728 HOWARD AVENUE · BIN 3081484
💬 Discuss this project
1920Year Built
4Stories
C1Building Class
R6Zoning
34,074 sfGross Floor Area
22Units
LL97 CoveredRent Stabilized3 Active Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: NYC Pact Preservation Partners · 6,700 sf lot · 5.09 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofNYCHA - Reid Park Rock brick replacement4p · 3 filings · 20 docs
Floor 4Plumbing fixture installation66p · 3 filings · 20 docs
Floor 3Plumbing fixture installation66p · 3 filings · 20 docs
Floor 2Plumbing fixture installation66p · 3 filings · 20 docs
Floor 1Unit 1, Unit 1A, Unit 1D73p · 3 filings · 20 docs
CellarPlumbing work79p · 5 filings · 20 docs
Site & exteriorHeavy duty sidewalk shed installationUnder Construction34p · 8 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority904/09/2026
NYC Pact Preservation Partners407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Always Fast Services106/01/2026
Bitopi Consultants103/11/2026
Dagher Engineering812/08/2025
Fazal Bangash109/18/2025
Madsen Consulting Engineering208/04/2025
Ashraf107/31/2025
SLM Architecture204/02/2025
Socotec103/11/2024
A.P. Associates103/31/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sandeep Kaur103/21/2026
KD Designs103/21/2026
Metropolis Group2403/21/2026
Socotec103/21/2026
Green Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dual Fuel Plumbing & Heatingspecialty_contractor1007/08/2026
FSC D&CGeneral Contractor504/09/2026
Ace ContractingPlumbing403/21/2026
Arsenal ScaffoldScaffold307/30/2026
LS GeneralScaffold307/08/2026
Liberty NY Restorationspecialty_contractor204/09/2026
LS GeneralGeneral Contractor204/11/2026
Parsons ConstructionScaffold107/08/2026
Ace Group NYScaffold107/08/2026
A & E PlumbingPlumbing107/08/2026
Navtech ConstructionGeneral Contractor209/22/2010
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PCS Engineering3745104/14/2026
Metric Consulting18031212/08/2025
Building Lifecycle
11/18/2026
Signed off — Alteration
B01381390-I1
11/12/2026
Signed off — Alteration
WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL GROUND LEVEL HARDSCAPE REPAIRS AND IMPROVEMENTS AS NEEDED PER PLANS.
B00918343-I1
09/19/2026
Permit expired, never signed off — Supported Scaffold
The city's record still shows this permit as issued, with no sign-off on its filing
B01289412-I1-SF
09/18/2026
Signed off — Alteration
structural work including SOUTH existing fire escape repairs on all levels as needed. No demolition is required. Existing elements shall be resecured to maintain structural integrity.
B00913577-I1
09/02/2026
Signed off — Alteration
Facade repairs. No change in egress, use or occupancy.
B00930823-I1
146 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offArsenal Scaffold07/29/2026
DOB NOWSidewalk ShedPermit IssuedLS General06/01/2026
DOB NOWSuspended ScaffoldSigned-offLS General04/24/2026
DOB NOWSupported ScaffoldPermit IssuedLS General04/09/2026
DOB NOWGeneral ConstructionSigned-offLS General04/09/2026
DOB NOWGeneral ConstructionSigned-offFSC D&C03/18/2026
DOB NOWGeneral ConstructionSigned-offLS General03/13/2026
DOB NOWSupported ScaffoldPermit IssuedLS General03/12/2026
DOB NOWStructuralSigned-offLiberty NY Restoration09/29/2025
DOB NOWSupported ScaffoldPermit IssuedAce Group NY09/19/2025
DOB NOWGeneral ConstructionSigned-offLiberty NY Restoration08/21/2025
DOB NOWSidewalk ShedSigned-offArsenal Scaffold07/31/2025
DOB NOWPlumbingSigned-offDual Fuel Plumbing & Heating07/02/2025
DOB NOWMechanical SystemsSigned-offDual Fuel Company07/02/2025
DOB NOWBoiler EquipmentSigned-offDual Fuel Plumbing & Heating07/01/2025
DOB NOWGeneral ConstructionSigned-offFSC D&C06/25/2025
DOB NOWPlumbingSigned-offA & E Plumbing08/13/2024
DOB NOWMechanical SystemsSigned-offPyramid Etc Companies08/13/2024
DOB NOWGeneral ConstructionSigned-offFSC D&C07/23/2024
DOB NOWPlumbingSigned-offDual Fuel Plumbing & Heating07/15/2024
DOB NOWMechanical SystemsSigned-offDual Fuel Company05/03/2024
DOB NOWBoiler EquipmentSigned-offDual Fuel Plumbing & Heating05/01/2024
DOB NOWSidewalk ShedPermit IssuedParsons Construction03/31/2021
BISBLISSUEDAce Contracting07/27/2018
BISPLISSUEDAce Contracting07/27/2018
BISPLISSUEDAce Contracting03/08/2017
BISBLISSUEDAce Contracting11/09/2016
BISBLISSUEDAce Contracting04/08/2016
BISPLISSUEDAce Contracting01/22/2016
BISBLISSUEDAce Contracting01/22/2016
BISEQISSUEDNavtech Construction09/22/2010
BISEQISSUEDNavtech Construction06/14/2010
2 projects · most recent 10/16/2026
General Wiring
FiledStatusContractorScope
10/16/2026CompleteAtlas-Acon Electric ServiceGeneral Wiring
04/16/2021Permit IssuedBDS Electric—
1 project · most recent 08/04/2025
Steel
FiledStatusContractorScope
08/04/2025Signed-offLiberty NY RestorationSteel
3 projects · most recent 06/01/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
06/01/2026Permit IssuedLS GeneralSidewalk Shed
03/11/2026Permit IssuedLS GeneralScaffold
07/31/2025Signed-offArsenal ScaffoldSidewalk Shed
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/13/2026Pass-Final General Construction Non-Directive 14PassView ↗
12/31/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/16/2025Pass-Final Boiler Equipment InspectionPassView ↗
12/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/02/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/27/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 79
DateRequirementInspectorRole
04/07/2026Post-installed AnchorsMichael Walshspecial
04/07/2026Alternative Materials - OTCR Buildings Bulletin NumberMichael Walshspecial
12/09/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
12/09/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
12/09/2025Heating SystemsSAMI HAJJAR P.Especial
12/09/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
12/09/2025Maintenance informationSAMI HAJJAR P.Eenergy_progress
12/09/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
10/23/2025Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
10/23/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
10/23/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
10/23/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
10/23/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
10/23/2025Maintenance informationSAMI HAJJAR P.Eenergy_progress
08/14/2025FinalSAMI HAJJAR P.Eprogress
08/14/2025Structural Steel - DetailsSAMI HAJJAR P.Especial
08/14/2025Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
08/14/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
08/14/2025Structural Steel - WeldingSAMI HAJJAR P.Especial
07/28/2025FinalSAMI HAJJAR P.Eprogress
07/28/2025Tenant Protection Plan Compliance—special
07/28/2025Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
07/28/2025Structural Steel - DetailsSAMI HAJJAR P.Especial
07/28/2025Structural Steel - WeldingSAMI HAJJAR P.Especial
04/04/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
Latest 25 of 79.
140 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account