Office with commercial, 7-19 stories
641 AVENUE OF THE AMERICAS
MANHATTAN · BIN 1014732
💬 Discuss this project
1902Year Built
8Stories
O6Building Class
C6-2AZoning
149,885 sfGross Floor Area
10Units
LL97 Covered0 Active ViolationsFISP: SAFE
Office with commercial, 7-19 stories · Owner of record: 641 Aoa Owner · 18,491 sf lot · 8.11 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsDSM Firmenich1 filing
RoofDSM Firmenich, MoMath: National Museum of Mathematics +1Under Construction17p · 12 filings · 20 docs
Floor 12eBay1 filing · 5 docs
Floor 11
Floor 10
Floor 9
Floor 8pear Street Capital, DSM Firmenich +1Under Construction67p · 17 filings · 20 docs
Floor 7DSM Firmenich, Firstmark Capital51p · 13 filings · 20 docs
Floor 6Firstmark Capital13p · 11 filings · 17 docs
Floor 5CBRE Property Management1 filing · 11 docs
Floor 4Infor9p · 4 filings · 17 docs
Floor 3Infor6p · 4 filings · 17 docs
Floor 2MoMath: National Museum of Mathematics4p · 2 filings · 20 docs
Floor 1MoMath: National Museum of MathematicsUnder Construction29p · 17 filings · 20 docs
CellarMoMath: National Museum of MathematicsUnder Construction47p · 12 filings · 20 docs
Site & exteriorMoMath: National Museum of Mathematics14 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SL Green Realty18007/08/2026
641 LLC4903/21/2026
Urbicum Associates L P3903/21/2026
Atlas Capital Group3603/21/2026
641 Owner3503/22/2026
Urbicom1003/21/2026
641 LLC/Olmstead Properties303/21/2026
Orbicum Associates203/21/2026
641LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/07/2021$203.8M—— → —$1,360/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Archetype Consultants6003/21/2026
Mbe Code Zoning3803/21/2026
Building Brothers1003/21/2026
Beam Living503/21/2026
A1 Expediting Service203/21/2026
Rigid Structural Design203/21/2026
Desarno Associates1803/21/2026
Socotec203/21/2026
Synergy Building Consultants303/21/2026
Milrose Consultants503/21/2026
Municipal Building Consultants103/21/2026
Rock Group NY603/21/2026
Spring Scaffolding403/21/2026
Green Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Core Four ConstructionGeneral Contractor3607/08/2026
JRM Construction ManagementGeneral Contractor2607/08/2026
Allertonfox ConstructionGeneral Contractor1107/08/2026
Platinum Services NYScaffold807/08/2026
A Plus PlumbingPlumbing507/08/2026
Rock Group NYScaffold507/08/2026
SW Contracting and ConsultingScaffold507/08/2026
A1 SpecializedSign hanger507/08/2026
DK Construction OneGeneral Contractor507/08/2026
CS BridgeScaffold507/08/2026
Intersystems Installation S&SScaffold407/08/2026
Elysium ConstructionGeneral Contractor307/08/2026
Bedrock MechanicalFire Protection307/08/2026
A + SprinklerFire Protection307/08/2026
Ocean Pacific Interiors *General Contractor207/08/2026
Swinerton BuildersGeneral Contractor203/21/2026
M.C. Electrical NYElectrical203/21/2026
Arsenal ScaffoldScaffold203/21/2026
Spring ScaffoldingScaffold207/08/2026
Bedrock Plumbing & HeatingPlumbing207/08/2026
Dynamic Air Conditioningspecialty_contractor203/21/2026
Upright Fire ProtctnFire Protection107/08/2026
Nash Electric ServicesElectrical103/22/2026
Ranco ElectricalElectrical103/21/2026
Deboccia Electric ConstructionElectrical103/21/2026
Ranieri NicolaElectrical103/21/2026
R.C.M. ElectricElectrical103/21/2026
Delta Star ElectricElectrical103/21/2026
W5 GroupGeneral Contractor107/08/2026
S&E Bridge & ScaffoldScaffold104/09/2026
A & M Warshaw Plumbing & HeatingPlumbing107/08/2026
A&M Warshaw ServicesFire Protection107/08/2026
A Plus PlumbingFire Protection106/02/2026
Dependable MechanicalFire Protection107/08/2026
Expert Fire SprinklerFire Protection107/08/2026
Standard Fire ProtectionFire Protection107/08/2026
Judd ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Eti Consultants76941807/20/2026
Synergy Engineering7841307/08/2026
AK Consulting Services, I6198205/20/2026
Ancora Engineering6818205/20/2026
WPM NY Engineers8597205/20/2026
Hansen Engineering8174705/12/2026
Milrose Consultants2003904/23/2026
G. Blinn Consulting2894109/23/2025
Codegreen510110/25/2024
Pinto Engineering Consulting9110203/14/2024
Joseph Martines PE1428401/04/2024
DNA Controlled Inspection554306/20/2023
Trolydia Testing & Inspec4422101/05/2023
Building Lifecycle
All (300)Filed (67)Permit Issued (50)Signed Off (37)Facade (FISP) (3)Violation (1)Inspection (32)Objection (80)Special Inspection (30)
07/27/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Alec Strongin
07/22/2026
Special inspection requirement — Sprinkler Systems
ANTHONY MUSUMECI
07/20/2026
Filed — Alteration
Sprinkler work on part of the 8th floor as indicated on drawings.
M01043607-P2
07/08/2026
Filed — Alteration CO
M01140826-P4
07/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Alec Strongin
06/30/2026
Special inspection requirement — Final
ANTHONY MUSUMECI
06/30/2026
Special inspection requirement — Fire-Resistance Rated Construction
ANTHONY MUSUMECI
06/29/2026
Filed — Alteration
Construction work to create protected openings to adjacent building (635 Avenue of the Americas) on the 8th floor per CCD1 # 73709
M01043540-P2
06/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
ANTHONY MUSUMECI
06/25/2026
Special inspection requirement — Final
ANTHONY MUSUMECI
06/24/2026
Signed off — Alteration
Architectural modifications to windows and lobby entry door at 1st floor facade along West 20th Street and minor interior signage and tile work at Sixth Street lobby as indicated on drawings.
M01084751-I1
06/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/09/2026
Signed off — Alteration
Sprinkler Head changes as indicated on plans.
M00868403-I1
06/09/2026
Signed off — Alteration
Plumbing Fixture changes as indicated on plans.
M00868390-I1
06/04/2026
Filed — Alteration CO
M01140826-P3
06/01/2026
Special inspection requirement — Sprinkler Systems
ANTHONY MUSUMECI
05/27/2026
Permit issued — Structural
M01356597-I1-FO
05/27/2026
Permit issued — Foundation
M01356597-I1-EA
05/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christopher Pinto
05/22/2026
Special inspection requirement — Final
Christopher Pinto
05/22/2026
Special inspection requirement — Concrete - Cast-In-Place
WALIUR RAHMAN
05/22/2026
Special inspection requirement — Footing and Foundation
WALIUR RAHMAN
05/22/2026
Special inspection requirement — Structural Steel - Welding
WALIUR RAHMAN
05/22/2026
Special inspection requirement — Sprayed fire-resistant materials
WALIUR RAHMAN
05/22/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Gregory Moormann
05/22/2026
Special inspection requirement — Structural Steel - Details
WALIUR RAHMAN
05/22/2026
Special inspection requirement — Subgrade Inspections
Gregory Moormann
05/22/2026
Special inspection requirement — Structural Steel - High Strength Bolting
WALIUR RAHMAN
05/21/2026
Permit issued — Sprinklers
M01043607-I1-EW-SP
05/20/2026
Filed — Alteration
Structural, foundation, earthwork on the cellar and 1st floor as indicated on drawings
M01356597-P2
05/20/2026
Special inspection requirement — Structural Steel - Welding
WALIUR RAHMAN
05/20/2026
Special inspection requirement — Structural Steel - Details
WALIUR RAHMAN
05/20/2026
Special inspection requirement — Structural Steel - High Strength Bolting
WALIUR RAHMAN
05/20/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Gregory Moormann
05/20/2026
Special inspection requirement — Footing and Foundation
WALIUR RAHMAN
05/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christopher Pinto
05/20/2026
Special inspection requirement — Concrete - Cast-In-Place
WALIUR RAHMAN
05/20/2026
Special inspection requirement — Subgrade Inspections
Gregory Moormann
05/20/2026
Special inspection requirement — Sprayed fire-resistant materials
WALIUR RAHMAN
05/20/2026
Special inspection requirement — Final
Christopher Pinto
05/18/2026
Signed off — Alteration
INSTALL INTERIOR NON-ILLUMINATED WINDOW SIGN (MO MATH)
M01276144-I1
05/18/2026
Signed off — Alteration
M01276091-I1
05/18/2026
Signed off — Alteration
INSTALL INTERIOR NON-ILLUMINATED WINDOW SIGN (MO MATH)
M01276141-I1
05/18/2026
Signed off — Alteration
INSTALL EXTERIOR NON-ILLUMINATED WALL SIGN (NATIONAL MUSEUM OF MATHEMATICS)
M01276130-I1
05/18/2026
Signed off — Alteration
INSTALL EXTERIOR NON-ILLUMINATED BLADE SIGN (MOMATH)
M01276120-I1
05/18/2026
Permit issued — Sign
M01276144-I1-SG
05/18/2026
Permit issued — Sign
M01276141-I1-SG
05/14/2026
Special inspection requirement — Sprinkler Systems
Ryan Hansen
05/12/2026
Signed off — Alteration
M01221592-I1
05/12/2026
Filed — Alteration
Interior sprinkler demolition and installation of temporary sprinkler loop on the 7th and 8th floor as indicated on drawings
M01097417-P2
05/12/2026
Special inspection requirement — Final
Ryan Hansen
05/11/2026
Filed — Alteration
Architectural modifications to windows and lobby entry door at 1st floor facade along West 20th Street and minor interior signage and tile work at Sixth Street lobby as indicated on drawings.
M01084751-P2
05/11/2026
Filed — Alteration
Interior demolition of non load bearing partitions and related work on the 7th and 8th floor as indicated on drawings.
M01089783-P2
05/05/2026
Signed off — Alteration
Modifications to plumbing and sprinkler systems as per plans filed herewith.
M01221608-I1
05/04/2026
Permit issued — Earth Work
M01356597-I1-GC
04/29/2026
Filed — Alteration
Sprinkler work on part of the 8th floor as indicated on drawings.
M01043607-P1
04/28/2026
Permit issued — General Construction
M01356597-I1-ST
04/23/2026
Filed — Alteration
Modifications to plumbing and sprinkler systems as per plans filed herewith.
M01221608-P2
04/23/2026
Permit issued — Sprinklers
M01298467-I1-EW-SP
04/21/2026
Filed — No Work
M01163037-P2
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedJRM Construction Management05/27/2026
DOB NOWStructuralPermit IssuedJRM Construction Management05/27/2026
DOB NOWSprinklersPermit IssuedStandard Fire Protection05/21/2026
DOB NOWSignSigned-offMad Signs05/18/2026
DOB NOWSignSigned-offMad Signs05/18/2026
DOB NOWEarth WorkPermit IssuedJRM Construction Management05/04/2026
DOB NOWGeneral ConstructionPermit IssuedJRM Construction Management04/28/2026
DOB NOWSprinklersPermit IssuedA Plus Plumbing04/23/2026
DOB NOWPlumbingPermit IssuedA Plus Plumbing04/09/2026
DOB NOWGeneral ConstructionPermit IssuedJRM Construction Management03/26/2026
DOB NOWMechanical SystemsPermit IssuedJRM Construction Management03/25/2026
DOB NOWSignSigned-offMad Signs03/19/2026
DOB NOWSignSigned-offMad Signs02/19/2026
DOB NOWSignSigned-offMad Signs02/19/2026
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding11/14/2025
DOB NOWGeneral ConstructionPermit IssuedCore Four Construction11/07/2025
DOB NOWStructuralPermit IssuedCore Four Construction11/06/2025
DOB NOWGeneral ConstructionSigned-offCore Four Construction11/06/2025
DOB NOWSupported ScaffoldSigned-offS&E Bridge & Scaffold09/24/2025
DOB NOWStructuralSigned-offJRM Construction Management08/13/2025
DOB NOWPlumbingSigned-offA Plus Plumbing08/06/2025
DOB NOWSprinklersSigned-offA + Sprinkler08/06/2025
DOB NOWGeneral ConstructionSigned-offJRM Construction Management07/29/2025
DOB NOWMechanical SystemsSigned-offJRM Construction Management07/07/2025
DOB NOWGeneral ConstructionPermit IssuedJRM Construction Management06/03/2025
DOB NOWMechanical SystemsSigned-offDK Construction One05/27/2025
DOB NOWPlumbingSigned-offA Plus Plumbing05/01/2025
DOB NOWSprinklersSigned-offA + Sprinkler05/01/2025
DOB NOWSidewalk ShedSigned-offSpring Scaffolding04/25/2025
DOB NOWStructuralSigned-offJRM Construction Management04/16/2025
DOB NOWStructuralSigned-offJRM Construction Management03/19/2025
DOB NOWGeneral ConstructionSigned-offJRM Construction Management03/11/2025
DOB NOWSprinklersSigned-offA + Sprinkler03/10/2025
DOB NOWMechanical SystemsSigned-offJRM Construction Management03/07/2025
DOB NOWGeneral ConstructionPermit IssuedCore Four Construction01/30/2025
DOB NOWStructuralPermit IssuedCore Four Construction01/29/2025
DOB NOWPlumbingSigned-offA Plus Plumbing01/27/2025
DOB NOWMechanical SystemsSigned-offJRM Construction Management01/24/2025
DOB NOWGeneral ConstructionSigned-offJRM Construction Management01/08/2025
DOB NOWGeneral ConstructionSigned-offCore Four Construction12/22/2024
+ 60 more permits on file
2 projects · most recent 03/19/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/19/2026Permit IssuedJRM Construction ManagementAir Conditioning Systems
Cooling
Trane TWE240K3BA/TAA240K3DAA 8,000 CFM · Split System ×1
TWE240K3BA/TTA240K3DAA 8,000 CFM · Split System ×1
10/25/2024Permit IssuedDynamic Air ConditioningAir Conditioning Systems
Cooling
Trane RAUJC60FEF13A0D00001 795,910 BTU · Condensing Unit ×1
4 projects · most recent 07/20/2026
FiledStatusContractorScope
07/20/2026Permit IssuedStandard Fire Protection6 heads
05/12/2026Permit IssuedA&H Express Plumbing & Heating219 heads
04/23/2026Signed-offA + Sprinkler554 heads
03/19/2026Permit IssuedA Plus Plumbing209 heads
4 projects · most recent 04/23/2026
Water/Sanitary Storm
FiledStatusContractorScope
04/23/2026Signed-offA Plus PlumbingStorm, Water/Sanitary
03/19/2026Permit IssuedA Plus PlumbingWater/Sanitary
03/12/2026Signed-offA Plus PlumbingWater/Sanitary
09/19/2021——Water/Sanitary
19 projects · most recent 05/15/2026
General Wiring
FiledStatusContractorScope
05/15/2026Permit IssuedTitan Electrical & Elev ContractingGeneral Wiring
05/15/2026Permit IssuedTitan Electrical & Elev Contracting—
05/15/2026Permit IssuedTitan Electrical & Elev ContractingGeneral Wiring
05/15/2026Permit IssuedTitan Electrical & Elev Contracting—
05/15/2026Permit IssuedTitan Electrical & Elev Contracting15 meters, 1 new_meters
05/15/2026Permit IssuedTitan Electrical & Elev ContractingGeneral Wiring
05/11/2026Permit IssuedTuxedo Electrical Contracting—
04/09/2026Permit IssuedJSP Electl CNTNGGeneral Wiring
03/30/2026CompleteErne Valley ElectricalGeneral Wiring
04/25/2025Permit IssuedCogen Electrical ServicesGeneral Wiring
04/23/2025CompleteTop Shelf Electric—
02/05/2025CompleteCogen Electrical Services—
12/28/2023Permit IssuedMikoma ElectricGeneral Wiring
08/10/2023Permit IssuedShelby ElectricalGeneral Wiring
05/10/2023CompleteP.E. StoneGeneral Wiring
3 projects · most recent 05/20/2026
Steel Concrete
FiledStatusContractorScope
05/20/2026Permit IssuedJRM Construction ManagementSteel, Concrete
03/12/2026Signed-offA Plus PlumbingSteel, Concrete
09/24/2021——1 scope_items
▾Field Inspections (DOB CAP) — 44
DateTypeResultReport
06/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/14/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/09/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/08/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/08/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/07/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/07/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/02/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/30/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/21/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/05/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/12/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/11/2025Fail-Final CND-Occupancy InspectionFailView ↗
12/10/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/01/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/27/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/19/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/17/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
Latest 25 of 44.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/27/2026Structural Stability – Alterations of existing buildingsAlec Stronginspecial
07/22/2026Sprinkler SystemsANTHONY MUSUMECIspecial
07/07/2026Structural Stability – Alterations of existing buildingsAlec Stronginspecial
06/30/2026FinalANTHONY MUSUMECIprogress
06/30/2026Fire-Resistance Rated ConstructionANTHONY MUSUMECIprogress
06/25/2026Fire-Resistance Rated ConstructionANTHONY MUSUMECIprogress
06/25/2026FinalANTHONY MUSUMECIprogress
06/01/2026Sprinkler SystemsANTHONY MUSUMECIspecial
05/22/2026FinalChristopher Pintoprogress
05/22/2026Subgrade InspectionsGregory Moormannspecial
05/22/2026Structural Steel - High Strength BoltingWALIUR RAHMANspecial
05/22/2026Sprayed fire-resistant materialsWALIUR RAHMANspecial
05/22/2026Subsurface Investigations (Borings/Test Pits)Gregory Moormannspecial
05/22/2026Concrete - Cast-In-PlaceWALIUR RAHMANspecial
05/22/2026Structural Steel - WeldingWALIUR RAHMANspecial
05/22/2026Structural Steel - DetailsWALIUR RAHMANspecial
05/22/2026Footing and FoundationWALIUR RAHMANprogress
05/22/2026Structural Stability – Alterations of existing buildingsChristopher Pintospecial
05/20/2026FinalChristopher Pintoprogress
05/20/2026Subsurface Investigations (Borings/Test Pits)Gregory Moormannspecial
05/20/2026Subgrade InspectionsGregory Moormannspecial
05/20/2026Structural Steel - WeldingWALIUR RAHMANspecial
05/20/2026Structural Steel - High Strength BoltingWALIUR RAHMANspecial
05/20/2026Structural Steel - DetailsWALIUR RAHMANspecial
05/20/2026Structural Stability – Alterations of existing buildingsChristopher Pintospecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
MoMath: National Museum of MathematicsArts / Culture / EntertainmentCellar, Floors 1, 2, Roof
Project M01276091 Alteration · LOC Issued · 12/15/2025
Project M01163037 No Work · PA Certificate of Operation Issued · 10/10/2025
Project M01141627 Alteration · Permit Entire · 02/03/2025
Project M01141694 Alteration · LOC Issued · 02/03/2025
Project M01139602 Alteration · LOC Issued · 01/28/2025
Project M01158131 Alteration · LOC Issued · 01/07/2025
Project M01140826 Alteration CO · Permit Entire · 12/12/2024
Project M01139596 Alteration · LOC Issued · 12/08/2024
DSM FirmenichLaboratoryFloors 1–8, Roof
Project M01291761 Alteration · LOC Issued · 09/23/2025
Project M01221592 Alteration · LOC Issued · 07/24/2025
Project M01221594 Alteration · LOC Issued · 07/15/2025
Project M01221603 Alteration · LOC Issued · 07/02/2025
Project M01221608 Alteration · LOC Issued · 07/02/2025
pear Street CapitalOfficeFloor 8
Project M01043540 Alteration · Permit Entire · 01/23/2025
Project M01043604 Alteration · Permit Entire · 01/23/2025
Project M01043607 Alteration · Permit Entire · 01/23/2025
InforOfficeFloors 3, 4, 8
Project M00899675 Alteration · LOC Issued · 01/04/2024
Project M00899698 Alteration · LOC Issued · 01/04/2024
Project M00899707 Alteration · LOC Issued · 01/04/2024
Project M00596608 Alteration · LOC Issued · 03/02/2022
Project M00596647 Alteration · LOC Issued · 02/28/2022
Project M00596634 Alteration · LOC Issued · 02/25/2022
Project M00596091 Alteration · Filing Withdrawn · 12/08/2021
Firstmark CapitalOfficeFloors 6–8
Project M00859536 Alteration · LOC Issued · 06/20/2023
Project M00859543 Alteration · LOC Issued · 06/16/2023
Project M00859547 Alteration · LOC Issued · 06/16/2023
Project M00859551 Alteration · LOC Issued · 06/16/2023
Project M00865461 Alteration · Permit Entire · 06/15/2023
Project M00868376 Alteration · Permit Entire · 06/14/2023
Project M00868390 Alteration · LOC Issued · 06/14/2023
Project M00868403 Alteration · LOC Issued · 06/14/2023
eBayOfficeFloor 12
Project M00809394 Alteration · LOC Issued · 02/03/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 2,218 on file (BIS + DOB NOW)
▸Plans & Drawings109
▸DOB NOWPlans/Sketch103
09/06/2026M01298457-I1Request digital key ↗
09/06/2026M00075121-I1Request digital key ↗
09/06/2026M00075115-I1Request digital key ↗
Showing 3 of 103 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold3
09/04/2026M00390522-I1Request digital key ↗
Showing 1 of 3 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00317058-I1Request digital key ↗
▸Applications & Permits429
▸BISPLAN / WORK APPROVAL APPLICATION205
03/06/2026104782790Open ↗
03/06/2026121728238Open ↗
03/06/2026122991566Open ↗
Showing 3 of 205 on file for this type
▸BISWORK PERMIT APPLICATION137
02/13/2026120733554Open ↗
02/13/2026122260702Open ↗
07/29/2020123792217Open ↗
Showing 3 of 137 on file for this type
▸DOB NOWLPC Approval/Permit79
09/02/2026M00596634-I1Open ↗
09/02/2026M00713393-I1Open ↗
08/29/2026M00713377-I1Open ↗
Showing 3 of 79 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION4
07/26/2018123584861Open ↗
Showing 1 of 4 on file for this type
▸BISPLACE OF ASSEMBLY4
05/09/2019123585762Open ↗
11/09/2018123585762Open ↗
11/09/2018123585762Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records11
▸DOB NOWRestrictive Declaration/Easement 15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWRestrictive Declaration/Easement 25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION1
07/19/2018123584861Open ↗
▸Seals & Professional Certifications619
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION229
11/20/2019123792217Open ↗
03/19/2019123367221Open ↗
03/19/2019123367221Open ↗
Showing 3 of 229 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature113
09/06/2026M01298457-I1Open ↗
09/05/2026M00317058-I1Open ↗
09/04/2026M00390522-I1Open ↗
Showing 3 of 113 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST72
11/20/2019123792217Open ↗
06/11/2018123585762Open ↗
06/11/2018123584861Open ↗
Showing 3 of 72 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature71
09/29/2026M01221608-P2Open ↗
09/25/2026M01298467-I1Open ↗
09/23/2026M01356597-P1Open ↗
Showing 3 of 71 on file for this type
▸DOB NOWProgress Inspector Seal & Signature56
09/23/2026M01356597-P1Open ↗
09/23/2026M01356597-P1Open ↗
09/19/2026M01297682-I1Open ↗
Showing 3 of 56 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT40
11/20/2019123792217Open ↗
06/11/2018123585762Open ↗
06/11/2018123584861Open ↗
Showing 3 of 40 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM37
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 37 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment163
▸BISSELF-CERT PLUMBING NOTICE43
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 43 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE28
12/31/2019122991566Open ↗
12/27/2019122991566Open ↗
Showing 2 of 28 on file for this type
▸BISSCHEDULE B - PLUMBING24
04/16/2021122991566Open ↗
03/16/2021122991566Open ↗
Showing 2 of 24 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA22
11/01/2018122980088Open ↗
05/31/2018123183955Open ↗
Showing 2 of 22 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT19
03/19/2019123367221Open ↗
06/12/2018123112808Open ↗
Showing 2 of 19 on file for this type
▸BISEQUIPMENT USE PERMITS15
03/19/2019123367221Open ↗
06/12/2018123112808Open ↗
Showing 2 of 15 on file for this type
▸BISSPRINKLER INSP REPORT : FP-856
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSTANDPIPE INSP REPORT : FP-843
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSTREET TREE CHECKLIST2
07/20/2018123584861Open ↗
Showing 1 of 2 on file for this type
▸BISTenant Protection Plan and Notes1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos181
▸DOB NOWDEP ACP-5: Asbestos Assessment Report89
09/06/2026M01298457-I1Open ↗
09/03/2026M00596091-I1Open ↗
09/02/2026M00596634-I1Open ↗
Showing 3 of 89 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)60
11/20/2019123792217Open ↗
02/20/2019123682041Open ↗
06/20/2018123584861Open ↗
Showing 3 of 60 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance67
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS40
11/20/2019123792217Open ↗
03/19/2019123367221Open ↗
06/20/2018123584861Open ↗
Showing 3 of 40 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS15
09/27/2022123792217Open ↗
04/20/2021122991566Open ↗
03/19/2019123367221Open ↗
Showing 3 of 15 on file for this type
▸BISTR8: Energy Code Progress Inspections6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Inspections & Test Reports11
▸BISHYDRAULIC FLOW CALCULATIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY3
09/27/2022123792217Open ↗
04/20/2021122991566Open ↗
Showing 2 of 3 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
03/02/2018122972863Open ↗
03/02/2018122972863Open ↗
▸DOB NOWSOIL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs226
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST88
02/25/2026121868416Open ↗
09/29/2022123792217Open ↗
04/26/2021122991566Open ↗
Showing 3 of 88 on file for this type
▸BISLANDMARKS APPROVAL61
11/20/2019123792217Open ↗
06/27/2018123585762Open ↗
06/20/2018123584861Open ↗
Showing 3 of 61 on file for this type
▸BISADMINISTRATIVE OBJECTIONS42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 42 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE15
02/11/2026121056999Open ↗
02/05/2026121056999Open ↗
07/22/2024121056999Open ↗
Showing 3 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
03/16/2021122991566Open ↗
01/30/2018122970598Open ↗
Showing 2 of 12 on file for this type
▸BISSUPERSEDING LETTER4
02/13/2026120733554Open ↗
02/13/2026122260702Open ↗
Showing 2 of 4 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
07/19/2018123584861Open ↗
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLANDMARKS SIGNOFF1
02/25/2026121868416Open ↗
▸DOB NOWDEP Variance (V5) letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership153
▸BISCOST AFFIDAVIT152
09/27/2022123792217Open ↗
04/20/2021122991566Open ↗
11/20/2019123792217Open ↗
Showing 3 of 152 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
02/25/2026121868416Open ↗
▸Filing & Intake Forms190
▸BISEFILING COVER SHEET106
11/20/2019123792217Open ↗
02/20/2019123682041Open ↗
06/11/2018123584861Open ↗
Showing 3 of 106 on file for this type
▸BISADDITIONAL INFORMATION49
04/13/2022123792217Open ↗
04/16/2021122991566Open ↗
03/17/2021122991566Open ↗
Showing 3 of 49 on file for this type
▸BISBOROUGH INTAKE FORM30
02/13/2026120733554Open ↗
02/13/2026122260702Open ↗
12/31/2019122991566Open ↗
Showing 3 of 30 on file for this type
▸BISeFiling Job Application Cover Sheet5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Other Documents43
▸DOB NOWProof of Historic Building23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION8
06/07/2018123183955Open ↗
Showing 1 of 8 on file for this type
▸DOB NOWProperty Ownership Certification5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSupporting Document: Fee Exempt2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSITE CONNECTION: DEP2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLOT DIAGRAM2
06/11/2018123584861Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type