← Back
Over six families without stores
Reid Park Rock
694 RALPH AVENUE · BIN 3080792
💬 Discuss this project
1920Year Built
4Stories
C1Building Class
R6Zoning
36,170 sfGross Floor Area
26Units
LL97 CoveredRent Stabilized13 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: NYC PACT PRESERVATION PARTNERS LLC · 12,886 sf lot · 2.81 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof3p · 2 filings · 15 docs
Floor 41p · 1 filing · 4 docs
Floor 31p · 1 filing · 4 docs
Floor 21p · 1 filing · 4 docs
Floor 19p · 3 filings · 20 docs
CellarUnder Construction9p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY HOUSING AUTHORITY2707/08/2026
FAIRSTEAD MANAGEMENT304/09/2026
NYC PACT PRESERVATION PARTNERS LLC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DAGHER ENGINEERING PLLC603/05/2026
ASHRAF CORP104/03/2025
MADSEN CONSULTING ENGINEERING, PLLC210/07/2024
SOCOTEC, INC.204/25/2024
SLM ARCHITECTURE, P.C.110/31/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC1803/21/2026
RYBAK DEVELOPMENT203/21/2026
RIGGING CONSULTANTS203/21/2026
KD DESIGNS103/21/2026
CONVERSANO ASSOCIATES, INC.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FSC D&C LLCGeneral Contractor1307/08/2026
DUAL FUEL PLUBING & HTINGPlumbing407/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor207/08/2026
PYRAMID ETC COMPANIES, LLGeneral Contractor104/09/2026
A & E PLUMBING CORPPlumbing107/08/2026
LS GENERAL CORPGeneral Contractor104/09/2026
DUAL FUEL COMPANY LLCGeneral Contractor107/08/2026
ATLAS-ACON ELEC. SERVICEElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS18031303/05/2026
PCS ENGINEERING3745107/01/2025
Building Lifecycle
All (141)Filed (13)Permit Issued (18)Signed Off (7)Violation (60)Inspection (7)Objection (6)Special Inspection (30)
08/18/2026
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01204565-I1
08/01/2026
Violation issued (HPD, open)
B
08/01/2026
Violation issued (HPD, open)
C
08/01/2026
Violation issued (HPD, open)
B
07/10/2026
Signed off — Alteration
Facade repairs. No change in egress, use or occupancy.
B00930783-I1
06/10/2026
Violation issued (HPD, closed)
B
06/10/2026
Violation issued (HPD, open)
A
06/09/2026
Permit issued — Sidewalk Shed
B01204565-I1-SH
05/27/2026
Signed off — Alteration
SCOPE OF WORK INCLUDES THE REPLACEMENT OF GAS BOILERS AND ASSOCIATED PIPING AND DUCTWORK.
B00925054-I1
05/19/2026
Signed off — Alteration
Installation of plumbing fixtures along with related piping. installation of 2 domestic water heaters and pumps.
B00925837-I1
05/05/2026
Signed off — Alteration
B00948280-I1
04/17/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/14/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/30/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/26/2026
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
03/19/2026
Signed off — Alteration
Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as needed.
B00923604-I1
03/18/2026
Permit issued — General Construction
B00918308-I1-GC
03/11/2026
Signed off — Alteration
Installation of plumbing fixtures along with related piping.
B00937698-I1
03/10/2026
Permit issued — Plumbing
B00925837-I1-PL
03/10/2026
Permit issued — Boiler Equipment
B00925054-I1-BE
03/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
03/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
03/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
03/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
03/06/2026
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
03/06/2026
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
03/05/2026
Filed — Alteration
SCOPE OF WORK INCLUDES THE REPLACEMENT OF GAS BOILERS AND ASSOCIATED PIPING AND DUCTWORK.
B00925054-P1
03/04/2026
Violation issued (HPD, closed)
C
03/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
03/03/2026
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
03/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
03/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
03/03/2026
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
02/05/2026
Violation issued (HPD, closed)
C
01/03/2026
Violation issued (HPD, closed)
B
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (HPD, closed)
C
08/06/2025
Permit issued — Structural
B00911162-I1-ST
07/13/2025
Violation issued (HPD, closed)
C
07/11/2025
Permit issued — General Construction
B00930783-I1-GC
07/08/2025
Permit issued — Suspended Scaffold
B01242624-I1-SC
07/08/2025
Objection resolved — Addressed
07/02/2025
Objection raised — Other
07/01/2025
Filed — Alteration
Suspended Scaffold for Facade Repair
B01242624-I1
06/28/2025
Special inspection requirement — Post-installed Anchors
Michael Walsh
06/28/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Walsh
06/10/2025
Violation issued (HPD, closed)
A
04/23/2025
Violation issued (HPD, closed)
B
04/04/2025
Permit issued — Sidewalk Shed
B01204565-I1-SH
04/03/2025
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01204565-I1
03/23/2025
Violation issued (HPD, closed)
B
03/19/2025
Violation issued (ECB, closed)
Construction
03/17/2025
Permit issued — General Construction
B00918308-I1-GC
02/16/2025
Violation issued (HPD, open)
C
02/16/2025
Violation issued (HPD, closed)
B
02/10/2025
Violation issued (HPD, open)
C
02/06/2025
Violation issued (HPD, closed)
C
Latest 60 of 141 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC06/09/2026
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC03/18/2026
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING03/10/2026
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING03/10/2026
DOB NOWStructuralSigned-offFSC D&C LLC08/06/2025
DOB NOWGeneral ConstructionSigned-offLS GENERAL CORP07/11/2025
DOB NOWSuspended ScaffoldPermit IssuedLUAN SELA07/08/2025
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC04/04/2025
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC03/17/2025
DOB NOWMechanical SystemsPermit IssuedDUAL FUEL COMPANY LLC01/16/2025
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING01/16/2025
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING01/16/2025
DOB NOWStructuralSigned-offFSC D&C LLC04/29/2024
DOB NOWPlumbingSigned-offA & E PLUMBING CORP04/01/2024
DOB NOWMechanical SystemsSigned-offPYRAMID ETC COMPANIES, LL03/29/2024
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC03/22/2024
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC11/21/2023
DOB NOWStructuralSigned-offFSC D&C LLC11/09/2023
BISPLISSUEDNYC HOUSING AUTHORITY03/31/2011
BISPLISSUEDNYC HOUSING AUTHORITY02/11/2010
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING04/05/2007
BISOTISSUEDBRI-DEN CONSTRUCTION COMPANY INC04/04/2007
BISEQISSUEDBRI-DEN CONSTRUCTION COMPANY INC04/04/2007
BISEQISSUEDBRI-DEN CONSTRUCTION COMPANY INC01/11/2007
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING01/10/2007
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING04/13/2006
BISOTISSUEDBRI-DEN CONSTRUCTION COMPANY INC01/23/2006
BISEQISSUEDBRI-DEN CONSTRUCTION COMPANY INC01/23/2006
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING01/18/2006
BISEQISSUEDBRI-DEN CONST CORP01/12/2006
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING12/28/2005
1 project · most recent 01/05/2024
Water/Sanitary
FiledStatusContractorScope
01/05/2024Signed-offDUAL FUEL PLUBING & HTINGWater/Sanitary
3 projects · most recent 06/05/2026
General Wiring
FiledStatusContractorScope
06/05/2026Permit IssuedSOLAS ELECTRICAL CORP—
12/20/2025CompleteATLAS-ACON ELEC. SERVICEGeneral Wiring
04/09/2025Permit IssuedITKIN ELECTRIC CORP.—
1 project · most recent 10/07/2024
Steel Concrete
FiledStatusContractorScope
10/07/2024Signed-offFSC D&C LLCSteel, Concrete
1 project · most recent 04/03/2025
Sidewalk Shed
FiledStatusContractorScope
04/03/2025Signed-offARSENAL SCAFFOLD INCSidewalk Shed
1 project · most recent 07/01/2025
Suspended Scaffold
FiledStatusContractorScope
07/01/2025Permit IssuedLS GENERAL CORPSuspended Scaffold
1 project · most recent 07/01/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
07/01/2025Permit IssuedLS GENERAL CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/17/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/14/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/26/2026Fail-Final Boiler Equipment InspectionFailView ↗
06/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/10/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
03/06/2026Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
03/06/2026HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
03/06/2026HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
03/06/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
03/06/2026Maintenance informationSAMI HAJJAR P.Eenergy_progress
03/06/2026Heating SystemsSAMI HAJJAR P.Especial
03/03/2026HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
03/03/2026Heating SystemsSAMI HAJJAR P.Especial
03/03/2026Tenant Protection Plan Compliance—special
03/03/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
03/03/2026HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
03/03/2026Maintenance informationSAMI HAJJAR P.Eenergy_progress
06/28/2025Post-installed AnchorsMichael Walshspecial
06/28/2025Alternative Materials - OTCR Buildings Bulletin NumberMichael Walshspecial
10/11/2024FinalSAMI HAJJAR P.Eprogress
10/11/2024Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
10/11/2024Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
10/11/2024Post-installed AnchorsSAMI HAJJAR P.Especial
10/11/2024Structural Steel - DetailsSAMI HAJJAR P.Especial
10/11/2024Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
10/11/2024Structural Steel - High Strength BoltingSAMI HAJJAR P.Especial
10/11/2024Structural Steel - WeldingSAMI HAJJAR P.Especial
08/19/2024Structural Steel - High Strength BoltingSAMI HAJJAR P.Especial
08/19/2024FinalSAMI HAJJAR P.Eprogress
08/19/2024Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
Latest 25 of 45.
▾Documents — 88 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/26/2026B00918308-I1Request digital key ↗
08/26/2026B00937698-I1Request digital key ↗
08/26/2026B00925054-P1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
03/17/2010320128795Open ↗
02/11/2010320128795Open ↗
▸BISWORK PERMIT APPLICATION2
04/04/2011320128795Open ↗
02/11/2010320128795Open ↗
▸Seals & Professional Certifications39
▸DOB NOWSpecial Inspector Seal & Signature15
09/01/2026B00930783-I1Open ↗
09/01/2026B00911162-I1Open ↗
09/01/2026B00911162-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/26/2026B00925054-I1Open ↗
08/26/2026B00925837-I1Open ↗
08/26/2026B00923604-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026B00930783-I1Open ↗
09/01/2026B00911162-I1Open ↗
08/30/2026B00925837-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
02/11/2010320128795Open ↗
02/11/2010320128795Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/11/2010320128795Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
02/11/2010320128795Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING2
03/17/2010320128795Open ↗
02/11/2010320128795Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/26/2026B00925054-I1Open ↗
08/26/2026B00925837-I1Open ↗
08/26/2026B00923604-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
02/11/2010320128795Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/25/2026B00930783-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/26/2026B00925054-I1Open ↗
▸Approvals, Objections & Sign-offs14
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/26/2026B00925054-I1Open ↗
08/25/2026B00948280-I1Open ↗
08/13/2026B00930783-P1Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
02/11/2010320128795Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/22/2026B01204565-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
02/11/2010320128795Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
02/11/2010320128795Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026B01242624-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01242624-I1Open ↗