627 WEST 165TH STREET
MANHATTAN · BIN 1084387
💬 Discuss this project
1930Year Built
22Stories
I1Building Class
R8Zoning
3,693,539 sfGross Floor Area
1Units
LL97 Covered6 Active Violations 0 unresolved · 6 paperwork only ▸FISP: SWARMP
Hospital, sanitarium, mental institution · 364,433 sf lot · 10.14 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsStandpipe system installation1 filing
RoofNewYork-Presbyterian, New York Presbyterian Hospital +1Under Construction20p · 9 filings · 15 docs
Floor 7NewYork-Presbyterian, New York Presbyterian Hospital +1Under Construction3p · 6 filings · 15 docs
Floor 6NewYork-Presbyterian, New York Presbyterian Hospital +1Under Construction9p · 9 filings · 15 docs
Floor 5NewYork-Presbyterian, New York Presbyterian Hospital +1Under Construction9p · 10 filings · 15 docs
Floor 4New York Presb Presbyterian, NewYork-Presbyterian +1Under Construction13p · 12 filings · 18 docs
Floor 3NewYork-Presbyterian, New York Presbyterian Hospital +1Under Construction16p · 10 filings · 15 docs
Floor 2NewYork-Presbyterian, New York Presbyterian HospitalUnder Construction15p · 12 filings · 15 docs
Floor 1NewYork-Presbyterian, New York Presbyterian HospitalUnder Construction23p · 20 filings · 15 docs
CellarNewYork-Presbyterian, New York Presbyterian Hospital +1Under Construction20p · 15 filings · 19 docs
Sub-CellarNewYork-Presbyterian1 filing · 20 docs
BasementNewYork-Presbyterian, New York Presbyterian HospitalUnder Construction15p · 6 filings · 15 docs
Sub-BasementNewYork-Presbyterian, New York Presbyterian HospitalUnder Construction11 filings · 17 docs
Site & exteriorNew York Presbyterian Hospital, NewYork-PresbyterianUnder Construction12 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York Presbyterian Hospital27209/16/2026
NYPH103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Howard I Shapiro Associates3003/21/2026
Rigging Consultants1203/21/2026
Municipal Expediting10303/21/2026
A1 Expediting Service5003/21/2026
Eurocelt Expediting603/21/2026
Orion Expediting203/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Consigli Construction CoGeneral Contractor5007/08/2026
Safway AtlanticScaffold3610/03/2026
Lendlease (US) ConstructionGeneral Contractor2807/08/2026
Sirina Fire ProtectionFire Protection1707/08/2026
Alliance PlumbingPlumbing1007/08/2026
Current Fire ProtectionFire Protection607/08/2026
Universal Builders SupplyScaffold607/08/2026
H.M. Hughes CoGeneral Contractor407/08/2026
E-J Electric Installation CoElectrical403/22/2026
Spring ScaffoldingScaffold303/21/2026
Starr IndustriesScaffold303/21/2026
Hugh O'Kane Electric CoElectrical303/21/2026
O'Kane JohnElectrical303/21/2026
Cardoza PlumbingPlumbing207/08/2026
Consigli Construction CoScaffold203/21/2026
Gramercy GroupGeneral Contractor203/21/2026
Gramercy GroupScaffold203/21/2026
Corporate Electric GroupElectrical103/22/2026
Building ManagementElectrical103/21/2026
Scala, Jr., AnthonyElectrical103/21/2026
Dooley Electric CoElectrical103/21/2026
Gilston Electrical ContngElectrical103/22/2026
The GrenadierGeneral Contractor107/08/2026
Harley Electric CoElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alan Margolin & Associates4236904/16/2026
PCS Engineering3745611/21/2025
Fna Engineering Services7846110/24/2024
Lpe Engineering3102109/14/2021
Building Lifecycle
All (300)Filed (65)Permit Issued (80)Signed Off (24)Violation (1)Inspection (40)Objection (60)Special Inspection (30)
10/20/2026
Signed off — Alteration
FACADE RESTORATOIN VIA SUSPENDED SCAFFOLDING
M01111232-I1
10/02/2026
Permit issued — Sidewalk Shed
M00934840-I1-SH
09/30/2026
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00934840-P4
09/29/2026
Filed — Alteration
CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00941492-P3
09/18/2026
Permit issued — Construction Fence
M00941492-I1-FN
09/15/2026
Permit issued — Suspended Scaffold
M01111232-I1-SC
08/18/2026
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE.
M00933220-I1
08/04/2026
Signed off — Alteration
Means and methods for partial demolition of loading dock slab, as per plans filed herewith.
M01231096-S1
08/04/2026
Signed off — Alteration
Installation of temporary shoring at cellar and ground floor interior and partial demolition means and methods using hand tools only, as per plans filed herewith.
M00958026-I1
07/22/2026
Signed off — Alteration
SB Shops: Modifications of HVAC equipment and ductwork to accommodate alterations to existing accessory storage and offices on basement and 1st floor as per plans filed herewith only.
M08052696-I1
07/21/2026
Signed off — Alteration
SB Shops: Modifications of interior partitions and finishes to accommodate alterations on partial basement and 1st floor in the existing hospital related building as per plans filed herewith only.
M08052547-I1
05/18/2026
Signed off — Alteration
M00802289-I1
04/24/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/22/2026
Permit issued — Plumbing
M01330920-S1-EW-SD
04/21/2026
Permit issued — Sprinklers
M01330920-S1-PL
04/20/2026
Permit issued — Standpipe
M01330920-S1-EW-SP
04/16/2026
Filed — Alteration
SB TUNNEL SP: MODIFICATION OF SPRINKLER PIPING AS INDICATED ON PLANS FILED HEREWITH.
M01388600-I1
04/16/2026
Special inspection requirement — Sprinkler Systems
Young Suh
04/13/2026
Permit issued — General Construction
M08054296-I1-GC
04/13/2026
Objection resolved — Addressed
04/13/2026
Objection resolved — Addressed
04/13/2026
Objection resolved — Addressed
04/13/2026
Objection resolved — Addressed
04/10/2026
Permit issued — Plumbing
M08052683-I1-EW-SP
04/10/2026
Permit issued — Mechanical Systems
M01330920-I1-MS
04/10/2026
Objection resolved — Addressed
04/10/2026
Objection resolved — Addressed
04/10/2026
Objection resolved — Addressed
04/09/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
04/07/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/02/2026
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
04/02/2026
Special inspection requirement — Sprinkler Systems
Young Suh
04/02/2026
Special inspection requirement — Standpipe Systems
Young Suh
04/02/2026
Special inspection requirement — Post-installed Anchors
Young Suh
04/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
04/01/2026
Special inspection requirement — Masonry
Young Suh
04/01/2026
Special inspection requirement — Structural Steel - Welding
Young Suh
04/01/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Young Suh
04/01/2026
Special inspection requirement — Footing and Foundation
Young Suh
04/01/2026
Special inspection requirement — Final
Young Suh
04/01/2026
Special inspection requirement — Concrete - Cast-In-Place
Young Suh
04/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Young Suh
04/01/2026
Special inspection requirement — Structural Steel - Details
Young Suh
03/31/2026
Signed off — Alteration
M08053544-I1
03/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Young Suh
03/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
03/24/2026
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
03/24/2026
Special inspection requirement — Standpipe Systems
Young Suh
03/24/2026
Special inspection requirement — Post-installed Anchors
Young Suh
03/24/2026
Special inspection requirement — Sprinkler Systems
Young Suh
03/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
03/23/2026
Special inspection requirement — Post-installed Anchors
Young Suh
03/23/2026
Special inspection requirement — Sprinkler Systems
Young Suh
03/23/2026
Special inspection requirement — Standpipe Systems
Young Suh
03/17/2026
Signed off — Alteration
SUSPENDED SCAFFOLDING FOR FACADE RESTORATION & MONORAIL SYSTEM FOR MATERIAL HOISTING AS SHOWN ON PLANS
M01242338-I1
03/11/2026
Filed — Alteration
Service Building Post Partum: Install HVAC equipment and ductwork on floors 5 through 7 and roof to accommodate hospital alterations.
M00904175-P4
03/11/2026
Filed — Alteration
Means and methods for partial demolition of loading dock slab, as per plans filed herewith.
M00903198-P9
03/11/2026
Filed — Alteration
SB Shops: Modifications of sprinkler, standpipe, and plumbing piping and fixtures on cellar, basement and 1st floor in the existing hospital related building as per plans filed herewith only.
M08052683-P3
03/10/2026
Special inspection requirement — Post-installed Anchors
Young Suh
03/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedSafway Atlantic10/02/2026
DOB NOWConstruction FencePermit IssuedSafway Atlantic09/18/2026
DOB NOWSuspended ScaffoldSigned-offWestern Waterproofing Co09/15/2026
DOB NOWStandpipePermit IssuedSirina Fire Protection04/22/2026
DOB NOWPlumbingPermit IssuedAlliance Plumbing04/21/2026
DOB NOWSprinklersPermit IssuedSirina Fire Protection04/20/2026
DOB NOWGeneral ConstructionPermit IssuedConsigli Construction Co04/13/2026
DOB NOWMechanical SystemsPermit IssuedConsigli Construction Co04/10/2026
DOB NOWSprinklersPermit IssuedCurrent Fire Protection I04/10/2026
DOB NOWSprinklersPermit IssuedSirina Fire Protection02/09/2026
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co01/06/2026
DOB NOWFoundationPermit IssuedConsigli Construction Co12/23/2025
DOB NOWMechanical SystemsSigned-offConsigli Construction Co12/19/2025
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co12/19/2025
DOB NOWStructuralSigned-offConsigli Construction Co12/19/2025
DOB NOWMechanical SystemsSigned-offConsigli Construction Co12/19/2025
DOB NOWStandpipePermit IssuedCurrent Fire Protection I11/14/2025
DOB NOWFoundationPermit IssuedConsigli Construction Co10/24/2025
DOB NOWPlumbingSigned-offCardoza Plumbing Wmbe10/23/2025
DOB NOWGeneral ConstructionPermit IssuedConsigli Construction Co10/23/2025
DOB NOWPlumbingSigned-offCardoza Plumbing Wmbe10/23/2025
DOB NOWSidewalk ShedSigned-offUniversal Build Supp10/01/2025
DOB NOWSidewalk ShedPermit IssuedSafway Atlantic09/30/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSafway Atlantic09/29/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSafway Atlantic09/29/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSafway Atlantic09/26/2025
DOB NOWSupported ScaffoldPermit IssuedSafway Atlantic09/26/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSafway Atlantic09/26/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSafway Atlantic09/26/2025
DOB NOWSupported ScaffoldPermit IssuedSafway Atlantic09/26/2025
DOB NOWSuspended ScaffoldSigned-offWestern Waterproofing Co09/25/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSafway Atlantic09/25/2025
DOB NOWConstruction FencePermit IssuedSafway Atlantic09/25/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSafway Atlantic09/25/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSafway Atlantic09/25/2025
DOB NOWPlumbingSigned-offCardoza Plumbing Wmbe09/08/2025
DOB NOWStandpipeSigned-offSirina Fire Protection09/08/2025
DOB NOWMechanical SystemsPermit IssuedConsigli Construction Co08/13/2025
DOB NOWSuspended ScaffoldSigned-offWestern Waterproofing Co07/09/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSafway Atlantic07/03/2025
+ 60 more permits on file
5 projects · most recent 03/11/2026
Heating and Air Conditioning Systems Air Conditioning Systems Ventilation Systems Associated Ducts and Piping Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
03/11/2026Permit IssuedConsigli Construction CoHeating and Air Conditioning Systems
Heat / Cool
N/A 100 5,400 BTU · Fan Coil Indoor ×18
03/11/2026Signed-offConsigli Construction CoAir Conditioning Systems, Associated Ducts and Piping
Cooling
Multiaqua MHQWW-36-H-3 37,500 BTU · Chiller ×6
Liebert MM92C 103,500 BTU ×2
Ducts & Piping
__Junk__ ductwork & piping 1 BTU · Ductwork ×2
12/15/2025Permit IssuedConsigli Construction CoAir Conditioning Systems, Ventilation Systems
Cooling
Liebert MM92C 69,800 BTU ×1
Ventilation
Greenheck EXHAUST & RETURN DUCT & FAN 600 CFM · Exhaust Fan ×2
08/06/2025Permit IssuedConsigli Construction CoHeating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Trane TPWCCMV0150D4-MM 119,000 BTU · Chiller ×1
Heating
Bell & Gossett BP423-20 132,900 BTU · Heat Exchanger ×1
Ventilation
Greenheck EXHAUST & RETURN DUCT & FAN 600 CFM · Exhaust Fan ×2
03/28/2025Signed-offConsigli Construction CoAir Conditioning Systems, Associated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Daikin RXYQ336XAYD 20,000 CFM · Vrf Outdoor ×6
Liebert MM36K - 42,000 BTU · Crac Unit ×2
PFH037A-L 42,000 BTU · Condensing Unit ×3
MM36K 42,000 BTU · Crac Unit ×1
Heat / Cool
Kilmore Evo CUSTOM 20,000 CFM · Ahu ×3
Ventilation
__Junk__ EXHAUST & RETURN DUCT & FAN 1 CFM · Exhaust Fan ×3
Ducts & Piping
__Junk__ ductwork & piping 1 CFM · Ductwork ×3
5 projects · most recent 04/16/2026
FiledStatusContractorScope
04/16/2026———
03/11/2026Signed-offSirina Fire Protection1,356 heads, 16 outlets
03/11/2026Signed-offSirina Fire Protection3,190 heads, 80 outlets
03/11/2026Permit IssuedCurrent Fire Protection I1,187 heads, 4 outlets
12/15/2025Permit IssuedSirina Fire Protection183 heads, 2 outlets
4 projects · most recent 03/11/2026
Water/Sanitary Storm Medical Gas
FiledStatusContractorScope
03/11/2026Signed-offAlliance PlumbingStorm, Water/Sanitary
03/11/2026Signed-offAlliance PlumbingMedical Gas, Storm, Water/Sanitary
03/11/2026Signed-offCardoza PlumbingStorm, Water/Sanitary
12/15/2025Permit IssuedCardoza Plumbing WmbeMedical Gas, Water/Sanitary
15 projects · most recent 05/11/2026
General Wiring Lighting
FiledStatusContractorScope
05/11/2026Permit IssuedE-J Electric Installation CoGeneral Wiring
04/24/2026Permit IssuedE-J Electric Installation CoGeneral Wiring
07/28/2025Permit IssuedE-J Electric Installation CoGeneral Wiring
03/06/2025Permit IssuedE-J Electric Installation CoGeneral Wiring
03/06/2025Permit IssuedE-J Electric Installation CoGeneral Wiring
01/30/2025Permit IssuedJam Electrical—
10/23/2024Permit IssuedE-J Electric Installation CoGeneral Wiring
07/18/2024Permit IssuedE-J Electric Installation Co—
06/07/2024Permit IssuedE-J Electric Installation CoGeneral Wiring
05/20/2024Permit IssuedE-J Electric Installation Co—
12/11/2023Permit IssuedGilston Electrical ContngGeneral Wiring, Lighting
09/28/2023Permit IssuedCorporate Electric Group—
03/15/2023Permit IssuedGilston Electrical Contng—
05/03/2022CompleteTop Shelf Electric—
06/30/2021CompleteLowy & Donnath—
3 projects · most recent 03/11/2026
Steel Concrete Masonry
FiledStatusContractorScope
03/11/2026Permit IssuedConsigli Construction CoSteel, Concrete, Masonry
01/13/2026Signed-offConsigli Construction Co4 scope_items
06/13/2025Signed-offConsigli Construction Co2 scope_items
1 project · most recent 04/18/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
04/18/2025Signed-offWestern Waterproofing CoSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 40
DateTypeResultReport
04/24/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/09/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
04/07/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/19/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
02/12/2026Fail-Final SP - Up to 3 Requested FloorsFailView ↗
02/12/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/03/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/03/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
01/29/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/29/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
01/29/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
01/27/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/27/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
01/21/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/21/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/26/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/06/2025Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
08/05/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
08/05/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
08/05/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
06/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/11/2025Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
05/20/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/08/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
Latest 25 of 40.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
04/16/2026Sprinkler SystemsYoung Suhspecial
04/02/2026Sprinkler SystemsYoung Suhspecial
04/02/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
04/02/2026Energy Code Compliance InspectionsYoung Suhprogress
04/02/2026Standpipe SystemsYoung Suhspecial
04/02/2026Post-installed AnchorsYoung Suhspecial
04/01/2026Structural Stability – Alterations of existing buildingsYoung Suhspecial
04/01/2026Footing and FoundationYoung Suhprogress
04/01/2026MasonryYoung Suhspecial
04/01/2026Structural Steel - DetailsYoung Suhspecial
04/01/2026Structural Steel - WeldingYoung Suhspecial
04/01/2026Structural Steel - High Strength BoltingYoung Suhspecial
04/01/2026FinalYoung Suhprogress
04/01/2026Concrete - Cast-In-PlaceYoung Suhspecial
03/24/2026Post-installed AnchorsYoung Suhspecial
03/24/2026Energy Code Compliance InspectionsYoung Suhprogress
03/24/2026Sprinkler SystemsYoung Suhspecial
03/24/2026HVAC-R and service water piping design and insulationYoung Suhenergy_progress
03/24/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
03/24/2026Standpipe SystemsYoung Suhspecial
03/23/2026Sprinkler SystemsYoung Suhspecial
03/23/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
03/23/2026Standpipe SystemsYoung Suhspecial
03/23/2026Post-installed AnchorsYoung Suhspecial
03/10/2026Sprinkler SystemsYoung Suhspecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
NewYork-PresbyterianMedical / HealthcareSub-cellar, Cellar, Sub-basement, Basement, Floors 1–7, Roof
Project M01388600 Alteration · Approved · 04/16/2026
Project M01259694 Alteration · Permit Entire · 08/06/2025
Project M00947625 Alteration · LOC Issued · 10/18/2023
Project M08053544 Alteration · LOC Issued · 10/03/2023
Project M08053558 Alteration · LOC Issued · 10/03/2023
Project M08053509 Alteration · LOC Issued · 10/02/2023
Project M00933220 Alteration · LOC Issued · 09/20/2023
Project M08054296 Alteration CO · Permit Entire · 02/13/2023
Project M00809045 Alteration · LOC Issued · 01/26/2023
Project M08052683 Alteration · Permit Entire · 01/25/2023
Project M08052696 Alteration · LOC Issued · 01/25/2023
Project M00802289 Alteration · LOC Issued · 01/24/2023
New York Presb PresbyterianMedical / HealthcareCellar, Floors 3–7, Roof
Project M01330920 Alteration · Permit Entire · 12/15/2025
Project M00904175 Alteration · Permit Entire · 08/08/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 879 on file (BIS + DOB NOW)
▸Plans & Drawings105
▸DOB NOWPlans/Sketch104
09/03/2026M00584414-I1Request digital key ↗
09/02/2026M00730557-I1Request digital key ↗
09/01/2026M08014319-P1Request digital key ↗
Showing 3 of 104 on file for this type
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00221693-I1Request digital key ↗
▸Applications & Permits90
▸BISPLAN / WORK APPROVAL APPLICATION48
07/12/2023102774543Open ↗
03/03/2023102774543Open ↗
12/17/2019103234493Open ↗
Showing 3 of 48 on file for this type
▸BISWORK PERMIT APPLICATION39
02/13/2018122810690Open ↗
04/28/2016121932793Open ↗
04/21/2016121932793Open ↗
Showing 3 of 39 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
02/27/2024102774543Open ↗
03/10/2023102774543Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/10/2023102774543Open ↗
▸Seals & Professional Certifications302
▸DOB NOWDPL-1: Design Professional Seal & Signature104
10/05/2026M00934840-P4Open ↗
10/05/2026M00941492-P3Open ↗
09/05/2026M00221693-I1Open ↗
Showing 3 of 104 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature76
10/19/2026M00903198-P7Open ↗
10/18/2026M00903198-I1Open ↗
10/07/2026M01330920-S1Open ↗
Showing 3 of 76 on file for this type
▸DOB NOWProgress Inspector Seal & Signature68
10/19/2026M00903198-P7Open ↗
10/18/2026M00903198-I1Open ↗
09/23/2026M01259694-I1Open ↗
Showing 3 of 68 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION41
09/27/2018121778317Open ↗
05/04/2018122810690Open ↗
12/06/2016122810690Open ↗
Showing 3 of 41 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
09/14/2016122810690Open ↗
07/14/2014121932793Open ↗
09/23/2013121778317Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
09/14/2016122810690Open ↗
07/21/2014121158745Open ↗
07/14/2014121932793Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
08/06/2012121158745Open ↗
Showing 1 of 3 on file for this type
▸Trade Schedules & Equipment36
▸BISSELF-CERT PLUMBING NOTICE13
12/29/2015120854245Open ↗
05/08/2013120854245Open ↗
11/19/2012120464498Open ↗
Showing 3 of 13 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA12
07/22/2020103234493Open ↗
05/07/2014121836825Open ↗
02/26/2014121836825Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING6
11/15/2011120854245Open ↗
Showing 1 of 6 on file for this type
▸DOB NOWFDNY: Letter of No Objection4
08/25/2026M00903198-P4Open ↗
Showing 1 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/14/2014121932793Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Environmental & Asbestos87
▸DOB NOWOER: Notice to Proceed29
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 29 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form28
09/01/2026M08018959-I1Open ↗
08/29/2026M08053558-I1Open ↗
08/29/2026M08053544-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWOER: Notice of Satisfaction15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISASBESTOS INSPECTION REPORT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
08/06/2012121158745Open ↗
Showing 1 of 3 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
09/20/2016122810690Open ↗
07/14/2014121932793Open ↗
Showing 2 of 3 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/05/2026M00221693-I1Open ↗
09/03/2026M00584414-I1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
02/27/2012120854245Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
11/23/2016122905632Open ↗
07/13/2016120854245Open ↗
07/14/2014121932793Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
09/21/2016121932793Open ↗
07/13/2016120854245Open ↗
▸BISTECHNICAL REPORT: ENERGY2
01/24/2012120854245Open ↗
10/17/2011120854245Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/26/2024102774543Open ↗
06/05/2023102774543Open ↗
▸BISMECHANICAL SYSTEMS2
03/10/2023120113796Open ↗
03/10/2023120113796Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
09/14/2016122810690Open ↗
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-011
03/01/2023102774543Open ↗
▸Approvals, Objections & Sign-offs146
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter99
10/05/2026M00934840-P4Open ↗
10/05/2026M00941492-P3Open ↗
09/05/2026M00221693-I1Open ↗
Showing 3 of 99 on file for this type
▸BISADMINISTRATIVE OBJECTIONS19
09/23/2013121778317Open ↗
05/07/2013120845032Open ↗
08/06/2012121158745Open ↗
Showing 3 of 19 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST17
07/22/2020103234493Open ↗
10/26/2018122810690Open ↗
10/26/2018122810690Open ↗
Showing 3 of 17 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
08/02/2014121158745Open ↗
05/22/2013121158745Open ↗
08/13/2012120991383Open ↗
▸DOB NOWDEP Variance (V5) letter3
09/01/2026M08018959-I1Open ↗
Showing 1 of 3 on file for this type
▸BISSUPERSEDING LETTER2
04/21/2016120854245Open ↗
08/02/2014121158745Open ↗
▸BISFINAL1
03/23/2023121158745Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
04/19/2013120854245Open ↗
▸BISFA LETTER OF DEFECT : FD-FALD1
12/12/2019103234493Open ↗
▸Cost, Insurance & Ownership34
▸BISCOST AFFIDAVIT34
07/22/2020103234493Open ↗
10/26/2018122810690Open ↗
11/23/2016122905632Open ↗
Showing 3 of 34 on file for this type
▸Filing & Intake Forms33
▸BISEFILING COVER SHEET25
11/23/2016122905632Open ↗
09/14/2016122810690Open ↗
07/14/2014121932793Open ↗
Showing 3 of 25 on file for this type
▸BISBOROUGH INTAKE FORM4
12/12/2019103234493Open ↗
11/22/2019103234493Open ↗
10/26/2018122810690Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION3
02/27/2024102774543Open ↗
07/05/2012120464498Open ↗
11/17/2011120354589Open ↗
▸BISeFiling Job Application Cover Sheet1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents28
▸DOB NOWManufacturer's Specifications6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWCalculations6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWProperty Ownership Certification5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
11/23/2016122905632Open ↗
11/18/2011120354589Open ↗
▸BIS* FIRE STOPS 27-3451
06/27/2023102774543Open ↗
▸BISSHUTOFF DAMPERS1
03/10/2023120854245Open ↗
▸BISSupporting Document: Fee Exempt1
07/14/2014121932793Open ↗
▸BIS* SPRAY ON FIREPROOF.-NEW INSTALL 27-324(F)1
06/27/2023102774543Open ↗
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type