEHE090 92,000 BTU · Wshp ×3
GEHE120 123,000 BTU · Wshp ×3
GEHG036 37,910 BTU · Wshp ×3
GEHG048 52,420 BTU · Wshp ×3
GEHG072 76,900 BTU · Wshp ×3
TRANE 123,000 BTU · Wshp ×1
3 projects · most recent 08/24/2026
FiledStatusContractorScope
08/24/2026Permit IssuedFull Capacity Fire14 heads
07/27/2026Permit IssuedGrushinsky Pipng & Heating—
06/30/2026Permit IssuedOrbit Sprinkler33 heads
6 projects · most recent 10/14/2026
Water/Sanitary
FiledStatusContractorScope
10/14/2026Permit IssuedBedrock Plumbing & HeatingWater/Sanitary
08/24/2026———
08/19/2026Signed-offOrbit Plumbing & HeatingWater/Sanitary
07/27/2026Permit IssuedPFL MechanicalWater/Sanitary
06/30/2026———
09/22/2021Signed-offProdigy Plumbing & HeatingWater/Sanitary
23 projects · most recent 08/21/2026
General Wiring
FiledStatusContractorScope
08/21/2026Permit IssuedRX ElectricGeneral Wiring
08/21/2026Permit IssuedRX Electric—
08/14/2026Permit IssuedUltra ElectricGeneral Wiring
03/26/2026CompleteMetropolis ElectricGeneral Wiring
01/27/2026CompleteTop Notch ElectricGeneral Wiring
06/13/2025CompleteTop Shelf Electric—
05/23/2024CompletePremier ElectricGeneral Wiring
07/31/2023CompleteAllstate Electrical ContGeneral Wiring
03/27/2023CompleteAllstate Electrical ContGeneral Wiring
12/29/2022Permit IssuedRobert Chimenti3 meters, 1 new_meters
12/15/2022Permit IssuedCommercial Electric ContGeneral Wiring
11/18/2022CompleteNead ElectricGeneral Wiring
08/26/2022CompleteNead Electric—
05/20/2022Permit IssuedStanco System Electrical ContGeneral Wiring
01/25/2022Complete5 J'S Electl Conts—
4 projects · most recent 07/27/2026
Steel Concrete
FiledStatusContractorScope
07/27/2026——1 scope_items
06/30/2026Permit IssuedOrbit Sprinkler1 scope_items
12/13/2021Permit IssuedAmbassador ConstructionSteel, Concrete
11/08/2021Permit IssuedGreen Earth Buildings ConSteel
2 projects · most recent 01/11/2023
Scaffold Sidewalk Shed Fence
FiledStatusContractorScope
01/11/2023Permit IssuedSpring ScaffoldingScaffold, Sidewalk Shed
11/16/2022Permit IssuedLhotseFence
▾Field Inspections (DOB CAP) — 58
DateTypeResultReport
11/18/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/22/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/03/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/03/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
05/01/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/01/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/01/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/18/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/13/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/13/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/09/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/04/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/02/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/11/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/02/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/02/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/11/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/27/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/12/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/07/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/18/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/20/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/25/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/25/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
Latest 25 of 58.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
10/09/2026Fire-Resistant Penetrations and JointsRyan Hansenspecial
10/09/2026Post-installed AnchorsRyan Hansenspecial
09/02/2026Fire-Resistance Rated ConstructionRyan Hansenprogress
09/02/2026FinalRyan Hansenprogress
09/02/2026Fire-Resistant Penetrations and JointsRyan Hansenspecial
08/27/2026FinalRyan Hansenprogress
08/27/2026Fire-Resistant Penetrations and JointsRyan Hansenspecial
08/27/2026Fire-Resistance Rated ConstructionRyan Hansenprogress
08/11/2026Lighting controlsRyan Hansenenergy_progress
08/11/2026Interior lighting powerRyan Hansenenergy_progress
08/11/2026HVAC-R and service water piping design and insulationRyan Hansenenergy_progress
08/06/2026Post-installed AnchorsRyan Hansenspecial
08/06/2026Fire-Resistant Penetrations and JointsRyan Hansenspecial
08/06/2026Post-installed AnchorsRyan Hansenspecial
08/06/2026Fire-Resistant Penetrations and JointsRyan Hansenspecial
07/23/2026Mechanical SystemsRyan Hansenspecial
07/23/2026Sprinkler SystemsRyan Hansenspecial
07/23/2026FinalRyan Hansenprogress
07/15/2026Fire-Resistant Penetrations and JointsRyan Hansenspecial
07/08/2026Shutoff dampersRyan Hansenenergy_progress
07/08/2026Interior lighting powerRyan Hansenenergy_progress
07/08/2026HVAC-R and service water piping design and insulationRyan Hansenenergy_progress
07/08/2026Fire-Resistant Penetrations and JointsRyan Hansenspecial
07/08/2026Post-installed AnchorsRyan Hansenspecial
07/08/2026Maintenance informationRyan Hansenenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
American GemOfficeFloor 6
Project M01435668 Alteration · Permit Entire · 08/24/2026
Project M01435677 Alteration · Permit Entire · 08/24/2026
Project M01435689 Alteration · Permit Entire · 08/24/2026
Project M01435663 Alteration · Permit Entire · 08/21/2026
Madison Square GardenOfficeFloor 5
Project M01408566 Alteration · Approved · 07/27/2026
Project M01408579 Alteration · Permit Entire · 07/27/2026
Project M01408595 Alteration · Permit Entire · 07/27/2026
Project M01408559 Alteration · Permit Entire · 07/24/2026
B+H TimepieceOfficeFloor 9
Project M01260216 Alteration · Permit Entire · 07/31/2025
Project M01260223 Alteration · Permit Entire · 07/30/2025
Project M01260259 Alteration · LOC Issued · 07/30/2025
Project M01260262 Alteration · Permit Entire · 07/30/2025
AritziaRetailCellar, Floors 1, 2, Mezzanine
Project M01232204 Alteration · LOC Issued · 06/06/2025
Project M01033010 Alteration · LOC Issued · 04/22/2024
Project M00979669 Alteration · Permit Entire · 04/19/2024
Project M00979789 Alteration · LOC Issued · 04/19/2024
Project M00977328 Alteration · LOC Issued · 04/18/2024
Project M00972436 Alteration · LOC Issued · 04/17/2024
Project M00914623 Alteration · LOC Issued · 12/19/2023
NankaOfficeFloor 11
Project M01159292 Alteration · Approved · 01/27/2025
Lauren BRetailFloor 3
Project M00752044 Alteration · LOC Issued · 03/15/2023
Project M00752178 Alteration · LOC Issued · 03/15/2023
Project M00752726 Alteration · LOC Issued · 03/10/2023
Project M00751984 Alteration · LOC Issued · 03/07/2023
Omnispective ManagementOfficeFloors 1–3
Project M00752076 Alteration · LOC Issued · 08/18/2022
Project M00752113 Alteration · LOC Issued · 08/16/2022
Project M00762556 Alteration · LOC Issued · 08/16/2022
Project M00751854 Alteration · LOC Issued · 08/15/2022
Project M00657413 Alteration · LOC Issued · 05/18/2022
Project M00657422 Alteration · LOC Issued · 05/17/2022
Project M00657427 Alteration · LOC Issued · 05/17/2022
Project M00657409 Alteration · LOC Issued · 05/16/2022
Avroc InternationalOfficeFloor 8
Project M00732528 Alteration · LOC Issued · 06/03/2022
Project M00732537 Alteration · LOC Issued · 06/03/2022
Project M00732547 Alteration · LOC Issued · 06/03/2022
Gubelin Gemological LabLaboratoryFloor 7
Project M00579837 Alteration · LOC Issued · 12/02/2021
Project M00588426 Alteration · LOC Issued · 12/02/2021
Project M00588437 Alteration · LOC Issued · 12/02/2021
Project M00588442 Alteration · LOC Issued · 12/02/2021
Reginald MillerOfficeFloor 8
Project M00543404 Alteration · LOC Issued · 11/11/2021
Project M00543416 Alteration · LOC Issued · 11/11/2021
Project M00543419 Alteration · LOC Issued · 11/11/2021
Project M00543390 Alteration · LOC Issued · 11/10/2021
CosmeaOfficeFloor 11
Project M00588934 Alteration · Permit Entire · 09/22/2021
Project M00583301 Alteration · Permit Entire · 09/20/2021
Project M00583443 Alteration · Permit Entire · 09/20/2021
Evolution DiamondOfficeFloor 8
Project M00530907 Alteration · LOC Issued · 06/21/2021
Project M00530919 Alteration · LOC Issued · 06/21/2021
Project M00530944 Alteration · LOC Issued · 06/21/2021
Project M00530862 Alteration · LOC Issued · 06/17/2021
Forever DiamondsRetailFloor 9
Project M00504088 Alteration · LOC Issued · 06/16/2021
Project M00504115 Alteration · LOC Issued · 06/16/2021
Project M00504141 Alteration · LOC Issued · 06/16/2021
Project M00504363 Alteration · LOC Issued · 06/16/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 2,568 on file (BIS + DOB NOW)
▸Plans & Drawings120
▸DOB NOWPlans/Sketch115
09/03/2026M00497880-P1Request digital key ↗
09/03/2026M00497880-P2Request digital key ↗
09/03/2026M00497880-I1Request digital key ↗
Showing 3 of 115 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00318453-I1Request digital key ↗
09/04/2026M00365602-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly2
09/01/2026M07993325-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00453517-I1Request digital key ↗
▸Applications & Permits430
▸BISPLAN / WORK APPROVAL APPLICATION211
05/07/2025121776970Open ↗
11/08/2023121776970Open ↗
11/15/2022121776970Open ↗
Showing 3 of 211 on file for this type
▸BISWORK PERMIT APPLICATION138
09/15/2023122609276Open ↗
12/21/2020140985110Open ↗
11/13/2018123414563Open ↗
Showing 3 of 138 on file for this type
▸DOB NOWLPC Approval/Permit79
10/16/2026M01435677-P1Open ↗
09/10/2026M01435663-P1Open ↗
09/03/2026M00530907-I1Open ↗
Showing 3 of 79 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
01/26/2023121776970Open ↗
06/01/2021121776970Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISZRD1-Zoning Resolution Determination3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Seals & Professional Certifications734
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION309
06/12/2019122576845Open ↗
06/12/2019122576845Open ↗
05/03/2019123414563Open ↗
Showing 3 of 309 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature119
10/16/2026M01435677-P1Open ↗
09/10/2026M01435663-P1Open ↗
09/04/2026M00453517-I1Open ↗
Showing 3 of 119 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT77
12/09/2020140985110Open ↗
11/09/2018123414563Open ↗
Showing 2 of 77 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST69
11/09/2018123414563Open ↗
05/10/2018123102524Open ↗
05/01/2018123102524Open ↗
Showing 3 of 69 on file for this type
▸DOB NOWProgress Inspector Seal & Signature63
09/23/2026M01435663-I1Open ↗
09/23/2026M01435663-P1Open ↗
09/23/2026M01435668-I1Open ↗
Showing 3 of 63 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature59
10/16/2026M01435677-P1Open ↗
09/23/2026M01435663-P1Open ↗
09/23/2026M01435663-I1Open ↗
Showing 3 of 59 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION8
12/09/2020140985110Open ↗
Showing 1 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY8
12/09/2020140985110Open ↗
Showing 1 of 8 on file for this type
▸BISProfessional and Owner Certification (POC3)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment194
▸BISEQUIPMENT USE PERMITS37
06/03/2019123414563Open ↗
06/03/2019123414563Open ↗
05/30/2018122334410Open ↗
Showing 3 of 37 on file for this type
▸BISSELF-CERT PLUMBING NOTICE37
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 37 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT35
05/30/2018122334410Open ↗
05/22/2018123102524Open ↗
Showing 2 of 35 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE33
03/26/2019123414563Open ↗
03/25/2019123414563Open ↗
11/09/2018123414563Open ↗
Showing 3 of 33 on file for this type
▸BISSCHEDULE B - PLUMBING25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA23
01/29/2020123007227Open ↗
07/29/2019123542853Open ↗
05/17/2019123434426Open ↗
Showing 3 of 23 on file for this type
▸BISSPRINKLER INSP REPORT : FP-854
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos189
▸DOB NOWDEP ACP-5: Asbestos Assessment Report71
10/16/2026M01435677-P1Open ↗
09/10/2026M01435663-P1Open ↗
09/04/2026M00453517-I1Open ↗
Showing 3 of 71 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)53
12/09/2020140985110Open ↗
03/15/2019123542853Open ↗
11/14/2018123373429Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form19
09/03/2026M00504141-I1Open ↗
09/03/2026M00543404-I1Open ↗
09/01/2026M00668401-I1Open ↗
Showing 3 of 19 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS INSPECTION REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance174
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS119
11/09/2018123167296Open ↗
07/02/2018123051053Open ↗
05/30/2018122334410Open ↗
Showing 3 of 119 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS29
10/02/2020122130942Open ↗
12/20/2018140669532Open ↗
11/09/2018123167296Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.10
09/03/2026M00530907-I1Open ↗
09/03/2026M00543404-I1Open ↗
Showing 2 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
10/02/2020122130942Open ↗
10/02/2020122130942Open ↗
10/02/2020122130942Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification2
08/29/2026M00864966-I1Open ↗
Showing 1 of 2 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports29
▸BISTECHNICAL REPORT: RESPONSIBILITY23
05/04/2021140985110Open ↗
12/21/2020140985110Open ↗
12/09/2020140985110Open ↗
Showing 3 of 23 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs230
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST113
05/13/2021140985110Open ↗
11/20/2020123328416Open ↗
11/20/2020122576845Open ↗
Showing 3 of 113 on file for this type
▸BISLANDMARKS APPROVAL62
12/09/2020140985110Open ↗
11/09/2018123167296Open ↗
05/22/2018123102524Open ↗
Showing 3 of 62 on file for this type
▸BISADMINISTRATIVE OBJECTIONS14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
04/01/2021122609276Open ↗
Showing 1 of 11 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISLANDMARKS SIGNOFF7
11/20/2020123328416Open ↗
11/20/2020122576845Open ↗
10/02/2020104158082Open ↗
Showing 3 of 7 on file for this type
▸BISSUPERSEDING LETTER7
10/02/2020104158082Open ↗
10/02/2020122130942Open ↗
10/02/2020121581225Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
01/25/2023121776970Open ↗
11/19/2022121776970Open ↗
11/15/2022121776970Open ↗
Showing 3 of 6 on file for this type
▸Cost, Insurance & Ownership213
▸BISCOST AFFIDAVIT213
05/13/2021140985110Open ↗
12/09/2020140985110Open ↗
11/20/2020123328416Open ↗
Showing 3 of 213 on file for this type
▸Filing & Intake Forms229
▸BISEFILING COVER SHEET114
03/15/2019123542853Open ↗
11/14/2018123373429Open ↗
11/09/2018123414563Open ↗
Showing 3 of 114 on file for this type
▸BISBOROUGH INTAKE FORM73
09/15/2023122609276Open ↗
04/01/2021122609276Open ↗
03/12/2020121776970Open ↗
Showing 3 of 73 on file for this type
▸BISADDITIONAL INFORMATION32
01/25/2023121776970Open ↗
06/01/2021121776970Open ↗
05/16/2019121776970Open ↗
Showing 3 of 32 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET10
12/09/2020140985110Open ↗
Showing 1 of 10 on file for this type
▸Other Documents11
▸DOB NOWManufacturer's Specifications3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWCalculations3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWProof of Historic Building2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWWaiver Document1
09/03/2026M00638678-I1Open ↗