Over six families without stores
Reid Park Rock
674 RALPH AVENUE · BIN 3080790
💬 Discuss this project
1920Year Built
4Stories
C1Building Class
R6Zoning
25,600 sfGross Floor Area
26Units
LL97 CoveredRent Stabilized4 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: NYC PACT PRESERVATION PARTNERS LLC · 19,411 sf lot · 1.32 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingOther
Roof3p · 2 filings · 16 docs
Floor 81p · 1 filing · 12 docs
Floor 7
Floor 6
Floor 5
Floor 41p · 1 filing · 6 docs
Floor 31p · 1 filing · 6 docs
Floor 21p · 1 filing · 6 docs
Floor 116p · 3 filings · 20 docs
Cellar7p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FAIRSTEAD MANAGEMENT404/09/2026
NEW YORK CITY HOUSING AUTHORITY1603/22/2026
NYC PACT PRESERVATION PARTNERS503/22/2026
NYC HOUSING AUTHORITY1103/22/2026
NYCHA 996103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DAGHER ENGINEERING PLLC803/05/2026
ASHRAF CORP104/03/2025
MADSEN CONSULTING ENGINEERING, PLLC308/12/2024
SOCOTEC, INC.204/25/2024
SLM ARCHITECTURE, P.C.102/01/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC2403/21/2026
KD DESIGNS103/21/2026
RYBAK DEVELOPMENT203/21/2026
CONVERSANO ASSOCIATES, INC.103/21/2026
RIGGING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FSC D&C LLCGeneral Contractor804/09/2026
DUAL FUEL PLUBING & HTINGPlumbing407/08/2026
LS GENERAL CORPGeneral Contractor303/21/2026
DUAL FUEL COMPANY LLCGeneral Contractor303/21/2026
ARSENAL SCAFFOLD INCGeneral Contractor207/08/2026
PYRAMID ETC COMPANIES, LLGeneral Contractor104/09/2026
A & E PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS18031303/05/2026
Building Lifecycle
All (137)Filed (16)Permit Issued (16)Signed Off (7)Violation (60)Inspection (6)Objection (2)Special Inspection (30)
08/18/2026
Signed off — Alteration
B01204562-I1
07/10/2026
Signed off — Alteration
Facade repairs. No change in egress, use or occupancy.
B00930770-I1
06/09/2026
Permit issued — Sidewalk Shed
B01204562-I1-SH
05/27/2026
Signed off — Alteration
Installation of plumbing fixtures along with related piping. installation of 2 domestic water heaters and pumps.
B00925721-I1
05/27/2026
Signed off — Alteration
SCOPE OF WORK INCLUDES THE REPLACEMENT OF GAS BOILERS AND ASSOCIATED PIPING AND DUCTWORK.
B00925040-I1
05/05/2026
Signed off — Alteration
MECHANICAL WORK INCLUDES INSTALLATION OF NEW GAS VENT DUCTS IN BOILER ROOM - EXISTING CHIMNEY - CELLAR LEVEL.
B00926257-I1
03/25/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/23/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/19/2026
Signed off — Alteration
Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as needed.
B00923592-I1
03/18/2026
Permit issued — General Construction
B00918304-I1-GC
03/11/2026
Signed off — Alteration
Installation of plumbing fixtures along with related piping.
B00969129-I1
03/11/2026
Permit issued — Boiler Equipment
B00925040-I1-BE
03/06/2026
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
03/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
03/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
03/06/2026
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
03/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
03/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
03/05/2026
Filed — Alteration
SCOPE OF WORK INCLUDES THE REPLACEMENT OF GAS BOILERS AND ASSOCIATED PIPING AND DUCTWORK.
B00925040-P1
03/03/2026
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
03/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
03/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
03/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
02/07/2026
Violation issued (HPD, open)
C
02/07/2026
Violation issued (HPD, closed)
C
01/29/2026
Permit issued — Plumbing
B00925721-I1-PL
01/28/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/18/2026
Violation issued (HPD, closed)
C
01/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
01/12/2026
Special inspection requirement — Electrical motors and elevators
SAMI HAJJAR P.E
01/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
01/12/2026
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
01/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
01/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
01/09/2026
Filed — Alteration
Installation of plumbing fixtures along with related piping. installation of 2 domestic water heaters and pumps.
B00925721-P2
01/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/28/2025
Violation issued (HPD, closed)
B
12/28/2025
Violation issued (HPD, closed)
A
12/28/2025
Violation issued (HPD, closed)
B
12/28/2025
Violation issued (HPD, closed)
B
12/28/2025
Violation issued (HPD, closed)
C
12/28/2025
Violation issued (HPD, closed)
B
12/28/2025
Violation issued (HPD, closed)
A
12/28/2025
Violation issued (HPD, closed)
B
12/28/2025
Violation issued (HPD, closed)
C
11/17/2025
Filed — Alteration
Installation of plumbing fixtures along with related piping. installation of 2 domestic water heaters and pumps.
B00925721-P1
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
08/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
08/20/2025
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
08/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
08/20/2025
Special inspection requirement — Electrical motors and elevators
SAMI HAJJAR P.E
08/06/2025
Permit issued — Structural
B00911153-I1-ST
07/11/2025
Permit issued — General Construction
B00930770-I1-GC
06/09/2025
Filed — Alteration
Facade Repair Via Suspended Scaffolding
B01233086-I1
06/09/2025
Permit issued — Suspended Scaffold
B01233086-I1-SC
05/29/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Walsh
04/04/2025
Permit issued — Sidewalk Shed
B01204562-I1-SH
Latest 60 of 137 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC06/09/2026
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC03/18/2026
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING03/11/2026
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING01/29/2026
DOB NOWStructuralPermit IssuedFSC D&C LLC08/06/2025
DOB NOWGeneral ConstructionSigned-offLS GENERAL CORP07/11/2025
DOB NOWSuspended ScaffoldPermit IssuedLUAN SELA06/09/2025
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC04/04/2025
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC03/17/2025
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING01/16/2025
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING01/16/2025
DOB NOWMechanical SystemsSigned-offDUAL FUEL COMPANY LLC01/16/2025
DOB NOWStructuralSigned-offSOHO CONSTRUCTION MANAGEM05/30/2024
DOB NOWPlumbingSigned-offA & E PLUMBING CORP04/01/2024
DOB NOWMechanical SystemsSigned-offPYRAMID ETC COMPANIES, LL03/29/2024
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC03/22/2024
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING04/05/2007
BISEQISSUEDBRI-DEN CONST CO INC04/05/2007
BISOTISSUEDBRI-DEN CONST CO INC04/05/2007
BISEQISSUEDBRI-DEN CONST CO INC01/11/2007
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING01/06/2007
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING04/13/2006
BISOTISSUEDBRI-DEN CONST CO INC01/23/2006
BISEQISSUEDBRI-DEN CONST CO INC01/23/2006
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING01/18/2006
BISEQISSUEDBRI-DEN CONST CORP01/12/2006
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING12/27/2005
1 project · most recent 01/09/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/09/2026Signed-offDUAL FUEL PLUBING & HTINGGas, Water/Sanitary
3 projects · most recent 06/05/2026
General Wiring
FiledStatusContractorScope
06/05/2026CompleteSOLAS ELECTRICAL CORP—
12/20/2025CompleteATLAS-ACON ELEC. SERVICEGeneral Wiring
03/17/2025Permit IssuedITKIN ELECTRIC CORP.—
1 project · most recent 08/12/2024
Steel Wood
FiledStatusContractorScope
08/12/2024Permit IssuedFSC D&C LLCSteel, Wood
1 project · most recent 06/09/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
06/09/2025Permit IssuedLS GENERAL CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/25/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/23/2026Pass-Final Boiler Equipment InspectionPassView ↗
01/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/10/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
03/06/2026Heating SystemsSAMI HAJJAR P.Especial
03/06/2026HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
03/06/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
03/06/2026Maintenance informationSAMI HAJJAR P.Eenergy_progress
03/06/2026HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
03/06/2026Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
03/03/2026Maintenance informationSAMI HAJJAR P.Eenergy_progress
03/03/2026HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
03/03/2026HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
03/03/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
01/12/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
01/12/2026Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
01/12/2026Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
01/12/2026Maintenance informationSAMI HAJJAR P.Eenergy_progress
01/12/2026HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
01/12/2026HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
09/17/2025Tenant Protection Plan Compliance—special
08/20/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
08/20/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
08/20/2025Maintenance informationSAMI HAJJAR P.Eenergy_progress
08/20/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
08/20/2025Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
05/29/2025Alternative Materials - OTCR Buildings Bulletin NumberMichael Walshspecial
04/28/2024Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
04/28/2024MasonrySAMI HAJJAR P.Especial
Latest 25 of 46.
▾Documents — 81 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/26/2026B00925040-P1Request digital key ↗
08/26/2026B00925040-I1Request digital key ↗
08/26/2026B00969129-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Seals & Professional Certifications36
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/26/2026B00925040-I1Open ↗
08/26/2026B00925040-P1Open ↗
08/26/2026B00969129-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/17/2026B00969129-I1Open ↗
09/01/2026B00911153-P4Open ↗
09/01/2026B00911153-P4Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/17/2026B00969129-I1Open ↗
09/01/2026B00911153-P4Open ↗
09/01/2026B00925721-P1Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/26/2026B00925040-I1Open ↗
08/26/2026B00925040-P1Open ↗
08/26/2026B00969129-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026B00930770-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/26/2026B00925040-I1Open ↗
▸Approvals, Objections & Sign-offs14
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
08/26/2026B00925040-P1Open ↗
08/26/2026B00925040-I1Open ↗
08/26/2026B00918304-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/22/2026B01204562-I1Open ↗
▸Other Documents5
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll3
08/13/2026B00925721-I1Open ↗
08/13/2026B00925721-P1Open ↗
08/13/2026B00925721-P2Open ↗
▸DOB NOWCalculations1
08/13/2026B01233086-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01233086-I1Open ↗