← Back
Elevator apt, semi-fireproof without stores
Van Dyke I (NYCHA)
766 BLAKE AVENUE · BIN 3328040
💬 Discuss this project
1958Year Built
14Stories
D1Building Class
R6Zoning
451,586 sfGross Floor Area
525Units
LL97 Covered7 Open Violations 5 unresolved · 2 paperwork only ▸FISP: UNSAFEFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 305,266 sf lot · 1.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction56p · 4 filings · 20 docs
BulkheadUnder Construction2p · 1 filing · 14 docs
Floor 9Under Construction1p · 1 filing · 14 docs
Floor 8Under Construction1p · 1 filing · 14 docs
Floor 7Under Construction1p · 1 filing · 14 docs
Floor 6Under Construction1p · 1 filing · 14 docs
Floor 5Under Construction1p · 1 filing · 14 docs
Floor 4Under Construction1p · 1 filing · 14 docs
Floor 3Under Construction1p · 1 filing · 14 docs
Floor 2Under Construction1p · 1 filing · 14 docs
Floor 1Under Construction5p · 2 filings · 20 docs
CellarUnder Construction26p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA7608/30/2026
NEW YORK CITY HOUSING AUTHORITY1107/08/2026
NORTHROP GRUMMAN SYSTEMS CORP.503/22/2026
NYC HOUSING AUTHORITY1003/22/2026
NYCHA 99403/22/2026
M BHUIYAN CONSTRUCTION103/21/2026
ZORIA HOUSING203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS1003/21/2026
AK CONSULTING SERVICES403/21/2026
CONSTRUCTION PERMIT SERVICES103/21/2026
AE DESIGN SOLUTION203/21/2026
JOEL PHAGOO P.E. PLLC103/21/2026
NERIS403/21/2026
SYNERGY STRATEGIC DESIGN ARCHITECTS103/21/2026
JOEL PHAGOO P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROMA SCAFFOLDING INCGeneral Contractor2607/08/2026
J & N CONSTRUCTION GROUPGeneral Contractor2007/28/2026
KORDUN CONSTRUCTION CORPGeneral Contractor1307/08/2026
KORDUN CONSTRUCTION CORPPlumbing307/08/2026
L.E.C.INCGeneral Contractor203/21/2026
ORTEGA-CEDENO, DAVIDElectrical103/21/2026
PHILLIPS, WENDELLElectrical103/21/2026
RIVERA, EDWARDElectrical103/21/2026
ROBERT SPALLINOElectrical103/21/2026
CHRYSSIADIS, NICOLASElectrical103/21/2026
STANTON, TElectrical103/21/2026
VELEZ, CARLOSElectrical103/21/2026
ZENA ELECTRIC INCElectrical103/22/2026
D.D.S. MECH PBG&HTG CORPPlumbing107/08/2026
RONALD TESTA, JR.Electrical103/21/2026
INNER CITY CONTRACTINGElectrical103/21/2026
IOVINE, MICHAELElectrical103/21/2026
IRVING BAPTISTEElectrical103/21/2026
JEMCO ELECT. CONTRS INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983204/30/2026
RI CONSULTING SERVICES IN8904209/19/2025
JOEL PHAGOO ,PE, PLLC2416308/06/2025
BUREAU VERITAS NA69021007/24/2025
MP ENGINEERS & ARCHITECTS1438308/13/2024
LEO Y LEE ASSOCIATES2481103/04/2024
THE MTM DESIGN GROUP, LLC1319108/11/2021
Building Lifecycle
All (205)Filed (33)Permit Issued (44)Signed Off (8)Facade (FISP) (19)Violation (31)Inspection (18)Objection (22)Special Inspection (30)
08/25/2026
Signed off — Alteration
MECHANICAL WORK FOR CENTRAL BOILER PLANT AND DOMESTIC HOT WATER SYSTEM REPLACEMENT (VAN DYKE BLDG #14) AS PER THE PLANS FILED HEREWITH.
B00463375-I1
08/13/2026
Signed off — Alteration
B00457350-I1
08/05/2026
Signed off — Alteration
REMOVE AND REPLACE ALL GAS PIPING THROUGHOUT BUILDING INCLUDING RISER AND METERS. EXISTING GAS SERVICE TO REMAIN.
B08025783-I1
07/30/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/27/2026
Permit issued — Sidewalk Shed
B01046269-I1-SH
07/20/2026
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 330 POWELL STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01046269-P1
07/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/02/2026
Objection resolved — Resolved
06/30/2026
Objection resolved — Addressed
06/16/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/15/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/15/2026
Objection resolved — Addressed
06/09/2026
Permit issued — Supported Scaffold
B01237731-I1-SF
05/29/2026
Objection raised — Cost
05/29/2026
Objection raised — Scope
05/26/2026
Filed — Alteration
PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00463604-P4
05/21/2026
Permit issued — General Construction
B00457350-I1-GC
05/12/2026
Objection raised — Other
04/30/2026
Filed — Alteration
Facade restoration at Van Dkye #14 to comply with LL 11/98, Cycle 9 report. No change in use, egress, or occupancy.
B01133032-P1
04/30/2026
Special inspection requirement — Masonry
ALEXIS SCHLESSINGERMAN
04/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
04/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEXIS SCHLESSINGERMAN
04/30/2026
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
04/29/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/24/2026
Permit issued — General Construction
B00782723-I1-GC
04/24/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/23/2026
Permit issued — Sidewalk Shed
B01046269-I1-SH
04/16/2026
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
04/14/2026
Permit issued — Construction Fence
B01105056-I1-FN
03/18/2026
Permit issued — Plumbing
B00463604-I1-PL
03/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/17/2026
Permit issued — Suspended Scaffold
B01113393-I1-SC
02/25/2026
Signed off — Alteration
INSTALLATION OF SUPPORTED PIPE SCAFFOLD AT 330 POWELL STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01049253-I1
02/17/2026
Permit issued — General Construction
B01133032-I1-GC
11/20/2025
Cycle 10 facade report submitted
11/20/2025
Cycle 10 facade report signed — UNSAFE
10/28/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/16/2025
Cycle 10 facade inspection completed
09/25/2025
Special inspection requirement — Post-installed Anchors
MD ISLAM
09/22/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/19/2025
Filed — Alteration
SUSPENDED SCAFOLD OUTRIGGER SYSTEM AND MATERIAL HOIST SYSTEM FOR ROOF REPAIRS, REPLACEMENT AND FACADE RESTORATION WORKS. SUSPENDED SCAFFOLD AND MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPA
B01113393-P1
09/19/2025
Special inspection requirement — Post-installed Anchors
MD ISLAM
09/17/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/08/2025
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
08/26/2025
Violation issued (FDNY_ORDER, closed)
08/08/2025
Permit issued — Plumbing
B08025783-I1-PL
08/06/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01237731-P1
08/06/2025
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
08/04/2025
Special inspection requirement — Post-installed Anchors
IBRAHIM MOURAD
08/04/2025
Special inspection requirement — Tenant Protection Plan Compliance
IBRAHIM MOURAD
08/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
07/24/2025
Filed — Alteration
REMOVE AND REPLACE ALL GAS PIPING THROUGHOUT BUILDING INCLUDING RISER AND METERS. EXISTING GAS SERVICE TO REMAIN.
B08025783-P3
07/22/2025
Permit issued — Structural
B00461840-I1-ST
07/15/2025
Violation issued (FDNY_NOV, closed)
06/09/2025
Permit issued — Supported Scaffold
B01237731-I1-SF
06/06/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01237731-I1
06/05/2025
Filed — Alteration
REMOVE AND REPLACE ALL GAS PIPING THROUGHOUT BUILDING INCLUDING RISER AND METERS. EXISTING GAS SERVICE TO REMAIN.
B08025783-P2
06/05/2025
Objection resolved — Addressed
04/28/2025
Permit issued — General Construction
B00782723-I1-GC
Latest 60 of 205 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedJ & N CONSTRUCTION GROUP07/27/2026
DOB NOWSupported ScaffoldPermit IssuedJ & N CONSTRUCTION GROUP06/09/2026
DOB NOWGeneral ConstructionSigned-offKORDUN CONSTRUCTION CORP05/21/2026
DOB NOWGeneral ConstructionPermit IssuedJ & N CONSTRUCTION GROUP04/24/2026
DOB NOWSidewalk ShedPermit IssuedJ & N CONSTRUCTION GROUP04/23/2026
DOB NOWConstruction FencePermit IssuedJ & N CONSTRUCTION GROUP04/14/2026
DOB NOWPlumbingPermit IssuedKORDUN CONSTRUCTION CORP03/18/2026
DOB NOWSuspended ScaffoldPermit IssuedJ&N CONSTRUCTION GRP CORP03/17/2026
DOB NOWGeneral ConstructionPermit IssuedJ & N CONSTRUCTION GROUP02/17/2026
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP08/08/2025
DOB NOWStructuralPermit IssuedKORDUN CONSTRUCTION CORP07/22/2025
DOB NOWSupported ScaffoldPermit IssuedJ & N CONSTRUCTION GROUP06/09/2025
DOB NOWGeneral ConstructionPermit IssuedJ & N CONSTRUCTION GROUP04/28/2025
DOB NOWConstruction FencePermit IssuedJ & N CONSTRUCTION GROUP04/24/2025
DOB NOWSidewalk ShedPermit IssuedJ & N CONSTRUCTION GROUP04/24/2025
DOB NOWGeneral ConstructionSigned-offKORDUN CONSTRUCTION CORP04/16/2025
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP04/16/2025
DOB NOWSuspended ScaffoldPermit IssuedJ&N CONSTRUCTION GRP CORP03/28/2025
DOB NOWPlumbingPermit IssuedKORDUN CONSTRUCTION CORP03/05/2025
DOB NOWGeneral ConstructionPermit IssuedJ & N CONSTRUCTION GROUP01/30/2025
DOB NOWSuspended ScaffoldPermit IssuedJ&N CONSTRUCTION GRP CORP10/15/2024
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC09/09/2024
DOB NOWConstruction FencePermit IssuedJ & N CONSTRUCTION GROUP09/09/2024
DOB NOWStructuralPermit IssuedKORDUN CONSTRUCTION CORP07/22/2024
DOB NOWSupported ScaffoldSigned-offJ & N CONSTRUCTION GROUP05/15/2024
DOB NOWSidewalk ShedPermit IssuedJ & N CONSTRUCTION GROUP05/08/2024
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP04/05/2024
DOB NOWGeneral ConstructionSigned-offKORDUN CONSTRUCTION CORP04/05/2024
DOB NOWSuspended ScaffoldSigned-offSKYLINE RESTORATION INC03/15/2024
DOB NOWGeneral ConstructionSigned-offKORDUN CONSTRUCTION CORP02/26/2024
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP02/26/2024
DOB NOWPlumbingPermit IssuedKORDUN CONSTRUCTION CORP02/26/2024
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC12/04/2023
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC09/22/2023
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC01/24/2023
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC12/21/2022
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC02/04/2022
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC12/08/2021
DOB NOWGeneral ConstructionSigned-offL.E.C.INC08/18/2021
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC02/04/2021
+ 29 more permits on file
1 project · most recent 04/29/2021
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/29/2021Signed-offKORDUN CONSTRUCTION CORPVentilation Systems
Ventilation
Greenheck AER-S20C-610-VG 1,000 CFM ×1
2 projects · most recent 07/24/2025
Gas Storm
FiledStatusContractorScope
07/24/2025Signed-offD.D.S. MECH PBG&HTG CORPGas
08/13/2024——Storm
7 projects · most recent 01/15/2026
General Wiring
FiledStatusContractorScope
01/15/2026Permit IssuedAUJLA ELECTRIC CORP—
04/26/2024CompleteA.T.J. ELECTRICAL CO.INC.General Wiring
06/23/2023Permit IssuedMECO ELECTRIC CO. INC.General Wiring
04/25/2021CompleteCITY GRID ELECTRIC CORPGeneral Wiring
11/25/2019Permit IssuedRAIDEN ELECTRIC LLC—
08/16/2018CompleteJEMCO ELECT. CONTRS INCGeneral Wiring
07/28/2018CompleteZENA ELECTRIC INC—
1 project · most recent 02/28/2025
Concrete
FiledStatusContractorScope
02/28/2025——Concrete
3 projects · most recent 07/20/2026
Sidewalk Shed Scaffold Fence
FiledStatusContractorScope
07/20/2026Permit IssuedJ & N CONSTRUCTION GROUPSidewalk Shed
08/06/2025Permit IssuedJ & N CONSTRUCTION GROUPScaffold
09/04/2024Permit IssuedJ & N CONSTRUCTION GROUPFence
2 projects · most recent 09/19/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
09/19/2025Permit IssuedJ&N CONSTRUCTION GRP CORPSuspended Scaffold (SC)
03/25/2025Permit IssuedJ&N CONSTRUCTION GRP CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
07/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/16/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/15/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/29/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/24/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/16/2026Pass-Final PL - More than 10 Requested FloorsPassView ↗
03/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/22/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/08/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
03/07/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/27/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/28/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
04/30/2026MasonryALEXIS SCHLESSINGERMANspecial
04/30/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
04/30/2026Structural Stability – Alterations of existing buildingsALEXIS SCHLESSINGERMANspecial
04/30/2026FinalALEXIS SCHLESSINGERMANprogress
09/25/2025Post-installed AnchorsMD ISLAMspecial
09/19/2025Post-installed AnchorsMD ISLAMspecial
08/06/2025Post-installed AnchorsJOEL PHAGOOspecial
08/04/2025Post-installed AnchorsIBRAHIM MOURADspecial
08/04/2025Tenant Protection Plan ComplianceIBRAHIM MOURADspecial
08/04/2025Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
03/05/2025Post-installed Anchors—special
03/05/2025Fire-Resistant Penetrations and Joints—special
03/05/2025Tenant Protection Plan Compliance—special
03/03/2025Structural Stability – Alterations of existing buildingsIBRAHIM MOURADspecial
03/03/2025Concrete - Cast-In-PlaceIBRAHIM MOURADspecial
03/03/2025Subsurface Conditions – Fill Placement & In-Place DensityIBRAHIM MOURADspecial
03/03/2025Post-installed AnchorsIBRAHIM MOURADspecial
03/03/2025FinalIBRAHIM MOURADprogress
08/22/2024Post-installed AnchorsJAMES WILSONspecial
08/22/2024Structural Stability – Alterations of existing buildingsJAMES WILSONspecial
08/22/2024Insulation placement and R valuesJAMES WILSONenergy_progress
08/22/2024Fire-Resistant Penetrations and JointsJAMES WILSONspecial
08/22/2024MasonryJAMES WILSONspecial
06/14/2024Fire-Resistant Penetrations and JointsJAMES WILSONspecial
06/14/2024MasonryJAMES WILSONspecial
Latest 25 of 33.
▾Documents — 277 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch20
09/01/2026B00565143-I1Request digital key ↗
08/27/2026B00782723-S1Request digital key ↗
08/27/2026B00782723-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/01/2026B00463604-P2Request digital key ↗
09/01/2026B00463604-I1Request digital key ↗
08/15/2026B00463604-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Structural3
09/01/2026B00460614-P1Request digital key ↗
09/01/2026B00460614-I1Request digital key ↗
09/01/2026B00461840-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/01/2026B00463375-I1Request digital key ↗
09/01/2026B00463370-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/01/2026B00457350-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00273589-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00273528-I1Request digital key ↗
▸Applications & Permits24
▸BISWORK PERMIT APPLICATION15
10/22/2015340317696Open ↗
08/31/2015340298092Open ↗
08/28/2015340297734Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
10/22/2015340317696Open ↗
08/31/2015340298092Open ↗
08/28/2015340297734Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications82
▸DOB NOWDPL-1: Design Professional Seal & Signature29
09/01/2026B00463375-I1Open ↗
09/01/2026B00463370-I1Open ↗
09/01/2026B00457350-I1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/28/2026B01113393-I1Open ↗
09/21/2026B01237731-I1Open ↗
08/31/2026B01113393-P1Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
08/08/2016340272412Open ↗
12/31/2015340298092Open ↗
12/31/2015340297734Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
10/22/2015340317696Open ↗
08/31/2015340298092Open ↗
08/28/2015340297734Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
10/22/2015340317696Open ↗
08/31/2015340298092Open ↗
08/28/2015340297734Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
10/22/2015340317696Open ↗
08/31/2015340298092Open ↗
08/28/2015340297734Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/30/2026B00460614-I1Open ↗
08/25/2026B00463375-I1Open ↗
08/22/2026B00782723-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
03/06/2012320439717Open ↗
12/28/2011320413753Open ↗
08/13/2010320197951Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
03/06/2012320439717Open ↗
12/28/2011320413753Open ↗
08/13/2010320197951Open ↗
▸Trade Schedules & Equipment2
▸BISEQUIPMENT USE PERMITS1
02/12/2010310038367Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
02/08/2010310038367Open ↗
▸Safety & Tenant Protection2
▸DOB NOWTenant Protection Plan2
08/13/2026B00273528-I1Open ↗
08/13/2026B00273589-I1Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
09/01/2026B00463375-I1Open ↗
09/01/2026B00460614-I1Open ↗
09/01/2026B00461840-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/01/2026B00565143-I1Open ↗
08/21/2026B08025783-P3Open ↗
08/21/2026B08025783-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
03/06/2012320439717Open ↗
10/17/2007310038367Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
08/13/2010320197951Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/28/2015340297734Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
07/09/2015340272412Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
09/02/2014320777370Open ↗
09/11/2013320777370Open ↗
06/21/2013320777370Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/31/2015340298092Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/13/2013320439717Open ↗
▸BISTECHNICAL REPORT: ENERGY1
03/06/2012320439717Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00457350-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY4
10/22/2015340317696Open ↗
08/31/2015340298092Open ↗
08/28/2015340297734Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
06/21/2013320777370Open ↗
▸Approvals, Objections & Sign-offs81
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter32
09/01/2026B00463370-I1Open ↗
09/01/2026B00457350-I1Open ↗
09/01/2026B00460614-P1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)20
09/01/2026B00460614-P1Open ↗
09/01/2026B00460614-I1Open ↗
08/14/2026B00463604-P4Open ↗
Showing 3 of 20 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
08/08/2016340272412Open ↗
12/31/2015340298092Open ↗
12/31/2015340297734Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)8
09/01/2026B00463375-I1Open ↗
09/01/2026B00463370-I1Open ↗
09/01/2026B00457350-I1Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
12/31/2015340298092Open ↗
12/31/2015340297734Open ↗
12/31/2015340317696Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
06/21/2013320777370Open ↗
03/06/2012320439717Open ↗
12/28/2011320413753Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP Variance (V5) letter2
08/13/2026B01133032-I1Open ↗
08/13/2026B00782723-I1Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
08/08/2016340272412Open ↗
07/09/2015340272412Open ↗
08/04/2014320777370Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms8
▸BISEFILING JOB APPLICATION COVER SHEET4
10/22/2015340317696Open ↗
08/31/2015340298092Open ↗
08/28/2015340297734Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET4
06/21/2013320777370Open ↗
03/06/2012320439717Open ↗
12/28/2011320413753Open ↗
Showing 3 of 4 on file for this type
▸Other Documents13
▸DOB NOWManufacturer's Specifications4
08/13/2026B01198483-I1Open ↗
08/13/2026B01113393-I1Open ↗
08/13/2026B01004128-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations4
08/13/2026B01113393-P1Open ↗
08/13/2026B01198483-I1Open ↗
08/13/2026B01113393-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWWaiver Document2
08/14/2026B01133032-P1Open ↗
08/13/2026B01133032-I1Open ↗
▸BISOP-4 - Special Report1
10/09/2014320777370Open ↗
▸BISTENANT/OCCUPANT PROTECTION PLAN 2008 CODE1
10/22/2015340317696Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
10/22/2015340317696Open ↗