← Back
Over six families without stores
Reid Park Rock
664 RALPH AVENUE · BIN 3080789
💬 Discuss this project
1920Year Built
4Stories
C1Building Class
R6Zoning
24,600 sfGross Floor Area
26Units
Rent Stabilized16 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: NYC PACT PRESERVATION PARTNERS LLC · 13,878 sf lot · 1.77 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof3p · 2 filings · 16 docs
Floor 41p · 1 filing · 6 docs
Floor 31p · 1 filing · 6 docs
Floor 22p · 2 filings · 15 docs
Floor 18p · 2 filings · 13 docs
Cellar5p · 2 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY HOUSING AUTHORITY1604/09/2026
FAIRSTEAD MANAGEMENT404/09/2026
NYCHA303/21/2026
NY CITY HOUSING AUTHORITY203/21/2026
NYC PACT PRESERVATION PARTNERS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP104/03/2025
MADSEN CONSULTING ENGINEERING, PLLC207/18/2024
SOCOTEC, INC.204/25/2024
DAGHER ENGINEERING PLLC202/09/2024
SLM ARCHITECTURE, P.C.101/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KD DESIGNS103/21/2026
CONVERSANO ASSOCIATES, INC.103/21/2026
METROPOLIS GROUP INC1003/21/2026
RIGGING CONSULTANTS403/21/2026
RYBAK DEVELOPMENT203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FSC D&C LLCGeneral Contractor507/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor207/08/2026
ATLAS-ACON ELEC. SERVICEElectrical103/22/2026
LS GENERAL CORPGeneral Contractor104/09/2026
PYRAMID ETC COMPANIES, LLGeneral Contractor104/09/2026
A & E PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803707/18/2024
Building Lifecycle
All (102)Filed (10)Permit Issued (11)Signed Off (5)Violation (35)Inspection (3)Objection (8)Special Inspection (30)
08/18/2026
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01204557-I1
07/10/2026
Signed off — Alteration
Facade repairs. No change in egress, use or occupancy.
B00930761-I1
06/09/2026
Permit issued — Sidewalk Shed
B01204557-I1-SH
05/02/2026
Violation issued (HPD, open)
A
05/02/2026
Violation issued (HPD, open)
A
03/30/2026
Violation issued (HPD, open)
B
03/30/2026
Violation issued (HPD, closed)
C
03/30/2026
Violation issued (HPD, closed)
C
03/26/2026
Signed off — Alteration
structural work for new interior cold formed steel ramp and reframing/reinforcing of existing wood joists as needed at first floor common area.
B00911151-I1
03/19/2026
Signed off — Alteration
Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as needed.
B00923575-I1
03/18/2026
Permit issued — General Construction
B00918303-I1-GC
03/11/2026
Signed off — Alteration
Installation of plumbing fixtures along with related piping.
B00969119-I1
02/09/2026
Violation issued (HPD, closed)
C
12/11/2025
Violation issued (HPD, open)
C
12/11/2025
Violation issued (HPD, closed)
C
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/05/2025
Permit issued — Structural
B00911151-I1-ST
08/04/2025
Objection resolved — Addressed
08/04/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Walsh
08/01/2025
Objection raised — Other
07/31/2025
Filed — Alteration
Facade Repair Via Suspended Scaffolding | Outrigger Beams Material Hoist
B01233040-P1
07/22/2025
Special inspection requirement — Wood – Seismic Resistance
07/11/2025
Permit issued — General Construction
B00930761-I1-GC
06/12/2025
Permit issued — Suspended Scaffold
B01233040-I1-SC
06/11/2025
Objection resolved — Addressed
06/09/2025
Filed — Alteration
Facade Repair Via Suspended Scaffolding | Outrigger Beams Material Hoist
B01233040-I1
06/09/2025
Objection raised — Admin
04/04/2025
Permit issued — Sidewalk Shed
B01204557-I1-SH
04/03/2025
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01204557-I1
03/17/2025
Permit issued — General Construction
B00918303-I1-GC
08/13/2024
Objection resolved — Addressed
07/29/2024
Objection raised — Other
07/27/2024
Violation issued (HPD, open)
B
07/27/2024
Violation issued (HPD, open)
C
07/18/2024
Filed — Alteration
structural work for new interior cold formed steel ramp and reframing/reinforcing of existing wood joists as needed at first floor common area.
B00911151-P1
07/09/2024
Special inspection requirement — Post-installed Anchors
07/02/2024
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
07/02/2024
Special inspection requirement — Structural Steel - Welding
SAMI HAJJAR P.E
07/02/2024
Special inspection requirement — Final
SAMI HAJJAR P.E
07/02/2024
Special inspection requirement — Structural Wood Frame
SAMI HAJJAR P.E
07/02/2024
Special inspection requirement — Tenant Protection Plan Compliance
07/02/2024
Special inspection requirement — Structural Cold-Formed Steel
SAMI HAJJAR P.E
07/02/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
06/10/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/07/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/07/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/30/2024
Permit issued — Structural
B00911151-I1-ST
04/28/2024
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
04/28/2024
Special inspection requirement — Final
SAMI HAJJAR P.E
04/28/2024
Special inspection requirement — Masonry
SAMI HAJJAR P.E
04/25/2024
Filed — Alteration
Facade repairs. No change in egress, use or occupancy.
B00930761-P1
04/11/2024
Violation issued (HPD, closed)
A
04/01/2024
Permit issued — Plumbing
B00969119-I1-PL
03/31/2024
Violation issued (HPD, open)
A
03/31/2024
Violation issued (HPD, open)
A
Latest 60 of 102 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC06/09/2026
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC03/18/2026
DOB NOWStructuralSigned-offFSC D&C LLC08/05/2025
DOB NOWGeneral ConstructionSigned-offLS GENERAL CORP07/11/2025
DOB NOWSuspended ScaffoldPermit IssuedLUAN SELA06/12/2025
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC04/04/2025
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC03/17/2025
DOB NOWStructuralSigned-offFSC D&C LLC05/30/2024
DOB NOWPlumbingSigned-offA & E PLUMBING CORP04/01/2024
DOB NOWMechanical SystemsSigned-offPYRAMID ETC COMPANIES, LL03/29/2024
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC03/22/2024
BISPLISSUEDACE CONTRACTING, INC05/09/2014
BISPLISSUEDACE CONTRACTING, INC02/27/2013
BISBLISSUEDACE CONTRACTING, INC02/27/2013
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING04/05/2007
BISEQISSUEDBRI-DEN CONSTRUCTION CO., INC04/04/2007
BISOTISSUEDBRI-DEN CONSTRUCTION CO., INC04/04/2007
BISEQISSUEDBRI-DEN CONSTRUCTION CO., INC01/11/2007
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING01/06/2007
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING04/13/2006
BISEQISSUEDBRI-DEN CONSTRUCTION CO., INC01/12/2006
BISOTISSUEDBRI-DEN CONSTRUCTION CO., INC01/12/2006
BISEQISSUEDBRI-DEN CONST CORP01/12/2006
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING01/05/2006
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING12/27/2005
2 projects · most recent 06/05/2026
General Wiring
FiledStatusContractorScope
06/05/2026Permit IssuedSOLAS ELECTRICAL CORP—
12/20/2025CompleteATLAS-ACON ELEC. SERVICEGeneral Wiring
1 project · most recent 04/25/2024
FiledStatusContractorScope
04/25/2024Signed-offLS GENERAL CORP1 scope_items
1 project · most recent 04/03/2025
Sidewalk Shed
FiledStatusContractorScope
04/03/2025Signed-offARSENAL SCAFFOLD INCSidewalk Shed
1 project · most recent 07/31/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
07/31/2025Permit IssuedLS GENERAL CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/10/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/07/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
08/04/2025Alternative Materials - OTCR Buildings Bulletin NumberMichael Walshspecial
07/22/2025Wood – Seismic Resistance—special
07/09/2024Post-installed Anchors—special
07/02/2024Structural Steel - DetailsSAMI HAJJAR P.Especial
07/02/2024Structural Steel - WeldingSAMI HAJJAR P.Especial
07/02/2024FinalSAMI HAJJAR P.Eprogress
07/02/2024Structural Wood FrameSAMI HAJJAR P.Eprogress
07/02/2024Tenant Protection Plan Compliance—special
07/02/2024Structural Cold-Formed SteelSAMI HAJJAR P.Especial
07/02/2024Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
04/28/2024Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
04/28/2024FinalSAMI HAJJAR P.Eprogress
04/28/2024MasonrySAMI HAJJAR P.Especial
12/12/2023Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
12/12/2023Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
11/29/2023HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
11/29/2023Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
08/23/2023Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
08/23/2023Exterior lighting powerSAMI HAJJAR P.Eenergy_progress
08/23/2023VestibulesSAMI HAJJAR P.Eenergy_progress
08/23/2023Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
08/23/2023Lighting controlsSAMI HAJJAR P.Eenergy_progress
08/23/2023Mechanical SystemsSAMI HAJJAR P.Especial
08/23/2023FinalSAMI HAJJAR P.Eprogress
08/23/2023Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
Latest 25 of 32.
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/26/2026B00918303-I1Request digital key ↗
08/26/2026B00969119-I1Request digital key ↗
08/26/2026B00923575-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
10/09/2013320689304Open ↗
12/14/2012320689304Open ↗
▸BISWORK PERMIT APPLICATION1
02/28/2013320689304Open ↗
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026B00918303-I1Open ↗
08/26/2026B00969119-I1Open ↗
08/25/2026B00930761-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026B01233040-I1Open ↗
08/31/2026B00969119-I1Open ↗
08/29/2026B00911151-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/31/2026B00969119-I1Open ↗
08/29/2026B00911151-P1Open ↗
08/28/2026B00918303-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
12/14/2012320689304Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
10/09/2013320689304Open ↗
10/09/2013320689304Open ↗
10/08/2013320689304Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING3
10/09/2013320689304Open ↗
10/08/2013320689304Open ↗
12/14/2012320689304Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
07/22/2014320689304Open ↗
03/14/2013320689304Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026B00918303-I1Open ↗
08/26/2026B00969119-I1Open ↗
08/13/2026B00923575-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/25/2026B00930761-I1Open ↗
08/15/2026B00911151-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/14/2012320689304Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/14/2012320689304Open ↗
▸Approvals, Objections & Sign-offs12
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/15/2026B00911151-P1Open ↗
08/15/2026B00911151-I1Open ↗
08/13/2026B00918303-I1Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/10/2013320689304Open ↗
01/10/2013320689304Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
12/14/2012320689304Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/22/2026B01204557-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
12/14/2012320689304Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION3
11/16/2013320689304Open ↗
10/08/2013320689304Open ↗
03/18/2013320689304Open ↗
▸BISEFILING COVER SHEET1
12/14/2012320689304Open ↗
▸Other Documents4
▸DOB NOWManufacturer's Specifications2
08/13/2026B01233040-P1Open ↗
08/13/2026B01233040-I1Open ↗
▸DOB NOWCalculations2
08/13/2026B01233040-P1Open ↗
08/13/2026B01233040-I1Open ↗