BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Trump Tower
725 5TH AVENUE · BIN 1035794
💬 Discuss this project
1983Year Built
58Stories
RMBuilding Class
C5-3Zoning
626,593 sfGross Floor Area
232Units
LL97 CoveredRent Stabilized7 Active Violations 4 unresolved · 3 paperwork only 1 old, status unconfirmed ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: Gmac Commercial Mortgage · 19,450 sf lot · 32.22 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 65Replace HVAC units and ductwork4p · 2 filings · 9 docs
Floor 64Replace HVAC units and ductwork5p · 2 filings · 9 docs
Floor 63
Floor 62
Floor 61
Floor 60
Floor 59
Floor 58Unit PH3, Unit 58AB5p · 1 filing · 3 docs
Floor 57
Floor 56
Floor 5511p · 2 filings · 9 docs
Floor 54Unit 54D, Unit 54ABUnder Construction17p · 3 filings · 15 docs
Floor 53Unit 53CUnder Construction6p · 3 filings · 14 docs
Floor 52
Floor 51Unit 51AB4p · 2 filings · 7 docs
Floor 50Unit 50B, Unit 50C21p · 4 filings · 15 docs
Floor 49Unit 49J16p · 2 filings · 6 docs
Floor 48Unit 48J13p · 4 filings · 16 docs
Floor 4710p · 2 filings · 11 docs
Floor 46
Floor 45
Floor 44Unit 44A, Unit 44B, Unit 44C +336p · 6 filings · 15 docs
Floor 43Unit 43C26p · 3 filings · 15 docs
Floor 42Under Construction8p · 1 filing · 10 docs
Floor 41Unit 41E, Unit 41H15p · 3 filings · 16 docs
Floor 40Unit 40H8p · 1 filing · 11 docs
Floor 39Unit 39EUnder Construction14p · 1 filing · 14 docs
Floor 38
Floor 37Unit 37D1p · 1 filing · 3 docs
Floor 36
Floor 35
Floor 34Unit 34G9p · 2 filings · 14 docs
Floor 33Unit 33A, Unit 33B3p · 1 filing · 4 docs
Floor 32The Trump Organization, Unit 32F, Unit 32G1p · 1 filing · 2 docs
Floor 31Unit 31E, Unit 31G20p · 2 filings · 16 docs
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24Unit 24X, Marketing floor 2422p · 3 filings · 9 docs
Floor 23
Floor 22The Trump Organization, Aman49p · 7 filings · 15 docs
Floor 21The Trump Organization, Marketing floor 2119p · 3 filings · 12 docs
Floor 20Marketing floor 20Under Construction27p · 1 filing · 16 docs
Floor 19Plumbing and sprinkler modifications on 19th floor44p · 1 filing · 16 docs
Floor 18TRUMP TOWER 18th Floor Plumbing WorkUnder Construction36p · 2 filings · 16 docs
Floor 17
Floor 16The Trump Organization, Marketing floor 1632p · 2 filings · 16 docs
Floor 15Marketing floor 15Under Construction2p · 1 filing · 13 docs
Floor 14ICC Industries, Marketing floor 14Under Construction54p · 4 filings · 18 docs
Floor 13Trump Building interior renovation3p · 2 filings · 9 docs
Floor 12Trump Building interior renovation5p · 3 filings · 11 docs
Floor 11Trump Building interior renovation5p · 3 filings · 11 docs
Floor 10Trump Building interior renovation5p · 3 filings · 11 docs
Floor 9Trump Building interior renovation5p · 3 filings · 11 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3Gucci Tower5p · 3 filings · 7 docs
Floor 2Gucci Tower5p · 3 filings · 7 docs
Floor 1Gucci Tower, The Trump Organization10p · 5 filings · 14 docs
CellarThe Trump Organization34p · 2 filings · 16 docs
Site & exteriorSidewalk shed construction6p · 3 filings · 9 docs
Filed — no permit issuedHeavy duty sidewalk shed3p · 1 filing · 1 doc
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
The Trump27909/23/2026
Trump Tower Commercial27907/08/2026
Trump Organization24709/02/2026
Trump Equitable Fifth Ave Co3003/21/2026
Harbour Point Holdings1803/21/2026
Reside1303/21/2026
Multiplex Enterprises1203/21/2026
HRH Condominium1003/21/2026
Monder603/21/2026
Multidex603/21/2026
Yonghui Investment603/21/2026
Tiffany503/22/2026
40 Wall Street403/21/2026
View on 55303/21/2026
Tee Assets303/21/2026
721 Fifth Avenue303/21/2026
GHCR203/22/2026
Kritikos Real Estate Holdings203/21/2026
Delshah 721 5th 45 K203/21/2026
Trum203/21/2026
Ephoca108/26/2026
Icer Realestate Services103/22/2026
The Board of Managers of103/21/2026
Legacy Business School103/21/2026
Park South Associates103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Trump Development ServiceGeneral Contractor3008/27/2026
Elite GC NYGeneral Contractor1207/08/2026
HLP ContractingGeneral Contractor1207/08/2026
Safway AtlanticScaffold1107/08/2026
A + SprinklerFire Protection1007/08/2026
Structure ToneGeneral Contractor807/08/2026
A Plus PlumbingPlumbing809/19/2026
Casino MechanicalPlumbing707/08/2026
John Petrocelli ConstructionGeneral Contractor707/08/2026
Aqueduct MechanicalPlumbing507/08/2026
Gray Dawg ConstructionGeneral Contractor403/21/2026
Fine Waterproofingspecialty_contractor408/26/2026
H Interior Design ConstructionGeneral Contractor307/08/2026
TodericGeneral Contractor303/21/2026
212 Renovations GroupGeneral Contractor303/21/2026
J. Caiazzo Plumbing & HeatingPlumbing307/08/2026
HTC Construction ManagementGeneral Contractor303/21/2026
A.M.NPlumbing207/08/2026
Ascuatech ElectricalElectrical203/22/2026
Switch Electric of the FiveElectrical203/22/2026
Gem Air Conditioningspecialty_contractor207/08/2026
Advanced Plumbing MechanicalPlumbing207/08/2026
American Standard P&H CororpPlumbing207/08/2026
A Plus PlumbingFire Protection209/23/2026
Cam Energy Heating & MechanicalPlumbing207/08/2026
City/Suburban PlumbingPlumbing207/08/2026
Crossfield Plumbing & HeatingPlumbing207/08/2026
GHCRGeneral Contractor107/08/2026
Star-Delta ElectricElectrical103/21/2026
Nelson & Tom Maintenance Inc DBElectrical103/22/2026
Lne ElectricalElectrical103/22/2026
Alva ElectricalElectrical103/21/2026
A & S Master ElectricalElectrical103/21/2026
Manhattan Mechanical Contspecialty_contractor107/08/2026
Mastro BrothersGeneral Contractor107/08/2026
Production ContractingGeneral Contractor107/08/2026
PSI ConstructionGeneral Contractor104/09/2026
Rock Solid Landscape andspecialty_contractor107/08/2026
Sagewood Construction & DGeneral Contractor107/08/2026
Solomon ContractingGeneral Contractor109/02/2026
STM InteriorsGeneral Contractor104/09/2026
Borowide Elect'l ContractorsElectrical103/21/2026
Ganly ElectricalElectrical103/22/2026
Empire Lic Electrical ContractorsElectrical103/22/2026
Lina ElectricElectrical103/21/2026
A.M.A. HoldingsSign hanger107/08/2026
Abco-Peerless SprinklerFire Protection107/08/2026
Flint MechanicalPlumbing107/08/2026
A & E PlumbingPlumbing106/28/2026
Genesis Plumbing and HeatingPlumbing107/08/2026
Alef Electrical ContractingElectrical103/21/2026
Delco ElectricalElectrical103/22/2026
Integral Electrical PWR & CNTRElectrical103/21/2026
CBS ElectricElectrical103/21/2026
Carollo AnthonyElectrical103/21/2026
Joe Parziale Plumbing CoPlumbing106/28/2026
Island Computer ProductsElectrical103/21/2026
Catman PlumbingPlumbing107/08/2026
Noble Plumbing & HeatingPlumbing106/28/2026
Wawel Plumbing and HeatingPlumbing107/08/2026
Star-Delta ElectricElectrical103/22/2026
A.C. & H. MaintenanceGeneral Contractor104/09/2026
CVM ConstructionGeneral Contractor107/08/2026
R.C.M. ElectricElectrical103/21/2026
Fadjol KolaGeneral Contractor104/09/2026
Riviera ElectricElectrical103/22/2026
Ethos PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Thomas Veltre, P.E4594708/26/2026
NKM Engineering6244307/07/2026
McDonough Engineering Pra9377304/09/2026
Outsource Special Inspection2827103/27/2026
Atmosphere Design Group8581103/27/2026
Steel Core Engineering PL1098812/08/2025
O'Rourke Engineering5873711/04/2024
MG New York Architects, P3444210/28/2024
A Tech Engineering NYC, P6738101/09/2024
Macia Inspection & Testin402207/24/2023
Gilsanz Murray Steficek240106/19/2023
Szekely Engineering299105/24/2023
CL Engineering6781105/16/2023
Josef Prini Architect5482105/05/2023
Atelier NY Architecture2438101/27/2023
Hamann Engineering4949211/18/2022
WSP USA1848107/27/2022
Gordon H. Smith464104/27/2022
Boltarchitecture6712104/07/2022
Niza Works of Architects6101104/04/2022
Crosscheck Inspection Services544308/05/2021
Leo Y Lee Associates2481105/31/2021
Building Lifecycle
All (300)Filed (80)Permit Issued (80)Signed Off (15)Facade (FISP) (13)Violation (16)Inspection (60)Objection (6)Special Inspection (30)
09/22/2026
Permit issued — Sprinklers
M01407719-S3-EW-SP
09/21/2026
Signed off — Alteration
Propose interior renovation of apartment 40H. Removal and installation of no loading bearing partitions and related finishes all as per plans herewith filed. No change in use, egress or occupancy filed under this application.
M01081152-I1
09/18/2026
Permit issued — Plumbing
M01407719-S2-PL
09/11/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/01/2026
Permit issued — General Construction
M01447066-I1-GC
08/26/2026
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 54TH FLOOR (UNIT 54D) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
M01447066-I1
08/26/2026
Permit issued — General Construction
M01407719-I1-GC
08/24/2026
Filed — Alteration
APPLICATION FILED FOR MECHANICAL ADDITIONS/MODIFICATIONS ON THE 14TH FLOOR (MARKETING FLOOR) / 6TH FLOOR (CONSTRUCTION FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
M01407719-S3
08/24/2026
Filed — Alteration
APPLICATION FILED FOR MECHANICAL ADDITIONS/MODIFICATIONS ON THE 14TH FLOOR (MARKETING FLOOR) / 6TH FLOOR (CONSTRUCTION FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
M01407719-S2
08/20/2026
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01244753-P1
08/19/2026
Special inspection requirement — Energy Code Compliance Inspections
Thomas Veltre
08/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Veltre
08/19/2026
Special inspection requirement — Lighting in dwelling units
Thomas Veltre
08/18/2026
Permit issued — Mechanical Systems
M01423262-I1-MS
08/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
Thomas Veltre
08/18/2026
Special inspection requirement — Sprinkler Systems
Thomas Veltre
08/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Veltre
08/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Veltre
08/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
Thomas Veltre
08/17/2026
Special inspection requirement — Final
VICTOR FAMULARI
08/07/2026
Signed off — Alteration
RENOVATIONS TO EXISTING RETAIL STORE. REMOVAL OF INTERIOR WALL CLADDING AND MILLWORK. REPLACE WITH NEW DRYWALL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01375625-I1
07/20/2026
Filed — Alteration
APPLICATION FILED FOR MECHANICAL ADDITIONS/MODIFICATIONS ON THE 14TH FLOOR (MARKETING FLOOR) / 6TH FLOOR (CONSTRUCTION FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
M01407719-I1
07/07/2026
Filed — Alteration
Installstion of new plumbing fixtures in Apartment 53C with related domestic water, sanitary and vent piping connections. No gas work proposed.
M01423262-I1
07/07/2026
Filed — Alteration
Installstion of new plumbing fixtures in Apartment 53C with related domestic water, sanitary and vent piping connections. No gas work proposed.
M01423262-S1
07/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
06/29/2026
Permit issued — General Construction
M01281598-I1-GC
06/26/2026
Permit issued — Plumbing
M01081152-S1-PL
06/26/2026
Special inspection requirement — Mechanical Systems
NARESH MAHANGU
06/26/2026
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
06/26/2026
Special inspection requirement — Final
Lester Katz
06/04/2026
Permit issued — Plumbing
M01373085-S2-PL
05/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
Thomas Veltre
05/27/2026
Special inspection requirement — Final
Stephen DiGiuseppi
04/30/2026
Permit issued — General Construction
M01373085-I1-GC
04/29/2026
Violation issued (HPD, closed)
A
04/27/2026
Objection resolved — Resolved
04/22/2026
Objection raised — Cost
04/09/2026
Filed — Alteration
Mechanical system installation associated with the interior renovation of the 39th floor, Apartment 39E.
M01373085-S1
04/09/2026
Filed — Alteration
Mechanical system installation associated with the interior renovation of the 39th floor, Apartment 39E.
M01373085-S2
04/06/2026
Permit issued — General Construction
M01375625-I1-GC
04/02/2026
Special inspection requirement — Final
VICTOR FAMULARI
04/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Veltre
03/27/2026
Filed — Alteration
RENOVATIONS TO EXISTING RETAIL STORE. REMOVAL OF INTERIOR WALL CLADDING AND MILLWORK. REPLACE WITH NEW DRYWALL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01375625-I1
03/25/2026
Filed — Alteration
Mechanical system installation associated with the interior renovation of the 39th floor, Apartment 39E.
M01373085-I1
03/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS LORIA
03/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
03/20/2026
Special inspection requirement — Final
LOUIS LORIA
03/17/2026
Special inspection requirement — Final
Brian McDonough
03/17/2026
Special inspection requirement — Maintenance information
Brian McDonough
03/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
Brian McDonough
03/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Brian McDonough
03/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
Brian McDonough
03/17/2026
Special inspection requirement — Duct leakage testing, insulation and design
Brian McDonough
03/17/2026
Special inspection requirement — Mechanical Systems
Brian McDonough
03/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Brian McDonough
03/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
Brian McDonough
03/03/2026
Permit issued — General Construction
M01359286-I1-GC
02/27/2026
Permit issued — Sprinklers
M00356061-I1-EW-SP
02/26/2026
Permit issued — Plumbing
M01109983-S1-PL
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedA Plus Plumbing09/22/2026
DOB NOWPlumbingPermit IssuedA Plus Plumbing09/18/2026
DOB NOWGeneral ConstructionPermit IssuedSolomon Contracting09/01/2026
DOB NOWGeneral ConstructionPermit IssuedTrump Development Service08/26/2026
DOB NOWMechanical SystemsPermit IssuedFine Waterproofing08/18/2026
DOB NOWGeneral ConstructionPermit IssuedFine Waterproofing06/29/2026
DOB NOWPlumbingSigned-offNoble Plumbing & Heating06/26/2026
DOB NOWPlumbingPermit IssuedFlint Mechanical06/04/2026
DOB NOWGeneral ConstructionPermit IssuedGHCR04/30/2026
DOB NOWGeneral ConstructionSigned-offSTM Interiors04/06/2026
DOB NOWGeneral ConstructionPermit IssuedTrump Development Service03/03/2026
DOB NOWSprinklersPermit IssuedA Plus Plumbing02/27/2026
DOB NOWPlumbingPermit IssuedAqueduct Mechanical02/26/2026
DOB NOWGeneral ConstructionPermit IssuedFine Waterproofing02/17/2026
DOB NOWPlumbingPermit IssuedAqueduct Mechanical01/20/2026
DOB NOWSprinklersSigned-offA + Sprinkler12/10/2025
DOB NOWSprinklersSigned-offA + Sprinkler12/10/2025
DOB NOWSprinklersSigned-offA + Sprinkler12/05/2025
DOB NOWSprinklersPermit IssuedA + Sprinkler12/05/2025
DOB NOWSprinklersSigned-offA Plus Plumbing12/04/2025
DOB NOWGeneral ConstructionSigned-offJohn Petrocelli Construction11/25/2025
DOB NOWGeneral ConstructionPermit IssuedFadjol Kola11/24/2025
DOB NOWMechanical SystemsPermit IssuedTrump Development Service11/12/2025
DOB NOWPlumbingSigned-offA Plus Plumbing10/16/2025
DOB NOWGeneral ConstructionPermit IssuedTrump Development Service10/14/2025
DOB NOWGeneral ConstructionPermit IssuedFine Waterproofing10/08/2025
DOB NOWGeneral ConstructionPermit IssuedTrump Development Service08/21/2025
DOB NOWPlumbingSigned-offA & E Plumbing08/07/2025
DOB NOWPlumbingSigned-offA.M.N06/06/2025
DOB NOWMechanical SystemsSigned-offA.C. & H. Maintenance04/25/2025
DOB NOWPlumbingSigned-offJoe Parziale Plumbing Co02/13/2025
DOB NOWStructuralPermit IssuedHLP Contracting02/10/2025
DOB NOWGeneral ConstructionPermit IssuedHLP Contracting02/06/2025
DOB NOWMechanical SystemsPermit IssuedGem Air Conditioning01/23/2025
DOB NOWGeneral ConstructionPermit IssuedJohn Petrocelli Construction01/17/2025
DOB NOWGeneral ConstructionSigned-offPSI Construction01/14/2025
DOB NOWPlumbingSigned-offCity/Suburban Plumbing01/13/2025
DOB NOWPlumbingPermit IssuedAqueduct Mechanical01/08/2025
DOB NOWPlumbingSigned-offA Plus Plumbing12/04/2024
DOB NOWSprinklersSigned-offA + Sprinkler12/04/2024
+ 60 more permits on file
12 projects · most recent 08/24/2026
Heating and Air Conditioning Systems Ventilation Systems Associated Ducts and Piping Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/24/2026Permit IssuedTrump Development ServiceVentilation Systems
Ventilation
Greenheck SP-A1050-VG 500 CFM · Exhaust Fan ×1
07/07/2026Permit IssuedFine WaterproofingHeating and Air Conditioning Systems
Heat / Cool
Sinergia 800-1 14,700 BTU ×1
800-3 20,000 BTU ×1
04/09/2026Permit IssuedGHCRHeating and Air Conditioning Systems
Heat / Cool
Iec MPY04 7,752 BTU · Fan Coil Indoor ×1
MPY08 12,090 BTU · Fan Coil Indoor ×1
01/16/2024Permit IssuedTrump Development ServiceHeating and Air Conditioning Systems
Heat / Cool
International Environmental HPY10 32,700 BTU · Fan Coil Indoor ×2
01/03/2024Permit IssuedTrump Development ServiceAssociated Ducts and Piping, Heating and Air Conditioning Systems
Heat / Cool
International Environmental HPY12 42,110 BTU · Fan Coil Indoor ×2
Ducts & Piping
N/A N/A Ductwork ×1
07/28/2023Permit IssuedElite GC NYVentilation Systems—
11/18/2022Permit Issued212 Renovations GroupVentilation Systems—
08/03/2022Permit IssuedTrump Development ServiceAir Conditioning Systems, Associated Ducts and Piping
Cooling
International Environmental MSY-03A 11,500 BTU · Fan Coil Indoor ×3
Ducts & Piping
N/A n/a Ductwork ×1
07/28/2022Permit IssuedTrump Development ServiceAssociated Ducts and Piping, Ventilation Systems
Ventilation
Greenheck SQ-100 600 CFM · Exhaust Fan ×1
Ducts & Piping
N/A N/A Ductwork ×1
04/07/2022Permit IssuedMastro BrothersHeating and Air Conditioning Systems
Heat / Cool
Iec IEC Model MPY-06A, fan coil unit utilizes building chilled and hot water. 600 CFM · Fan Coil Indoor ×1
IEC Model MPY-08A, fan coil unit utilizes building chilled and hot water. 800 CFM · Fan Coil Indoor ×1
06/05/2020Permit IssuedProduction ContractingAir Conditioning Systems
Cooling
United Cool Air ED2.5GITA 850 CFM ×2
B5G3ATA 5 tons · Condensing Unit ×1
06/01/2020Permit IssuedManhattan Mechanical ContAir Conditioning Systems
Cooling
International Environmental CPY12 966 CFM · Fan Coil Indoor ×45
MPY06 590 CFM · Fan Coil Indoor ×25
MPY12 1,250 CFM · Fan Coil Indoor ×15
VEY20 1,784 CFM · Fan Coil Indoor ×10
7 projects · most recent 08/24/2026
FiledStatusContractorScope
08/24/2026Permit IssuedA Plus Plumbing148 heads
10/29/2025Signed-offA + Sprinkler249 heads
05/19/2025Signed-offA + Sprinkler46 heads
05/13/2025Signed-offA + Sprinkler86 heads
01/16/2024Signed-offA + Sprinkler157 heads
07/28/2022Signed-offA + Sprinkler46 heads
07/10/2020Permit IssuedA Plus Plumbing26 heads
17 projects · most recent 08/24/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/24/2026Permit IssuedA Plus PlumbingWater/Sanitary
07/07/2026——Water/Sanitary
04/09/2026Permit IssuedBletsas P&HGas, Water/Sanitary
10/29/2025Signed-offA Plus PlumbingWater/Sanitary
10/07/2025Permit IssuedJ. Caiazzo Plumbing & HeatingGas, Water/Sanitary
05/19/2025Signed-offA Plus PlumbingGas, Water/Sanitary
05/13/2025Signed-offA Plus PlumbingWater/Sanitary
11/04/2024Permit IssuedAqueduct MechanicalWater/Sanitary
10/28/2024Signed-offNoble Plumbing & HeatingGas, Water/Sanitary
01/16/2024Signed-offA Plus PlumbingWater/Sanitary
07/28/2023——Water/Sanitary
07/24/2023Permit IssuedCrossfield Plumbing & HeatingWater/Sanitary
11/18/2022Permit IssuedWawel Plumbing and HeatingWater/Sanitary
07/28/2022Signed-offCasino MechanicalWater/Sanitary
07/18/2022——Gas, Water/Sanitary
25 projects · most recent 10/04/2026
General Wiring Lighting
FiledStatusContractorScope
10/04/2026Permit IssuedCresco ElectricalGeneral Wiring
09/28/2026Permit IssuedForest Brook Electrical ContractingGeneral Wiring
05/26/2026Permit IssuedJam Electrical—
05/26/2026CompleteAscuatech Electrical—
05/01/2026Permit IssuedLens ElectricGeneral Wiring
04/21/2026Permit IssuedJam Electrical—
04/21/2026Permit IssuedJam Electrical—
11/20/2025CompleteAscuatech Electrical—
11/07/2025CompleteAscuatech Electrical—
10/06/2025CompleteAscuatech Electrical—
09/02/2025Permit IssuedDelco ElectricalGeneral Wiring
02/25/2025CompleteRiviera ElectricGeneral Wiring
02/06/2025CompleteDenmar Electric—
01/15/2025Permit IssuedDenmar ElectricGeneral Wiring
01/09/2025CompleteDenmar Electric—
1 project · most recent 11/21/2017
Sidewalk Shed
FiledStatusContractorScope
11/21/2017——Sidewalk Shed
3 projects · most recent 08/26/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
08/26/2026Permit IssuedSolomon ContractingTenant Protection Plan 72 Hour
08/20/2026Permit IssuedTrump Development ServiceTenant Protection Plan 72 Hour
09/24/2025Permit IssuedFine WaterproofingTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 62
DateTypeResultReport
09/11/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/20/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/11/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/02/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/29/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/23/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/04/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/30/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/06/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/08/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/24/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/27/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/25/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/25/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/27/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/04/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/27/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/20/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
Latest 25 of 62.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/19/2026Lighting in dwelling unitsThomas Veltreenergy_progress
08/19/2026Energy Code Compliance InspectionsThomas Veltreprogress
08/19/2026Fire-Resistant Penetrations and JointsThomas Veltrespecial
08/18/2026Tenant Protection Plan ComplianceThomas Veltrespecial
08/18/2026Fire-Resistant Penetrations and JointsThomas Veltrespecial
08/18/2026Fire-Resistant Penetrations and JointsThomas Veltrespecial
08/18/2026Tenant Protection Plan ComplianceThomas Veltrespecial
08/18/2026Sprinkler SystemsThomas Veltrespecial
08/17/2026FinalVICTOR FAMULARIprogress
07/02/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
06/26/2026Energy Code Compliance InspectionsNARESH MAHANGUprogress
06/26/2026Mechanical SystemsNARESH MAHANGUspecial
06/26/2026FinalLester Katzprogress
05/27/2026FinalStephen DiGiuseppiprogress
05/27/2026Tenant Protection Plan ComplianceThomas Veltrespecial
04/02/2026Fire-Resistant Penetrations and JointsThomas Veltrespecial
04/02/2026FinalVICTOR FAMULARIprogress
04/02/2026Tenant Protection Plan Compliance—special
03/23/2026Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
03/23/2026Fire-Resistant Penetrations and JointsLOUIS LORIAspecial
03/20/2026FinalLOUIS LORIAprogress
03/17/2026Fire-Resistant Penetrations and JointsBrian McDonoughspecial
03/17/2026Duct leakage testing, insulation and designBrian McDonoughenergy_progress
03/17/2026Tenant Protection Plan ComplianceBrian McDonoughspecial
03/17/2026Maintenance informationBrian McDonoughenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Gucci TowerOfficeFloors 1–3
Project M01375625 Alteration · LOC Issued · 03/27/2026
Project M00095999 Alteration · LOC Issued · 11/19/2018
The Trump OrganizationOfficeCellar, Floors 1, 16, 21, 22, 32
Project M01244753 Alteration · Permit Entire · 07/24/2025
Project M01050580 Alteration · Permit Entire · 05/15/2024
Project M00978819 Alteration · Permit Entire · 01/09/2024
Project M00981662 Alteration · Permit Entire · 01/03/2024
Project M00814175 Alteration · Permit Entire · 03/08/2023
Project M00814183 Alteration · Permit Entire · 03/08/2023
Project M00734485 Alteration · Permit Entire · 07/28/2022
Project M00734492 Alteration · Permit Entire · 07/28/2022
Project M00746668 Alteration · Permit Entire · 07/28/2022
Project M00754029 Alteration · Permit Entire · 07/28/2022
AmanHotel / LodgingFloor 22
Project M00734470 Alteration · Permit Entire · 08/09/2022
ICC IndustriesOfficeFloor 14
Project M00343035 Alteration · Permit Entire · 06/05/2020
TIFFANY & CoRetail—
Project M00272266 Alteration · Filing Withdrawn · 12/02/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 3,165 on file (BIS + DOB NOW)
▸Plans & Drawings120
▸DOB NOWPlans/Sketch104
09/06/2026M00002162-I1Request digital key ↗
09/06/2026M00095999-I1Request digital key ↗
09/03/2026M00491556-I1Request digital key ↗
Showing 3 of 104 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/05/2026M00212785-I1Request digital key ↗
09/05/2026M00212785-P1Request digital key ↗
09/05/2026M00260210-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/05/2026M00212814-I1Request digital key ↗
09/04/2026M00351542-I1Request digital key ↗
Showing 2 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly2
09/05/2026M00223443-I1Request digital key ↗
09/05/2026M00267695-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe1
09/05/2026M00272266-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00151387-I1Request digital key ↗
▸Applications & Permits629
▸BISPLAN / WORK APPROVAL APPLICATION352
01/20/2026101241470Open ↗
01/20/2026101381345Open ↗
01/20/2026102672804Open ↗
Showing 3 of 352 on file for this type
▸BISWORK PERMIT APPLICATION271
02/26/2025110308952Open ↗
03/23/2022122835487Open ↗
09/24/2021122939197Open ↗
Showing 3 of 271 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
05/15/2020120419118Open ↗
05/15/2020120419118Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
03/10/2025110308952Open ↗
Showing 1 of 2 on file for this type
▸BISPLACE OF ASSEMBLY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications888
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION295
05/04/2020123697348Open ↗
04/10/2020110018043Open ↗
04/10/2020110018043Open ↗
Showing 3 of 295 on file for this type
▸DOB NOWProgress Inspector Seal & Signature133
10/18/2026M00716996-I1Open ↗
09/27/2026M00712097-I1Open ↗
09/26/2026M01081152-I1Open ↗
Showing 3 of 133 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature120
09/10/2026M01407719-S2Open ↗
09/10/2026M01407719-S3Open ↗
09/06/2026M00095999-I1Open ↗
Showing 3 of 120 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature94
10/18/2026M00716996-I1Open ↗
10/02/2026M00814175-I1Open ↗
09/26/2026M01081152-I1Open ↗
Showing 3 of 94 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST88
05/04/2020123697348Open ↗
Showing 1 of 88 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT66
12/01/2020140965132Open ↗
05/04/2020123697348Open ↗
Showing 2 of 66 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM65
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 65 on file for this type
▸BISPC FULL REPORT11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION9
12/01/2020140965132Open ↗
Showing 1 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY7
12/01/2020140965132Open ↗
Showing 1 of 7 on file for this type
▸Trade Schedules & Equipment260
▸BISSELF-CERT PLUMBING NOTICE105
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 105 on file for this type
▸BISSCHEDULE B - PLUMBING88
05/22/2020122430547Open ↗
05/20/2020122430547Open ↗
Showing 2 of 88 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE51
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 51 on file for this type
▸BISSPRINKLER INSP REPORT : FP-858
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE PERMITS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection38
▸BISTenant Protection Plan and Notes25
05/04/2020123697348Open ↗
Showing 1 of 25 on file for this type
▸DOB NOWTenant Protection Plan7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Environmental & Asbestos236
▸DOB NOWDEP ACP-5: Asbestos Assessment Report94
09/10/2026M01407719-S2Open ↗
09/10/2026M01407719-S1Open ↗
09/10/2026M01407719-S3Open ↗
Showing 3 of 94 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'73
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 73 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)55
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 55 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Energy Compliance145
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS74
05/04/2020123697348Open ↗
Showing 1 of 74 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS24
05/24/2021140875391Open ↗
06/22/2020122430547Open ↗
05/21/2020123902394Open ↗
Showing 3 of 24 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY16
03/24/2021123879053Open ↗
12/01/2020140965132Open ↗
11/25/2020123801779Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: ENERGY12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISTR8: Energy Code Progress Inspections12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸DOB NOWEN2: As Built Energy Analysis4
09/02/2026M00709116-I1Open ↗
09/02/2026M00709123-I1Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
12/01/2020140965132Open ↗
Showing 1 of 3 on file for this type
▸Inspections & Test Reports42
▸BISTECHNICAL REPORT: RESPONSIBILITY38
11/18/2025103506948Open ↗
11/18/2025103506948Open ↗
09/04/2025103347709Open ↗
Showing 3 of 38 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)2
12/02/2020140965132Open ↗
Showing 1 of 2 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19752
09/04/2025103347709Open ↗
03/10/2025101589791Open ↗
▸Approvals, Objections & Sign-offs188
▸BISADMINISTRATIVE OBJECTIONS85
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 85 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST82
01/26/2026102686737Open ↗
01/26/2026103446353Open ↗
01/26/2026103993163Open ↗
Showing 3 of 82 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION14
12/01/2020140965132Open ↗
Showing 1 of 14 on file for this type
▸BISSUPERSEDING LETTER7
02/26/2025110308952Open ↗
03/23/2022122835487Open ↗
09/23/2021123401176Open ↗
Showing 3 of 7 on file for this type
▸Cost, Insurance & Ownership292
▸BISCOST AFFIDAVIT264
01/22/2026101381345Open ↗
01/22/2026101825526Open ↗
01/22/2026102672804Open ↗
Showing 3 of 264 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW35
01/22/2026103993163Open ↗
01/14/2026104093516Open ↗
01/14/2026104290143Open ↗
Showing 3 of 5 on file for this type
▸BISDEPT OF FINANCE VERIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms286
▸BISEFILING COVER SHEET164
05/04/2020123697348Open ↗
Showing 1 of 164 on file for this type
▸BISBOROUGH INTAKE FORM64
02/26/2025110308952Open ↗
03/23/2022122835487Open ↗
09/23/2021123401176Open ↗
Showing 3 of 64 on file for this type
▸BISADDITIONAL INFORMATION40
06/22/2020122430547Open ↗
06/11/2020122430547Open ↗
Showing 2 of 40 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET18
12/01/2020140965132Open ↗
Showing 1 of 18 on file for this type
▸Other Documents20
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
12/01/2020140965132Open ↗
05/04/2020123697348Open ↗
Showing 2 of 7 on file for this type
▸BISSupporting Document: Fee Exempt4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISUnknown4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
06/22/2020122430547Open ↗
Showing 1 of 3 on file for this type
▸BIS* HIGH STRENGTH BOLTS TABLE 10-22
09/04/2025103347709Open ↗
09/04/2025103347709Open ↗