| Owner | Filings | Most Recent |
|---|---|---|
| MARX REALTY | 383 | 09/22/2026 |
| CAVA | 7 | 07/08/2026 |
| SWEETGREEN | 5 | 07/08/2026 |
| RELIABLE ENTERPRISES | 10 | 07/08/2026 |
| JJS BUILDERS | 4 | 07/08/2026 |
| SUPER US CONTRACTING | 8 | 03/22/2026 |
| 708 THIRD AVENUE ASSOCIATES | 91 | 03/22/2026 |
| PHASE 3 INTERIORS | 1 | 03/22/2026 |
| GENCI SELA PHASE 3 INTERI | 1 | 03/22/2026 |
| 708 THIRD AVENYE ASSOCIAT | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| ROBERT DERECTOR ASSOCIATES | 86 | 09/11/2026 |
| RANDALL P. COLLINS ARCHITECT, PC | 16 | 08/25/2026 |
| REL ENGINEERING PC | 1 | 08/10/2026 |
| MG ENGINEERING D.P.C. | 3 | 06/30/2026 |
| STUDIOS ARCHITECTURE | 5 | 11/26/2025 |
| SEVERUD ASSOCIATES | 2 | 09/19/2025 |
| PCS ENGINEERING | 1 | 08/21/2024 |
| SALAS OBRIEN | 3 | 06/08/2023 |
| GREENBERGFARROW | 4 | 09/08/2022 |
| POLARIS CONSULTING ENGINEERS, PC | 4 | 09/07/2022 |
| LEON SKVIRSKY PE | 4 | 07/29/2022 |
| OTJ ARCHITECTS | 1 | 07/29/2021 |
| ARQUITECTURA VARELA | 2 | 07/07/2021 |
| ENTHINK ENGINEERS LLC | 3 | 05/06/2021 |
| CANY ARCHITECTURE & ENGINEERING DPC | 1 | 04/28/2021 |
| ROSINI ENGINEERING, PC | 2 | 10/01/2020 |
| JOSE L. PENA,P.E. | 2 | 07/22/2020 |
| FISKAA ENGINEERING | 3 | 02/24/2020 |
| SCALAR ARCHITECTURE PC | 2 | 10/17/2018 |
| GREEN DESIGN | 1 | 09/27/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| ARCHETYPE CONSULTANTS | 68 | 03/21/2026 |
| RIZZO GROUP | 85 | 03/21/2026 |
| BURNHAM NATIONWIDE INC | 3 | 03/21/2026 |
| RIGGING CONSULTANTS | 2 | 03/21/2026 |
| ALLCITYEXPEDITING | 2 | 03/21/2026 |
| ATLANTIC BUILDING SUPPLY INC. | 2 | 03/21/2026 |
| LOUIS STRIAR | 4 | 03/21/2026 |
| BUILDING BROTHERS | 8 | 03/21/2026 |
| AE DESIGN SOLUTION | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| PHASE 3 INTERIORS LLC | General Contractor | 64 | 09/22/2026 |
| A&A PLUMBING CORP | Plumbing | 31 | 07/08/2026 |
| DEPENDABLE MECHANICAL COR | Fire Protection | 23 | 07/08/2026 |
| CMA PLUMBING & HEATING IN | Fire Protection | 12 | 07/08/2026 |
| PRIME MECHANICAL CONTRACT | General Contractor | 11 | 09/13/2026 |
| SOUTH EAST CONSTRUCTION G | General Contractor | 10 | 07/08/2026 |
| STEPHEN ROSTOWSKY | Electrical | 7 | 03/21/2026 |
| AGIUS PLUMBING & HTG INC | Plumbing | 7 | 07/08/2026 |
| SUPER US CONTRACTING INC | General Contractor | 5 | 07/08/2026 |
| PAUL SIGNS | Scaffold | 4 | 07/08/2026 |
| INOR BUILDERS GROUP LLC | General Contractor | 4 | 07/08/2026 |
| RAYMOND WILSON | Electrical | 4 | 03/21/2026 |
| RELIABLE ENTERPRISES INC | General Contractor | 3 | 07/08/2026 |
| SIGNSTAR NYC | Scaffold | 2 | 07/08/2026 |
| GRUSHINSKY PIPNG & HTG IN | Fire Protection | 2 | 07/08/2026 |
| J. CAIAZZO PLBG & HTG CORP | Fire Protection | 2 | 07/08/2026 |
| EVEREST SCAFFOLDING INC | General Contractor | 2 | 07/08/2026 |
| JJS BUILDERS | General Contractor | 2 | 07/08/2026 |
| J. CAIAZZO PLBG & HTG COR | Plumbing | 2 | 07/08/2026 |
| TRANSFORM ELECTL CONTRS I | Electrical | 1 | 03/22/2026 |
| NEE ELECTRICAL, LLC | Electrical | 1 | 03/22/2026 |
| KARAGIANNIS, DIMITRIOS | Electrical | 1 | 03/21/2026 |
| A&E ELECTRICAL SYSTEMS CO | Electrical | 1 | 03/22/2026 |
| FARID MARJI | Electrical | 1 | 03/21/2026 |
| CUSTOM COMMERCIAL CONSTRUCTION | General Contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| CODEGREEN | 510 | 72 | 09/11/2026 |
| BECKER ENGINEERING, PC | 633 | 14 | 06/30/2026 |
| RYAN SPECIAL ENGINEERING | 2018 | 11 | 06/08/2023 |
| HANSEN ENGINEERING PC | 8174 | 2 | 02/10/2023 |
| VIBRANALYSIS INC., DBA VT | 6864 | 2 | 09/08/2022 |
| OUTSOURCE SPECIAL INSPECT | 2827 | 1 | 01/13/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Mechanical Systems | Permit Issued | PHASE 3 INTERIORS LLC | 09/21/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | PRIME MECHANICAL CONTRACT | 09/11/2026 |
| DOB NOW | General Construction | Permit Issued | PHASE 3 INTERIORS LLC | 09/08/2026 |
| DOB NOW | Sprinklers | Permit Issued | DEPENDABLE MECHANICAL COR | 04/15/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | PHASE 3 INTERIORS LLC | 04/13/2026 |
| DOB NOW | Plumbing | Permit Issued | AGIUS PLUMBING & HTG INC | 04/06/2026 |
| DOB NOW | General Construction | Permit Issued | PHASE 3 INTERIORS LLC | 03/18/2026 |
| DOB NOW | Plumbing | Signed-off | AGIUS PLUMBING & HTG INC | 01/30/2026 |
| DOB NOW | Plumbing | Signed-off | AGIUS PLUMBING & HTG INC | 01/30/2026 |
| DOB NOW | Sprinklers | Permit Issued | DEPENDABLE MECHANICAL COR | 01/21/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A PLUMBING CORP | 01/14/2026 |
| DOB NOW | Plumbing | Signed-off | AGIUS PLUMBING & HTG INC | 01/07/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | PHASE 3 INTERIORS LLC | 12/19/2025 |
| DOB NOW | General Construction | Signed-off | PHASE 3 INTERIORS LLC | 12/09/2025 |
| DOB NOW | Mechanical Systems | Signed-off | PHASE 3 INTERIORS LLC | 12/08/2025 |
| DOB NOW | General Construction | Permit Issued | PHASE 3 INTERIORS LLC | 11/19/2025 |
| DOB NOW | Sprinklers | Permit Issued | DEPENDABLE MECHANICAL COR | 10/14/2025 |
| DOB NOW | Structural | Permit Issued | PRIME MECHANICAL CONTRACT | 09/26/2025 |
| DOB NOW | Plumbing | Signed-off | AGIUS PLUMBING & HTG INC | 09/19/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | PHASE 3 INTERIORS LLC | 09/18/2025 |
| DOB NOW | General Construction | Permit Issued | PHASE 3 INTERIORS LLC | 09/18/2025 |
| DOB NOW | Standpipe | Signed-off | DEPENDABLE MECHANICAL COR | 09/02/2025 |
| DOB NOW | General Construction | Permit Issued | PHASE 3 INTERIORS LLC | 09/02/2025 |
| DOB NOW | Sprinklers | Signed-off | DEPENDABLE MECHANICAL COR | 09/02/2025 |
| DOB NOW | Sprinklers | Signed-off | DEPENDABLE MECHANICAL COR | 08/29/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | PHASE 3 INTERIORS LLC | 08/25/2025 |
| DOB NOW | Plumbing | Signed-off | AGIUS PLUMBING & HTG INC | 08/25/2025 |
| DOB NOW | Standpipe | Signed-off | DEPENDABLE MECHANICAL COR | 07/17/2025 |
| DOB NOW | Plumbing | Permit Issued | AGIUS PLUMBING & HTG INC | 06/12/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | PHASE 3 INTERIORS LLC | 06/10/2025 |
| DOB NOW | Standpipe | Signed-off | DEPENDABLE MECHANICAL COR | 06/04/2025 |
| DOB NOW | Sprinklers | Signed-off | DEPENDABLE MECHANICAL COR | 06/04/2025 |
| DOB NOW | General Construction | Permit Issued | PHASE 3 INTERIORS LLC | 06/03/2025 |
| DOB NOW | Mechanical Systems | Signed-off | PHASE 3 INTERIORS LLC | 05/09/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | PRIME MECHANICAL CONTRACT | 05/01/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | PRIME MECHANICAL CONTRACT | 04/14/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | PRIME MECHANICAL CONTRACT | 04/07/2025 |
| DOB NOW | Standpipe | Signed-off | DEPENDABLE MECHANICAL COR | 04/07/2025 |
| DOB NOW | Sprinklers | Signed-off | DEPENDABLE MECHANICAL COR | 04/03/2025 |
| DOB NOW | Sprinklers | Signed-off | DEPENDABLE MECHANICAL COR | 03/17/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 12/12/2025 | Permit Issued | PHASE 3 INTERIORS LLC | Air Conditioning Systems | Cooling Trane PEFY-P36NMAU-E3 1,200 CFM · Vrf Indoor ×1 |
| 08/19/2025 | Permit Issued | PHASE 3 INTERIORS LLC | Air Conditioning Systems | Cooling Lg ZRUN024GSS0 2 tons · Vrf Outdoor ×1 |
| 06/04/2025 | Permit Issued | PHASE 3 INTERIORS LLC | Air Conditioning Systems | Cooling Trane UCCAP17A0F0EGL 20 tons · Fan Coil Indoor ×1 |
| 03/28/2025 | Permit Issued | PRIME MECHANICAL CONTRACT | Air Conditioning Systems | Cooling York YKCQCPQ4-EJHS 3,600,000 BTU · Wshp ×1 |
| 12/05/2023 | Signed-off | PHASE 3 INTERIORS LLC | Air Conditioning Systems, Associated Ducts and Piping, Ventilation Systems | Cooling Mitsubishi Electric PUHY-P168TNU-A 14 tons · Vrf Outdoor ×1 Ventilation Mitsubishi Electric PEFY-P48NMAU-E4 48,000 BTU · Vrf Indoor ×3 Ducts & Piping N/A N/A Ductwork ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/11/2026 | — | — | 14 heads |
| 06/30/2026 | Signed-off | A&H EXPRESS PLBG&HTG CORP | — |
| 04/22/2026 | Signed-off | A&H EXPRESS PLBG&HTG CORP | 60 heads |
| 03/10/2026 | Permit Issued | A&H EXPRESS PLBG&HTG CORP | — |
| 03/09/2026 | Permit Issued | A&H EXPRESS PLBG&HTG CORP | 203 heads |
| 01/05/2026 | Signed-off | A&H EXPRESS PLBG&HTG CORP | 436 heads |
| 09/11/2025 | Permit Issued | A&H EXPRESS PLBG&HTG CORP | 284 heads |
| 05/29/2025 | Signed-off | A&H EXPRESS PLBG&HTG CORP | 1 outlets |
| 10/23/2023 | Permit Issued | A&H EXPRESS PLBG&HTG CORP | 56 heads |
| 02/10/2023 | — | — | 4 heads |
| 10/01/2020 | Signed-off | GRUSHINSKY PIPNG & HTG IN | 98 heads |
| 03/10/2020 | — | — | 39 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/11/2026 | — | — | — |
| 04/22/2026 | — | — | — |
| 03/09/2026 | Permit Issued | AGIUS PLUMBING & HTG INC | Water/Sanitary |
| 01/05/2026 | — | — | — |
| 12/12/2025 | Signed-off | AGIUS PLUMBING & HTG INC | Water/Sanitary |
| 09/12/2025 | Signed-off | AGIUS PLUMBING & HTG INC | Water/Sanitary |
| 09/11/2025 | — | — | — |
| 10/31/2023 | Permit Issued | A&A PLUMBING CORP | Water/Sanitary |
| 02/24/2020 | Signed-off | J. CAIAZZO PLBG & HTG COR | Water/Sanitary |
| 01/13/2020 | Signed-off | A&A PLUMBING CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/21/2026 | Complete | TRANSFORM ELECTL CONTRS I | General Wiring |
| 12/31/2025 | Permit Issued | M&L ELECL CONTNG CORP | General Wiring |
| 05/28/2025 | Permit Issued | TRANSFORM ELECTL CONTRS I | General Wiring |
| 12/11/2024 | Complete | ATTRACTIVE LIGHTING ELECL | — |
| 12/10/2024 | Complete | ATTRACTIVE LIGHTING ELECL | — |
| 06/25/2024 | Permit Issued | TITAN ELEC'L & ELEV CONTR | General Wiring |
| 04/10/2024 | Permit Issued | TRANSFORM ELECTL CONTRS I | General Wiring |
| 07/17/2023 | Complete | JANON ELECTRIC CORP | General Wiring |
| 05/31/2023 | Complete | TRANSFORM ELECTL CONTRS I | General Wiring |
| 09/08/2022 | Complete | GREEN APPLE ELECL SVCS LL | General Wiring |
| 06/11/2021 | Permit Issued | RICHARD NEU | — |
| 03/04/2021 | Permit Issued | RICHARD NEU | — |
| 03/02/2021 | Permit Issued | ROBERT CHIMENTI | 3 meters, 1 new_meters |
| 02/12/2021 | Complete | RICH BRZESKI ELECTRIC INC | General Wiring |
| 12/15/2020 | Complete | TRANSFORM ELECTL CONTRS I | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/19/2025 | Permit Issued | PRIME MECHANICAL CONTRACT | Steel, Concrete |
| 09/15/2025 | Permit Issued | PHASE 3 INTERIORS LLC | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/07/2021 | Permit Issued | SUPER US CONTRACTING INC | Scaffold |
| 05/06/2021 | Permit Issued | RELIABLE ENTERPRISES INC | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/10/2026 | — | — | — |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/03/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/31/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/28/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/22/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/22/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/22/2026 | Pass-Final SD - Up to 9 Requested Floors | Pass | View ↗ |
| 05/21/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/18/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/05/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/05/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Water Test | Certified | View ↗ |
| 05/01/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/07/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/14/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/11/2026 | Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish | Certified | View ↗ |
| 03/04/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/04/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 02/26/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/26/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/26/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/02/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 01/22/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/22/2026 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 01/21/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/16/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 01/09/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/02/2026 | Interior lighting power | James Sullivan Jr | energy_progress |
| 09/02/2026 | Lighting controls | James Sullivan Jr | energy_progress |
| 09/02/2026 | Post-installed Anchors | James Sullivan Jr | special |
| 08/21/2026 | Fire-Resistance Rated Construction | James Sullivan Jr | progress |
| 08/21/2026 | Fire-Resistant Penetrations and Joints | James Sullivan Jr | special |
| 08/21/2026 | Energy Code Compliance Inspections | James Sullivan Jr | progress |
| 08/11/2026 | Mechanical Systems | James Sullivan Jr | special |
| 08/11/2026 | Sprinkler Systems | James Sullivan Jr | special |
| 08/11/2026 | Final | James Sullivan Jr | progress |
| 08/04/2026 | Final | James Sullivan Jr | progress |
| 07/01/2026 | Fire-Resistant Penetrations and Joints | Ryan Hansen | special |
| 07/01/2026 | Sprinkler Systems | Ryan Hansen | special |
| 04/23/2026 | Post-installed Anchors | HATIM ELSAID | special |
| 04/23/2026 | Sprinkler Systems | HATIM ELSAID | special |
| 04/23/2026 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| 04/22/2026 | Sprinkler Systems | HATIM ELSAID | special |
| 04/22/2026 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| 04/22/2026 | Post-installed Anchors | HATIM ELSAID | special |
| 03/11/2026 | Post-installed Anchors | James Sullivan Jr | special |
| 03/11/2026 | Fire-Resistant Penetrations and Joints | James Sullivan Jr | special |
| 03/11/2026 | Sprinkler Systems | James Sullivan Jr | special |
| 03/09/2026 | Post-installed Anchors | James Sullivan Jr | special |
| 03/09/2026 | Fire-Resistant Penetrations and Joints | James Sullivan Jr | special |
| 01/06/2026 | Post-installed Anchors | HATIM ELSAID | special |
| 01/06/2026 | Sprinkler Systems | HATIM ELSAID | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| AsianFusiones | Restaurant / Food Service | Floor 1 | Project M00694505 |
| Cava New York | Restaurant / Food Service | Floors 1, 2 | Project M00694537 |
| Little Collins | Restaurant / Food Service | Floor 1 | Project M00372203 |
| Crux Informatics | Office | Floor 18 | Project M00217533 |