Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofParamount Group54p · 4 filings · 20 docs
ArchitectureDMGeneralMechanical
Issued Permit Scope
Mechanical Systems
Cooling tower and AC unit replacement as per plans. No change to use, egress or occupancy.
On file for this project
17 documents
Installation of new ventilation grates, waterproofing membrane, reinforced topping slab, new steel-faced curb and waterproofing injection to treat leaks at 58th street below-grade vault wall as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 2 drawing sheets
Replacement of roof setbacks as per plans. No change to use, egress or occupancy.
On file for this project
15 documents · 11 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 36Paramount Group4p · 2 filings · 18 docs
Architecture
Issued Permit Scope
General Construction
Replacement of roof setbacks as per plans. No change to use, egress or occupancy.
On file for this project
15 documents
Installation of equipment in head end room, GPS antenna and related wiring as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Floor 35Paramount Group, Inc.7p · 3 filings · 13 docs
Fire ProtectionGeneralMechanical
Issued Permit Scope
Mechanical Systems · Sprinklers
Removal and disposal of existing AC units and duct work on the 34th and 35th floors as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 3 drawing sheets
Removal of existing sprinkler heads and piping with installation of temporary loops on the 34th and 35th floors as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 3 drawing sheets
No filed description on record for this project.
On file for this project
3 documents · 2 drawing sheets
Floor 34Paramount Group, Inc.5p · 3 filings · 13 docs
Fire ProtectionMechanical
Issued Permit Scope
Mechanical Systems · Sprinklers
Removal and disposal of existing AC units and duct work on the 34th and 35th floors as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 2 drawing sheets
Removal of existing sprinkler heads and piping with installation of temporary loops on the 34th and 35th floors as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
No filed description on record for this project.
On file for this project
3 documents · 2 drawing sheets
Floor 33Paramount Group19p · 5 filings · 19 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Removal of existing plumbing fixtures and associated piping on the 7th and 33rd floors (LL Demo) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Modifications to the existing sprinkler systems with installation of temporary loops on the 7th and 33rd floors (LL Demo) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Removal and disposal of interior partitions, doors, suspended ceilings and finishes on the 7th and 33rd floors (LL Demo) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 32
Floor 31
Floor 30SPNY Capital43p · 7 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Plumbing modifications to take place on the 30th floor as per drawings filed herewith. No change in use,egress, or occupancy.
On file for this project
3 documents
Sprinkler modifications to take place on the 30th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
General Construction to take place on the 30th Floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
12 documents
Latest 3 of 7 filings on this floor.
Floor 29Hakluyt & Company84p · 9 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modifications to the existing plumbing system on the 27th & 28th floors (28th & 29th floors - Marketing) - Hakluyt as per plans. No change to use, egress or occupancy.
On file for this project
8 documents
Cooling tower and AC unit replacement as per plans. No change to use, egress or occupancy.
On file for this project
17 documents · 1 drawing sheet
Interior renovation as per plans filed herewith.
On file for this project
5 documents · 4 drawing sheets
Latest 3 of 9 filings on this floor.
Floor 28Hakluyt & Company116p · 8 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modifications to the existing sprinkler system on the 28th & 29th floors - Hakluyt as per plans. No change to use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
Modifications to the existing plumbing system on the 27th & 28th floors (28th & 29th floors - Marketing) - Hakluyt as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Modifications to the existing HVAC system on the 28th & 29th floors - Hakluyt as per plans. No change to use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 27Hakluyt & Company, Searchlight Capital74p · 14 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modifications to the existing sprinkler system on the 28th & 29th floors - Hakluyt as per plans. No change to use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
Modifications to the existing HVAC system on the 28th & 29th floors - Hakluyt as per plans. No change to use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 27th floor (28th floor -Marketing) - Hakluyt as per plans. No change to use, egress or occupancy.
On file for this project
12 documents · 4 drawing sheets
Latest 3 of 14 filings on this floor.
Floor 26Searchlight Capital34p · 7 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modifications to the existing sprinkler system on the 26th floor (Searchlight Capital) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 4 drawing sheets
Minor demolition with installation of new partitions, doors, ceilings and finishes on the 26th floor (Searchlight Capital) as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 5 drawing sheets
Modifications to the existing HVAC system on the 26th floor (Searchlight Capital) as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 5 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 25
Floor 24Fundamental Advisors, Royce & Associates, Marketing floor 2561p · 11 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modifications to the existing sprinkler system on the 17th and 24th floors (Demo) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 3 drawing sheets
Removal and disposal of interior partitions, doors, ceilings and finishes on the 17th and 24th floors as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 3 drawing sheets
Modifications to the existing HVAC system on the 17th and 24th floors (Demo) as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 2 drawing sheets
Latest 3 of 11 filings on this floor.
Floor 23Royce & Associates26p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Structural
Modifications to the existing sprinkler system on the 21st through 23rd floors (Royce) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents
Removal of existing stairs with patch and repair to affected areas from the 21st through 24th floors (Royce) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Steel supports and infill for stair removal from the 21st to 24th floors (Royce) as per plans. No change to use, egress or occupancy.
On file for this project
10 documents
Latest 3 of 4 filings on this floor.
Floor 22Royce & Associates24p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Structural
Modifications to the existing sprinkler system on the 21st through 23rd floors (Royce) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents
Removal of existing stairs with patch and repair to affected areas from the 21st through 24th floors (Royce) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents
Steel supports and infill for stair removal from the 21st to 24th floors (Royce) as per plans. No change to use, egress or occupancy.
On file for this project
10 documents
Latest 3 of 4 filings on this floor.
Floor 21Royce & AssociatesUnder Construction72p · 8 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modifications to the existing HVAC system on the 18th and 21st floors as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 8 drawing sheets
Modifications to the existing plumbing system on the 18th and 21st floors as per plans. No change to use, egress or occupancy.
On file for this project
6 drawing sheets
Modifications to the existing sprinkler system on the 18th and 21st floors as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 9 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 20
Floor 19Eurazeo58p · 5 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modifications to the existing sprinkler system on the 19th floor (Eurazeo) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 8 drawing sheets
Modifications to the existing HVAC system on the 19th floor (Eurazeo) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 9 drawing sheets
Modifications to the existing plumbing system on the 19th floor (Eurazeo) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 5 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 18Elecor PropertiesUnder Construction26p · 4 filings · 16 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modifications to the existing HVAC system on the 18th and 21st floors as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Modifications to the existing plumbing system on the 18th and 21st floors as per plans. No change to use, egress or occupancy.
On file for this project
1 drawing sheet
Modifications to the existing sprinkler system on the 18th and 21st floors as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 17Paramount Group10p · 7 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modifications to the existing sprinkler system on the 17th and 24th floors (Demo) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 3 drawing sheets
Removal and disposal of interior partitions, doors, ceilings and finishes on the 17th and 24th floors as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Modifications to the existing HVAC system on the 17th and 24th floors (Demo) as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 16Lionstone140p · 11 filings · 20 docs
ArchitectureCivilDMElectricalFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Cooling tower and AC unit replacement as per plans. No change to use, egress or occupancy.
On file for this project
17 documents · 2 drawing sheets
Installation of new new interior wall, modification to office front and patching of ceilings on the 16th floor as per plans. No change to use, egress or occupancy.
On file for this project
4 documents
Modifications to the existing HVAC system on the 16th floor as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 5 drawing sheets
Latest 3 of 11 filings on this floor.
Floor 15LionTree52p · 8 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Installation of a new sprinkler system on the 15th floor (Lion Tree) as per plans. No change to use, egress or occupancy.
On file for this project
11 documents · 1 drawing sheet
Installation of new HVAC system on the 15th floor (Lion Tree) as per plans. No change to use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 15th floor (Lion Tree) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 14LionTree, FCO Advisors76p · 11 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Structural modifications on the 14th floor (LionTree) as per plans. No change to use, egress or occupancy.
On file for this project
5 documents
Modifications to the existing plumbing system on the 14th floor (LionTree LLC) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 2 drawing sheets
Modifications to the existing sprinkler system on the 14th floor (LionTree LLC) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 11 filings on this floor.
Floor 13
Floor 12
Floor 11Paramount Group80p · 4 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Cooling tower and AC unit replacement as per plans. No change to use, egress or occupancy.
On file for this project
17 documents
Modifications to the existing sprinkler systems on the 10th and 11th floors (Haug Partners LLC- Demo & Buildout) as per plans. No change to use, egress or occupancy.
On file for this project
7 documents
Remove portions of existing ductwork, units and piping. Install new ductwork, VAV boxes, and new AC units on the 10th and 11th floors (Haug Partners LLC- Demo & Buildout) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 10Paramount Group82p · 5 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Structural
Cooling tower and AC unit replacement as per plans. No change to use, egress or occupancy.
On file for this project
17 documents
Modifications to the existing sprinkler systems on the 10th and 11th floors (Haug Partners LLC- Demo & Buildout) as per plans. No change to use, egress or occupancy.
On file for this project
7 documents
Remove portions of existing ductwork, units and piping. Install new ductwork, VAV boxes, and new AC units on the 10th and 11th floors (Haug Partners LLC- Demo & Buildout) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 9Radial Equity65p · 10 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Installation of new sprinkler heads and associated piping on the 9th floor (Radial Equity) as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Installation of new fire hose cabinet and associated piping on the 9th floor (Radial Equity) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Modifications to the existing plumbing system on the 9th floor (Radial Equity) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents
Latest 3 of 10 filings on this floor.
Floor 8Hildred54p · 8 filings · 20 docs
ArchitectureCivilFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modifications to the existing plumbing system on the 8th floor (Demo, Corridor & Bathrooms) as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 7 drawing sheets
Installation of new plumbing fixtures and associated piping on the 8th floor (Hildred) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 5 drawing sheets
Modifications to the existing sprinkler system on the 8th floor (Demo, Corridor & Bathrooms) as per plans. No change to use, egress or occupancy.
On file for this project
11 documents · 7 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 7Paramount Group8p · 4 filings · 16 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Removal of existing plumbing fixtures and associated piping on the 7th and 33rd floors (LL Demo) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Modifications to the existing sprinkler systems with installation of temporary loops on the 7th and 33rd floors (LL Demo) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Removal and disposal of interior partitions, doors, suspended ceilings and finishes on the 7th and 33rd floors (LL Demo) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 6MoMA Sales Center16p · 6 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Removal of existing plumbing fixtures and associated piping on the 6th floors (Demo) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Modifications to the existing sprinkler system on the 6th floor (Demo) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 3 drawing sheets
Modifications to the existing HVAC system on the 6th floor (Demo) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 5Carr Workplaces13p · 3 filings · 11 docs
ArchitectureFire ProtectionGeneralPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers
Modifications to the existing sprinkler system on the 5th floor (Carr Workplaces- Suite 500) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 5 drawing sheets
Modifications to the existing plumbing system on the 5th floor (Carr Workplaces- Suite 500) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 6 drawing sheets
Minor demolition with installation of new partitions, doors, ceilings and finishes on the 5th floor (Carr Workplaces- Suite 500) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents
Floor 4
Floor 3Christian Dior, Bergdorf Goodman41p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Modifications to the existing HVAC system on the 3rd floor (Dior Men's Shop- Bergdorf Goodman) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 3rd floor (Dior Men's Shop- Bergdorf Goodman) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents
Modifications to the existing sprinkler system on the 3rd floor (Bergdorf Goodman Men's Fitting Room) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents
Latest 3 of 6 filings on this floor.
Floor 2Bergdorf Goodman, Zegna +165p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Modifications to the existing sprinkler system (BG Men's Store) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents
Modifications to the existing HVAC system (BG Men's Store) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents
Modifications to the existing HVAC system on the 1st and 2nd floor (Zegna) as per plans. No change to use, egress or occupancy.
On file for this project
11 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 1Bergdorf Goodman, Zegna11p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Modifications to the existing sprinkler system on the 1st floor (Men's Shoes & Leather Goods) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 1st floor (Bergdorf Goodman- Men's Shoes & Leather Goods) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents
Modifications to the existing HVAC system on the 1st floor (Bergdorf Goodman- Men's Shoes & Leather Goods) as per plans. No change to use, egress or occupancy.
On file for this project
9 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
CellarParamount Group, INC.7p · 3 filings · 16 docs
ArchitectureElectricalMechanicalStructural
Issued Permit Scope
Antenna · Mechanical Systems · Protection and Mechanical Methods
Air conditioning unit replacement for the cellar elevator machine room. No change in use egress and occupancy.
On file for this project
9 documents
TEMPORARY SHORING TO SUPPORT SIDEWALK VAULT SLAB.
On file for this project
4 documents
Installation of equipment in head end room, GPS antenna and related wiring as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Sub-CellarLionstone1p · 1 filing · 8 docs
Fire Protection
Modifications to the existing sprinkler system on the 16th floor (Lionstone) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
BasementBergdorf Goodman1p · 1 filing · 3 docs
Mechanical
Replacement of (1) heat pump condensing unit & (2) indoor heat pump units & all associated piping in elevator machine rooms in basement.
On file for this project
3 documents · 1 drawing sheet
Sub-BasementBergdorf Goodman4p · 1 filing · 3 docs
Mechanical
Issued Permit Scope
Mechanical Systems
Replacement of (1) heat pump condensing unit & (2) indoor heat pump units & all associated piping in elevator machine rooms in basement.
On file for this project
3 documents
Site & exteriorParamount Group, INC.10p · 3 filings · 10 docs
ElectricalEquipmentGeneralMechanicalStructural
Issued Permit Scope
Sidewalk Shed · Supported Scaffold
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
2 documents · 2 drawing sheets
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 2 drawing sheets
ERECT, MAINTAIN & DISMANTLE OF SCAFFOLD FOR FACADE REPAIRS AS PER DRAWINGS ATTACHED HEREWITH.
On file for this project
5 documents · 6 drawing sheets