Elevator apt, miscellaneous
Reid Park Rock
710 EAST NEW YORK AVENUE · Prospect Lefferts Gardens-Wingate · BIN 3106612
💬 Discuss this project
1968Year Built
20Stories
D9Building Class
R6Zoning
139,710 sfGross Floor Area
230Units
LL97 CoveredRent Stabilized11 Open Violations 10 unresolved · 1 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator apt, miscellaneous · Owner of record: NYC PACT PRESERVATION PARTNERS LLC · 69,700 sf lot · 2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 12 docs
Floor 1Under Construction10p · 7 filings · 20 docs
CellarUnder Construction12p · 8 filings · 20 docs
Site & exteriorUnder Construction9 filings · 20 docs
Filed — no permit issued2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA3107/08/2026
NEW YORK CITY HOUSING AUTHORITY2907/08/2026
NYC Housing Authority1003/21/2026
NYC PACT PRESERVATION PARTNERS909/30/2026
RELIABLE ENTERPRISES507/08/2026
FAIRSTEAD MANAGEMENT407/08/2026
SKYWORX CONTRACTING303/21/2026
SHARAN BUILDERS303/21/2026
NYC PACT PRESEVATION MM LLC103/22/2026
NYCHA REID SC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIGGING CONSULTANTS203/21/2026
SNR EXPEDITING DESIGN203/21/2026
RYBAK DEVELOPMENT203/21/2026
METROPOLIS GROUP INC3603/21/2026
DANICO SERVICES203/21/2026
KD DESIGNS103/21/2026
CONVERSANO ASSOCIATES, INC.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FSC D&C LLCGeneral Contractor1909/30/2026
PRIME CONTRACTORS, INCGeneral Contractor1107/08/2026
PYRAMID ETC COMPANIES, LLGeneral Contractor804/09/2026
NEELAM CONSTRUCTION CORPGeneral Contractor707/08/2026
LET IT GROW, INCORPORATEDGeneral Contractor509/18/2026
ARSENAL SCAFFOLD INCGeneral Contractor407/08/2026
VIKRANT CONTRACTING & BUILDERGeneral Contractor403/21/2026
MPC PLUMBING & HEATING INCPlumbing407/08/2026
DUAL FUEL COMPANY LLCGeneral Contractor407/08/2026
A & E PLUMBING CORPPlumbing307/08/2026
JRCRUZ CORPGeneral Contractor304/09/2026
DUAL FUEL PLUBING & HTINGPlumbing307/11/2026
RELIABLE ENTERPRISES INCGeneral Contractor207/08/2026
AURICCHIO, ANNIELLEElectrical103/21/2026
PANILI PLUMBING & HTG LLCPlumbing107/08/2026
BILLS, ANTHONYElectrical103/21/2026
CONWAY, JR, WILLIAMElectrical103/21/2026
DEFRANCO BROS' PLUMBINGElectrical103/21/2026
GEORGE BASSOLINOElectrical103/21/2026
ITKIN ELECTRIC CORP.Electrical103/22/2026
KHAIT, SElectrical103/21/2026
KHARGIE, MAHENDRANAUTHElectrical103/21/2026
LACAYO, AElectrical103/21/2026
LACLAIR, KEVINElectrical103/21/2026
LAURA ELEC'L LIGHTING &Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS18031808/26/2026
TECTONIC ENGINEERING CONS106504/07/2026
SOCOTEC, INC.301204/25/2024
JOEL PHAGOO ,PE, PLLC2416104/11/2024
Building Lifecycle
All (239)Filed (39)Permit Issued (51)Signed Off (15)Facade (FISP) (17)Violation (60)Inspection (10)Objection (17)Special Inspection (30)
09/29/2026
Permit issued — General Construction
B01214210-I1-GC
09/17/2026
Permit issued — General Construction
B01450934-I1-GC-CX
08/27/2026
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00965052-I1
08/26/2026
Filed — Alteration
GENERAL LANDSCAPING WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01450934-I1
08/25/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
08/25/2026
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
08/24/2026
Signed off — Alteration
Installation of gas meter (1), direct water heaters (2), assorted pumps (9), thermal expansion tank (1), and assorted piping. EXISTING PIPE, PIPE AND FITTING INSULATION TO REMAIN AND WILL NOT BE DISTURBED DURING CONSTRUCTION ACTIVITY.
B00946347-I1
07/28/2026
Violation issued (HPD, open)
C
07/22/2026
Special inspection requirement — Maintenance information
07/15/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/10/2026
Permit issued — Plumbing
B00946347-I1-PL
07/07/2026
Cycle 10 facade report signed — SAFE
06/19/2026
Filed — Alteration
FUEL OIL STORAGE AS PER PLANS
B00980645-I1
06/17/2026
Signed off — Alteration
Facade repairs. No change in egress, use or occupancy.
B00930791-I1
06/16/2026
Filed — Alteration
Installation of plumbing fixtures along with related piping.
B01029222-P1
06/16/2026
Special inspection requirement — Interior lighting power
06/16/2026
Special inspection requirement — Lighting controls
06/16/2026
Special inspection requirement — Energy Code Compliance Inspections
06/15/2026
Violation issued (HPD, open)
C
06/12/2026
Objection raised — Energy
06/12/2026
Objection resolved — Addressed
05/28/2026
Cycle 10 facade inspection completed
05/28/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/22/2026
Filed — Alteration
Installation of gas meter (1), direct water heaters (2), assorted pumps (9), thermal expansion tank (1), and assorted piping. EXISTING PIPE, PIPE AND FITTING INSULATION TO REMAIN AND WILL NOT BE DISTURBED DURING CONSTRUCTION ACTIVITY.
B00946347-P1
05/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
05/22/2026
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
05/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
05/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
05/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
05/22/2026
Special inspection requirement — Electrical motors and elevators
SAMI HAJJAR P.E
05/19/2026
Signed off — Alteration
SCOPE OF WORK INCLUDES THE REPLACEMENT OF GAS BOILERS AND ASSOCIATED PIPING AND DUCTWORK.
B00980636-I1
05/15/2026
Signed off — Alteration
structural work for reinforcement of structural slab below first floor and new ramp in cellar.
B00911175-I1
05/14/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/12/2026
Filed — Alteration
structural work for reinforcement of structural slab below first floor and new ramp in cellar.
B00911175-P3
05/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/12/2026
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
05/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
05/12/2026
Special inspection requirement — Electrical motors and elevators
SAMI HAJJAR P.E
05/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
05/12/2026
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
05/12/2026
Special inspection requirement — Electrical motors and elevators
SAMI HAJJAR P.E
05/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
05/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
05/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
05/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
05/11/2026
Special inspection requirement — Concrete - Cast-In-Place
05/06/2026
Signed off — Alteration
RETROFIT EXISTING IMPERVIOUS SURFACES TO INCLUDE GREEN INFRASTRUCTURE (GI) THAT WILL MANAGESTORMWATER RUNOFF FROM TRIBUTARY IMPERVIOUS SURFACES. THE WORK IS PART OF NYC'S GIPROGRAM WITH THE PRIMARY GOAL TO REDUCE COMBINED SEWER OVERFLOWS INTO NY HARBOR.
B00697460-S2
05/05/2026
Signed off — Alteration
MECHANICAL WORK INCLUDES INSTALLATION OF NEW GAS VENT DUCT IN BOILER ROOM
B00951965-I1
04/30/2026
Special inspection requirement — Structural Steel - High Strength Bolting
SAMI HAJJAR P.E
04/30/2026
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
04/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
04/30/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
04/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
04/28/2026
Filed — Alteration
RETROFIT EXISTING IMPERVIOUS SURFACES TO INCLUDE GREEN INFRASTRUCTURE (GI) THAT WILL MANAGESTORMWATER RUNOFF FROM TRIBUTARY IMPERVIOUS SURFACES. THE WORK IS PART OF NYC'S GIPROGRAM WITH THE PRIMARY GOAL TO REDUCE COMBINED SEWER OVERFLOWS INTO NY HARBOR.
B00697460-P3
04/27/2026
Signed off — Alteration
RETROFIT EXISTING IMPERVIOUS SURFACES TO INCLUDE GREEN INFRASTRUCTURE (GI) THAT WILL MANAGESTORMWATER RUNOFF FROM TRIBUTARY IMPERVIOUS SURFACES. THE WORK IS PART OF NYC'S GIPROGRAM WITH THE PRIMARY GOAL TO REDUCE COMBINED SEWER OVERFLOWS INTO NY HARBOR.
B00697460-I1
04/27/2026
Signed off — Alteration
RETROFIT EXISTING IMPERVIOUS SURFACES TO INCLUDE GREEN INFRASTRUCTURE (GI) THAT WILL MANAGESTORMWATER RUNOFF FROM TRIBUTARY IMPERVIOUS SURFACES. THE WORK IS PART OF NYC'S GIPROGRAM WITH THE PRIMARY GOAL TO REDUCE COMBINED SEWER OVERFLOWS INTO NY HARBOR.
B00697460-S1
04/07/2026
Filed — Alteration
RETROFIT EXISTING IMPERVIOUS SURFACES TO INCLUDE GREEN INFRASTRUCTURE (GI) THAT WILL MANAGESTORMWATER RUNOFF FROM TRIBUTARY IMPERVIOUS SURFACES. THE WORK IS PART OF NYC'S GIPROGRAM WITH THE PRIMARY GOAL TO REDUCE COMBINED SEWER OVERFLOWS INTO NY HARBOR.
B00697460-P2
04/02/2026
Permit issued — General Construction
B00697460-I1-EA
03/19/2026
Signed off — Alteration
B00946786-I1
Latest 60 of 239 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedFSC D&C LLC09/29/2026
DOB NOWGeneral ConstructionPermit IssuedLET IT GROW, INCORPORATED09/17/2026
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING07/10/2026
DOB NOWGeneral ConstructionSigned-offJRCRUZ CORP04/02/2026
DOB NOWGeneral ConstructionPermit IssuedFSC D&C LLC03/18/2026
DOB NOWSupported ScaffoldPermit IssuedRELIABLE ENTERPRISES INC01/29/2026
DOB NOWPlumbingPermit IssuedPANILI PLUMBING & HTG LLC01/09/2026
DOB NOWGeneral ConstructionPermit IssuedLET IT GROW, INCORPORATED12/22/2025
DOB NOWEarth WorkPermit IssuedLET IT GROW, INCORPORATED12/22/2025
DOB NOWGeneral ConstructionPermit IssuedFSC D&C LLC12/15/2025
DOB NOWGeneral ConstructionPermit IssuedFSC D&C LLC12/15/2025
DOB NOWSuspended ScaffoldPermit IssuedPREMIER CONSTRUCTION INC12/08/2025
DOB NOWGeneral ConstructionPermit IssuedFSC D&C LLC11/20/2025
DOB NOWPlumbingPermit IssuedA & E PLUMBING CORP11/19/2025
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC11/06/2025
DOB NOWSupport of ExcavationSigned-offJRCRUZ CORP08/28/2025
DOB NOWEarth WorkSigned-offJRCRUZ CORP07/15/2025
DOB NOWPlumbingSigned-offA & E PLUMBING CORP07/14/2025
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLBG & HTG CORP06/26/2025
DOB NOWMechanical SystemsSigned-offDUAL FUEL COMPANY LLC06/25/2025
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING06/24/2025
DOB NOWGeneral ConstructionSigned-offPYRAMID ETC COMPANIES, LL06/03/2025
DOB NOWSuspended ScaffoldPermit IssuedLUAN SELA05/28/2025
DOB NOWPlumbingSigned-offMPC PLUMBING & HEATING IN04/28/2025
DOB NOWStructuralSigned-offFSC D&C LLC03/24/2025
DOB NOWSupported ScaffoldPermit IssuedRELIABLE ENTERPRISES INC02/25/2025
DOB NOWSuspended ScaffoldPermit IssuedLUAN SELA02/19/2025
DOB NOWGeneral ConstructionPermit IssuedFSC D&C LLC12/09/2024
DOB NOWGeneral ConstructionPermit IssuedFSC D&C LLC12/09/2024
DOB NOWGeneral ConstructionPermit IssuedFSC D&C LLC11/24/2024
DOB NOWMechanical SystemsSigned-offPYRAMID ETC COMPANIES, LL11/22/2024
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC11/20/2024
DOB NOWPlumbingSigned-offA & E PLUMBING CORP10/03/2024
DOB NOWGeneral ConstructionSigned-offPYRAMID ETC COMPANIES, LL06/10/2024
DOB NOWGeneral ConstructionSigned-offPYRAMID ETC COMPANIES, LL05/24/2024
DOB NOWBoiler EquipmentSigned-offAMERICAN BOILER & WELDING05/02/2024
DOB NOWMechanical SystemsSigned-offDUAL FUEL COMPANY LLC05/01/2024
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING05/01/2024
DOB NOWSuspended ScaffoldPermit IssuedPREMIER CONSTRUCTION INC04/26/2024
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC11/27/2023
+ 54 more permits on file
3 projects · most recent 06/16/2026
Gas Water/Sanitary Storm
FiledStatusContractorScope
06/16/2026Permit IssuedLEEMA PLBNG & HEATING INCGas, Water/Sanitary
05/22/2026Signed-offDUAL FUEL PLUBING & HTINGGas, Water/Sanitary
09/22/2025Permit IssuedPANILI PLUMBING & HTG LLCStorm
13 projects · most recent 08/11/2025
General Wiring Boiler Controls
FiledStatusContractorScope
08/11/2025Permit IssuedANGLER ELECTRICGeneral Wiring
08/11/2025Permit IssuedANGLER ELECTRICGeneral Wiring
07/03/2025Permit IssuedATLAS-ACON ELEC. SERVICEGeneral Wiring
03/11/2025Permit IssuedR.C.M. ELECTRIC CORP.—
03/11/2025CompleteR.C.M. ELECTRIC CORP.—
10/06/2024Permit IssuedDENALI ELECTRIC CORP—
06/23/2024Permit IssuedITKIN ELECTRIC CORP.Boiler Controls
04/22/2024CompleteZENA ELECTRIC INC—
01/03/2024CompleteLAURA ELEC'L LIGHTING &—
12/04/2023Permit IssuedNASH ELECTRIC SERVICES IN—
06/22/2022CompleteLIT MODE ELECL CONTG INC—
04/25/2020CompleteMAC FHIONNGHAILE & SONSGeneral Wiring
12/12/2019CompleteRAIDEN ELECTRIC LLC—
3 projects · most recent 08/26/2026
FiledStatusContractorScope
08/26/2026Permit IssuedLET IT GROW, INCORPORATED2 scope_items
04/28/2026Signed-offJRCRUZ CORP2 scope_items
09/22/2025Permit IssuedPANILI PLUMBING & HTG LLC1 scope_items
2 projects · most recent 02/25/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
02/25/2025Permit IssuedRELIABLE ENTERPRISES INCScaffold
11/22/2023Signed-offARSENAL SCAFFOLD INCSidewalk Shed
1 project · most recent 04/28/2026
Earthwork
FiledStatusContractorScope
04/28/2026Signed-offJRCRUZ CORPEarthwork
2 projects · most recent 02/17/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
02/17/2025Permit IssuedLS GENERAL CORPSuspended Scaffold (SC)
04/11/2024Permit IssuedPREMIER CONSTRUCTION INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
07/15/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/28/2026Pass-Final General Construction Non-Directive 14PassView ↗
05/14/2026Fail-Final General Construction Non-Directive 14FailView ↗
12/24/2025Pass-Final Boiler Equipment InspectionPassView ↗
11/06/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/22/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/25/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/06/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/15/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 111
DateRequirementInspectorRole
08/25/2026FinalSAMI HAJJAR P.Eprogress
08/25/2026Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
07/22/2026Maintenance information—energy_progress
06/16/2026Interior lighting power—energy_progress
06/16/2026Lighting controls—energy_progress
06/16/2026Energy Code Compliance Inspections—progress
05/22/2026HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
05/22/2026HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
05/22/2026Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
05/22/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
05/22/2026Maintenance informationSAMI HAJJAR P.Eenergy_progress
05/22/2026Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
05/12/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
05/12/2026Maintenance informationSAMI HAJJAR P.Eenergy_progress
05/12/2026Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
05/12/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
05/12/2026HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
05/12/2026HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
05/12/2026Tenant Protection Plan Compliance—special
05/12/2026Maintenance informationSAMI HAJJAR P.Eenergy_progress
05/12/2026HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
05/12/2026Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
05/12/2026HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
05/12/2026Tenant Protection Plan Compliance—special
05/11/2026Concrete - Cast-In-Place—special
Latest 25 of 111.
▾Documents — 377 on file (BIS + DOB NOW)
▸Plans & Drawings39
▸DOB NOWPlans/Sketch36
08/29/2026B00761507-I1Request digital key ↗
08/29/2026B00761503-I1Request digital key ↗
08/27/2026B01450934-I1Request digital key ↗
Showing 3 of 36 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00299481-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00299474-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/19/2026B01193063-I1Request digital key ↗
▸Applications & Permits43
▸BISWORK PERMIT APPLICATION22
08/27/2020340714622Open ↗
10/30/2019320529683Open ↗
10/12/2019340553038Open ↗
Showing 3 of 22 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION20
02/03/2023321735565Open ↗
06/14/2021340714622Open ↗
08/12/2020340714622Open ↗
Showing 3 of 20 on file for this type
▸BISPLACE OF ASSEMBLY1
03/14/2018321735565Open ↗
▸Seals & Professional Certifications122
▸DOB NOWDPL-1: Design Professional Seal & Signature37
08/29/2026B00761507-I1Open ↗
08/29/2026B00761503-I1Open ↗
08/27/2026B01450934-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/27/2026B00918311-I1Open ↗
09/27/2026B00918311-I1Open ↗
09/23/2026B01450934-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
10/02/2026B01264478-I1Open ↗
09/27/2026B00918311-I1Open ↗
09/23/2026B01450934-I1Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
12/26/2019340553038Open ↗
12/26/2019340552878Open ↗
12/26/2019340552878Open ↗
Showing 3 of 16 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION9
10/10/2017340553038Open ↗
10/10/2017340552878Open ↗
03/02/2015340234972Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY9
10/10/2017340553038Open ↗
10/10/2017340552878Open ↗
03/02/2015340234972Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
10/10/2017340553038Open ↗
10/10/2017340552878Open ↗
03/02/2015340234972Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
01/27/2020340714622Open ↗
04/03/2019340655810Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/02/2010320208100Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/02/2010320208100Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING2
07/24/2012320529683Open ↗
01/18/2011320261239Open ↗
▸BISPLUMBING (PL) SIGNOFF1
06/25/2025302279781Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/25/2023321735565Open ↗
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes4
01/27/2020340714622Open ↗
01/24/2019340655810Open ↗
10/10/2017340553038Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026B00299474-I1Open ↗
08/13/2026B00299481-I1Open ↗
▸Environmental & Asbestos24
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/25/2026B00980636-I1Open ↗
08/25/2026B00980636-P1Open ↗
08/20/2026B01029222-P1Open ↗
Showing 3 of 14 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
01/31/2013340034242Open ↗
01/31/2013340034331Open ↗
07/24/2012320529683Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/25/2026B00930791-I1Open ↗
08/23/2026B01116664-I1Open ↗
08/13/2026B01101681-I1Open ↗
▸BISASBESTOS: VARIANCE (DEP FORM V5)1
02/04/2015340228783Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
08/20/2020340714622Open ↗
▸BISASBESTOS INSPECTION REPORT1
04/11/2011320261239Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/02/2010320208100Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
06/14/2021340714622Open ↗
08/20/2020340714622Open ↗
08/20/2020340714622Open ↗
Showing 3 of 5 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
10/10/2017340553038Open ↗
08/20/2014340177891Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/25/2026B00980636-I1Open ↗
08/16/2026B00946347-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/14/2021340714622Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/14/2021340714622Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY14
01/25/2023321735565Open ↗
06/14/2021340714622Open ↗
06/14/2021340714622Open ↗
Showing 3 of 14 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)5
08/20/2020340714622Open ↗
10/10/2017340553038Open ↗
10/10/2017340552878Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs65
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter38
09/10/2026B01450934-I1Open ↗
08/29/2026B00761507-I1Open ↗
08/29/2026B00761503-I1Open ↗
Showing 3 of 38 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
02/07/2023321735565Open ↗
06/14/2021340714622Open ↗
12/26/2019340553038Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
01/25/2023321735565Open ↗
07/24/2015340234972Open ↗
01/10/2014340034242Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
07/24/2012320529683Open ↗
01/18/2011320261239Open ↗
09/02/2010320208100Open ↗
▸BISSHED LETTER2
10/02/2018340553038Open ↗
03/03/2014320208100Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS2
03/07/2013320208100Open ↗
03/07/2013320208100Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)2
08/13/2026B00299474-I1Open ↗
08/13/2026B00299481-I1Open ↗
▸BISLANDMARKS APPROVAL1
01/06/2014340034215Open ↗
▸BISFLAME SPREAD/FIRE LETTER1
01/25/2023321735565Open ↗
▸BISCCD1-Construction Code Determination1
08/23/2013340034215Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026B00918311-I1Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT5
06/14/2021340714622Open ↗
01/27/2020340714622Open ↗
01/31/2013340034331Open ↗
Showing 3 of 5 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
08/27/2020340714622Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
06/02/2021340714622Open ↗
▸Filing & Intake Forms26
▸BISEFILING JOB APPLICATION COVER SHEET11
01/27/2020340714622Open ↗
01/24/2019340655810Open ↗
10/10/2017340553038Open ↗
Showing 3 of 11 on file for this type
▸BISADDITIONAL INFORMATION10
05/05/2021340714622Open ↗
08/27/2020340714622Open ↗
08/27/2020340714622Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET3
08/21/2012320529683Open ↗
01/18/2011320261239Open ↗
09/02/2010320208100Open ↗
▸BISBOROUGH INTAKE FORM2
12/26/2019340553038Open ↗
12/26/2019340552878Open ↗
▸Other Documents11
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
01/25/2023321735565Open ↗
03/26/2018321735565Open ↗
▸DOB NOWCalculations2
08/13/2026B01182116-I1Open ↗
08/13/2026B01019014-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00697460-I1Open ↗
08/13/2026B00697460-S2Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026B01019014-I1Open ↗
08/13/2026B01182116-I1Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
02/07/2023321735565Open ↗
▸BISSupporting Document: Fee Deferment1
01/25/2023321735565Open ↗
▸DOB NOWAlternate Plan 11
08/19/2026B01193063-I1Open ↗