64-56 KISSENA BOULEVARD · BIN 4439915
💬 Discuss this project
1907Year Built
3Stories
W5Building Class
R4Zoning
2,096,206 sfGross Floor Area
35Units
LL97 Covered11 Active Violations 9 unresolved · 2 paperwork only 22 likely answered ▸FDNY Report ↗
City university · Owner of record: Dormitory Authority of the State of New York · 2,567,000 sf lot · 0.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofQueens College Boiler PlantUnder Construction72p · 9 filings · 16 docs
Floor 10Queens College Boiler PlantUnder Construction1p · 1 filing · 11 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Queens College Boiler PlantUnder Construction80p · 5 filings · 16 docs
MezzanineQueens College Boiler PlantUnder Construction71p · 5 filings · 16 docs
BasementQueens College Boiler PlantUnder Construction10p · 3 filings · 16 docs
Sub-BasementQueens College Boiler PlantUnder Construction66p · 5 filings · 16 docs
Site & exteriorQueens College Boiler Plant7p · 3 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Dasny5111/05/2026
Dormitory Authority of the State1303/21/2026
CUNY211/07/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Willdan911/09/2026
Jensen/BRV Engineering104/30/2026
Syska Hennessy Group111/06/2024
KS Engineers102/14/2024
Genesys Engineering902/08/2024
Superstructures Engineering + Architects102/05/2024
Merritt Engineering Consultants412/29/2023
AK Consulting Services212/30/2022
KMB Design Group110/24/2022
Silman105/08/2020
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Infinity Contracting ServiceGeneral Contractor1208/20/2026
P B ContractingScaffold603/21/2026
Ara PlumbingPlumbing507/08/2026
Agee Heating ServicePlumbing307/08/2026
Aks InternationalGeneral Contractor310/16/2026
TristruxGeneral Contractor307/08/2026
Associated Electric Cont of NElectrical203/21/2026
Unity BuildconGeneral Contractor107/08/2026
Boyd MechanicalPlumbing107/08/2026
Applied ElectricElectrical103/21/2026
Forsythe Plumbing & HeatingPlumbing107/08/2026
J.M.C. ElectricalElectrical103/21/2026
Ronald Testa, JRElectrical103/21/2026
P B ContractingGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Future Tech Consultants O5891411/04/2026
Socotec Engineering4983104/30/2026
Tectonic Engineering Cons106511/06/2024
KMB Design Group513110/24/2022
Building Lifecycle
11/09/2026
Filed — Alteration
boiler replacement as per plans filed herewith.
Q00344356-P3
11/06/2026
Special inspection requirement — Maintenance information
Stephen Marchese
11/05/2026
Signed off — Alteration
STRUCTURAL WORK , PROVIDE AN ACCESS PLATFORM ON MEZZANINE 1 FOR ACCESS TO EQUIPMENT. PROVIDE AN ACCESS PLATFORM AND LADDERS ABOVE MEZZANINE 1 FORACCESS TO EQUIPMENT. PROVIDE AN ACCESS PLATFORM AND LADDERS BELOW THE ROOF FOR ACCESSTO EQUIPMENT AS PER PLANS
Q01390588-I1
11/04/2026
Filed — Alteration
mechanical work at queens college for boiler plant replacement
Q00344331-P3
11/03/2026
Special inspection requirement — High-Pressure Steam Piping (Welding)
MARISA HARTE
153 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedAks International10/15/2026
DOB NOWStructuralSigned-offUnity Buildcon05/26/2026
DOB NOWGeneral ConstructionPermit IssuedAks International05/05/2026
DOB NOWMechanical SystemsPermit IssuedInfinity Contracting Service04/24/2026
DOB NOWBoiler EquipmentPermit IssuedAgee Heating Service04/21/2026
DOB NOWGeneral ConstructionPermit IssuedAks International04/09/2026
DOB NOWMechanical SystemsPermit IssuedInfinity Contracting Service11/12/2025
DOB NOWPlumbingPermit IssuedForsythe Plumbing & Heating09/03/2025
DOB NOWBoiler EquipmentPermit IssuedAgee Heating Service04/17/2025
DOB NOWMechanical SystemsPermit IssuedInfinity Contracting Service02/21/2025
DOB NOWPlumbingPermit IssuedAra Plumbing03/12/2024
DOB NOWMechanical SystemsPermit IssuedInfinity Contracting Service01/10/2024
DOB NOWMechanical SystemsPermit IssuedInfinity Contracting Service11/09/2023
DOB NOWPlumbingSigned-offBoyd Mechanical04/25/2023
DOB NOWAntennaSigned-offTristrux04/21/2023
DOB NOWPlumbingPermit IssuedAra Plumbing04/04/2023
DOB NOWGeneral ConstructionSigned-offP B Contracting03/28/2023
DOB NOWConstruction FencePermit IssuedP B Contracting12/31/2022
DOB NOWSidewalk ShedPermit IssuedP B Contracting12/31/2022
DOB NOWAntennaSigned-offTristrux12/16/2022
DOB NOWMechanical SystemsPermit IssuedInfinity Contracting Service11/10/2022
DOB NOWPlumbingPermit IssuedAra Plumbing01/26/2022
DOB NOWPlumbingPermit IssuedAra Plumbing11/18/2021
DOB NOWMechanical SystemsPermit IssuedInfinity Contracting Service11/15/2021
DOB NOWBoiler EquipmentPermit IssuedAgee Heating Service07/02/2021
DOB NOWPlumbingPermit IssuedAra Plumbing01/23/2021
DOB NOWMechanical SystemsPermit IssuedInfinity Contracting Service01/07/2021
BISOTISSUEDInfinity Contracting Service03/13/2025
BISOTISSUEDInfinity Contracting Service03/13/2025
BISOTISSUEDInfinity Contracting Service11/12/2024
BISOTISSUEDInfinity Contracting Service11/12/2024
BISOTISSUEDInfinity Contracting Service05/16/2024
BISOTISSUEDInfinity Contracting Service05/16/2024
BISOTISSUEDInfinity Contracting Service11/24/2023
BISOTISSUEDInfinity Contracting Service11/24/2023
BISOTISSUEDInfinity Contracting Service11/09/2023
BISOTISSUEDInfinity Contracting Service11/09/2023
BISOTISSUEDInfinity Contracting Service09/06/2023
BISOTISSUEDInfinity Contracting Service09/06/2023
BISOTISSUEDInfinity Contracting Service08/28/2023
+ 21 more permits on file
1 project · most recent 11/04/2026
Air Conditioning Systems Heating Systems
FiledStatusContractorScope
11/04/2026Permit IssuedInfinity Contracting ServiceAir Conditioning Systems, Heating Systems
1 project · most recent 01/22/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/22/2026Permit IssuedForsythe Plumbing & HeatingGas, Storm, Water/Sanitary
2 projects · most recent 02/15/2023
General Wiring
FiledStatusContractorScope
02/15/2023CompleteGottlieb ElectricGeneral Wiring
12/04/2020Permit IssuedWelsbach ElectricGeneral Wiring
2 projects · most recent 04/30/2026
Steel Concrete
FiledStatusContractorScope
04/30/2026Signed-offUnity BuildconSteel
02/14/2024Permit IssuedAks InternationalConcrete
2 projects · most recent 12/30/2022
Sidewalk Shed Fence
FiledStatusContractorScope
12/30/2022Permit IssuedP B ContractingSidewalk Shed
12/30/2022Permit IssuedP B ContractingFence
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/01/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/30/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/27/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 104
DateRequirementInspectorRole
11/06/2026Maintenance informationStephen Marcheseenergy_progress
11/03/2026Mechanical SystemsMARISA HARTEspecial
11/03/2026High-Pressure Steam Piping (Welding)MARISA HARTEspecial
11/03/2026Heating SystemsMARISA HARTEspecial
11/03/2026Fire-Resistant Penetrations and JointsMARISA HARTEspecial
11/03/2026Chimneys and ventsMARISA HARTEspecial
11/03/2026Energy Code Compliance InspectionsMARISA HARTEprogress
11/03/2026HVAC and service water heating equipment Stephen Marcheseenergy_progress
11/03/2026Permanent certificateStephen Marcheseenergy_progress
11/03/2026FinalJohn Elderprogress
11/03/2026Electrical motorsStephen Marcheseenergy_progress
11/03/2026HVAC insulation and sealing Stephen Marcheseenergy_progress
11/03/2026HVAC and service water heating system controls Stephen Marcheseenergy_progress
11/03/2026Maintenance informationStephen Marcheseenergy_progress
06/18/2026Maintenance informationStephen Marcheseenergy_progress
04/27/2026Structural Steel - DetailsMARISA HARTEspecial
04/21/2026FinalJason Vigilprogress
02/05/2026High-Pressure Fuel-Gas Piping (Welding)MARISA HARTEspecial
02/05/2026HVAC insulation and sealing MARISA HARTEenergy_progress
02/05/2026Maintenance informationMARISA HARTEenergy_progress
02/05/2026HVAC and service water heating equipment MARISA HARTEenergy_progress
02/05/2026Energy Code Compliance InspectionsStephen Marcheseprogress
02/05/2026Fire-Resistant Penetrations and JointsMARISA HARTEspecial
02/02/2026Mechanical SystemsMARISA HARTEspecial
02/02/2026Energy Code Compliance InspectionsStephen Marcheseprogress
Latest 25 of 104.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Queens College Boiler PlantEducationEntire building
Project Q01390588 Alteration · LOC Issued · 04/30/2026
Project Q01045182 Alteration · Approved · 11/06/2024
Project Q00984460 Alteration · Permit Entire · 02/05/2024
Project Q08050404 Alteration · Permit Entire · 12/30/2022
Project Q08050473 Alteration · Permit Entire · 12/30/2022
Project Q08022789 Alteration · LOC Issued · 10/24/2022
Project Q00592529 Alteration · LOC Issued · 09/14/2021
Project Q00592545 Alteration · LOC Issued · 09/14/2021
Project Q00344331 Alteration · Plan Examiner Review · 05/11/2020
Project Q00344344 Alteration · Permit Entire · 05/11/2020
Project Q00344356 Alteration · Plan Examiner Review · 05/11/2020
Project Q00344365 Alteration · Incomplete · 05/08/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
290 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account