← Back
BuildNYC
Two family frame
711 GREENWOOD AVENUE
BROOKLYN · BIN 3122637
💬 Discuss this project
1925Year Built
2Stories
B2Building Class
R5BZoning
1,950 sfGross Floor Area
2Units
Two family frame · 2,500 sf lot · 0.78 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof5p · 1 filing · 6 docs
AtticUnder Construction13p · 2 filings · 20 docs
Floor 2Under Construction27p · 3 filings · 20 docs
Floor 1Under Construction26p · 4 filings · 20 docs
CellarFoundation, cellar, and basement framingUnder Construction35p · 5 filings · 20 docs
BasementUnder Construction11p · 3 filings · 20 docs
Sub-Basement21p · 3 filings · 20 docs
Site & exteriorHardie board plank installation3p · 2 filings · 4 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/07/2022$2.0M—Private party → Private party$1,013/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Siris Coombs Architecture402/05/2026
HGT Studio Engineering211/06/2025
Hamann Engineering110/29/2025
Co Adaptive Architecture303/15/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Co Adaptive Architecture603/21/2026
Municipal Building Consultants603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SimonsaysGeneral Contractor508/30/2026
JTK Home ImprovementGeneral Contractor303/21/2026
RenovytGeneral Contractor107/08/2026
SimonsaysScaffold104/09/2026
A.M.N.Plumbing106/28/2026
Brooklyn SolarworksGeneral Contractor105/17/2022
Henry Myers P & HPlumbing109/08/2009
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Project Tactical Solution5859202/05/2026
Studio Nyandak8378311/06/2025
Blockwork Design Build8258203/15/2022
Building Lifecycle
11/19/2026
Signed off — Alteration
FACADE ALTERATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01343426-I1
11/05/2026
Permit expired, never signed off — Construction Fence
The city's record still shows this permit as issued, with no sign-off on its filing
B01309614-I1-FN
10/24/2026
Permit expired, never signed off — Plumbing
The city's record still shows this permit as issued, with no sign-off on its filing
B01189688-I1-PL
10/08/2026
Signed off — Alteration
RENOVATION OF ONE-FAMILY HOUSE INCLUDING FRAMING, BRACING, NEW WALL OPENING, AND CONCRETE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01204141-I1
10/06/2026
Signed off — Alteration
FOUNDATION SCOPE OF WORK FOR THIS APPLICATION INCLUDES THE ADDITION OF NEW CONCRETE KNEE-WALLS FOR A REAR PATIO, AND THE ADDITION OF NEW CONCRETE KNEE-WALLS AT BOTH THE NEW ENTRANCE AND SUPPORTING A NEW SINGLE STORY LIGHTWEIGHT GREENHOUSE PER PLANS FILED.
B01211547-I1
92 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSimonsays08/28/2026
DOB NOWGeneral ConstructionPermit IssuedSimonsays04/28/2026
DOB NOWFoundationSigned-offSimonsays12/17/2025
DOB NOWGeneral ConstructionPermit IssuedSimonsays11/17/2025
DOB NOWStructuralSigned-offSimonsays11/06/2025
DOB NOWConstruction FencePermit IssuedSimonsays11/05/2025
DOB NOWPlumbingPermit IssuedA.M.N.10/24/2025
DOB NOWStructuralSigned-offJTK Home Improvement03/29/2022
DOB NOWGeneral ConstructionSigned-offRenovyt02/18/2022
BISOTISSUEDBrooklyn Solarworks05/17/2022
BISPLISSUEDHenry Myers P & H09/08/2009
1 project · most recent 02/05/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/05/2026Permit IssuedA.M.N.Gas, Storm, Water/Sanitary
2 projects · most recent 11/12/2025
General Wiring
FiledStatusContractorScope
11/12/2025Permit IssuedA.L. ElectricalGeneral Wiring
05/20/2022CompleteBrookyln Solarworks—
2 projects · most recent 11/06/2025
Concrete Masonry Wood
FiledStatusContractorScope
11/06/2025Signed-offSimonsays—
08/20/2025Signed-offSimonsaysConcrete, Masonry, Wood
1 project · most recent 10/29/2025
Fence
FiledStatusContractorScope
10/29/2025Permit IssuedSimonsaysFence
1 project · most recent 11/06/2025
Earthwork
FiledStatusContractorScope
11/06/2025Signed-offSimonsaysEarthwork
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
11/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
03/05/2026Fire-Resistant Penetrations and JointsMax Leespecial
01/08/2026Energy Code Compliance InspectionsANN COOMBSprogress
01/07/2026FinalANN COOMBSprogress
08/05/2025Subsurface Investigations (Borings/Test Pits)DAVID WASHINGTONspecial
04/02/2025Structural Wood FrameTENZIN NYANDAKprogress
04/01/2025Structural Stability – Alterations of existing buildingsTENZIN NYANDAKspecial
04/01/2025FinalTENZIN NYANDAKprogress
04/01/2025Wood – Prefabricated I-JoistsTENZIN NYANDAKspecial
04/01/2025Post-installed AnchorsTENZIN NYANDAKspecial
04/01/2025MasonryTENZIN NYANDAKspecial
03/31/2025Permanent certificateANN COOMBSenergy_progress
03/31/2025Insulation placement and R valuesANN COOMBSenergy_progress
03/31/2025Air barrier - visual inspectionANN COOMBSenergy_progress
03/31/2025Maintenance informationANN COOMBSenergy_progress
03/03/2025Fenestration and door U-factor and product ratingsANN COOMBSenergy_progress
03/03/2025Fenestration air leakageANN COOMBSenergy_progress
03/03/2025Fenestration areasANN COOMBSenergy_progress
01/09/2025Energy Code Compliance InspectionsANN COOMBSprogress
01/09/2025Fire-Resistant Penetrations and JointsTENZIN NYANDAKspecial
01/09/2025Post-installed AnchorsTENZIN NYANDAKspecial
01/09/2025Interior lighting powerANN COOMBSenergy_progress
01/09/2025Fire-Resistance Rated ConstructionTENZIN NYANDAKprogress
03/28/2022Structural Steel - DetailsSteven Cummingsspecial
03/28/2022MasonrySteven Cummingsspecial
03/28/2022FinalROBERT JOHNSTONprogress
Latest 25 of 27.
93 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account