Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsTemporary sidewalk shed installation2 filings
Project M00697485Signed-off · 06/20/2025
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
38 documents
Project M00782870Signed-off · 07/28/2022
INSTALLATION OF ALTERNATIVE COMMON PLATFORM TIE.
On file for this project
6 documents
RoofTemporary supported scaffold installation1p · 2 filings · 3 docs
EquipmentMechanicalStructural
Issued Permit Scope
Protection and Mechanical Methods · Supported Scaffold
Project M08047940Signed-off · 12/01/2022
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
1 document
Project M00779137Signed-off · 08/19/2022
INSTALLATION OF PIPE SCAFFOLDING AROUND EAST AND WEST TOWERS SETBACKS AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
On file for this project
2 documents
Floor 35Hfz Capital Group5p · 1 filing
ElectricalEquipmentMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · Supported Scaffold
Project M00299388Signed-off · 04/13/2022
Installation of gas boilers as shown drawings filed herewith. No change in use, egress or occupancy.
On file for this project
16 documents
Floor 34The Hudson Trust, Unit PH, Unit PH36WUnder Construction4p · 1 filing · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Supported Scaffold
Project M01159923Signed-off · 09/28/2026
Renovation of existing private terrace on the 34th floor. Work to include removal and replacement of existing stone pavers on pedestal system as per plans filed herewith. No change in use, egress or occupation.
On file for this project
36 documents
Floor 33
Floor 32
Floor 31Unit PH31A, Unit PH33AUnder Construction1 filing · 16 docs
ArchitectureElectricalEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Supported Scaffold
Project M01201379Permit Issued · 12/19/2025
SPRINKLER MODIFICATIONS AT EXISTING 31ST FLOOR APT PH31A (PH31A_CO/PH33A_M) AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
18 documents
Floor 30
Floor 29Forecast Blue, Unit 29BUnder Construction3 filings · 7 docs
ArchitectureElectricalEquipmentMechanicalStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Supported Scaffold
Project M01322180Permit Issued · 01/15/2026
INTERIOR ALTERATION OF APARTMENT W31C ON THE 29TH CONSTRUCTION FLOOR/31ST MARKETING FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
7 documents
Project M01038421Signed-off · 08/06/2024
Interior renovations to apartment 29B including the removal and installation on non-load bearing partitions and related finishes. No change in use, egress or occupancy.
On file for this project
4 documents
Project M00136249Objections
No filed description on record for this project.
On file for this project
1 document
Floor 28
Floor 27
Floor 26Mechanical boiler installation 26th floor1p · 1 filing
ElectricalEquipmentMechanicalStructural
Issued Permit Scope
Boiler Equipment · Protection and Mechanical Methods · Supported Scaffold
Project M00821130Signed-off · 08/14/2023
Installation of four (4) gas boilers on the 26th floor of the East Tower as per plans filed herewith. No change in use, egress or occupancy under this application. Filed in conjunction with New Building # 121190308.
On file for this project
5 documents
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20The Hafen LLC Apt., Unit 20C1 filing · 6 docs
ArchitectureElectricalEquipmentMechanicalStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Supported Scaffold
Project M01411979Signed-off · 07/16/2026
Application filed for limited interior renovation of existing dwelling unit 20C
On file for this project
6 documents
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 44th floor mezzanine slab demolition for commercial buildingUnder Construction2 filings · 9 docs
Structural
Issued Permit Scope
Structural · Supported Scaffold
Project M01408287Permit Issued · 07/02/2026
Demolition of 4th floor Mezz Slab and Two Columns Below it
On file for this project
4 documents
Project M00054427Signed-off · 08/19/2019
INSTALLATION OF TEMPORARY SCAFFOLD SYSTEM FOR WORKER ACCESS DURING CONSTRUCTION. SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS, OR OCCUPATION.
On file for this project
5 documents
Floor 3Temporary scaffold system for span bridge1 filing · 5 docs
Structural
Issued Permit Scope
Supported Scaffold
Project M00054427Signed-off · 08/19/2019
INSTALLATION OF TEMPORARY SCAFFOLD SYSTEM FOR WORKER ACCESS DURING CONSTRUCTION. SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS, OR OCCUPATION.
On file for this project
5 documents
Floor 2One High Line interior renovationUnder Construction1p · 3 filings · 9 docs
ArchitectureStructural
Issued Permit Scope
General Construction · Supported Scaffold
Project M01437266Permit Issued · 09/09/2026
REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS, DOORS AND CARPENTRY AS PER PLANS FILED HEREWITH. DEMO PORTION OF EXISTING WALL TO PROVIDE (2) 5 PENETRATIONS FOR INSTALLATION OF (2) NEW ELECTRICAL CONDUITS. FILED IN CONJUNCTION WITH NB#121190308
On file for this project
2 documents
Project M00054427Signed-off · 08/19/2019
INSTALLATION OF TEMPORARY SCAFFOLD SYSTEM FOR WORKER ACCESS DURING CONSTRUCTION. SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS, OR OCCUPATION.
On file for this project
5 documents
Project M01179310PA Certificate of Operation Issued
No filed description on record for this project.
On file for this project
2 documents
Floor 1WOODS Mechanical Reclamation Room exhaust systemUnder Construction1p · 3 filings · 18 docs
ArchitectureElectricalEquipmentMechanicalStructural
Issued Permit Scope
Mechanical Systems · Protection and Mechanical Methods · Structural
Project M01358402Permit Issued · 03/18/2026
Slab opening on the 1st floor and reinforcing a section of an existing block wall adjacent to this opening at the cellar level as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
19 documents
Project M01179310PA Certificate of Operation Issued
No filed description on record for this project.
On file for this project
2 documents
Project M00857489Objections
INSTALLATION OF OVERHEAD PROTECTION AND CONSTRUCTION FENCE IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
1 document
Mezzanine4th floor mezzanine slab demolition for commercial buildingUnder Construction2p · 1 filing · 4 docs
GeneralStructural
Project M01408287Permit Issued · 07/02/2026
Demolition of 4th floor Mezz Slab and Two Columns Below it
On file for this project
4 documents
CellarHfz Capital GroupUnder Construction2p · 2 filings · 18 docs
MechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Structural
Project M01358402Permit Issued · 03/18/2026
Slab opening on the 1st floor and reinforcing a section of an existing block wall adjacent to this opening at the cellar level as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
19 documents
Project M00299388Signed-off · 04/13/2022
Installation of gas boilers as shown drawings filed herewith. No change in use, egress or occupancy.
On file for this project
16 documents
Site & exteriorNYC Department of Parks and Recreation, The high Line21 filings · 9 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · Plumbing · Protection and Mechanical Methods · Sidewalk Shed · Sign · Structural · Supported Scaffold
Project M00703555Signed-off · 03/04/2026
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Project M00738838Signed-off · 07/02/2025
APPLICATION FILED TO INSTALL ONE DRINKING FOUNTAIN. FILED IN CONJUNCTION WITH NB #121190308.
On file for this project
2 documents
Project M01224827Permit Issued · 07/01/2025
INSTALL ILLUMINATED SIGN ON EXTERIOR WALL (FAENA)
On file for this project
3 documents
Latest 3 of 21 filings on this floor.