| Owner | Filings | Most Recent |
|---|---|---|
| NY 717 Fifth Ave | 157 | 03/21/2026 |
| Shorenstein Realty Services | 132 | 03/21/2026 |
| Equity Office Properties | 123 | 03/21/2026 |
| 717 GFC | 113 | 03/21/2026 |
| NY717 5th Ave Off | 21 | 03/21/2026 |
| Wharton Properties | 13 | 03/21/2026 |
| Equitable Life Assurance Society | 13 | 03/21/2026 |
| NY-7175Thaveofficellcc Oequity | 11 | 03/21/2026 |
| Metropolitan Life Insurance Co | 10 | 03/21/2026 |
| 272 East Fordham Road | 6 | 03/21/2026 |
| 717 GFC LLC C Osl Green Realty | 5 | 03/21/2026 |
| Edward S. Gordon Co | 4 | 03/21/2026 |
| E.S. Gordon Co | 3 | 03/21/2026 |
| 55 5th Ave | 1 | 03/21/2026 |
| Central Park Conservancy | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| New Ridge Engineering | 2 | 10/14/2026 |
| IMEG | 1 | 10/14/2026 |
| Efh Architecture | 1 | 10/13/2026 |
| Goldman Copeland Associates | 1 | 10/08/2026 |
| AMA Consulting Engineers | 44 | 10/06/2026 |
| Integral Engineering Services | 1 | 09/17/2026 |
| TPG Architecture | 6 | 06/30/2026 |
| Project Tactical Solutions | 1 | 04/06/2026 |
| WSP | 1 | 02/13/2026 |
| AKF Engineers | 12 | 12/03/2025 |
| Rosini Engineering | 7 | 12/02/2025 |
| Callisonrtkl Architects | 2 | 12/01/2025 |
| Severud Associates Consulting Engineering | 2 | 12/01/2025 |
| Alliance Architecture | 8 | 05/20/2025 |
| Otj Architects | 2 | 05/16/2025 |
| Loring Consulting Engineers | 2 | 02/27/2025 |
| MB Architect | 1 | 09/24/2024 |
| Thornton Tomasetti | 1 | 03/13/2024 |
| Ancora Engineering | 1 | 05/16/2023 |
| Robert Derector Associates | 5 | 05/04/2023 |
| John F. Giuseffi, Architect | 3 | 04/28/2023 |
| Pei Cobb Freed & Partners Architect | 1 | 04/21/2023 |
| KZ Engineering | 2 | 03/31/2023 |
| New Age | 1 | 01/03/2023 |
| Moloney | 1 | 07/07/2022 |
| EP Engineering | 2 | 10/05/2020 |
| Diaz Architects Inc., PA | 1 | 10/17/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| Codegreen | 76 | 03/21/2026 |
| Municipal Building Consultants | 11 | 03/21/2026 |
| Empire City Consultants | 2 | 03/21/2026 |
| Synergy Building Consultants | 2 | 03/21/2026 |
| Burnham Nationwide | 2 | 03/21/2026 |
| Outsource Consultants | 4 | 03/21/2026 |
| A&A Construction Services | 2 | 03/21/2026 |
| Milrose Consultants | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Icon Interiors | General Contractor | 12 | 07/08/2026 |
| Elysium Construction | General Contractor | 11 | 07/08/2026 |
| L&K Partners | General Contractor | 9 | 07/08/2026 |
| Northeast Specialist Group | General Contractor | 4 | 07/08/2026 |
| Standard Fire Protection | Fire Protection | 4 | 09/07/2026 |
| Bedrock Mechanical | Fire Protection | 4 | 10/04/2026 |
| Reidy Contracting Group | General Contractor | 4 | 08/26/2026 |
| Coastal Waterproofing | specialty_contractor | 4 | 07/08/2026 |
| Penava Mechanical | specialty_contractor | 3 | 07/08/2026 |
| Benchmark Builders | General Contractor | 3 | 07/08/2026 |
| Tri City Construction | General Contractor | 3 | 03/21/2026 |
| Schimenti Construction Co | General Contractor | 3 | 08/26/2026 |
| S.B.A. Plumbing | Fire Protection | 3 | 07/08/2026 |
| Full Capacity Fire | Fire Protection | 2 | 07/08/2026 |
| C.M.S. Electrical Services | Electrical | 2 | 03/21/2026 |
| Donnelly Mechanical | specialty_contractor | 2 | 07/08/2026 |
| Interior Builders Group | General Contractor | 2 | 07/08/2026 |
| Arsenal Scaffold | Scaffold | 2 | 07/08/2026 |
| Abco-Peerless Sprinkler | Fire Protection | 2 | 07/08/2026 |
| Advanced Plumbing, Mechanical & Sprinkler | Fire Protection | 2 | 07/08/2026 |
| A & M Warshaw Plumbing & Heating | Plumbing | 2 | 07/08/2026 |
| Bedrock Plumbing & Heating | Plumbing | 2 | 07/08/2026 |
| Par Plumbing Co | Plumbing | 2 | 08/16/2026 |
| S.B.A. Plumbing | Plumbing | 2 | 07/08/2026 |
| Sirina Fire Protection | Fire Protection | 2 | 07/08/2026 |
| Off Shore Electric | Electrical | 1 | 03/21/2026 |
| William C. Gerakaris P&H | Plumbing | 1 | 07/08/2026 |
| Zapas Construction | Plumbing | 1 | 07/08/2026 |
| Fred Geller Electrical | Electrical | 1 | 03/21/2026 |
| Star Electrical Contractors | Electrical | 1 | 03/21/2026 |
| Denko Mechanical | Fire Protection | 1 | 07/08/2026 |
| Absolute Electrical Contg | Electrical | 1 | 03/21/2026 |
| Lab Plumbing & Heating Co | Plumbing | 1 | 07/08/2026 |
| Standard Plumbing Services | Plumbing | 1 | 07/08/2026 |
| Top Notch Electric | Electrical | 1 | 03/22/2026 |
| A/C Electric of New York | Electrical | 1 | 03/21/2026 |
| Shawmut Woodworking & Supply | General Contractor | 1 | 07/08/2026 |
| Awesome Electl Contng | Electrical | 1 | 03/21/2026 |
| Patriot Fire Suppression | Fire Protection | 1 | 07/08/2026 |
| Breaking Solutions | Scaffold | 1 | 09/25/2026 |
| A&A Plumbing | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Outsource Special Inspection | 2827 | 5 | 10/14/2026 |
| Socotec Engineering | 4983 | 65 | 10/06/2026 |
| Concrete Solutions Lab Co | 5344 | 10 | 09/17/2026 |
| DNA Controlled Inspection | 554 | 9 | 11/11/2024 |
| AK Engineering | 678 | 1 | 03/13/2024 |
| Crosscheck Inspection Services | 544 | 5 | 05/04/2023 |
| New Age Engineering | 7746 | 1 | 01/03/2023 |
| AKF Engineers | 2751 | 1 | 06/10/2021 |
| EP Inspections and Commis | 7079 | 2 | 10/05/2020 |
| Sag Engineering & Consulting | 608 | 1 | 10/17/2019 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Breaking Solutions | 09/24/2026 |
| DOB NOW | Sprinklers | Permit Issued | Bedrock Mechanical | 09/03/2026 |
| DOB NOW | Sprinklers | Permit Issued | Standard Fire Protection | 09/02/2026 |
| DOB NOW | Sprinklers | Permit Issued | Bedrock Mechanical | 09/01/2026 |
| DOB NOW | Plumbing | Permit Issued | Par Plumbing Co | 08/14/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Schimenti Construction Co | 07/22/2026 |
| DOB NOW | Structural | Permit Issued | Schimenti Construction Co | 07/21/2026 |
| DOB NOW | General Construction | Permit Issued | Schimenti Construction Co | 07/17/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Reidy Contracting Group | 07/14/2026 |
| DOB NOW | General Construction | Permit Issued | Reidy Contracting Group | 07/06/2026 |
| DOB NOW | Plumbing | Permit Issued | Bedrock Plumbing & Heating | 07/06/2026 |
| DOB NOW | Sprinklers | Permit Issued | Bedrock Mechanical | 07/02/2026 |
| DOB NOW | Structural | Signed-off | Icon Interiors | 03/19/2026 |
| DOB NOW | Sprinklers | Permit Issued | S. Tieger Plumbing Co | 03/17/2026 |
| DOB NOW | Plumbing | Signed-off | A&A Plumbing | 02/19/2026 |
| DOB NOW | Mechanical Systems | Signed-off | Icon Interiors | 02/05/2026 |
| DOB NOW | General Construction | Signed-off | Icon Interiors | 01/26/2026 |
| DOB NOW | General Construction | Signed-off | Benchmark Builders | 11/28/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Donnelly Mechanical | 11/28/2025 |
| DOB NOW | Sprinklers | Signed-off | Bedrock Mechanical | 11/24/2025 |
| DOB NOW | Plumbing | Signed-off | Bedrock Plumbing & Heating | 11/21/2025 |
| DOB NOW | General Construction | Signed-off | Benchmark Builders | 09/19/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Donnelly Mechanical | 09/16/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Reidy Contracting Group | 09/15/2025 |
| DOB NOW | Plumbing | Signed-off | Zapas Construction | 09/12/2025 |
| DOB NOW | General Construction | Signed-off | Reidy Contracting Group | 09/12/2025 |
| DOB NOW | Sprinklers | Signed-off | Full Capacity Fire | 09/12/2025 |
| DOB NOW | General Construction | Signed-off | Benchmark Builders | 09/12/2025 |
| DOB NOW | Plumbing | Signed-off | S.B.A. Plumbing | 07/29/2025 |
| DOB NOW | Sprinklers | Signed-off | S.B.A. Plumbing | 07/24/2025 |
| DOB NOW | Sprinklers | Signed-off | Full Capacity Fire | 06/23/2025 |
| DOB NOW | Plumbing | Signed-off | William C. Gerakaris P&H | 06/18/2025 |
| DOB NOW | Mechanical Systems | Signed-off | L&K Partners | 05/30/2025 |
| DOB NOW | General Construction | Signed-off | L&K Partners | 05/27/2025 |
| DOB NOW | Mechanical Systems | Signed-off | L&K Partners | 02/27/2025 |
| DOB NOW | General Construction | Signed-off | L&K Partners | 02/18/2025 |
| DOB NOW | Mechanical Systems | Signed-off | L&K Partners | 02/18/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Icon Interiors | 02/13/2025 |
| DOB NOW | Sprinklers | Permit Issued | S.B.A. Plumbing | 02/13/2025 |
| DOB NOW | General Construction | Signed-off | Icon Interiors | 02/12/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 10/14/2026 | — | — | Air Conditioning Systems | Cooling Magic-Aire HHA 1,350 CFM · Fan Coil Indoor ×8 Bosch WW240-4USC 20 tons · Water Cooled Chiller ×2 |
| 10/05/2020 | Permit Issued | Interior Builders Group | Associated Ducts and Piping | Ducts & Piping Anemostat ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/08/2026 | — | — | — |
| 10/06/2026 | Permit Issued | Bedrock Mechanical | 119 heads |
| 08/28/2026 | Permit Issued | Bedrock Mechanical | 61 heads |
| 01/12/2026 | Permit Issued | Denko Mechanical | 133 heads |
| 12/01/2025 | Permit Issued | Standard Fire Protection | Sprinkler System |
| 09/05/2025 | Signed-off | Full Capacity Fire | 127 heads |
| 04/01/2024 | Permit Issued | S.B.A. Plumbing | — |
| 02/21/2024 | — | — | — |
| 10/05/2020 | Permit Issued | Patriot Fire Suppression | 50 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/14/2026 | — | — | Water/Sanitary |
| 10/06/2026 | Permit Issued | Bedrock Plumbing & Heating | Water/Sanitary |
| 01/13/2026 | Signed-off | A&A Plumbing | Water/Sanitary |
| 01/12/2026 | — | — | — |
| 12/03/2025 | Signed-off | A & M Warshaw Plumbing & Heating | Storm, Water/Sanitary |
| 12/01/2025 | Permit Issued | Par Plumbing Co | Gas, Water/Sanitary |
| 11/20/2025 | Signed-off | Bedrock Plumbing & Heating | Water/Sanitary |
| 09/05/2025 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/17/2026 | Permit Issued | Atlas-Acon Electric Service | 1 meters |
| 08/04/2026 | Permit Issued | Patriot Electric | — |
| 07/07/2026 | Permit Issued | Prosto Electric | — |
| 01/26/2026 | Complete | Ennell Group Electric | General Wiring |
| 01/19/2026 | Complete | Omta Tech | General Wiring |
| 10/25/2025 | Complete | Top Notch Electric | General Wiring |
| 09/15/2025 | Complete | Omta Tech | — |
| 09/02/2025 | Complete | A2K Electric | General Wiring |
| 07/30/2025 | Permit Issued | P.E. Stone | General Wiring |
| 05/23/2025 | Complete | United Electric & Lighting Co | General Wiring |
| 01/31/2025 | Complete | P.E. Stone | General Wiring |
| 10/30/2024 | Complete | Metropolis Electric | General Wiring |
| 06/20/2023 | Complete | Atlas-Acon Electric Service | General Wiring |
| 06/20/2023 | Complete | Atlas-Acon Electric Service | General Wiring |
| 04/18/2023 | Complete | Atlas-Acon Electric Service | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/14/2026 | — | — | Steel, Concrete, Wood |
| 02/13/2026 | Signed-off | Icon Interiors | Steel, Concrete |
| 12/01/2025 | Permit Issued | Standard Fire Protection | Steel, Concrete |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/27/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/17/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/17/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/17/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/06/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/02/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/02/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/06/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/26/2025 | Certified Storm Drainage-ST-Fixtures-Finish | Certified | View ↗ |
| 12/24/2025 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 12/04/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/04/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/23/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 10/22/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/20/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/20/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/09/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/26/2025 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 09/09/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/03/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/27/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/15/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/08/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/28/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/28/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 10/02/2026 | Shutoff dampers | JONAR MADRIAGA | energy_progress |
| 10/02/2026 | Fire-Resistant Penetrations and Joints | JONAR MADRIAGA | special |
| 10/02/2026 | HVAC-R and service water piping design and insulation | JONAR MADRIAGA | energy_progress |
| 10/02/2026 | HVAC-R and service water heating system controls | JONAR MADRIAGA | energy_progress |
| 10/02/2026 | HVAC-R and service water heating equipment | JONAR MADRIAGA | energy_progress |
| 09/29/2026 | Post-installed Anchors | JONAR MADRIAGA | special |
| 09/29/2026 | Structural Steel - Welding | JONAR MADRIAGA | special |
| 09/29/2026 | Structural Steel - High Strength Bolting | JONAR MADRIAGA | special |
| 09/29/2026 | Structural Stability – Alterations of existing buildings | JONAR MADRIAGA | special |
| 09/29/2026 | Concrete - Cast-In-Place | JONAR MADRIAGA | special |
| 09/24/2026 | Post-installed Anchors | ALEXIS SCHLESSINGERMAN | special |
| 09/24/2026 | Final | ALEXIS SCHLESSINGERMAN | progress |
| 09/24/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 09/24/2026 | Structural Steel - Details | JONAR MADRIAGA | special |
| 09/24/2026 | Mechanical Systems | ALEXIS SCHLESSINGERMAN | special |
| 09/16/2026 | Sprinkler Systems | JONAR MADRIAGA | special |
| 09/16/2026 | Final | JONAR MADRIAGA | progress |
| 09/16/2026 | Mechanical Systems | JONAR MADRIAGA | special |
| 09/16/2026 | Final | JONAR MADRIAGA | progress |
| 09/16/2026 | Ventilation and air distribution system | JONAR MADRIAGA | energy_progress |
| 09/16/2026 | Final | JONAR MADRIAGA | progress |
| 09/16/2026 | Duct leakage testing, insulation and design | JONAR MADRIAGA | energy_progress |
| 09/10/2026 | Demolition | MINA HANNA | special |
| 09/10/2026 | Structural Stability – Alterations of existing buildings | MINA HANNA | special |
| 08/05/2026 | Sprinkler Systems | ALEXIS SCHLESSINGERMAN | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Stark | Office | Floors 13, 14 | Project M01322748 Project M01322732 Project M01322736 Project M01322740 Project M01322743 |
| Kering America | Retail | Cellar, Floors 1–3 | Project M01318963 Project M01201119 |
| Hilton | Hotel / Lodging | Floor 14 | Project M01204956 Project M01154487 Project M01154478 Project M01154485 Project M01154469 Project M01017513 Project M01017514 Project M01017515 Project M01017512 Project M01004628 |
| Cleardusk | Office | Floor 14 | Project M01204957 Project M01204959 Project M01202229 |
| Island Capital Group | Office | Floor 18 | Project M01119449 |
| WJWM | Office | Floor 11 | Project M01017508 Project M01017510 Project M01017511 Project M01015212 |
| Corsair Capital | Office | Floors 23, 24 | Project M01016181 Project M00401983 Project M00402001 |
| AB Stable | Office | Floor 12 | Project M00808624 Project M00808630 Project M00808635 Project M00808610 |
| Harry Winston | Retail | Floor 10 | Project M08004344 Project M08004379 Project M08004409 Project M08004479 |
| Central Park Conservancy | Community Facility | Floor 5 | Project M00729423 Project M00730946 Project M00730958 Project M00730968 |