Fresh Meadows Place Campus Parent
61-18 190TH STREET · BIN 4446209
💬 Discuss this project
1950Year Built
2Stories
K6Building Class
C4-2Zoning
136,500 sfGross Floor Area
26Units
LL97 Covered0 Active ViolationsFDNY Report ↗
Shopping center, with or without parking · Owner of record: Street Retail · 364,775 sf lot · 0.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHappy Days Restaurant Group, Umar Alizai Ventures63p · 4 filings · 20 docs
PenthouseFederal Realty1p · 1 filing · 20 docs
Floor 5GNC illuminated wall sign1p · 1 filing · 4 docs
Floor 4GNC illuminated wall sign1p · 1 filing · 4 docs
Floor 3GNC illuminated wall sign1p · 1 filing · 4 docs
Floor 2Dr. David Beyda87p · 5 filings · 20 docs
Floor 1Happy Days Restaurant Group, General Nutrition Center +4173p · 19 filings · 20 docs
CellarFederal Realty Investment Trust34p · 1 filing · 14 docs
BasementVgr LLC1p · 1 filing · 4 docs
Sub-BasementVgr LLC9p · 3 filings · 9 docs
Site & exteriorYou Rock Gao, Starbucks +115p · 13 filings · 20 docs
Filed — no permit issuedDuck Donuts2p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Federeal Realty Investment Trust13007/08/2026
Street Retail4603/21/2026
VGR407/08/2026
Pokeworks103/22/2026
Dress Barn103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Piro Studio104/09/2026
Mihai Radu Architects202/11/2026
You Gao601/12/2026
Doshi Consultant412/05/2023
Gregory Ralph, Architect510/12/2023
Shaaban Engineering409/11/2023
Combined Resources Consulting & de108/09/2023
Richard Wainer Architect108/04/2023
Lga Partners105/07/2023
Mohammad Ahead, PE104/28/2023
Catapano Engineering904/21/2023
TSS Engineers112/27/2022
Associates412/09/2022
PR211/04/2022
Allen Shinfeld, P.E208/12/2022
HNY Consulting Engineers303/11/2022
HC Engineering311/09/2021
Ware Malcomb109/28/2021
Gerald Rumplick207/09/2021
Fellenzer Engineering107/09/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Indesign Studio1203/21/2026
Jenny Flores Expediting303/21/2026
Catapano Engineering1803/21/2026
Mbe Code Zoning1003/21/2026
Gregory Ralph Architect803/21/2026
Kazam Consultants803/21/2026
Youn Design403/21/2026
D R Brown203/21/2026
Outsource Consultants803/21/2026
Municipal Building Consultants203/21/2026
George E Berger Ass203/21/2026
JP Expedite603/21/2026
Louis Striar203/21/2026
2260 MAG203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Fabrizzio ConstructionGeneral Contractor904/09/2026
N.Y. Sign ArtSign hanger407/08/2026
Michelle KuoGeneral Contractor403/21/2026
N-Store ServicesGeneral Contractor407/08/2026
Fabrizzio ConstructionScaffold403/21/2026
Neptune Signs & AwningsSign hanger407/08/2026
TumenGeneral Contractor303/21/2026
Fortini JohnElectrical203/21/2026
P.D. Carpentry & Masonryspecialty_contractor203/21/2026
L.E.B. ElectricElectrical203/22/2026
Cook & KrupaGeneral Contractor207/08/2026
Brennan OperatingGeneral Contractor204/09/2026
Signs CadSign hanger207/08/2026
Signstar NYCSign hanger107/08/2026
A&A PlumbingPlumbing107/08/2026
Authentic PlumbingPlumbing107/08/2026
Bedrock Plumbing & HeatingPlumbing107/08/2026
Catman PlumbingPlumbing107/08/2026
Drilon Plumbing & HeatingPlumbing107/08/2026
L & N PlumbingPlumbing107/08/2026
Marathon MechanicalPlumbing107/08/2026
Tri State Plumbing & HeatingPlumbing107/08/2026
Ultimate Plumbing and HeatingPlumbing107/08/2026
Bestco General Electric MaintenanceElectrical103/21/2026
XH&RC Plumbing and HeatingPlumbing107/08/2026
Ampere Electrical ServicesElectrical103/22/2026
Berger CarlosElectrical103/21/2026
R. Castaldo Electrical Cont IElectrical103/21/2026
Glendale Electl ContngElectrical103/22/2026
Absolute Electrical SvceElectrical103/21/2026
Frank Torrone & SonsElectrical103/21/2026
AinsworthGeneral Contractor107/08/2026
Great One ConstructionGeneral Contractor104/09/2026
Victory Building & ConsGeneral Contractor107/08/2026
Cad Signs NYCSign hanger107/08/2026
L.S. Sign CoSign hanger107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Piro Studio7503104/09/2026
Alan Margolin & Associates423102/11/2026
You Gao9407601/12/2026
Trolydia Testing & Inspec4422312/05/2023
MJ Engineering & Design5546210/12/2023
Catalpa Special Inspectio2004105/07/2023
Catapano Engineering & AR3235604/21/2023
Soil Mechanics Drilling2325304/18/2023
TSS Engineers4492312/27/2022
Outsource Special Inspection2827203/11/2022
Building Lifecycle
All (229)Filed (54)Permit Issued (43)Signed Off (33)Violation (29)Inspection (26)Objection (14)Special Inspection (30)
07/23/2026
Signed off — Alteration
WORK TO INCLUDE NEW PLUMBING FIXTURES FOR EXAMROOMS, PANTRY & TOILETS. WORK ON SUITE 215INTERIORS ONLY.
Q01352748-S1
07/23/2026
Signed off — Alteration
WORK TO INCLUDE NEW PLUMBING FIXTURES FOR EXAMROOMS, PANTRY & TOILETS. WORK ON SUITE 215INTERIORS ONLY.
Q01352748-I1
05/13/2026
Signed off — Alteration
Q01374838-I1
04/14/2026
Permit issued — Mechanical Systems
Q01374838-I1-MS
04/09/2026
Filed — Alteration
Q01374838-I1
03/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
PIETRO ROSATO
03/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
PIETRO ROSATO
03/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
PIETRO ROSATO
03/26/2026
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
03/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
03/19/2026
Special inspection requirement — Final
PIETRO ROSATO
03/19/2026
Special inspection requirement — Mechanical Systems
PIETRO ROSATO
03/17/2026
Signed off — Alteration
FILE PLUMBING WORK FOR COMMERCIAL SPACE AT 001 AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01255550-S1
03/09/2026
Signed off — Alteration
FILE PLUMBING WORK FOR COMMERCIAL SPACE AT 001 AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01255550-I1
03/09/2026
Permit issued — Plumbing
Q01352748-S1-PL
03/06/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/27/2026
Permit issued — Mechanical Systems
Q01352748-I1-MS
02/27/2026
Permit issued — General Construction
Q01352748-I1-GC
02/25/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/25/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/11/2026
Filed — Alteration
WORK TO INCLUDE NEW PLUMBING FIXTURES FOR EXAMROOMS, PANTRY & TOILETS. WORK ON SUITE 215INTERIORS ONLY.
Q01352748-S1
02/11/2026
Filed — Alteration
WORK TO INCLUDE NEW PLUMBING FIXTURES FOR EXAMROOMS, PANTRY & TOILETS. WORK ON SUITE 215INTERIORS ONLY.
Q01352748-I1
02/11/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/28/2026
Special inspection requirement — Mechanical Systems
Young Suh
01/28/2026
Special inspection requirement — Final
Young Suh
01/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
You Gao
01/23/2026
Special inspection requirement — Energy Code Compliance Inspections
You Gao
01/23/2026
Special inspection requirement — Interior lighting power
You Gao
01/12/2026
Filed — Alteration
FILE PLUMBING WORK FOR COMMERCIAL SPACE AT 001 AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01255550-P2
01/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
You Gao
01/09/2026
Special inspection requirement — Energy Code Compliance Inspections
You Gao
01/09/2026
Special inspection requirement — Interior lighting power
You Gao
12/03/2025
Signed off — Alteration
ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01281871-I1
12/03/2025
Signed off — Alteration
Q01281869-I1
11/14/2025
Signed off — Alteration
Proposing to renovate the storefront for tenant space #36. Install new Storefront System with new entry door. Alterations to Existing Bulkhead wall. All work as per plans.
Q00757109-I1
11/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/05/2025
Permit issued — Sign
Q01281869-I1-SG
11/05/2025
Permit issued — Sign
Q01281871-I1-SG
10/30/2025
Special inspection requirement — Energy Code Compliance Inspections
You Gao
10/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
You Gao
10/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
You Gao
10/29/2025
Filed — Alteration
FILE PLUMBING WORK FOR COMMERCIAL SPACE AT 001 AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01255550-P1
10/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
You Gao
10/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
You Gao
10/29/2025
Special inspection requirement — Energy Code Compliance Inspections
You Gao
10/02/2025
Filed — Alteration
ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01281871-I1
10/02/2025
Filed — Alteration
Q01281869-I1
09/04/2025
Special inspection requirement — Final
You Gao
09/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
You Gao
08/08/2025
Permit issued — Plumbing
Q01255550-S1-PL
07/21/2025
Permit issued — General Construction
Q01255550-I1-GC
07/15/2025
Filed — Alteration
FILE PLUMBING WORK FOR COMMERCIAL SPACE AT 001 AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01255550-S1
07/15/2025
Filed — Alteration
FILE PLUMBING WORK FOR COMMERCIAL SPACE AT 001 AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01255550-I1
02/02/2024
Signed off — Alteration
Modify mechanical ductwork, fire dampers, ventilation and piping along with replacement of slit unit.
Q00912906-I1
12/12/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/07/2023
Signed off — Alteration
Plumbing work for Interior Tenant Fit Out for Jersey Mike's Subs - Restaurant
Q00898152-I1
12/06/2023
Signed off — Alteration
Modification of plumbing fixtures and related piping on 2nd floor
Q00912923-I1
12/06/2023
Signed off — Alteration
Renovate interior partitions, ceilings and doors on 2nd floor as shown on plans.
Q00912877-I1
12/05/2023
Filed — Alteration
Modify mechanical ductwork, fire dampers, ventilation and piping along with replacement of slit unit.
Q00912906-P2
12/04/2023
Special inspection requirement — Final
JAIME MOYA
Latest 60 of 229 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAinsworth04/14/2026
DOB NOWPlumbingSigned-offA&A Plumbing03/09/2026
DOB NOWMechanical SystemsSigned-offBrennan Operating02/27/2026
DOB NOWGeneral ConstructionSigned-offBrennan Operating02/27/2026
DOB NOWSignSigned-offDesthers, Joseph11/05/2025
DOB NOWSignSigned-offDesthers, Joseph11/05/2025
DOB NOWPlumbingSigned-offCatman Plumbing08/08/2025
DOB NOWGeneral ConstructionSigned-offGreat One Construction07/21/2025
DOB NOWSignSigned-offSkanska Building09/14/2023
DOB NOWSignSigned-offSkanska Building09/12/2023
DOB NOWSignSigned-offSkanska Building09/12/2023
DOB NOWSignSigned-offSkanska Building09/12/2023
DOB NOWGeneral ConstructionSigned-offCook & Krupa08/18/2023
DOB NOWMechanical SystemsSigned-offCook & Krupa08/15/2023
DOB NOWPlumbingSigned-offBedrock Plumbing & Heating08/14/2023
DOB NOWSignSigned-offWeinfeld, Elliot08/07/2023
DOB NOWMechanical SystemsPermit Issued18-15 Realty07/25/2023
DOB NOWPlumbingSigned-offDW Plumbing07/21/2023
DOB NOWGeneral ConstructionSigned-off18-15 Realty07/10/2023
DOB NOWStructuralPermit IssuedFabrizzio Construction05/18/2023
DOB NOWGeneral ConstructionSigned-offP.D. Carpentry & Masonry05/11/2023
DOB NOWSignSigned-offSignstar NYC05/01/2023
DOB NOWPlumbingSigned-offAuthentic Plumbing04/21/2023
DOB NOWGeneral ConstructionPermit IssuedFabrizzio Construction03/08/2023
DOB NOWConstruction FenceSigned-offFabrizzio Construction03/08/2023
DOB NOWGeneral ConstructionSigned-offFabrizzio Construction03/08/2023
DOB NOWPlumbingSigned-offL & N Plumbing03/06/2023
DOB NOWSignSigned-offNeptune Signs & Awnings09/02/2022
DOB NOWGeneral ConstructionSigned-offFabrizzio Construction08/23/2022
DOB NOWConstruction FenceSigned-offFabrizzio Construction08/23/2022
DOB NOWGeneral ConstructionPermit IssuedFabrizzio Construction08/23/2022
DOB NOWPlumbingSigned-offXH&RC Plumbing and Heating06/30/2022
DOB NOWGeneral ConstructionSigned-offTumen06/03/2022
DOB NOWSignSigned-offNeptune Signs & Awnings05/03/2022
DOB NOWSignSigned-offSigns Cad11/09/2021
DOB NOWSignSigned-offSigns Cad11/09/2021
DOB NOWGeneral ConstructionSigned-offN-Store Services10/07/2021
DOB NOWPlumbingSigned-offUltimate Plumbing and Heating09/29/2021
DOB NOWMechanical SystemsSigned-offN-Store Services09/29/2021
DOB NOWPlumbingSigned-offDrilon Plumbing & Heating07/23/2021
+ 53 more permits on file
1 project · most recent 04/18/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/18/2023Permit IssuedFabrizzio ConstructionHeating and Air Conditioning Systems
Heat / Cool
Magic-Aire HBB020A 5 tons · Ahu ×4
HBB030A 90,000 BTU · Ahu ×2
4 projects · most recent 02/11/2026
Water/Sanitary
FiledStatusContractorScope
02/11/2026Signed-offA&A PlumbingWater/Sanitary
10/12/2023Signed-offTri State Plumbing & HeatingWater/Sanitary
04/21/2023Signed-offS.O.S. Plumbing & HeatingWater/Sanitary
07/09/2021Signed-offDrilon Plumbing & HeatingWater/Sanitary
25 projects · most recent 08/09/2026
General Wiring Lighting
FiledStatusContractorScope
08/09/2026CompleteCL ElectricalGeneral Wiring
03/02/2026CompleteOff Shore ElectricGeneral Wiring
09/09/2024CompleteL.E.B. ElectricGeneral Wiring
08/22/2024CompleteL.E.B. ElectricGeneral Wiring
12/06/2023CompleteJem Electrical ContractingGeneral Wiring
09/26/2023CompleteSpectrum on Broadway-Electric—
09/26/2023CompleteSpectrum on Broadway-Electric—
09/21/2023Permit IssuedAUR0RA Electrical Contg—
08/29/2023CompleteC.M. Richey Electrical ContractingGeneral Wiring
07/25/2023CompleteValentis ElectricGeneral Wiring
06/06/2023CompleteAll Ways Electric Corp.wGeneral Wiring
05/03/2023CompleteLife Spot Electric—
01/24/2023CompleteGenmar Electric Cont'gGeneral Wiring
09/21/2022CompleteJong Hyun Kim—
08/07/2022CompleteAll Around ElectricGeneral Wiring
1 project · most recent 04/18/2023
Steel Concrete
FiledStatusContractorScope
04/18/2023Permit IssuedFabrizzio ConstructionSteel, Concrete
▾Field Inspections (DOB CAP) — 26
DateTypeResultReport
03/06/2026Pass-Final General Construction Non-Directive 14PassView ↗
02/25/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/25/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/11/2026Fail-Final General Construction Non-Directive 14FailView ↗
11/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/12/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/01/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/14/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/08/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/05/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/05/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/17/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/10/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/08/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/15/2022Pass-Final General Construction Non-Directive 14PassView ↗
11/14/2022Fail-Final General Construction Non-Directive 14FailView ↗
09/08/2022Pass-Final Sign Permit InspectionPassView ↗
08/02/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/08/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/23/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/08/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
Latest 25 of 26.
▾Special Inspection Requirements (DOB NOW) — 130
DateRequirementInspectorRole
03/26/2026Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
03/26/2026HVAC-R and service water heating equipmentPIETRO ROSATOenergy_progress
03/26/2026Energy Code Compliance InspectionsPIETRO ROSATOprogress
03/26/2026HVAC-R and service water heating system controlsPIETRO ROSATOenergy_progress
03/26/2026HVAC-R and service water piping design and insulationPIETRO ROSATOenergy_progress
03/19/2026Mechanical SystemsPIETRO ROSATOspecial
03/19/2026FinalPIETRO ROSATOprogress
01/28/2026Mechanical SystemsYoung Suhspecial
01/28/2026FinalYoung Suhprogress
01/23/2026Energy Code Compliance InspectionsYou Gaoprogress
01/23/2026Interior lighting powerYou Gaoenergy_progress
01/23/2026Fire-Resistant Penetrations and JointsYou Gaospecial
01/09/2026Interior lighting powerYou Gaoenergy_progress
01/09/2026Fire-Resistant Penetrations and JointsYou Gaospecial
01/09/2026Energy Code Compliance InspectionsYou Gaoprogress
10/30/2025Energy Code Compliance InspectionsYou Gaoprogress
10/30/2025Fire-Resistant Penetrations and JointsYou Gaospecial
10/30/2025HVAC-R and service water piping design and insulationYou Gaoenergy_progress
10/29/2025Fire-Resistant Penetrations and JointsYou Gaospecial
10/29/2025HVAC-R and service water piping design and insulationYou Gaoenergy_progress
10/29/2025Energy Code Compliance InspectionsYou Gaoprogress
09/04/2025Structural Stability – Alterations of existing buildingsYou Gaospecial
09/04/2025FinalYou Gaoprogress
12/04/2023HVAC-R and service water heating system controlsJAIME MOYAenergy_progress
12/04/2023Shutoff dampersJAIME MOYAenergy_progress
Latest 25 of 130.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Dr. David BeydaMedical / HealthcareFloor 2
Project Q01352748 Alteration · LOC Issued · 02/11/2026
You Rock GaoRetail—
Project Q01281871 Alteration · LOC Issued · 10/02/2025
Happy Days Restaurant GroupRestaurant / Food ServiceFloor 1, Roof
Project Q00898152 Alteration · Permit Entire · 07/06/2023
General Nutrition CenterRetailFloor 1
Project Q00862558 Alteration · LOC Issued · 05/07/2023
Duck DonutsRestaurant / Food Service—
Project Q00800695 Alteration · Approved · 12/27/2022
Umar Alizai VenturesRestaurant / Food ServiceFloor 1
Project Q08031017 Alteration · LOC Issued · 11/04/2022
Project Q08032056 Alteration · LOC Issued · 11/04/2022
StarbucksRestaurant / Food ServiceFloor 1
Project Q00754066 Alteration · LOC Issued · 07/08/2022
SpectrumRetailFloor 1
Project Q00610449 Alteration · LOC Issued · 11/09/2021
Project Q00610462 Alteration · LOC Issued · 11/09/2021
Project Q00578693 Alteration · LOC Issued · 09/17/2021
Project Q00578729 Alteration · LOC Issued · 09/17/2021
European Wax CenterPersonal servicesFloor 1
Project Q00044089 Alteration · LOC Issued · 05/22/2018
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 658 on file (BIS + DOB NOW)
▸Plans & Drawings53
▸DOB NOWPlans/Sketch52
08/29/2026Q01374838-I1Request digital key ↗
08/27/2026Q00515690-I1Request digital key ↗
08/27/2026Q00555056-I1Request digital key ↗
Showing 3 of 52 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
08/28/2026Q00345300-I1Request digital key ↗
▸Applications & Permits84
▸BISWORK PERMIT APPLICATION44
06/03/2019440542879Open ↗
04/12/2019440542879Open ↗
04/12/2019440542879Open ↗
Showing 3 of 44 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION37
05/12/2025421615005Open ↗
01/16/2025421615005Open ↗
12/13/2024421615005Open ↗
Showing 3 of 37 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISRescission of Intent to Revoke Approval/Permit1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications247
▸DOB NOWProgress Inspector Seal & Signature75
10/04/2026Q00931323-I1Open ↗
10/04/2026Q01281871-I1Open ↗
09/29/2026Q00578729-P1Open ↗
Showing 3 of 75 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature53
08/29/2026Q01374838-I1Open ↗
08/28/2026Q00345300-I1Open ↗
08/26/2026Q00578729-I1Open ↗
Showing 3 of 53 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION50
01/13/2020421640861Open ↗
09/06/2019440542879Open ↗
02/20/2019421379626Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature27
10/04/2026Q01281871-I1Open ↗
09/29/2026Q00578729-P1Open ↗
09/10/2026Q01255550-S1Open ↗
Showing 3 of 27 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST16
06/12/2018421640861Open ↗
04/12/2018421615005Open ↗
10/25/2017421560509Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT14
04/12/2019440542879Open ↗
06/12/2018421640861Open ↗
04/12/2018421615005Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/12/2019440542879Open ↗
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/12/2019440542879Open ↗
▸Trade Schedules & Equipment36
▸BISSELF-CERT PLUMBING NOTICE10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISEQUIPMENT USE PERMITS7
03/27/2025421615005Open ↗
01/22/2025421615005Open ↗
03/14/2018421513525Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT7
03/27/2025421615005Open ↗
12/17/2024421615005Open ↗
12/12/2024421615005Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING6
04/12/2019440542879Open ↗
Showing 1 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
06/12/2018421640861Open ↗
04/12/2018421615005Open ↗
09/13/2017421513525Open ↗
▸BISSIGN HANGER CERTIFICATE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
02/21/2024421615005Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
02/21/2024421615005Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST3
09/13/2017421513525Open ↗
Showing 1 of 3 on file for this type
▸BISTenant Protection Plan and Notes1
09/13/2017421513525Open ↗
▸Environmental & Asbestos60
▸DOB NOWDEP ACP-5: Asbestos Assessment Report29
08/26/2026Q00578729-I1Open ↗
08/26/2026Q00578729-P1Open ↗
08/26/2026Q00742940-P1Open ↗
Showing 3 of 29 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)12
06/12/2018421640861Open ↗
04/12/2018421615005Open ↗
04/12/2018421615005Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)5
04/12/2019440542879Open ↗
02/11/2019421379635Open ↗
02/11/2019421379635Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/25/2026Q00757109-I1Open ↗
08/25/2026Q08031017-I1Open ↗
08/25/2026Q08032056-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS INSPECTION REPORT1
11/02/2016421379635Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP FORM V5 - ASBESTOS VARIANCE1
02/11/2019421379635Open ↗
▸Energy Compliance53
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS22
01/13/2020421640861Open ↗
09/06/2019440542879Open ↗
02/20/2019421379626Open ↗
Showing 3 of 22 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS11
01/13/2020421640861Open ↗
09/06/2019440542879Open ↗
02/20/2019421379626Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/22/2017440319344Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISELECTRIC MOTORS1
02/22/2024421615005Open ↗
▸BISLIGHTING CONTROLS1
02/22/2024421615005Open ↗
▸BIS* HVAC INSULATION AND SEALING1
02/22/2024421615005Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/12/2019440542879Open ↗
▸BISEXTERIOR LIGHTING POWER1
02/22/2024421615005Open ↗
▸BISINTERIOR LIGHTING POWER1
02/22/2024421615005Open ↗
▸BISNYCECC ANALYSIS1
04/12/2019440542879Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/21/2024421615005Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
03/22/2017440319344Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/23/2024421615005Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY4
02/10/2022421560509Open ↗
10/27/2021421560509Open ↗
03/22/2017440319344Open ↗
Showing 3 of 4 on file for this type
▸BISMECHANICAL SYSTEMS1
02/23/2024421615005Open ↗
▸Approvals, Objections & Sign-offs37
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST17
01/23/2025421615005Open ↗
02/25/2022421560509Open ↗
03/14/2020421640861Open ↗
Showing 3 of 17 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSUPERSEDING LETTER4
05/19/2017440319344Open ↗
05/01/2017440319344Open ↗
Showing 2 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
07/18/2017421485716Open ↗
07/17/2017421485716Open ↗
Showing 2 of 3 on file for this type
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
05/19/2017440319344Open ↗
▸BISFINAL1
01/16/2025421615005Open ↗
▸Cost, Insurance & Ownership46
▸BISCOST AFFIDAVIT45
02/10/2022421560509Open ↗
10/29/2021421560509Open ↗
10/27/2021421560509Open ↗
Showing 3 of 45 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/21/2025421615005Open ↗
▸Filing & Intake Forms30
▸BISEFILING COVER SHEET25
06/12/2018421640861Open ↗
04/12/2018421615005Open ↗
04/12/2018421615005Open ↗
Showing 3 of 25 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
04/12/2019440542879Open ↗
Showing 1 of 2 on file for this type
▸BISADDITIONAL INFORMATION2
01/02/2020421640861Open ↗
09/03/2019440542879Open ↗
▸BISBOROUGH INTAKE FORM1
11/04/2019421640861Open ↗
▸Other Documents2
▸BISSHUTOFF DAMPERS1
02/22/2024421615005Open ↗
▸BISMAINTENANCE INFORMATION1
02/22/2024421615005Open ↗