| Owner | Filings | Most Recent |
|---|---|---|
| SL Green Realty | 930 | 09/17/2026 |
| SLG 711 Fee | 21 | 03/22/2026 |
| SLG News Owners | 9 | 03/21/2026 |
| Green 90 Broad | 4 | 03/21/2026 |
| 711 Third Avenue Assocates | 3 | 03/21/2026 |
| Sovereign Bank | 2 | 03/21/2026 |
| K R Feinberg Associates As Reciever | 2 | 03/21/2026 |
| 304E 45 St LLC% Williams USA Realty | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| WB Engineers & Consultants | 28 | 10/09/2026 |
| Loffredo Brooks Architects | 11 | 10/09/2026 |
| Howell Belanger Castelli Architects | 2 | 09/03/2026 |
| Tohfaz Uddin PE | 3 | 08/05/2026 |
| Loring Consulting Engineers | 3 | 07/14/2026 |
| Projekt Collectiv | 1 | 05/15/2026 |
| Gilsanz Murray Steficek | 2 | 10/31/2025 |
| MG Engineering | 1 | 08/20/2025 |
| Sandeep Gunnala Engineering | 2 | 08/05/2025 |
| Cany Architecture & Engineering | 3 | 06/26/2025 |
| Socotec | 2 | 06/16/2025 |
| Wellworth Consulting | 1 | 04/22/2025 |
| Paul Perdek, Prof. Engineering | 3 | 05/06/2022 |
| Saa INTERIORS+ARCHITECTURE | 1 | 01/06/2021 |
| Walter T. Gorman, P.E | 1 | 10/21/2020 |
| Baileys Engineering | 1 | 11/20/2017 |
| Representative | Filings | Most Recent |
|---|---|---|
| Milrose Consultants | 40 | 03/21/2026 |
| Smep Design & Consultation | 8 | 03/21/2026 |
| Sandeep Gunnala Engineering | 4 | 03/21/2026 |
| United Safety Consultants | 1 | 03/21/2026 |
| AE Design Solution | 8 | 03/21/2026 |
| Codegreen | 2 | 03/21/2026 |
| Socotec | 1 | 03/21/2026 |
| Walter T Gorman PE | 2 | 03/21/2026 |
| Rybak Development | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Spring Scaffolding | Scaffold | 36 | 09/17/2026 |
| Structural Preserv System | General Contractor | 15 | 08/20/2026 |
| Concept Construction Service | General Contractor | 12 | 07/08/2026 |
| East Coast Office Solut | General Contractor | 7 | 10/17/2026 |
| SKH Mechanical | Fire Protection | 5 | 07/08/2026 |
| A&A Plumbing | Plumbing | 5 | 07/08/2026 |
| Crossland Mechanical | specialty_contractor | 4 | 04/09/2026 |
| A & F Fire Protection Co | Fire Protection | 4 | 07/08/2026 |
| Ashlar Mechanical | Fire Protection | 4 | 10/20/2026 |
| Ferran Contracting | General Contractor | 3 | 03/21/2026 |
| Hoboken Kitchen Bath | General Contractor | 3 | 03/21/2026 |
| Innovative Electrical Service | Electrical | 2 | 03/21/2026 |
| Moskowitz Stuart | Electrical | 2 | 03/21/2026 |
| Matros Automated Electrical | Electrical | 2 | 03/21/2026 |
| Cross Management | General Contractor | 2 | 07/08/2026 |
| Holt Construction | General Contractor | 2 | 07/08/2026 |
| Versatile Services | General Contractor | 2 | 04/09/2026 |
| Structural Preserv System | Scaffold | 2 | 07/03/2026 |
| Bedrock Plumbing & Heating | Plumbing | 2 | 07/08/2026 |
| G. C. Plumbing & Heating | Plumbing | 2 | 07/08/2026 |
| LT Fire Protection | Fire Protection | 2 | 07/08/2026 |
| Magic Mechanical | Fire Protection | 1 | 07/08/2026 |
| Spieler & Ricca Electrical Co | Electrical | 1 | 03/21/2026 |
| NY Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Soleire Electrical Soltns | Electrical | 1 | 03/22/2026 |
| Five Star Electric | Electrical | 1 | 03/21/2026 |
| Power-Tech Installation Electric | Electrical | 1 | 03/22/2026 |
| Bedrock Mechanical | Fire Protection | 1 | 07/08/2026 |
| Sean Coakley P & H | Fire Protection | 1 | 07/08/2026 |
| Capitol Fire Sprinkler Co | Fire Protection | 1 | 07/08/2026 |
| Enobrac Plumbing | Fire Protection | 1 | 07/08/2026 |
| Allran Electric of N.Y | Electrical | 1 | 03/21/2026 |
| Finaly General Contracting | General Contractor | 1 | 07/08/2026 |
| Tristate Plumbing Services | Plumbing | 1 | 07/08/2026 |
| North Star Air Condition* | specialty_contractor | 1 | 07/08/2026 |
| Nova Interiors Cons & Con | General Contractor | 1 | 07/08/2026 |
| Tikvah Electric Co | Electrical | 1 | 03/22/2026 |
| Tristate Air Conditioning | specialty_contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Alan Margolin & Associates | 423 | 11 | 10/09/2026 |
| WB Engineering | 533 | 22 | 10/06/2026 |
| SGM Engineering | 2366 | 1 | 09/03/2026 |
| Milrose Consultants | 2003 | 7 | 07/14/2026 |
| Socotec Engineering | 4983 | 3 | 02/17/2026 |
| Sandeep Gunnala Engineering | 8482 | 2 | 08/05/2025 |
| Socotec | 301 | 2 | 06/16/2025 |
| Walter T. Gorman, P.E., P | 268 | 1 | 10/21/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | East Coast Office Solut | 10/20/2026 |
| DOB NOW | Sprinklers | Permit Issued | Ashlar Mechanical | 10/19/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | East Coast Office Solut | 10/15/2026 |
| DOB NOW | Sprinklers | Permit Issued | Ashlar Mechanical | 10/15/2026 |
| DOB NOW | General Construction | Permit Issued | East Coast Office Solut | 10/15/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | East Coast Office Solut | 10/15/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Spring Scaffolding | 09/16/2026 |
| DOB NOW | General Construction | Signed-off | Structural Preserv System | 08/19/2026 |
| DOB NOW | General Construction | Signed-off | Structural Preserv System | 08/18/2026 |
| DOB NOW | General Construction | Permit Issued | Structural Preserv System | 08/05/2026 |
| DOB NOW | General Construction | Permit Issued | Structural Preserv System | 08/04/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | Structural Preservation System | 07/02/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | Structural Preservation System | 07/02/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Spring Scaffolding | 06/16/2026 |
| DOB NOW | Plumbing | Signed-off | G. C. Plumbing & Heating | 06/04/2026 |
| DOB NOW | Sprinklers | Permit Issued | LT Fire Protection | 06/04/2026 |
| DOB NOW | Sprinklers | Permit Issued | Magic Mechanical | 05/28/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | Spring Scaffolding | 05/26/2026 |
| DOB NOW | Sprinklers | Permit Issued | Bedrock Mechanical | 05/22/2026 |
| DOB NOW | Plumbing | Permit Issued | Bedrock Plumbing & Heating | 05/21/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Spring Scaffolding | 05/20/2026 |
| DOB NOW | General Construction | Permit Issued | Cross Management | 05/19/2026 |
| DOB NOW | Mechanical Systems | Signed-off | Cross Management | 05/19/2026 |
| DOB NOW | General Construction | Signed-off | East Coast Office Solut | 04/29/2026 |
| DOB NOW | Mechanical Systems | Signed-off | East Coast Office Solut | 04/29/2026 |
| DOB NOW | Supported Scaffold | Signed-off | Spring Scaffolding | 04/22/2026 |
| DOB NOW | Sprinklers | Permit Issued | Capitol Fire Sprinkler Co | 04/08/2026 |
| DOB NOW | Plumbing | Permit Issued | NY Plumbing & Heating | 04/07/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Versatile Services | 04/06/2026 |
| DOB NOW | General Construction | Signed-off | Versatile Services | 04/06/2026 |
| DOB NOW | Mechanical Systems | Signed-off | Crossland Mechanical | 03/24/2026 |
| DOB NOW | Structural | Signed-off | Crossland Mechanical | 03/24/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Spring Scaffolding | 03/17/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | Spring Scaffolding | 02/27/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | Spring Scaffolding | 02/27/2026 |
| DOB NOW | Structural | Signed-off | Crossland Mechanical | 02/26/2026 |
| DOB NOW | General Construction | Signed-off | Concept Construction Service | 02/13/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Structural Preserv System | 01/27/2026 |
| DOB NOW | Sprinklers | Permit Issued | LT Fire Protection | 01/09/2026 |
| DOB NOW | Plumbing | Signed-off | G. C. Plumbing & Heating | 01/09/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 10/09/2026 | Permit Issued | East Coast Office Solut | Air Conditioning Systems | Cooling |
| 03/04/2026 | Permit Issued | Versatile Services | Ventilation Systems | Ventilation Titus DESV Vav Box ×3 |
| 04/29/2022 | — | — | Air Conditioning Systems | Cooling Trane T FLEX AHU 651 BTU ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/09/2026 | Permit Issued | Ashlar Mechanical | 176 heads |
| 10/06/2026 | Permit Issued | Ashlar Mechanical | 12 heads |
| 07/14/2026 | Permit Issued | Magic Mechanical | — |
| 03/30/2026 | Permit Issued | LT Fire Protection | 38 heads |
| 03/04/2026 | Permit Issued | Capitol Fire Sprinkler Co | — |
| 11/20/2025 | Permit Issued | LT Fire Protection | 56 heads |
| 03/06/2025 | Signed-off | Sean Coakley P & H | 637 heads |
| 08/07/2020 | Permit Issued | SKH Mechanical | 1 outlets |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/09/2026 | — | — | Water/Sanitary |
| 10/06/2026 | — | — | Water/Sanitary |
| 07/14/2026 | Permit Issued | Bedrock Plumbing & Heating | Water/Sanitary |
| 03/30/2026 | Signed-off | G. C. Plumbing & Heating | Water/Sanitary |
| 03/04/2026 | Permit Issued | NY Plumbing & Heating | Water/Sanitary |
| 11/20/2025 | Signed-off | G. C. Plumbing & Heating | Water/Sanitary |
| 03/06/2025 | Permit Issued | A&A Plumbing | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/16/2026 | Permit Issued | Salvatore Campisi & Sons | General Wiring |
| 08/07/2026 | Complete | Salvatore Campisi & Sons | General Wiring |
| 06/18/2026 | Permit Issued | MRD Electrical Services | General Wiring |
| 05/26/2026 | Permit Issued | RX Electric | — |
| 05/26/2026 | Permit Issued | RX Electric | General Wiring |
| 05/04/2026 | Complete | Salvatore Campisi & Sons | General Wiring |
| 03/18/2025 | Complete | SRM Electrical Service | — |
| 02/05/2025 | Permit Issued | Tikvah Electric Co | General Wiring |
| 07/06/2023 | Complete | Daven Electric | — |
| 03/30/2022 | Complete | Daven Electric | — |
| 10/14/2021 | Permit Issued | Top Shelf Electric | — |
| 05/21/2021 | Complete | Premier Electric | General Wiring |
| 12/17/2020 | Permit Issued | Power-Tech Installation Electric | 5 meters, 1 new_meters |
| 09/14/2020 | Complete | Power-Tech Installation Electric | General Wiring |
| 09/14/2020 | Permit Issued | Power-Tech Installation Electric | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/06/2026 | Permit Issued | East Coast Office Solut | 1 scope_items |
| 10/06/2026 | Permit Issued | Ashlar Mechanical | 2 scope_items |
| 10/31/2025 | Signed-off | Crossland Mechanical | Steel, Concrete |
| 06/26/2025 | Permit Issued | Structural Preserv System | 1 scope_items |
| 06/16/2025 | Signed-off | Structural Preserv System | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/05/2026 | Permit Issued | Spring Scaffolding | Sidewalk Shed |
| 04/22/2025 | Signed-off | Spring Scaffolding | Scaffold |
| 05/06/2022 | Permit Issued | Spring Scaffolding | Scaffold |
| 10/25/2021 | Signed-off | Spring Scaffolding | Sidewalk Shed |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/17/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/15/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/11/2026 | Pass PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/23/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/23/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 06/25/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/11/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/09/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/09/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/22/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/03/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/03/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/16/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/09/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/06/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/04/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/04/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/04/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/25/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/19/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/19/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/30/2022 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/30/2022 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/30/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/09/2022 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 10/06/2026 | Post-installed Anchors | — | special |
| 09/23/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 09/23/2026 | Final | — | progress |
| 09/23/2026 | Mechanical Systems | — | special |
| 09/23/2026 | Sprinkler Systems | — | special |
| 09/22/2026 | Final | Frank Loffredo | progress |
| 09/03/2026 | HVAC-R and service water heating system controls | Young Suh | energy_progress |
| 09/03/2026 | Duct leakage testing, insulation and design | Young Suh | energy_progress |
| 09/03/2026 | Shutoff dampers | Young Suh | energy_progress |
| 09/03/2026 | HVAC-R and service water piping design and insulation | Young Suh | energy_progress |
| 09/03/2026 | HVAC-R and service water heating equipment | Young Suh | energy_progress |
| 09/02/2026 | Energy Code Compliance Inspections | Young Suh | progress |
| 09/02/2026 | Post-installed Anchors | Young Suh | special |
| 09/02/2026 | Energy Code Compliance Inspections | Young Suh | progress |
| 09/02/2026 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 09/01/2026 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 09/01/2026 | Final | Frank Loffredo | progress |
| 09/01/2026 | Sprinkler Systems | Young Suh | special |
| 09/01/2026 | Final | Young Suh | progress |
| 09/01/2026 | Mechanical Systems | Young Suh | special |
| 09/01/2026 | Sprayed fire-resistant materials | Young Suh | special |
| 07/15/2026 | Sprinkler Systems | Christopher Drutjons | special |
| 07/15/2026 | Post-installed Anchors | Christopher Drutjons | special |
| 07/09/2026 | Post-installed Anchors | Christopher Drutjons | special |
| 07/09/2026 | Sprinkler Systems | Christopher Drutjons | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Pura Vida | Restaurant / Food Service | Ground | Project M01426362 |
| AIPAC | Office | Floor 12 | Project M01396801 Project M01397009 Project M01396783 |
| Harold & Latern | Office | Floor 18 | Project M01377096 Project M01377563 Project M01378221 |
| Ellington | Office | Floors 5, 7 | Project M00508398 Project M00509685 |
| Chicago Title | Office | Floor 8, Roof | Project M00405160 |
| Goldberg Segalla | Office | Floor 15 | Project M00349027 Project M00349048 |
| Center on Addiction | Office | Floor 5 | Project M00360646 Project M00358623 Project M00358665 |