Elevator apt, miscellaneous
Reid Park Rock
720 EAST NEW YORK AVENUE · BIN 3106612
💬 Discuss this project
1968Year Built
20Stories
D9Building Class
R6Zoning
139,710 sfGross Floor Area
230Units
LL97 CoveredRent Stabilized5 Active Violations ▸FISP: SAFEFDNY Report ↗
Elevator apt, miscellaneous · Owner of record: NYC Pact Preservation Partners · 69,700 sf lot · 2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsNYC Pact Preservation PartnersUnder Construction3 filings
RoofNYC Pact Preservation Partners3p · 3 filings · 13 docs
Floor 1NYC Pact Preservation PartnersUnder Construction10p · 9 filings · 20 docs
CellarNYC Pact Preservation PartnersUnder Construction12p · 8 filings · 20 docs
Site & exteriorNYC Pact Preservation PartnersUnder Construction9 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority7207/08/2026
NYC Pact Preservation Partners1009/30/2026
Bnos Menachem103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
G3 Architecture Interiors Planning108/26/2026
Dagher Engineering1006/19/2026
Madsen Consulting Engineering405/12/2026
JR Cruz204/28/2026
Tetra Tech404/07/2026
SLM Architecture511/13/2025
AKRF208/07/2025
Mje Professional Services102/25/2025
Socotec204/25/2024
Ashraf111/22/2023
Joel Phagoo P.E406/22/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigging Consultants203/21/2026
SNR Expediting Design203/21/2026
Rybak Development203/21/2026
Metropolis Group3603/21/2026
Danico Services203/21/2026
KD Designs103/21/2026
Socotec103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FSC D&CGeneral Contractor1909/30/2026
Prime ContractorsScaffold1107/08/2026
Pyramid Etc CompaniesGeneral Contractor804/09/2026
Neelam ConstructionScaffold707/08/2026
Let It GrowGeneral Contractor509/18/2026
Vikrant Contracting & BuilderScaffold403/21/2026
Arsenal ScaffoldScaffold407/08/2026
MPC Plumbing & HeatingPlumbing407/08/2026
Dual Fuel CompanyGeneral Contractor407/08/2026
Dual Fuel Plumbing & HeatingPlumbing307/11/2026
A & E PlumbingPlumbing307/08/2026
JrcruzGeneral Contractor304/09/2026
Reliable EnterprisesScaffold207/08/2026
Panili Plumbing & HeatingPlumbing107/08/2026
Itkin ElectricElectrical103/22/2026
Olympic Electric WiringElectrical103/21/2026
Fernando's M ElectricalElectrical103/21/2026
Laura Electrical LightingElectrical103/22/2026
Raiden ElectricElectrical103/22/2026
Northeastern ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metric Consulting and Ins18031808/26/2026
Tectonic Engineering Cons106504/07/2026
Socotec301204/25/2024
Joel Phagoo, PE2416104/11/2024
Building Lifecycle
All (240)Filed (39)Permit Issued (51)Signed Off (15)Facade (FISP) (17)Violation (60)Inspection (11)Objection (17)Special Inspection (30)
09/29/2026
Permit issued — General Construction
B01214210-I1-GC
09/17/2026
Permit issued — General Construction
B01450934-I1-GC-CX
09/09/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/27/2026
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00965052-I1
08/26/2026
Filed — Alteration
GENERAL LANDSCAPING WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01450934-I1
08/25/2026
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
08/25/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
08/24/2026
Signed off — Alteration
Installation of gas meter (1), direct water heaters (2), assorted pumps (9), thermal expansion tank (1), and assorted piping. EXISTING PIPE, PIPE AND FITTING INSULATION TO REMAIN AND WILL NOT BE DISTURBED DURING CONSTRUCTION ACTIVITY.
B00946347-I1
07/28/2026
Violation issued (HPD, open)
C
07/22/2026
Special inspection requirement — Maintenance information
07/15/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/10/2026
Permit issued — Plumbing
B00946347-I1-PL
07/07/2026
Cycle 10 facade report signed — SAFE
06/19/2026
Filed — Alteration
FUEL OIL STORAGE AS PER PLANS
B00980645-I1
06/17/2026
Signed off — Alteration
Facade repairs. No change in egress, use or occupancy.
B00930791-I1
06/16/2026
Filed — Alteration
Installation of plumbing fixtures along with related piping.
B01029222-P1
06/16/2026
Special inspection requirement — Lighting controls
06/16/2026
Special inspection requirement — Interior lighting power
06/16/2026
Special inspection requirement — Energy Code Compliance Inspections
06/12/2026
Objection raised — Energy
06/12/2026
Objection resolved — Addressed
05/28/2026
Cycle 10 facade inspection completed
05/28/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/22/2026
Filed — Alteration
Installation of gas meter (1), direct water heaters (2), assorted pumps (9), thermal expansion tank (1), and assorted piping. EXISTING PIPE, PIPE AND FITTING INSULATION TO REMAIN AND WILL NOT BE DISTURBED DURING CONSTRUCTION ACTIVITY.
B00946347-P1
05/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
05/22/2026
Special inspection requirement — Electrical motors and elevators
SAMI HAJJAR P.E
05/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
05/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
05/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
05/22/2026
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
05/19/2026
Signed off — Alteration
SCOPE OF WORK INCLUDES THE REPLACEMENT OF GAS BOILERS AND ASSOCIATED PIPING AND DUCTWORK.
B00980636-I1
05/15/2026
Signed off — Alteration
structural work for reinforcement of structural slab below first floor and new ramp in cellar.
B00911175-I1
05/14/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/12/2026
Filed — Alteration
structural work for reinforcement of structural slab below first floor and new ramp in cellar.
B00911175-P3
05/12/2026
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
05/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
05/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/12/2026
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
05/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
05/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
05/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
05/12/2026
Special inspection requirement — Electrical motors and elevators
SAMI HAJJAR P.E
05/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
05/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
05/12/2026
Special inspection requirement — Electrical motors and elevators
SAMI HAJJAR P.E
05/11/2026
Special inspection requirement — Concrete - Cast-In-Place
05/06/2026
Signed off — Alteration
RETROFIT EXISTING IMPERVIOUS SURFACES TO INCLUDE GREEN INFRASTRUCTURE (GI) THAT WILL MANAGESTORMWATER RUNOFF FROM TRIBUTARY IMPERVIOUS SURFACES. THE WORK IS PART OF NYC'S GIPROGRAM WITH THE PRIMARY GOAL TO REDUCE COMBINED SEWER OVERFLOWS INTO NY HARBOR.
B00697460-S2
05/05/2026
Signed off — Alteration
MECHANICAL WORK INCLUDES INSTALLATION OF NEW GAS VENT DUCT IN BOILER ROOM
B00951965-I1
04/30/2026
Special inspection requirement — Structural Steel - High Strength Bolting
SAMI HAJJAR P.E
04/30/2026
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
04/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
04/30/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
04/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
04/28/2026
Filed — Alteration
RETROFIT EXISTING IMPERVIOUS SURFACES TO INCLUDE GREEN INFRASTRUCTURE (GI) THAT WILL MANAGESTORMWATER RUNOFF FROM TRIBUTARY IMPERVIOUS SURFACES. THE WORK IS PART OF NYC'S GIPROGRAM WITH THE PRIMARY GOAL TO REDUCE COMBINED SEWER OVERFLOWS INTO NY HARBOR.
B00697460-P3
04/27/2026
Signed off — Alteration
RETROFIT EXISTING IMPERVIOUS SURFACES TO INCLUDE GREEN INFRASTRUCTURE (GI) THAT WILL MANAGESTORMWATER RUNOFF FROM TRIBUTARY IMPERVIOUS SURFACES. THE WORK IS PART OF NYC'S GIPROGRAM WITH THE PRIMARY GOAL TO REDUCE COMBINED SEWER OVERFLOWS INTO NY HARBOR.
B00697460-S1
04/27/2026
Signed off — Alteration
RETROFIT EXISTING IMPERVIOUS SURFACES TO INCLUDE GREEN INFRASTRUCTURE (GI) THAT WILL MANAGESTORMWATER RUNOFF FROM TRIBUTARY IMPERVIOUS SURFACES. THE WORK IS PART OF NYC'S GIPROGRAM WITH THE PRIMARY GOAL TO REDUCE COMBINED SEWER OVERFLOWS INTO NY HARBOR.
B00697460-I1
04/07/2026
Filed — Alteration
RETROFIT EXISTING IMPERVIOUS SURFACES TO INCLUDE GREEN INFRASTRUCTURE (GI) THAT WILL MANAGESTORMWATER RUNOFF FROM TRIBUTARY IMPERVIOUS SURFACES. THE WORK IS PART OF NYC'S GIPROGRAM WITH THE PRIMARY GOAL TO REDUCE COMBINED SEWER OVERFLOWS INTO NY HARBOR.
B00697460-P2
04/02/2026
Permit issued — General Construction
B00697460-I1-EA
03/19/2026
Signed off — Alteration
B00946786-I1
Latest 60 of 240 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedFSC D&C09/29/2026
DOB NOWGeneral ConstructionPermit IssuedLet It Grow09/17/2026
DOB NOWPlumbingSigned-offDual Fuel Plumbing & Heating07/10/2026
DOB NOWGeneral ConstructionSigned-offJrcruz04/02/2026
DOB NOWGeneral ConstructionPermit IssuedFSC D&C03/18/2026
DOB NOWSupported ScaffoldPermit IssuedReliable Enterprises01/29/2026
DOB NOWPlumbingPermit IssuedPanili Plumbing & Heating01/09/2026
DOB NOWEarth WorkPermit IssuedLet It Grow12/22/2025
DOB NOWGeneral ConstructionPermit IssuedLet It Grow12/22/2025
DOB NOWGeneral ConstructionPermit IssuedFSC D&C12/15/2025
DOB NOWGeneral ConstructionPermit IssuedFSC D&C12/15/2025
DOB NOWSuspended ScaffoldPermit IssuedPremier Construction12/08/2025
DOB NOWGeneral ConstructionPermit IssuedFSC D&C11/20/2025
DOB NOWPlumbingPermit IssuedA & E Plumbing11/19/2025
DOB NOWSidewalk ShedSigned-offArsenal Scaffold11/06/2025
DOB NOWSupport of ExcavationSigned-offJrcruz08/28/2025
DOB NOWEarth WorkSigned-offJrcruz07/15/2025
DOB NOWPlumbingSigned-offA & E Plumbing07/14/2025
DOB NOWBoiler EquipmentSigned-offDual Fuel Plumbing & Heating06/26/2025
DOB NOWMechanical SystemsSigned-offDual Fuel Company06/25/2025
DOB NOWPlumbingSigned-offDual Fuel Plumbing & Heating06/24/2025
DOB NOWGeneral ConstructionSigned-offPyramid Etc Companies06/03/2025
DOB NOWSuspended ScaffoldPermit IssuedLuan Sela05/28/2025
DOB NOWPlumbingSigned-offMPC Plumbing & Heating04/28/2025
DOB NOWStructuralSigned-offFSC D&C03/24/2025
DOB NOWSupported ScaffoldPermit IssuedReliable Enterprises02/25/2025
DOB NOWSuspended ScaffoldPermit IssuedLuan Sela02/19/2025
DOB NOWGeneral ConstructionPermit IssuedFSC D&C12/09/2024
DOB NOWGeneral ConstructionPermit IssuedFSC D&C12/09/2024
DOB NOWGeneral ConstructionPermit IssuedFSC D&C11/24/2024
DOB NOWMechanical SystemsSigned-offPyramid Etc Companies11/22/2024
DOB NOWSidewalk ShedSigned-offArsenal Scaffold11/20/2024
DOB NOWPlumbingSigned-offA & E Plumbing10/03/2024
DOB NOWGeneral ConstructionSigned-offPyramid Etc Companies06/10/2024
DOB NOWGeneral ConstructionSigned-offPyramid Etc Companies05/24/2024
DOB NOWBoiler EquipmentSigned-offAmerican Boiler & Welding05/02/2024
DOB NOWMechanical SystemsSigned-offDual Fuel Company05/01/2024
DOB NOWPlumbingSigned-offDual Fuel Plumbing & Heating05/01/2024
DOB NOWSuspended ScaffoldPermit IssuedPremier Construction04/26/2024
DOB NOWSidewalk ShedSigned-offArsenal Scaffold11/27/2023
+ 55 more permits on file
3 projects · most recent 06/16/2026
Gas Water/Sanitary Storm
FiledStatusContractorScope
06/16/2026Permit IssuedLeema Plumbing & HeatingGas, Water/Sanitary
05/22/2026Signed-offDual Fuel Plumbing & HeatingGas, Water/Sanitary
09/22/2025Permit IssuedPanili Plumbing & HeatingStorm
13 projects · most recent 08/11/2025
General Wiring Boiler Controls
FiledStatusContractorScope
08/11/2025Permit IssuedAngler ElectricGeneral Wiring
08/11/2025Permit IssuedAngler ElectricGeneral Wiring
07/03/2025Permit IssuedAtlas-Acon Electric ServiceGeneral Wiring
03/11/2025CompleteR.C.M. Electric—
03/11/2025Permit IssuedR.C.M. Electric—
10/06/2024Permit IssuedDenali Electric—
06/23/2024Permit IssuedItkin ElectricBoiler Controls
04/22/2024CompleteZena Electric—
01/03/2024CompleteLaura Electrical Lighting—
12/04/2023Permit IssuedNash Electric Services—
06/22/2022CompleteLit Mode Electrical Contg—
04/25/2020CompleteMac Fhionnghaile & SonsGeneral Wiring
12/12/2019CompleteRaiden Electric—
3 projects · most recent 08/26/2026
FiledStatusContractorScope
08/26/2026Permit IssuedLet It Grow2 scope_items
04/28/2026Signed-offJrcruz2 scope_items
09/22/2025Permit IssuedPanili Plumbing & Heating1 scope_items
2 projects · most recent 02/25/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
02/25/2025Permit IssuedReliable EnterprisesScaffold
11/22/2023Signed-offArsenal ScaffoldSidewalk Shed
1 project · most recent 04/28/2026
Earthwork
FiledStatusContractorScope
04/28/2026Signed-offJrcruzEarthwork
2 projects · most recent 02/17/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
02/17/2025Permit IssuedLS GeneralSuspended Scaffold (SC)
04/11/2024Permit IssuedPremier ConstructionSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
09/09/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/15/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/28/2026Pass-Final General Construction Non-Directive 14PassView ↗
05/14/2026Fail-Final General Construction Non-Directive 14FailView ↗
12/24/2025Pass-Final Boiler Equipment InspectionPassView ↗
11/06/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/22/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/25/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/06/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/15/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 111
DateRequirementInspectorRole
08/25/2026Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
08/25/2026FinalSAMI HAJJAR P.Eprogress
07/22/2026Maintenance information—energy_progress
06/16/2026Interior lighting power—energy_progress
06/16/2026Energy Code Compliance Inspections—progress
06/16/2026Lighting controls—energy_progress
05/22/2026HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
05/22/2026HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
05/22/2026Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
05/22/2026Maintenance informationSAMI HAJJAR P.Eenergy_progress
05/22/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
05/22/2026Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
05/12/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
05/12/2026Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
05/12/2026Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
05/12/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
05/12/2026HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
05/12/2026Maintenance informationSAMI HAJJAR P.Eenergy_progress
05/12/2026HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
05/12/2026Tenant Protection Plan Compliance—special
05/12/2026Tenant Protection Plan Compliance—special
05/12/2026HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
05/12/2026Maintenance informationSAMI HAJJAR P.Eenergy_progress
05/12/2026HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
05/11/2026Concrete - Cast-In-Place—special
Latest 25 of 111.
▾Documents — 377 on file (BIS + DOB NOW)
▸Plans & Drawings39
▸DOB NOWPlans/Sketch36
08/29/2026B00761507-I1Request digital key ↗
08/29/2026B00761503-I1Request digital key ↗
08/27/2026B01450934-I1Request digital key ↗
Showing 3 of 36 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00299481-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00299474-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/19/2026B01193063-I1Request digital key ↗
▸Applications & Permits43
▸BISWORK PERMIT APPLICATION22
08/27/2020340714622Open ↗
10/30/2019320529683Open ↗
10/12/2019340553038Open ↗
Showing 3 of 22 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION20
02/03/2023321735565Open ↗
06/14/2021340714622Open ↗
08/12/2020340714622Open ↗
Showing 3 of 20 on file for this type
▸BISPLACE OF ASSEMBLY1
03/14/2018321735565Open ↗
▸Seals & Professional Certifications122
▸DOB NOWDPL-1: Design Professional Seal & Signature37
08/29/2026B00761507-I1Open ↗
08/29/2026B00761503-I1Open ↗
08/27/2026B01450934-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/27/2026B00918311-I1Open ↗
09/27/2026B00918311-I1Open ↗
09/23/2026B01450934-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
10/02/2026B01264478-I1Open ↗
09/27/2026B00918311-I1Open ↗
09/23/2026B01450934-I1Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
12/26/2019340553038Open ↗
12/26/2019340552878Open ↗
12/26/2019340552878Open ↗
Showing 3 of 16 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION9
10/10/2017340553038Open ↗
10/10/2017340552878Open ↗
03/02/2015340234972Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY9
10/10/2017340553038Open ↗
10/10/2017340552878Open ↗
03/02/2015340234972Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
10/10/2017340553038Open ↗
10/10/2017340552878Open ↗
03/02/2015340234972Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
01/27/2020340714622Open ↗
04/03/2019340655810Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/02/2010320208100Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/02/2010320208100Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING2
07/24/2012320529683Open ↗
01/18/2011320261239Open ↗
▸BISPLUMBING (PL) SIGNOFF1
06/25/2025302279781Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/25/2023321735565Open ↗
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes4
01/27/2020340714622Open ↗
01/24/2019340655810Open ↗
10/10/2017340553038Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026B00299481-I1Open ↗
08/13/2026B00299474-I1Open ↗
▸Environmental & Asbestos24
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/25/2026B00980636-I1Open ↗
08/25/2026B00980636-P1Open ↗
08/20/2026B01029222-P1Open ↗
Showing 3 of 14 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
01/31/2013340034242Open ↗
01/31/2013340034331Open ↗
07/24/2012320529683Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/25/2026B00930791-I1Open ↗
08/23/2026B01116664-I1Open ↗
08/13/2026B01101681-I1Open ↗
▸BISASBESTOS: VARIANCE (DEP FORM V5)1
02/04/2015340228783Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
08/20/2020340714622Open ↗
▸BISASBESTOS INSPECTION REPORT1
04/11/2011320261239Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/02/2010320208100Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
06/14/2021340714622Open ↗
08/20/2020340714622Open ↗
08/20/2020340714622Open ↗
Showing 3 of 5 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
10/10/2017340553038Open ↗
08/20/2014340177891Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/25/2026B00980636-I1Open ↗
08/16/2026B00946347-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/14/2021340714622Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/14/2021340714622Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY14
01/25/2023321735565Open ↗
06/14/2021340714622Open ↗
06/14/2021340714622Open ↗
Showing 3 of 14 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)5
08/20/2020340714622Open ↗
10/10/2017340553038Open ↗
10/10/2017340552878Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs65
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter38
09/10/2026B01450934-I1Open ↗
08/29/2026B00761507-I1Open ↗
08/29/2026B00761503-I1Open ↗
Showing 3 of 38 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
02/07/2023321735565Open ↗
06/14/2021340714622Open ↗
12/26/2019340553038Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
01/25/2023321735565Open ↗
07/24/2015340234972Open ↗
01/10/2014340034242Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
07/24/2012320529683Open ↗
01/18/2011320261239Open ↗
09/02/2010320208100Open ↗
▸BISSHED LETTER2
10/02/2018340553038Open ↗
03/03/2014320208100Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS2
03/07/2013320208100Open ↗
03/07/2013320208100Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)2
08/13/2026B00299481-I1Open ↗
08/13/2026B00299474-I1Open ↗
▸BISLANDMARKS APPROVAL1
01/06/2014340034215Open ↗
▸BISFLAME SPREAD/FIRE LETTER1
01/25/2023321735565Open ↗
▸BISCCD1-Construction Code Determination1
08/23/2013340034215Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026B00918311-I1Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT5
06/14/2021340714622Open ↗
01/27/2020340714622Open ↗
01/31/2013340034331Open ↗
Showing 3 of 5 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
08/27/2020340714622Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
06/02/2021340714622Open ↗
▸Filing & Intake Forms26
▸BISEFILING JOB APPLICATION COVER SHEET11
01/27/2020340714622Open ↗
01/24/2019340655810Open ↗
10/10/2017340553038Open ↗
Showing 3 of 11 on file for this type
▸BISADDITIONAL INFORMATION10
05/05/2021340714622Open ↗
08/27/2020340714622Open ↗
08/27/2020340714622Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET3
08/21/2012320529683Open ↗
01/18/2011320261239Open ↗
09/02/2010320208100Open ↗
▸BISBOROUGH INTAKE FORM2
12/26/2019340553038Open ↗
12/26/2019340552878Open ↗
▸Other Documents11
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
01/25/2023321735565Open ↗
03/26/2018321735565Open ↗
▸DOB NOWCalculations2
08/13/2026B01019014-I1Open ↗
08/13/2026B01182116-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00697460-I1Open ↗
08/13/2026B00697460-S2Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026B01182116-I1Open ↗
08/13/2026B01019014-I1Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
02/07/2023321735565Open ↗
▸BISSupporting Document: Fee Deferment1
01/25/2023321735565Open ↗
▸DOB NOWAlternate Plan 11
08/19/2026B01193063-I1Open ↗