Condo, residential unit in 2-10 unit building
74 2ND PLACE
BROOKLYN · BIN 3005276
💬 Discuss this project
1922Year Built
5Stories
R1Building Class
R6BZoning
12,053 sfGross Floor Area
10Units
Rent Stabilized3 Active Violations ▸
Condo, residential unit in 2-10 unit building · Owner of record: 74 2nd Place Condominum · 5,000 sf lot · 2.41 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofExterior and roof repairsUnder Construction15p · 4 filings · 20 docs
Floor 4Unit 4A6p · 3 filings · 16 docs
Floor 3Unit 3A1p · 1 filing · 7 docs
Floor 2Unit 2A12p · 1 filing · 20 docs
Floor 1Unit 1A, Unit 1B35p · 3 filings · 20 docs
Cellar6p · 3 filings · 20 docs
Basement1p · 1 filing · 20 docs
Sub-Basement11p · 1 filing · 20 docs
Site & exteriorPipe scaffold installationUnder Construction13p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
74 2nd Place Condominium1310/13/2026
David Weiss507/08/2026
ZG 2nd Place103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DY Expediting603/21/2026
Joseph Fellner1303/21/2026
Big Orange Expediting203/21/2026
Lizardos Engineering Associates203/21/2026
Moore Engineering of NY203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CDC HousingGeneral Contractor603/21/2026
Innovative Ventures TeamGeneral Contractor404/09/2026
Pearl ContractingScaffold403/21/2026
Urban Standard General CoScaffold303/21/2026
KG Management CnsltngGeneral Contractor207/08/2026
HV ElectricElectrical203/21/2026
Einstein ElectricalElectrical203/22/2026
HV ElectricGeneral Contractor203/22/2026
Kay Waterproofingspecialty_contractor209/07/2026
Kings Group NYScaffold209/29/2026
Clean Tech MechanicalPlumbing207/08/2026
Aspect Plumbing & Heating CoPlumbing107/08/2026
NU-Way Heating & Coolingspecialty_contractor107/08/2026
Omd ElectricalElectrical103/21/2026
A&H Express Plumbing & HeatingPlumbing106/28/2026
AMC Plumbing, Heating & CLNGPlumbing107/08/2026
Vanguard ResidentialGeneral Contractor104/09/2026
Kay WaterproofingScaffold109/15/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Moore Engineering of NY9134208/28/2026
Hardie & Associates, Cons3760502/04/2026
Boro Architects5981111/17/2025
DY Special Inspection7210112/17/2021
Sarah Jacoby Architect5641210/21/2021
Eric Safyan Architectpc3248410/07/2021
Building Lifecycle
All (129)Filed (31)Permit Issued (21)Signed Off (11)Violation (29)Inspection (1)Objection (6)Special Inspection (30)
10/20/2026
Signed off — Alteration
renovation of apartment. addition of vrf heat pumps.
B01325125-S2
10/20/2026
Signed off — Alteration
renovation of apartment. addition of vrf heat pumps.
B01325125-I1
09/28/2026
Permit issued — Sidewalk Shed
B01440581-S1-SH
09/25/2026
Filed — Alteration
B01440581-S1
09/25/2026
Permit issued — Supported Scaffold
B01440581-S2-SF
09/24/2026
Filed — Alteration
B01440581-S2
09/17/2026
Special inspection requirement — Post-installed Anchors
09/14/2026
Filed — Alteration
INSTALLATION & USE OF HOIST AS PER DRAWINGS ATTACHED HEREWITH
B01458745-I1
09/14/2026
Permit issued — Protection and Mechanical Methods
B01458745-I1-PMM
09/10/2026
Signed off — Alteration
renovation of apartment. addition of vrf heat pumps.
B01325125-S1
09/03/2026
Permit issued — Structural
B01440581-I1-GC-CX
08/28/2026
Filed — Alteration
renovation of apartment. addition of vrf heat pumps.
B01325125-P4
08/28/2026
Filed — Alteration
B01440581-I1
08/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christine Hobson
08/24/2026
Special inspection requirement — Structural Steel - Details
Christine Hobson
08/24/2026
Special inspection requirement — Post-installed anchors in masonry
Christine Hobson
08/24/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Christine Hobson
08/24/2026
Special inspection requirement — Structural Steel - Welding
Christine Hobson
08/04/2026
Special inspection requirement — Final
Christine Hobson
06/10/2026
Signed off — Alteration
B01316658-I1
04/30/2026
Violation issued (HPD, closed)
A
04/01/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/26/2026
Filed — Alteration
renovation of apartment. addition of vrf heat pumps.
B01325125-P3
02/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELLIOTT HARDIE
02/04/2026
Filed — Alteration
renovation of apartment. addition of vrf heat pumps.
B01325125-P2
02/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELLIOTT HARDIE
01/12/2026
Permit issued — Mechanical Systems
B01316658-I1-MS
01/05/2026
Permit issued — Plumbing
B01325125-S2-PL
12/26/2025
Permit issued — Mechanical Systems
B01325125-S1-MS
12/26/2025
Permit issued — General Construction
B01325125-I1-GC
12/08/2025
Filed — Alteration
renovation of apartment. addition of vrf heat pumps.
B01325125-P1
12/03/2025
Filed — Alteration
renovation of apartment. addition of vrf heat pumps.
B01325125-S2
12/03/2025
Filed — Alteration
renovation of apartment. addition of vrf heat pumps.
B01325125-I1
12/03/2025
Filed — Alteration
renovation of apartment. addition of vrf heat pumps.
B01325125-S1
11/26/2025
Special inspection requirement — Mechanical Systems
ELLIOTT HARDIE
11/26/2025
Special inspection requirement — Final
ELLIOTT HARDIE
11/20/2025
Violation issued (HPD, closed)
I
11/17/2025
Filed — Alteration
B01316658-I1
11/17/2025
Special inspection requirement — Maintenance information
DARRIN KRUMPUS
11/10/2025
Special inspection requirement — Final
DARRIN KRUMPUS
11/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
DARRIN KRUMPUS
11/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
DARRIN KRUMPUS
11/10/2025
Special inspection requirement — Mechanical Systems
DARRIN KRUMPUS
11/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DARRIN KRUMPUS
11/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
DARRIN KRUMPUS
06/05/2025
Violation issued (HPD, closed)
A
05/21/2024
Signed off — Alteration
ROOF REPLACEMENT AND EXTERIOR REPAIRS AS PER PLANS. WORK SHALL INCLUDE ROOF MEMBRANE REPLACEMENT, DECORATIVE LIMESTONE REPAIRS AND WINDOW SOFFIT REPLACEMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00905702-I1
10/23/2023
Permit issued — General Construction
B00905702-I1-GC
10/19/2023
Filed — Alteration
ROOF REPLACEMENT AND EXTERIOR REPAIRS AS PER PLANS. WORK SHALL INCLUDE ROOF MEMBRANE REPLACEMENT, DECORATIVE LIMESTONE REPAIRS AND WINDOW SOFFIT REPLACEMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00905702-I1
10/19/2023
Special inspection requirement — Final
Christine Hobson
10/19/2023
Special inspection requirement — Tenant Protection Plan Compliance
Christine Hobson
03/17/2023
Violation issued (HPD, closed)
A
04/28/2022
Signed off — Alteration
B00514636-I1
04/25/2022
Permit issued — Construction Fence
B00514636-I1-FN
03/08/2022
Permit issued — Mechanical Systems
B00648688-I1-MS
02/24/2022
Objection resolved — Addressed
02/24/2022
Objection resolved — Addressed
02/24/2022
Objection resolved — Addressed
02/24/2022
Special inspection requirement — HVAC-R and service water heating system controls
ELLIOTT HARDIE
02/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELLIOTT HARDIE
Latest 60 of 129 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedKings Group NY09/28/2026
DOB NOWSupported ScaffoldPermit IssuedKings Group NY09/25/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedKay Waterproofing09/14/2026
DOB NOWStructuralPermit IssuedKay Waterproofing09/03/2026
DOB NOWMechanical SystemsSigned-offVanguard Residential01/12/2026
DOB NOWPlumbingSigned-offA&H Express Plumbing & Heating01/05/2026
DOB NOWMechanical SystemsSigned-offInnovative Ventures Team12/26/2025
DOB NOWGeneral ConstructionSigned-offInnovative Ventures Team12/26/2025
DOB NOWGeneral ConstructionSigned-offKay Waterproofing10/23/2023
DOB NOWConstruction FenceSigned-offUrban Standard General Co04/25/2022
DOB NOWMechanical SystemsPermit IssuedCDC Housing03/08/2022
DOB NOWPlumbingPermit IssuedAMC Plumbing, Heating & CLNG02/03/2022
DOB NOWGeneral ConstructionPermit IssuedCDC Housing01/04/2022
DOB NOWMechanical SystemsSigned-offKG Management Cnsltng09/20/2021
DOB NOWPlumbingSigned-offClean Tech Mechanical09/14/2021
DOB NOWMechanical SystemsSigned-offNU-Way Heating & Cooling04/15/2021
DOB NOWPlumbingSigned-offClean Tech Mechanical03/10/2021
DOB NOWGeneral ConstructionSigned-offKG Management Cnsltng02/01/2021
DOB NOWPlumbingSigned-offAspect Plumbing & Heating Co12/21/2020
DOB NOWSupported ScaffoldPermit IssuedPearl Contracting12/14/2019
DOB NOWSupported ScaffoldPermit IssuedPearl Contracting09/26/2019
BISOTISSUEDUrban Standard General Co04/14/2021
BISOTISSUEDUrban Standard General Co04/14/2021
BISOTISSUEDUrban Standard General Co12/18/2020
BISOTISSUEDUrban Standard General Co12/15/2020
BISOTISSUEDPearl Contracting07/25/2019
BISPLISSUEDBranch Plumbing05/16/2012
BISOTISSUEDGrand Builder Contracting04/30/2012
BISPLISSUEDMartin PLG & Heating03/26/2007
BISOTISSUEDClermont GNRL Contracting02/16/2007
BISOTISSUEDLipton Associates07/12/2000
2 projects · most recent 08/28/2026
Heating and Air Conditioning Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/28/2026Signed-offInnovative Ventures TeamHeating and Air Conditioning Systems
Heat / Cool
Daikin 4MXM36AVJU9 36,000 BTU · Vrf Outdoor ×1
02/02/2022Permit IssuedCDC HousingAir Conditioning Systems
Cooling
Mitsubishi Electric NTXWST09A112A 9,000 BTU · Ahu ×3
MXZ-4C36NA2 36,000 BTU · Heat Pump Outdoor ×1
NTXWST12A112A 12,000 BTU · Ahu ×1
1 project · most recent 08/28/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/28/2026Signed-offA&H Express Plumbing & HeatingGas, Water/Sanitary
5 projects · most recent 09/25/2026
General Wiring
FiledStatusContractorScope
09/25/2026Permit IssuedHigh Quality Electric of NYC—
12/20/2025CompleteOmd ElectricalGeneral Wiring
06/27/2022CompleteHV ElectricGeneral Wiring
05/11/2022CompleteEinstein ElectricalGeneral Wiring
08/26/2021CompleteE & M Electrical NYGeneral Wiring
1 project · most recent 08/28/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
08/28/2026Signed-offA&H Express Plumbing & HeatingTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/01/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 89
DateRequirementInspectorRole
09/17/2026Post-installed Anchors—special
08/26/2026Tenant Protection Plan ComplianceChristine Hobsonspecial
08/24/2026Structural Steel - WeldingChristine Hobsonspecial
08/24/2026Post-installed anchors in masonryChristine Hobsonspecial
08/24/2026Structural Steel - High Strength BoltingChristine Hobsonspecial
08/24/2026Structural Steel - DetailsChristine Hobsonspecial
08/04/2026FinalChristine Hobsonprogress
02/06/2026Fire-Resistant Penetrations and JointsELLIOTT HARDIEspecial
02/02/2026Fire-Resistant Penetrations and JointsELLIOTT HARDIEspecial
11/26/2025FinalELLIOTT HARDIEprogress
11/26/2025Mechanical SystemsELLIOTT HARDIEspecial
11/17/2025Maintenance informationDARRIN KRUMPUSenergy_progress
11/10/2025HVAC-R and service water heating system controlsDARRIN KRUMPUSenergy_progress
11/10/2025HVAC-R and service water piping design and insulationDARRIN KRUMPUSenergy_progress
11/10/2025HVAC-R and service water heating equipmentDARRIN KRUMPUSenergy_progress
11/10/2025FinalDARRIN KRUMPUSprogress
11/10/2025Fire-Resistant Penetrations and JointsDARRIN KRUMPUSspecial
11/10/2025Mechanical SystemsDARRIN KRUMPUSspecial
10/19/2023Tenant Protection Plan ComplianceChristine Hobsonspecial
10/19/2023FinalChristine Hobsonprogress
02/24/2022HVAC-R and service water piping design and insulationELLIOTT HARDIEenergy_progress
02/24/2022Fire-Resistant Penetrations and JointsELLIOTT HARDIEspecial
02/24/2022Energy Code Compliance InspectionsELLIOTT HARDIEprogress
02/24/2022HVAC-R and service water heating equipmentELLIOTT HARDIEenergy_progress
02/24/2022HVAC-R and service water heating system controlsELLIOTT HARDIEenergy_progress
Latest 25 of 89.
▾Documents — 249 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch17
10/13/2026B01458745-I1Request digital key ↗
10/04/2026B01440581-I1Request digital key ↗
10/04/2026B01440581-S1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Plumbing7
09/02/2026B00417429-P3Request digital key ↗
09/02/2026B00417429-I1Request digital key ↗
09/01/2026B00453841-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/01/2026B00453841-I1Request digital key ↗
09/01/2026B00453841-P3Request digital key ↗
09/01/2026B00453841-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00417433-I1Request digital key ↗
08/15/2026B00417433-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00225877-I1Request digital key ↗
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION6
08/30/2021340775824Open ↗
12/07/2020340775860Open ↗
11/25/2020340775824Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION5
12/18/2020340775860Open ↗
12/15/2020340775824Open ↗
07/30/2019321976803Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications114
▸DOB NOWProgress Inspector Seal & Signature57
09/25/2026B00417433-I1Open ↗
09/25/2026B00417433-I1Open ↗
09/25/2026B00417433-I1Open ↗
Showing 3 of 57 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature31
10/14/2026B01325125-P4Open ↗
10/04/2026B01440581-S1Open ↗
10/04/2026B01440581-S2Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/25/2026B00417433-I1Open ↗
09/23/2026B00453841-S2Open ↗
09/23/2026B00453841-S2Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
07/30/2019321976803Open ↗
07/12/2019321976803Open ↗
04/17/2012320462307Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
12/07/2020340775860Open ↗
07/12/2019321976803Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/07/2020340775860Open ↗
10/26/2020340775824Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/07/2020340775860Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/26/2020340775824Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/12/2019321976803Open ↗
▸Trade Schedules & Equipment4
▸BISSELF-CERT PLUMBING NOTICE3
06/21/2012320462307Open ↗
06/09/2012320462307Open ↗
06/09/2012320462307Open ↗
▸BISSCHEDULE B - PLUMBING1
04/17/2012320462307Open ↗
▸Safety & Tenant Protection11
▸DOB NOWTenant Protection Plan7
08/13/2026B00417429-P3Open ↗
08/13/2026B00417433-P1Open ↗
08/13/2026B00225877-I1Open ↗
Showing 3 of 7 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
12/18/2020340775860Open ↗
12/15/2020340775824Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES2
12/07/2020340775860Open ↗
10/26/2020340775824Open ↗
▸Environmental & Asbestos30
▸DOB NOWDEP ACP-5: Asbestos Assessment Report25
10/14/2026B01325125-P4Open ↗
10/04/2026B01440581-I1Open ↗
09/01/2026B00453841-I1Open ↗
Showing 3 of 25 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
12/07/2020340775860Open ↗
10/26/2020340775824Open ↗
07/12/2019321976803Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/17/2012320462307Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026B00905702-I1Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
12/07/2021340775824Open ↗
12/07/2021340775860Open ↗
12/07/2020340775860Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00453841-I1Open ↗
08/13/2026B00453841-S2Open ↗
08/13/2026B00453841-S1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
12/07/2020340775860Open ↗
10/26/2020340775824Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
12/07/2021340775824Open ↗
12/07/2021340775860Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/12/2019321976803Open ↗
▸BISEN2 - As Built Energy Analysis1
12/17/2013320462307Open ↗
▸BISTECHNICAL REPORT: ENERGY1
04/17/2012320462307Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY9
12/07/2021340775824Open ↗
12/07/2021340775824Open ↗
12/07/2021340775860Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
12/17/2013320462307Open ↗
12/17/2013320462307Open ↗
▸BISSOIL REPORT1
12/07/2020340775860Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
12/10/2021340775824Open ↗
12/10/2021340775860Open ↗
12/23/2013320462307Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
07/30/2019321976803Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
04/17/2012320462307Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT5
12/07/2020340775860Open ↗
10/26/2020340775824Open ↗
07/12/2019321976803Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
12/07/2021340775824Open ↗
12/07/2021340775860Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE2
12/18/2020340775860Open ↗
12/15/2020340775824Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET2
07/10/2019321976803Open ↗
04/17/2012320462307Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
12/07/2020340775860Open ↗
10/26/2020340775824Open ↗
▸BISADDITIONAL INFORMATION1
09/08/2021340775824Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
12/18/2020340775860Open ↗
12/15/2020340775824Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
11/17/2020340775824Open ↗
11/17/2020340775824Open ↗