← Back
BuildNYC
Condo, commercial tower (mixed-use) [derived]
The 717 Fifth Avenue Condominium
717 5TH AVENUE · BIN 1035776
💬 Discuss this project
1958Year Built
26Stories
RCBuilding Class
C5-2.5Zoning
364,014 sfGross Floor Area
6Units
LL97 Covered1 Active Violation 1 likely answered 3 old, status unconfirmed ▸FISP: SWARMP
Condo, commercial tower (mixed-use) [derived] · 29,475 sf lot · 12.35 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsStandpipe installation1 filing
RoofFacade Restoration6p · 2 filings · 9 docs
Floor 25Sprinkler modifications, 24th and 25th floorsUnder Construction5p · 1 filing · 20 docs
Floor 24Corsair CapitalUnder Construction5p · 2 filings · 20 docs
Floor 23Corsair Capital2p · 2 filings · 13 docs
Floor 22Sprinkler modifications, 22nd floorUnder Construction2p · 1 filing · 4 docs
Floor 21
Floor 20Cbre, INC.Under Construction4p · 2 filings · 8 docs
Floor 19
Floor 18Island Capital Group1 filing · 20 docs
Floor 17Cbre, INC.6p · 3 filings · 11 docs
Floor 16
Floor 15
Floor 14Stark, Hilton +1Under Construction26p · 25 filings · 20 docs
Floor 13StarkUnder Construction2p · 11 filings · 20 docs
Floor 12AB Stable8p · 9 filings · 20 docs
Floor 11WJWM8p · 6 filings · 20 docs
Floor 10Harry Winston10p · 4 filings · 20 docs
Floor 9
Floor 8Mechanical modifications 8th, 12A, 14th floors5p · 9 filings · 20 docs
Floor 7
Floor 6
Floor 5Central Park Conservancy4p · 5 filings · 16 docs
Floor 4
Floor 3Kering AmericaUnder Construction13p · 3 filings · 20 docs
Floor 2Kering AmericaUnder Construction25p · 2 filings · 20 docs
Floor 1Kering AmericaUnder Construction30p · 8 filings · 20 docs
MezzanineKering AmericaUnder Construction2p · 1 filing · 20 docs
CellarKering AmericaUnder Construction32p · 5 filings · 20 docs
Sub-CellarChiller replacement in sub cellar mechanical room4p · 1 filing · 4 docs
Site & exteriorHeavy duty sidewalk shed4 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NY 717 Fifth Ave15703/21/2026
Shorenstein Realty Services13203/21/2026
Equity Office Properties12303/21/2026
717 GFC11303/21/2026
NY717 5th Ave Off2103/21/2026
Wharton Properties1303/21/2026
Equitable Life Assurance Society1303/21/2026
NY-7175Thaveofficellcc Oequity1103/21/2026
Metropolitan Life Insurance Co1003/21/2026
272 East Fordham Road603/21/2026
717 GFC LLC C Osl Green Realty503/21/2026
Edward S. Gordon Co403/21/2026
E.S. Gordon Co303/21/2026
55 5th Ave103/21/2026
Central Park Conservancy103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Codegreen7603/21/2026
Municipal Building Consultants1103/21/2026
Empire City Consultants203/21/2026
Synergy Building Consultants203/21/2026
Burnham Nationwide203/21/2026
Outsource Consultants403/21/2026
A&A Construction Services203/21/2026
Milrose Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Icon InteriorsGeneral Contractor1207/08/2026
Elysium ConstructionGeneral Contractor1107/08/2026
L&K PartnersGeneral Contractor907/08/2026
Northeast Specialist GroupGeneral Contractor407/08/2026
Standard Fire ProtectionFire Protection409/07/2026
Bedrock MechanicalFire Protection410/04/2026
Reidy Contracting GroupGeneral Contractor408/26/2026
Coastal Waterproofingspecialty_contractor407/08/2026
Penava Mechanicalspecialty_contractor307/08/2026
Benchmark BuildersGeneral Contractor307/08/2026
Tri City ConstructionGeneral Contractor303/21/2026
Schimenti Construction CoGeneral Contractor308/26/2026
S.B.A. PlumbingFire Protection307/08/2026
Full Capacity FireFire Protection207/08/2026
C.M.S. Electrical ServicesElectrical203/21/2026
Donnelly Mechanicalspecialty_contractor207/08/2026
Interior Builders GroupGeneral Contractor207/08/2026
Arsenal ScaffoldScaffold207/08/2026
Abco-Peerless SprinklerFire Protection207/08/2026
Advanced Plumbing, Mechanical & SprinklerFire Protection207/08/2026
A & M Warshaw Plumbing & HeatingPlumbing207/08/2026
Bedrock Plumbing & HeatingPlumbing207/08/2026
Par Plumbing CoPlumbing208/16/2026
S.B.A. PlumbingPlumbing207/08/2026
Sirina Fire ProtectionFire Protection207/08/2026
Off Shore ElectricElectrical103/21/2026
William C. Gerakaris P&HPlumbing107/08/2026
Zapas ConstructionPlumbing107/08/2026
Fred Geller ElectricalElectrical103/21/2026
Star Electrical ContractorsElectrical103/21/2026
Denko MechanicalFire Protection107/08/2026
Absolute Electrical ContgElectrical103/21/2026
Lab Plumbing & Heating CoPlumbing107/08/2026
Standard Plumbing ServicesPlumbing107/08/2026
Top Notch ElectricElectrical103/22/2026
A/C Electric of New YorkElectrical103/21/2026
Shawmut Woodworking & SupplyGeneral Contractor107/08/2026
Awesome Electl ContngElectrical103/21/2026
Patriot Fire SuppressionFire Protection107/08/2026
Breaking SolutionsScaffold109/25/2026
A&A PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Outsource Special Inspection2827510/14/2026
Socotec Engineering49836510/06/2026
Concrete Solutions Lab Co53441009/17/2026
DNA Controlled Inspection554911/11/2024
AK Engineering678103/13/2024
Crosscheck Inspection Services544505/04/2023
New Age Engineering7746101/03/2023
AKF Engineers2751106/10/2021
EP Inspections and Commis7079210/05/2020
Sag Engineering & Consulting608110/17/2019
Building Lifecycle
All (300)Filed (69)Permit Issued (56)Signed Off (45)Facade (FISP) (1)Violation (1)Inspection (40)Objection (58)Special Inspection (30)
10/14/2026
Signed off — Alteration
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON 13th and 14th FLOORS (12A and 14 MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01322732-I1
10/14/2026
Filed — Alteration
Filing herewith interior renovation of existing 8th floor space, US Fertility. No change in use, egress or occupancy.
M01460770-S1
10/14/2026
Filed — Alteration
Filing herewith interior renovation of existing 8th floor space, US Fertility. No change in use, egress or occupancy.
M01460770-S2
10/14/2026
Filed — Alteration
Filing herewith structural work on existing 8th floor space, US Fertility. No change in use, egress or occupancy.
M01460839-I1
10/13/2026
Signed off — Alteration
M01322736-I1
10/13/2026
Filed — Alteration
Filing herewith interior renovation of existing 8th floor space, US Fertility. No change in use, egress or occupancy.
M01460770-I1
10/13/2026
Signed off — Alteration
PLUMBING MODIFICATIONS TAKING PLACE ON THE 13TH (12A MARKETING) AND 14TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01322740-I1
10/08/2026
Filed — Alteration
Filing herewith sprinkler work at existing 8th floor space. No change in use egress or occupancy.
M01460826-I1
10/06/2026
Filed — Alteration
PLUMBING MODIFICATIONS TAKINGPLACE ON THE 24 AND 25TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01417066-P2
10/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JONAR MADRIAGA
10/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
JONAR MADRIAGA
10/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
10/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
JONAR MADRIAGA
10/02/2026
Special inspection requirement — Shutoff dampers
JONAR MADRIAGA
09/29/2026
Special inspection requirement — Concrete - Cast-In-Place
JONAR MADRIAGA
09/29/2026
Special inspection requirement — Structural Steel - High Strength Bolting
JONAR MADRIAGA
09/29/2026
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
09/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JONAR MADRIAGA
09/29/2026
Special inspection requirement — Structural Steel - Welding
JONAR MADRIAGA
09/28/2026
Filed — Alteration
PLUMBING MODIFICATIONS TAKINGPLACE ON THE 24 AND 25TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01417066-P1
09/24/2026
Permit issued — Protection and Mechanical Methods
M01458557-I1-PMM
09/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
09/24/2026
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
09/24/2026
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
09/24/2026
Special inspection requirement — Mechanical Systems
ALEXIS SCHLESSINGERMAN
09/24/2026
Special inspection requirement — Structural Steel - Details
JONAR MADRIAGA
09/17/2026
Filed — Alteration
Protection and mechanical methods associated with interior demolition as per plans.
M01458557-I1
09/16/2026
Special inspection requirement — Final
JONAR MADRIAGA
09/16/2026
Special inspection requirement — Ventilation and air distribution system
JONAR MADRIAGA
09/16/2026
Special inspection requirement — Final
JONAR MADRIAGA
09/16/2026
Special inspection requirement — Duct leakage testing, insulation and design
JONAR MADRIAGA
09/16/2026
Special inspection requirement — Sprinkler Systems
JONAR MADRIAGA
09/16/2026
Special inspection requirement — Final
JONAR MADRIAGA
09/16/2026
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
09/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MINA HANNA
09/10/2026
Special inspection requirement — Demolition
MINA HANNA
09/03/2026
Permit issued — Sprinklers
M01441669-I1-EW-SP
09/02/2026
Permit issued — Sprinklers
M01201119-S3-EW-SP
09/01/2026
Permit issued — Sprinklers
M01004638-I1-EW-SP
08/28/2026
Filed — Alteration
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 22ND FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01441669-I1
08/14/2026
Permit issued — Plumbing
M01201119-S1-PL
08/05/2026
Special inspection requirement — Sprinkler Systems
ALEXIS SCHLESSINGERMAN
07/27/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/22/2026
Permit issued — Mechanical Systems
M01201119-S2-MS
07/21/2026
Permit issued — Structural
M01201119-S4-ST
07/17/2026
Permit issued — General Construction
M01201119-I1-GC
07/14/2026
Permit issued — Mechanical Systems
M01417066-S1-MS
07/06/2026
Permit issued — General Construction
M01417066-I1-GC
07/06/2026
Permit issued — Plumbing
M01417066-S2-PL
07/02/2026
Permit issued — Sprinklers
M01417066-S3-EW-SP
07/01/2026
Filed — Alteration
PLUMBING MODIFICATIONS TAKINGPLACE ON THE 24 AND 25TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01417066-S1
06/30/2026
Filed — Alteration
PLUMBING MODIFICATIONS TAKINGPLACE ON THE 24 AND 25TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01417066-S3
06/30/2026
Filed — Alteration
PLUMBING MODIFICATIONS TAKINGPLACE ON THE 24 AND 25TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01417066-S2
06/30/2026
Filed — Alteration
PLUMBING MODIFICATIONS TAKINGPLACE ON THE 24 AND 25TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01417066-I1
06/15/2026
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
06/15/2026
Special inspection requirement — Sprinkler Systems
ALEXIS SCHLESSINGERMAN
06/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
06/15/2026
Special inspection requirement — Sprayed fire-resistant materials
ALEXIS SCHLESSINGERMAN
05/11/2026
Signed off — Alteration
PLUMBING MODIFICATIONS TAKING PLACE ON THE 1ST FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00808662-I1
05/08/2026
Signed off — Alteration
M01256035-I1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedBreaking Solutions09/24/2026
DOB NOWSprinklersPermit IssuedBedrock Mechanical09/03/2026
DOB NOWSprinklersPermit IssuedStandard Fire Protection09/02/2026
DOB NOWSprinklersPermit IssuedBedrock Mechanical09/01/2026
DOB NOWPlumbingPermit IssuedPar Plumbing Co08/14/2026
DOB NOWMechanical SystemsPermit IssuedSchimenti Construction Co07/22/2026
DOB NOWStructuralPermit IssuedSchimenti Construction Co07/21/2026
DOB NOWGeneral ConstructionPermit IssuedSchimenti Construction Co07/17/2026
DOB NOWMechanical SystemsPermit IssuedReidy Contracting Group07/14/2026
DOB NOWGeneral ConstructionPermit IssuedReidy Contracting Group07/06/2026
DOB NOWPlumbingPermit IssuedBedrock Plumbing & Heating07/06/2026
DOB NOWSprinklersPermit IssuedBedrock Mechanical07/02/2026
DOB NOWStructuralSigned-offIcon Interiors03/19/2026
DOB NOWSprinklersPermit IssuedS. Tieger Plumbing Co03/17/2026
DOB NOWPlumbingSigned-offA&A Plumbing02/19/2026
DOB NOWMechanical SystemsSigned-offIcon Interiors02/05/2026
DOB NOWGeneral ConstructionSigned-offIcon Interiors01/26/2026
DOB NOWGeneral ConstructionSigned-offBenchmark Builders11/28/2025
DOB NOWMechanical SystemsSigned-offDonnelly Mechanical11/28/2025
DOB NOWSprinklersSigned-offBedrock Mechanical11/24/2025
DOB NOWPlumbingSigned-offBedrock Plumbing & Heating11/21/2025
DOB NOWGeneral ConstructionSigned-offBenchmark Builders09/19/2025
DOB NOWMechanical SystemsSigned-offDonnelly Mechanical09/16/2025
DOB NOWMechanical SystemsSigned-offReidy Contracting Group09/15/2025
DOB NOWPlumbingSigned-offZapas Construction09/12/2025
DOB NOWGeneral ConstructionSigned-offReidy Contracting Group09/12/2025
DOB NOWSprinklersSigned-offFull Capacity Fire09/12/2025
DOB NOWGeneral ConstructionSigned-offBenchmark Builders09/12/2025
DOB NOWPlumbingSigned-offS.B.A. Plumbing07/29/2025
DOB NOWSprinklersSigned-offS.B.A. Plumbing07/24/2025
DOB NOWSprinklersSigned-offFull Capacity Fire06/23/2025
DOB NOWPlumbingSigned-offWilliam C. Gerakaris P&H06/18/2025
DOB NOWMechanical SystemsSigned-offL&K Partners05/30/2025
DOB NOWGeneral ConstructionSigned-offL&K Partners05/27/2025
DOB NOWMechanical SystemsSigned-offL&K Partners02/27/2025
DOB NOWGeneral ConstructionSigned-offL&K Partners02/18/2025
DOB NOWMechanical SystemsSigned-offL&K Partners02/18/2025
DOB NOWMechanical SystemsSigned-offIcon Interiors02/13/2025
DOB NOWSprinklersPermit IssuedS.B.A. Plumbing02/13/2025
DOB NOWGeneral ConstructionSigned-offIcon Interiors02/12/2025
+ 60 more permits on file
2 projects · most recent 10/14/2026
Air Conditioning Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
10/14/2026——Air Conditioning Systems
Cooling
Water Furnace VERSATEC 700 1,600 CFM · Wshp ×27
WATER FURNACE 1,050 CFM · Wshp ×1
Magic-Aire HHA 1,350 CFM · Fan Coil Indoor ×8
Bosch WW240-4USC 20 tons · Water Cooled Chiller ×2
10/05/2020Permit IssuedInterior Builders GroupAssociated Ducts and Piping
Ducts & Piping
9 projects · most recent 10/08/2026
Sprinkler System
FiledStatusContractorScope
10/08/2026———
10/06/2026Permit IssuedBedrock Mechanical119 heads
08/28/2026Permit IssuedBedrock Mechanical61 heads
01/12/2026Permit IssuedDenko Mechanical133 heads
12/01/2025Permit IssuedStandard Fire ProtectionSprinkler System
09/05/2025Signed-offFull Capacity Fire127 heads
04/01/2024Permit IssuedS.B.A. Plumbing—
02/21/2024———
10/05/2020Permit IssuedPatriot Fire Suppression50 heads
8 projects · most recent 10/14/2026
Water/Sanitary Storm Gas
FiledStatusContractorScope
10/14/2026——Water/Sanitary
10/06/2026Permit IssuedBedrock Plumbing & HeatingWater/Sanitary
01/13/2026Signed-offA&A PlumbingWater/Sanitary
01/12/2026———
12/03/2025Signed-offA & M Warshaw Plumbing & HeatingStorm, Water/Sanitary
12/01/2025Permit IssuedPar Plumbing CoGas, Water/Sanitary
11/20/2025Signed-offBedrock Plumbing & HeatingWater/Sanitary
09/05/2025———
24 projects · most recent 09/17/2026
General Wiring Lighting
FiledStatusContractorScope
09/17/2026Permit IssuedAtlas-Acon Electric Service1 meters
08/04/2026Permit IssuedPatriot Electric—
07/07/2026Permit IssuedProsto Electric—
01/26/2026CompleteEnnell Group ElectricGeneral Wiring
01/19/2026CompleteOmta TechGeneral Wiring
10/25/2025CompleteTop Notch ElectricGeneral Wiring
09/15/2025CompleteOmta Tech—
09/02/2025CompleteA2K ElectricGeneral Wiring
07/30/2025Permit IssuedP.E. StoneGeneral Wiring
05/23/2025CompleteUnited Electric & Lighting CoGeneral Wiring
01/31/2025CompleteP.E. StoneGeneral Wiring
10/30/2024CompleteMetropolis ElectricGeneral Wiring
06/20/2023CompleteAtlas-Acon Electric ServiceGeneral Wiring
06/20/2023CompleteAtlas-Acon Electric ServiceGeneral Wiring
04/18/2023CompleteAtlas-Acon Electric ServiceGeneral Wiring
3 projects · most recent 10/14/2026
Steel Concrete Wood
FiledStatusContractorScope
10/14/2026——Steel, Concrete, Wood
02/13/2026Signed-offIcon InteriorsSteel, Concrete
12/01/2025Permit IssuedStandard Fire ProtectionSteel, Concrete
▾Field Inspections (DOB CAP) — 57
DateTypeResultReport
07/27/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/17/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/17/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/06/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/02/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/02/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/06/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/26/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/24/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/04/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/23/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/20/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/20/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/09/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/26/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
09/09/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/27/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/15/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/28/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
Latest 25 of 57.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
10/02/2026Shutoff dampersJONAR MADRIAGAenergy_progress
10/02/2026Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
10/02/2026HVAC-R and service water piping design and insulationJONAR MADRIAGAenergy_progress
10/02/2026HVAC-R and service water heating system controlsJONAR MADRIAGAenergy_progress
10/02/2026HVAC-R and service water heating equipmentJONAR MADRIAGAenergy_progress
09/29/2026Post-installed AnchorsJONAR MADRIAGAspecial
09/29/2026Structural Steel - WeldingJONAR MADRIAGAspecial
09/29/2026Structural Steel - High Strength BoltingJONAR MADRIAGAspecial
09/29/2026Structural Stability – Alterations of existing buildingsJONAR MADRIAGAspecial
09/29/2026Concrete - Cast-In-PlaceJONAR MADRIAGAspecial
09/24/2026Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
09/24/2026FinalALEXIS SCHLESSINGERMANprogress
09/24/2026Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
09/24/2026Structural Steel - DetailsJONAR MADRIAGAspecial
09/24/2026Mechanical SystemsALEXIS SCHLESSINGERMANspecial
09/16/2026Sprinkler SystemsJONAR MADRIAGAspecial
09/16/2026FinalJONAR MADRIAGAprogress
09/16/2026Mechanical SystemsJONAR MADRIAGAspecial
09/16/2026FinalJONAR MADRIAGAprogress
09/16/2026Ventilation and air distribution systemJONAR MADRIAGAenergy_progress
09/16/2026FinalJONAR MADRIAGAprogress
09/16/2026Duct leakage testing, insulation and designJONAR MADRIAGAenergy_progress
09/10/2026DemolitionMINA HANNAspecial
09/10/2026Structural Stability – Alterations of existing buildingsMINA HANNAspecial
08/05/2026Sprinkler SystemsALEXIS SCHLESSINGERMANspecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
StarkOfficeFloors 13, 14
Project M01322748 Alteration · Permit Entire · 02/13/2026
Project M01322732 Alteration · LOC Issued · 01/12/2026
Project M01322736 Alteration · LOC Issued · 01/13/2026
Project M01322740 Alteration · LOC Issued · 01/13/2026
Project M01322743 Alteration · Permit Entire · 01/12/2026
Kering AmericaRetailCellar, Floors 1–3
Project M01318963 Alteration · Approved · 12/02/2025
Project M01201119 Alteration · Permit Entire · 04/15/2025
HiltonHotel / LodgingFloor 14
Project M01204956 Alteration · LOC Issued · 05/27/2025
Project M01154487 Alteration · LOC Issued · 04/03/2025
Project M01154478 Alteration · LOC Issued · 02/12/2025
Project M01154485 Alteration · LOC Issued · 02/12/2025
Project M01154469 Alteration · LOC Issued · 02/06/2025
Project M01017513 Alteration · LOC Issued · 02/05/2025
Project M01017514 Alteration · LOC Issued · 02/05/2025
Project M01017515 Alteration · LOC Issued · 02/05/2025
Project M01017512 Alteration · LOC Issued · 02/04/2025
Project M01004628 Alteration · Permit Entire · 04/01/2024
ClearduskOfficeFloor 14
Project M01204957 Alteration · LOC Issued · 05/22/2025
Project M01204959 Alteration · LOC Issued · 05/22/2025
Project M01202229 Alteration · LOC Issued · 05/20/2025
Island Capital GroupOfficeFloor 18
Project M01119449 Alteration · LOC Issued · 01/03/2025
WJWMOfficeFloor 11
Project M01017508 Alteration · LOC Issued · 04/22/2024
Project M01017510 Alteration · LOC Issued · 04/22/2024
Project M01017511 Alteration · LOC Issued · 04/22/2024
Project M01015212 Alteration · LOC Issued · 04/19/2024
Corsair CapitalOfficeFloors 23, 24
Project M01016181 Alteration · LOC Issued · 03/13/2024
Project M00401983 Alteration · Permit Entire · 10/05/2020
Project M00402001 Alteration · Permit Entire · 10/05/2020
AB StableOfficeFloor 12
Project M00808624 Alteration · LOC Issued · 05/04/2023
Project M00808630 Alteration · LOC Issued · 05/02/2023
Project M00808635 Alteration · LOC Issued · 05/02/2023
Project M00808610 Alteration · LOC Issued · 04/28/2023
Harry WinstonRetailFloor 10
Project M08004344 Alteration · LOC Issued · 10/20/2022
Project M08004379 Alteration · LOC Issued · 10/19/2022
Project M08004409 Alteration · LOC Issued · 10/19/2022
Project M08004479 Alteration · LOC Issued · 10/19/2022
Central Park ConservancyCommunity FacilityFloor 5
Project M00729423 Alteration · LOC Issued · 07/18/2022
Project M00730946 Alteration · LOC Issued · 07/11/2022
Project M00730958 Alteration · LOC Issued · 07/11/2022
Project M00730968 Alteration · LOC Issued · 07/11/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 2,892 on file (BIS + DOB NOW)
▸Plans & Drawings113
▸DOB NOWPlans/Sketch110
10/20/2026M01460770-S1Request digital key ↗
10/15/2026M01460839-I1Request digital key ↗
10/14/2026M01460770-S1Request digital key ↗
Showing 3 of 110 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler1
09/04/2026M00402001-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00401983-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00243016-I1Request digital key ↗
▸Applications & Permits517
▸BISPLAN / WORK APPROVAL APPLICATION293
11/14/2025141023336Open ↗
06/30/2023110246298Open ↗
06/21/2023110246298Open ↗
Showing 3 of 293 on file for this type
▸BISWORK PERMIT APPLICATION211
05/18/2023141023336Open ↗
10/06/2020140960878Open ↗
07/11/2019123749541Open ↗
Showing 3 of 211 on file for this type
▸BISPLACE OF ASSEMBLY7
08/06/2020110252887Open ↗
Showing 1 of 7 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications879
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION366
10/17/2019123749541Open ↗
10/17/2019123749541Open ↗
10/17/2019123749541Open ↗
Showing 3 of 366 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature115
10/15/2026M01460839-I1Open ↗
10/14/2026M01460770-S2Open ↗
10/14/2026M01460770-S1Open ↗
Showing 3 of 115 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST98
07/01/2019123749541Open ↗
07/01/2019123749541Open ↗
Showing 2 of 98 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature97
10/19/2026M01460839-I1Open ↗
10/19/2026M01460839-I1Open ↗
10/19/2026M01460839-I1Open ↗
Showing 3 of 97 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM73
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 73 on file for this type
▸DOB NOWProgress Inspector Seal & Signature69
10/19/2026M01460839-I1Open ↗
10/18/2026M01460770-S1Open ↗
10/18/2026M01460770-S1Open ↗
Showing 3 of 69 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT54
05/08/2023141023336Open ↗
10/02/2020140960878Open ↗
07/01/2019123749541Open ↗
Showing 3 of 54 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
05/08/2023141023336Open ↗
10/02/2020140960878Open ↗
Showing 2 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
05/08/2023141023336Open ↗
10/02/2020140960878Open ↗
Showing 2 of 3 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment226
▸BISSELF-CERT PLUMBING NOTICE72
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 72 on file for this type
▸BISSCHEDULE B - PLUMBING44
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 44 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE36
08/26/2019123898693Open ↗
07/01/2019123749541Open ↗
Showing 2 of 36 on file for this type
▸BISEQUIPMENT USE PERMITS27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA19
05/30/2019122031354Open ↗
05/30/2019122021007Open ↗
Showing 2 of 19 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8515
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSIGN HANGER CERTIFICATE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection7
▸BISTenant Protection Plan and Notes4
07/01/2019123749541Open ↗
06/26/2019123898693Open ↗
Showing 2 of 4 on file for this type
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Environmental & Asbestos251
▸DOB NOWDEP ACP-5: Asbestos Assessment Report95
10/15/2026M01460839-I1Open ↗
10/14/2026M01460770-S1Open ↗
10/14/2026M01460770-I1Open ↗
Showing 3 of 95 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)71
10/02/2020140960878Open ↗
07/01/2019123749541Open ↗
06/26/2019123898693Open ↗
Showing 3 of 71 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'57
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 57 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form10
09/02/2026M00761711-I1Open ↗
09/02/2026M00730946-I1Open ↗
09/02/2026M00729423-I1Open ↗
Showing 3 of 10 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance85
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS51
10/17/2019123749541Open ↗
10/17/2019123749541Open ↗
07/01/2019123749541Open ↗
Showing 3 of 51 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS15
09/02/2021123583354Open ↗
08/09/2021123379085Open ↗
10/17/2019123749541Open ↗
Showing 3 of 15 on file for this type
▸BISTR8: Energy Code Progress Inspections8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification4
09/02/2026M00730946-I1Open ↗
Showing 1 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/09/2021123379085Open ↗
10/06/2020140960878Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
09/02/2026M00730946-I1Open ↗
Showing 1 of 2 on file for this type
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY11
05/08/2023141023336Open ↗
05/08/2023141023336Open ↗
08/16/2021123379076Open ↗
Showing 3 of 11 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Approvals, Objections & Sign-offs244
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST120
12/03/2025141023336Open ↗
09/16/2021123583354Open ↗
09/02/2021123379076Open ↗
Showing 3 of 120 on file for this type
▸BISADMINISTRATIVE OBJECTIONS82
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 82 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE23
03/11/2020110246298Open ↗
04/25/2019121047376Open ↗
04/15/2019121047376Open ↗
Showing 3 of 23 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION17
06/10/2022123914826Open ↗
03/16/2022123914826Open ↗
12/24/2019110246298Open ↗
Showing 3 of 17 on file for this type
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership247
▸BISCOST AFFIDAVIT239
05/08/2023141023336Open ↗
09/02/2021123583354Open ↗
09/02/2021123379076Open ↗
Showing 3 of 239 on file for this type
▸BISDEPT OF FINANCE VERIFICATION8
05/02/2023123917397Open ↗
05/02/2023123917397Open ↗
04/12/2023123917397Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms267
▸BISEFILING COVER SHEET162
04/12/2023123917397Open ↗
03/16/2022123914826Open ↗
07/01/2019123749541Open ↗
Showing 3 of 162 on file for this type
▸BISBOROUGH INTAKE FORM50
04/12/2023123917397Open ↗
03/26/2020110246298Open ↗
03/11/2020110246298Open ↗
Showing 3 of 50 on file for this type
▸BISADDITIONAL INFORMATION41
07/05/2022123914826Open ↗
06/10/2022123914826Open ↗
06/22/2021123379085Open ↗
Showing 3 of 41 on file for this type
▸BISeFiling Job Application Cover Sheet14
05/08/2023141023336Open ↗
10/02/2020140960878Open ↗
Showing 2 of 14 on file for this type
▸Other Documents26
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION21
05/02/2023123917397Open ↗
05/02/2023123917397Open ↗
04/28/2023123917397Open ↗
Showing 3 of 21 on file for this type
▸BISRECORDS MGMT FEE PAYMENT RECEIPT2
05/02/2023123917397Open ↗
06/10/2022123914826Open ↗
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCURTAIN/PANEL WALL 1RCNY:32-011
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type