← Back
Five to six families
735 DEKALB AVENUE
BROOKLYN · Bedford-Stuyvesant (West) · BIN 3319488
💬 Discuss this project
1931Year Built
3Stories
C2Building Class
R6AZoning
4,875 sfGross Floor Area
6Units
Rent Stabilized46 Open Violations ▸FDNY Report ↗
Five to six families · Owner of record: 735 DEKALB REALTY LLC · 2,500 sf lot · 1.95 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction28p · 1 filing · 20 docs
Floor 6Under Construction59p · 1 filing · 20 docs
Floor 5Under Construction60p · 1 filing · 20 docs
Floor 4Under Construction20p · 1 filing · 20 docs
Floor 3Under Construction63p · 1 filing · 20 docs
Floor 2Under Construction61p · 1 filing · 20 docs
Floor 1Under Construction19p · 1 filing · 20 docs
CellarUnder Construction63p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NY CREATIVE DEVELOPERS1609/13/2026
735 DEKALB REALTY LLC1203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PAUL G. JONES, P.E.208/18/2026
VASILIOS ARTEMIOU PE406/09/2026
MOHAMMAD AHEAD, PE305/13/2026
R & O ENGINEERING403/17/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BAC Developers Group103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HIL GROUP LLCGeneral Contractor708/08/2026
CONSOLIDATED SCAFFOLDINGGeneral Contractor309/03/2026
WATERFRONT PROPERTY MGMTGeneral Contractor107/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RI CONSULTING SERVICES IN8904703/17/2026
Building Lifecycle
All (183)Filed (13)Permit Issued (11)Violation (60)Objection (69)Special Inspection (30)
09/02/2026
Permit issued — Supported Scaffold
B01418871-I1-SH
08/18/2026
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND MEDIUM DUTY PIPE SCAFFOLD AS PER DRAWINGS DURING GENERAL CONSTRUCTION WORK. SIDEWALK SHED AND PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2022.
B01418871-P1
08/07/2026
Permit issued — Structural
B01331724-S2-ST
08/05/2026
Permit issued — Foundation
B01331724-S7-FO
08/05/2026
Permit issued — Foundation
B01331724-S1-FO-EA
08/05/2026
Permit issued — Support of Excavation
B01331724-S6-SE
08/05/2026
Permit issued — General Construction
B01331724-I1-GC
07/16/2026
Permit issued — Mechanical Systems
B01331724-S3-MS
06/30/2026
Permit issued — Construction Fence
B01331724-S8-FN
06/23/2026
Permit issued — Sidewalk Shed
B01418871-I1-SF
06/23/2026
Permit issued — Supported Scaffold
B01418871-I1-SH
06/22/2026
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND MEDIUM DUTY PIPE SCAFFOLD AS PER DRAWINGS DURING GENERAL CONSTRUCTION WORK. SIDEWALK SHED AND PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2022.
B01418871-I1
06/22/2026
Objection resolved — Addressed
06/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MD ISLAM
06/12/2026
Special inspection requirement — Post-installed Anchors
MD ISLAM
06/12/2026
Special inspection requirement — Sprinkler Systems
MD ISLAM
06/11/2026
Objection raised — Other
06/09/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
STRUCTURAL APPLICATION FILED IN CONJUNCTION WITH ALT CO JOB NUMBER B01331724-I1.
B01331724-P1
06/04/2026
Objection raised — Other
06/04/2026
Objection resolved — Addressed
06/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/03/2026
Special inspection requirement — Sprinkler Systems
06/03/2026
Special inspection requirement — Post-installed Anchors
05/13/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
STRUCTURAL APPLICATION FILED IN CONJUNCTION WITH ALT CO JOB NUMBER B01331724-I1.
B01331724-S9
05/04/2026
Violation issued (HPD, open)
A
05/04/2026
Objection raised — Other
04/29/2026
Objection resolved — Resolved
04/28/2026
Objection resolved — Addressed
04/17/2026
Permit issued — Construction Fence
B01331724-S8-FN
04/15/2026
Objection resolved — Resolved
04/15/2026
Objection resolved — Resolved
04/15/2026
Objection resolved — Resolved
04/10/2026
Objection resolved — Resolved
04/10/2026
Objection resolved — Resolved
04/02/2026
Objection raised — Admin
03/30/2026
Objection resolved — Addressed
03/30/2026
Objection resolved — Addressed
03/30/2026
Objection resolved — Addressed
03/30/2026
Objection resolved — Resolved
03/30/2026
Objection resolved — Resolved
03/30/2026
Objection resolved — Resolved
03/30/2026
Objection resolved — Resolved
03/30/2026
Objection resolved — Resolved
03/27/2026
Objection raised — Structural
03/27/2026
Objection raised — Structural
03/27/2026
Objection raised — Plumbing
03/27/2026
Objection raised — Structural
03/27/2026
Objection raised — Structural
03/27/2026
Objection raised — Plumbing
03/27/2026
Objection raised — Structural
03/27/2026
Objection raised — Structural
03/27/2026
Objection raised — Scope
03/27/2026
Objection raised — Energy
03/27/2026
Objection raised — Mechanical
03/27/2026
Objection raised — Structural
03/27/2026
Objection raised — Structural
03/27/2026
Objection resolved — Addressed
03/27/2026
Objection resolved — Addressed
03/27/2026
Objection resolved — Addressed
03/26/2026
Objection raised — Energy
Latest 60 of 183 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedCONSOLIDATED SCAFFOLDING09/02/2026
DOB NOWStructuralPermit IssuedHIL GROUP LLC08/07/2026
DOB NOWFoundationPermit IssuedHIL GROUP LLC08/05/2026
DOB NOWFoundationPermit IssuedHIL GROUP LLC08/05/2026
DOB NOWSupport of ExcavationPermit IssuedHIL GROUP LLC08/05/2026
DOB NOWGeneral ConstructionPermit IssuedHIL GROUP LLC08/05/2026
DOB NOWMechanical SystemsPermit IssuedHIL GROUP LLC07/16/2026
DOB NOWConstruction FencePermit IssuedHIL GROUP LLC06/30/2026
DOB NOWSidewalk ShedPermit IssuedCONSOLIDATED SCAFFOLDING06/23/2026
DOB NOWSupported ScaffoldPermit IssuedCONSOLIDATED SCAFFOLDING06/23/2026
DOB NOWConstruction FencePermit IssuedWATERFRONT PROPERTY MGMT04/17/2026
1 project · most recent 06/09/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/09/2026Permit IssuedHIL GROUP LLCAir Conditioning Systems, Ventilation Systems
Cooling
Daikin RXTA60AAVJU 60,000 BTU · Vrf Outdoor ×8
Heating
Daikin RXTA60AAVJU 60,000 BTU · Vrf Outdoor ×8
Ventilation
Nutone PTE511RK 50 CFM · Exhaust Fan ×17
PTEL511RK 100 CFM · Exhaust Fan ×10
Greenheck G-098-VG 400 CFM · Exhaust Fan ×1
1 project · most recent 06/09/2026
Sprinkler System
FiledStatusContractorScope
06/09/2026——Sprinkler System
1 project · most recent 06/09/2026
FiledStatusContractorScope
06/09/2026———
2 projects · most recent 06/22/2026
General Wiring
FiledStatusContractorScope
06/22/2026Permit IssuedSOLAS ELECTRICAL CORP—
12/18/2025Permit IssuedBAY ELECTRICAL INCGeneral Wiring
1 project · most recent 06/09/2026
Steel Concrete
FiledStatusContractorScope
06/09/2026Permit IssuedHIL GROUP LLCSteel, Concrete
2 projects · most recent 08/18/2026
Scaffold Sidewalk Shed Fence
FiledStatusContractorScope
08/18/2026Permit IssuedCONSOLIDATED SCAFFOLDINGScaffold, Sidewalk Shed
06/09/2026Permit IssuedHIL GROUP LLCFence
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
06/12/2026Fire-Resistant Penetrations and JointsMD ISLAMspecial
06/12/2026Post-installed AnchorsMD ISLAMspecial
06/12/2026Sprinkler SystemsMD ISLAMspecial
06/03/2026Fire-Resistant Penetrations and Joints—special
06/03/2026Sprinkler Systems—special
06/03/2026Post-installed Anchors—special
03/10/2026Footing and FoundationMD ISLAMprogress
03/10/2026Subgrade InspectionsMD ISLAMspecial
03/10/2026Construction Operations Influencing Adjacent StructuresMD ISLAMspecial
03/10/2026Concrete - Cast-In-PlaceMD ISLAMspecial
03/10/2026Subsurface Investigations (Borings/Test Pits)SHAHRIAR QUAYYUMspecial
03/10/2026Underpinning and alternate methods of support of buildings and adjacent propertyMD ISLAMspecial
03/10/2026FinalMD ISLAMprogress
02/18/2026HVAC-R and service water heating equipmentMD ISLAMenergy_progress
02/18/2026Fire-Resistant Penetrations and JointsMD ISLAMspecial
02/18/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMD ISLAMspecial
02/18/2026HVAC-R and service water piping design and insulationMD ISLAMenergy_progress
02/18/2026HVAC-R and service water heating system controlsMD ISLAMenergy_progress
02/18/2026Maintenance informationMD ISLAMenergy_progress
01/22/2026Concrete - Cast-In-PlaceMD ISLAMspecial
01/22/2026Post-installed AnchorsMD ISLAMspecial
01/22/2026Structural Steel - High Strength BoltingMD ISLAMspecial
01/22/2026Structural Steel - WeldingMD ISLAMspecial
01/22/2026Structural Steel - DetailsMD ISLAMspecial
01/07/2026Footing and FoundationMD ISLAMprogress
Latest 25 of 49.
▾Documents — 95 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/17/2026B01331724-S2Request digital key ↗
08/17/2026B01331724-P1Request digital key ↗
08/17/2026B01331724-S8Request digital key ↗
Showing 3 of 12 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/17/2026B01331724-I1Open ↗
08/13/2026B01331724-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026B01331724-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01331724-I1Open ↗
▸Seals & Professional Certifications59
▸DOB NOWProgress Inspector Seal & Signature25
09/25/2026B01331724-S4Open ↗
09/25/2026B01331724-S4Open ↗
09/25/2026B01331724-S4Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/25/2026B01331724-S4Open ↗
09/25/2026B01331724-S4Open ↗
09/16/2026B01331724-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/20/2026B01418871-P1Open ↗
08/17/2026B01331724-P1Open ↗
08/17/2026B01331724-S9Open ↗
Showing 3 of 13 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/17/2026B01331724-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/17/2026B01331724-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/17/2026B01331724-S6Open ↗
08/17/2026B01331724-S7Open ↗
08/17/2026B01331724-S5Open ↗
Showing 3 of 9 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/17/2026B01331724-S7Open ↗
08/17/2026B01331724-S6Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/17/2026B01331724-S7Open ↗
08/17/2026B01331724-S6Open ↗
▸Other Documents5
▸DOB NOWAdjoining Owners Notification2
08/17/2026B01331724-S6Open ↗
08/17/2026B01331724-S1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01331724-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01331724-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026B01331724-I1Open ↗