← Back
One story - permanent living quarter
697 NORTH RAILROAD AVE
STATEN ISLAND · BIN 5050591
💬 Discuss this project
1950Year Built
1.67Stories
A2Building Class
R3XZoning
924 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
One story - permanent living quarter · Owner of record: IP DREAM HOUSE, LLC · 4,720 sf lot · 0.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Floor 2Under Construction28p · 1 filing · 20 docs
Floor 1Under Construction19p · 2 filings · 20 docs
CellarUnder Construction36p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CAVALRY203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SHARON ENGINEERING, P.C405/13/2026
CHUN ENGINEERING CONSULTANT PLLC604/23/2025
HAMANN ENGINEERING, PLLC111/09/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CAVALRY LLC803/21/2026
BIG ORANGE EXPEDITING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CAVALRY LLCGeneral Contractor607/08/2026
BIG I RESTORATION INCGeneral Contractor407/08/2026
CAVALRY GC&P LLCGeneral Contractor207/04/2026
FLOW-RIGHT FIRE SUPP CORPFire Protection107/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHUN ENGINEERING CONSULTA9605705/13/2026
DAL H CHUN ENGINEER PC1972107/02/2024
Building Lifecycle
All (90)Filed (11)Permit Issued (11)Signed Off (1)Violation (6)Inspection (2)Objection (36)Special Inspection (23)
07/09/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/06/2026
Permit issued — Sprinklers
S00958775-S8-EW-SP
07/02/2026
Permit issued — General Construction
S00958775-I1-GC
06/25/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALL NEW CURB CUT AS PER PLAN
S00958775-S7
06/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES CHUN
06/08/2026
Special inspection requirement — Wood – High-Load Diaphragms
JAMES CHUN
06/08/2026
Special inspection requirement — Final
CLOUD LEE
06/08/2026
Special inspection requirement — Post-installed Anchors
JAMES CHUN
05/13/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALL NEW CURB CUT AS PER PLAN
S00958775-P1
05/07/2026
Permit issued — Construction Fence
S00958775-S9-FN
05/07/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/16/2026
Violation issued (ECB, open)
Construction
04/13/2026
Permit issued — Plumbing
S00958775-S2-PL
01/22/2026
Violation issued (ECB, closed)
Construction
10/18/2025
Violation issued (ECB, closed)
Construction
07/21/2025
Permit issued — Foundation
S00958775-S5-FO
07/16/2025
Permit issued — Support of Excavation
S00958775-S7-SE
07/01/2025
Permit issued — Structural
S00958775-S6-ST
07/01/2025
Permit issued — General Construction
S00958775-I1-GC
06/09/2025
Objection resolved — Addressed
05/29/2025
Objection raised — Cost
05/28/2025
Objection resolved — Addressed
05/28/2025
Objection resolved — Addressed
05/28/2025
Objection resolved — Addressed
05/28/2025
Objection resolved — Addressed
05/23/2025
Objection resolved — Addressed
05/22/2025
Objection raised — Cost
05/19/2025
Objection resolved — Addressed
05/15/2025
Objection raised — Zoning
05/13/2025
Objection resolved — Addressed
05/13/2025
Objection resolved — Addressed
05/09/2025
Objection raised — Scope
05/09/2025
Objection raised — Zoning
05/05/2025
Objection resolved — Addressed
05/05/2025
Objection resolved — Addressed
05/02/2025
Objection raised — Scope
04/23/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALL NEW CURB CUT AS PER PLAN
S00958775-Z1
01/09/2025
Objection raised — Scope
01/08/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALL NEW CURB CUT AS PER PLAN
S00958775-S8
12/24/2024
Permit issued — Construction Fence
S00958775-S9-FN
12/19/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALL NEW CURB CUT AS PER PLAN
S00958775-S9
10/28/2024
Objection resolved — Addressed
10/18/2024
Violation issued (ECB, closed)
Construction
10/18/2024
Violation issued (ECB, closed)
Construction
10/03/2024
Objection raised — Other
10/02/2024
Objection resolved — Addressed
09/27/2024
Objection raised — Other
09/25/2024
Objection resolved — Addressed
09/09/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES CHUN
08/28/2024
Permit issued — Mechanical Systems
S00958775-S3-MS
07/29/2024
Objection raised — Scope
07/18/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALL NEW CURB CUT AS PER PLAN
S00958775-S5
07/16/2024
Objection raised — Scope
07/15/2024
Objection raised — Other
07/11/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALL NEW CURB CUT AS PER PLAN
S00958775-S7
07/11/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALL NEW CURB CUT AS PER PLAN
S00958775-S6
07/09/2024
Special inspection requirement — Footing and Foundation
JAMES CHUN
07/09/2024
Special inspection requirement — Concrete - Cast-In-Place
JAMES CHUN
07/09/2024
Special inspection requirement — Subgrade Inspections
JAMES CHUN
07/09/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
JAMES CHUN
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedFLOW-RIGHT FIRE SUPP CORP07/06/2026
DOB NOWGeneral ConstructionPermit IssuedCAVALRY GC&P LLC07/02/2026
DOB NOWConstruction FencePermit IssuedBIG I RESTORATION INC05/07/2026
DOB NOWPlumbingPermit IssuedFLOW-RIGHT PLBG & HTG COR04/13/2026
DOB NOWFoundationPermit IssuedCAVALRY LLC07/21/2025
DOB NOWSupport of ExcavationSigned-offCAVALRY LLC07/16/2025
DOB NOWStructuralSigned-offCAVALRY LLC07/01/2025
DOB NOWGeneral ConstructionPermit IssuedCAVALRY LLC07/01/2025
DOB NOWConstruction FencePermit IssuedBIG I RESTORATION INC12/24/2024
DOB NOWMechanical SystemsPermit IssuedBIG I RESTORATION INC08/28/2024
DOB NOWGeneral ConstructionPermit IssuedBIG I RESTORATION INC11/22/2023
1 project · most recent 05/13/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/13/2026Permit IssuedCAVALRY GC&P LLCHeating and Air Conditioning Systems
Heat / Cool
Daikin 5MXS48TVJU 48,500 BTU · Condensing Unit ×3
1 project · most recent 05/13/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/13/2026Permit IssuedFLOW-RIGHT PLBG & HTG CORGas, Water/Sanitary
1 project · most recent 12/16/2025
General Wiring
FiledStatusContractorScope
12/16/2025Permit IssuedDENMAR ELECTRIC CORPGeneral Wiring
1 project · most recent 05/13/2026
Wood
FiledStatusContractorScope
05/13/2026Permit IssuedFLOW-RIGHT FIRE SUPP CORPWood
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/07/2026Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
06/08/2026Structural Stability – Alterations of existing buildingsJAMES CHUNspecial
06/08/2026Wood – High-Load DiaphragmsJAMES CHUNspecial
06/08/2026FinalCLOUD LEEprogress
06/08/2026Post-installed AnchorsJAMES CHUNspecial
09/09/2024Structural Stability – Alterations of existing buildingsJAMES CHUNspecial
07/09/2024Footing and FoundationJAMES CHUNprogress
07/09/2024Concrete - Cast-In-PlaceJAMES CHUNspecial
07/09/2024Subgrade InspectionsJAMES CHUNspecial
07/09/2024Subsurface Conditions – Fill Placement & In-Place DensityJAMES CHUNspecial
07/09/2024FinalCLOUD LEEprogress
05/29/2024Air barrier - visual inspectionJAMES CHUNenergy_progress
05/28/2024Fire-Resistant Penetrations and JointsJAMES CHUNspecial
05/28/2024Energy Code Compliance InspectionsJAMES CHUNprogress
01/09/2024Permanent certificateJAMES CHUNenergy_progress
01/09/2024Air barrier — testing JAMES CHUNenergy_progress
01/09/2024Electric vehicle service equipment requirementsJAMES CHUNenergy_progress
01/09/2024Maintenance informationJAMES CHUNenergy_progress
01/09/2024Insulation placement and R valuesJAMES CHUNenergy_progress
01/09/2024Fenestration areasJAMES CHUNenergy_progress
01/09/2024Interior lighting powerJAMES CHUNenergy_progress
01/09/2024Fenestration air leakageJAMES CHUNenergy_progress
01/09/2024Fenestration and door U-factor and product ratingsJAMES CHUNenergy_progress
11/15/2023Structural Stability – Alterations of existing buildingsJAMES CHUNspecial
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/19/2026S00958775-S5Request digital key ↗
08/19/2026S00958775-S6Request digital key ↗
08/19/2026S00958775-S7Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
04/24/2025540265318Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
11/13/2024540265318Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00958775-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00958775-I1Open ↗
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/19/2026S00958775-S6Open ↗
08/19/2026S00958775-P1Open ↗
08/13/2026S00958775-S6Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/02/2026S00958775-S6Open ↗
09/01/2026S00958775-I1Open ↗
08/24/2026S00958775-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026S00958775-S6Open ↗
09/01/2026S00958775-I1Open ↗
08/24/2026S00958775-S2Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/13/2024540265318Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/13/2024540265318Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S00958775-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00958775-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/19/2026S00958775-P1Open ↗
08/13/2026S00958775-S8Open ↗
08/13/2026S00958775-S6Open ↗
Showing 3 of 10 on file for this type
▸Inspections & Test Reports3
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/13/2026S00958775-S7Open ↗
08/13/2026S00958775-S5Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
04/24/2025540265318Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
04/24/2025540265318Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
11/13/2024540265318Open ↗
▸Other Documents7
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
04/24/2025540265318Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
04/24/2025540265318Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00958775-S7Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00958775-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026S00958775-I1Open ↗
▸DOB NOWWaiver Document1
08/13/2026S00958775-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S00958775-I1Open ↗