← Back
Elevator apt, semi-fireproof without stores
Van Dyke I (NYCHA)
766 BLAKE AVENUE · BIN 3328045
💬 Discuss this project
1958Year Built
14Stories
D1Building Class
R6Zoning
451,586 sfGross Floor Area
525Units
LL97 Covered17 Open Violations 15 unresolved · 2 paperwork only ▸FISP: UNSAFEFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 305,266 sf lot · 1.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction74p · 3 filings · 20 docs
BulkheadUnder Construction2p · 1 filing · 16 docs
Floor 14Under Construction1 filing · 3 docs
Floor 13Under Construction1 filing · 3 docs
Floor 12Under Construction1 filing · 3 docs
Floor 11Under Construction1 filing · 3 docs
Floor 10Under Construction1 filing · 3 docs
Floor 9Under Construction1p · 2 filings · 19 docs
Floor 8Under Construction1p · 2 filings · 19 docs
Floor 7Under Construction1p · 2 filings · 19 docs
Floor 6Under Construction1p · 2 filings · 19 docs
Floor 5Under Construction1 filing · 3 docs
Floor 4Under Construction1 filing · 3 docs
Floor 3Under Construction1 filing · 3 docs
Floor 2Under Construction1 filing · 3 docs
Floor 1Under Construction4p · 2 filings · 20 docs
CellarUnder Construction16p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA8709/23/2026
NEW YORK CITY HOUSING AUTHORITY1504/09/2026
NYC HOUSING AUTHORITY 9103/22/2026
KORDUN CONSTRUCTION103/22/2026
NYC HOUSING AUATHORITY2603/22/2026
NYCHA 9 99103/22/2026
NYCHA 99403/22/2026
ROBERT YAUCH (NYCHA)103/22/2026
TECHNICO CONSTRUCTION SER103/21/2026
ZORIA HOUSING203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS1203/21/2026
AK CONSULTING SERVICES403/21/2026
NERIS403/21/2026
SYNERGY STRATEGIC DESIGN ARCHITECTS103/21/2026
AE DESIGN SOLUTION203/21/2026
JOEL PHAGOO P.E. PLLC103/21/2026
JOEL PHAGOO P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & N CONSTRUCTION GROUPGeneral Contractor2009/23/2026
ROMA SCAFFOLDING INCGeneral Contractor1807/08/2026
KORDUN CONSTRUCTION CORPGeneral Contractor1707/08/2026
KORDUN CONSTRUCTION CORPPlumbing1007/08/2026
LIT MODE ELECL CONTG INCElectrical103/22/2026
MICHAEL ALAIAElectrical103/21/2026
ORTEGA-CEDENO, DAVIDElectrical103/21/2026
ABE HIMELFARBElectrical103/21/2026
ROBERT SPALLINOElectrical103/21/2026
D.D.S. MECH PBG&HTG CORPPlumbing107/08/2026
PHILLIPS, WENDELLElectrical103/21/2026
CHARNJIT SINGHElectrical103/21/2026
CHRYSSIADIS, NICOLASElectrical103/21/2026
IOVINE, MICHAELElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RI CONSULTING SERVICES IN8904307/20/2026
SOCOTEC ENGINEERING4983205/12/2026
BUREAU VERITAS NA69021505/06/2026
JOEL PHAGOO ,PE, PLLC2416103/25/2025
MP ENGINEERS & ARCHITECTS1438208/13/2024
LEO Y LEE ASSOCIATES2481102/20/2024
Building Lifecycle
All (241)Filed (38)Permit Issued (52)Signed Off (9)Facade (FISP) (16)Violation (60)Inspection (28)Objection (8)Special Inspection (30)
09/22/2026
Permit issued — Sidewalk Shed
B01105052-I1-SH
09/22/2026
Permit issued — Construction Fence
B01105050-I1-FN
09/11/2026
Signed off — Alteration
GENERAL CONSTRUCTION IN THE CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00456789-I1
09/04/2026
Signed off — Alteration
REPLACEMENT OF THE FIVE (5) EXISTING FEDERAL BOILERS WITH NEW BOILERS (VAN DYKE BLDG #12) AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01323006-I1
09/01/2026
Filed — Alteration
PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00463350-P3
08/31/2026
Signed off — Alteration
MECHANICAL WORK FOR CENTRAL BOILER PLANT AND DOMESTIC HOT WATER SYSTEM REPLACEMENT (VAN DYKE BLDG #12) AS PER THE PLANS FILED HEREWITH.
B00462732-I1
08/11/2026
Signed off — Alteration
REMOVE AND REPLACE ALL GAS PIPING THROUGHOUT BUILDING INCLUDING RISER AND METERS. EXISTING GAS SERVICE TO REMAIN.
B08025780-I1
07/27/2026
Signed off — Alteration
VAN DYKE HOUSES (BUILDING #12), THE INSTALLATION OF THREE (3) TEMPORARY MOBILE BOILER TRAILERS CONNECTED TO THE EXISTING HEATING SYSTEM TO PROVIDE HEAT DURING THE HEATING SEASON. NO CHANGE IM USE, EGRESS OR OCCUPANCY.
B00873642-I1
07/27/2026
Permit issued — Supported Scaffold
B01387858-I1-SF
07/21/2026
Permit issued — Supported Scaffold
B01387858-I1-SF
07/20/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01387858-I1
07/14/2026
Special inspection requirement — Post-installed Anchors
Md Istiaque Hasan
06/30/2026
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
06/03/2026
Signed off — Alteration
VAN DYKE I & II HOUSES-BUILDING #12, INSTALLATION OF +/- 466 LINEAR FEET OF TEMPORARY 8 FEET HIGH CHAIN LINK FENCE SUBMITTING ON BEHALF OF G.C. IN CONJUNCTION WITH DOB # B00456789, B00460597, B00462732, B00463350. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00873653-I1
05/21/2026
Permit issued — Plumbing
B00463350-I1-PL
05/21/2026
Special inspection requirement — Masonry
ALEXIS SCHLESSINGERMAN
05/21/2026
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
05/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEXIS SCHLESSINGERMAN
05/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
05/12/2026
Filed — Alteration
Facade restoration at Van Dkye #12 to comply with LL 11/98, Cycle 9 report. No change in use, egress, or occupancy.
B01133031-P1
05/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEXIS SCHLESSINGERMAN
05/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
05/12/2026
Special inspection requirement — Masonry
ALEXIS SCHLESSINGERMAN
05/12/2026
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
05/06/2026
Filed — Alteration
REMOVE AND REPLACE ALL GAS PIPING THROUGHOUT BUILDING INCLUDING RISER AND METERS. EXISTING GAS SERVICE TO REMAIN.
B08025780-P4
05/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
05/01/2026
Special inspection requirement — Post-installed Anchors
IBRAHIM MOURAD
05/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/14/2026
Permit issued — Suspended Scaffold
B01198454-I1-SC
04/14/2026
Permit issued — Supported Scaffold
B01105051-I1-SF
04/14/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
04/13/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/09/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01105052-P1
04/08/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/13/2026
Violation issued (ECB, open)
Construction
03/13/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/12/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/11/2026
Permit issued — General Construction
B00782720-I1-GC
03/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/17/2026
Permit issued — General Construction
B01133031-I1-GC
01/27/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/15/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/24/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/12/2025
Permit issued — Mechanical Systems
B00873642-I1-MS
12/04/2025
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
12/03/2025
Permit issued — Boiler Equipment
B01323006-I1-BE
12/03/2025
Permit issued — Boiler Equipment
B01323006-S1-BE
11/24/2025
Filed — Alteration
REPLACEMENT OF THE FIVE (5) EXISTING FEDERAL BOILERS WITH NEW BOILERS (VAN DYKE BLDG #12) AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01323006-I1
11/24/2025
Filed — Alteration
REPLACEMENT OF THE FIVE (5) EXISTING FEDERAL BOILERS WITH NEW BOILERS (VAN DYKE BLDG #12) AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01323006-S1
11/21/2025
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
11/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
IBRAHIM MOURAD
11/21/2025
Special inspection requirement — Heating Systems
IBRAHIM MOURAD
11/21/2025
Special inspection requirement — Heating Systems
IBRAHIM MOURAD
11/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
IBRAHIM MOURAD
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 241 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedJ & N CONSTRUCTION GROUP09/22/2026
DOB NOWConstruction FencePermit IssuedJ & N CONSTRUCTION GROUP09/22/2026
DOB NOWSupported ScaffoldPermit IssuedJ & N CONSTRUCTION GROUP07/27/2026
DOB NOWSupported ScaffoldPermit IssuedJ & N CONSTRUCTION GROUP07/21/2026
DOB NOWPlumbingPermit IssuedKORDUN CONSTRUCTION CORP05/21/2026
DOB NOWSuspended ScaffoldPermit IssuedJ&N CONSTRUCTION GRP CORP04/14/2026
DOB NOWSupported ScaffoldPermit IssuedJ & N CONSTRUCTION GROUP04/14/2026
DOB NOWGeneral ConstructionPermit IssuedJ & N CONSTRUCTION GROUP03/11/2026
DOB NOWGeneral ConstructionPermit IssuedJ & N CONSTRUCTION GROUP02/17/2026
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP12/12/2025
DOB NOWBoiler EquipmentSigned-offKORDUN CONSTRUCTION CORP12/03/2025
DOB NOWBoiler EquipmentSigned-offKORDUN CONSTRUCTION CORP12/03/2025
DOB NOWBoiler EquipmentPermit IssuedKORDUN CONSTRUCTION CORP10/07/2025
DOB NOWSidewalk ShedPermit IssuedJ & N CONSTRUCTION GROUP09/23/2025
DOB NOWConstruction FencePermit IssuedJ & N CONSTRUCTION GROUP09/23/2025
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP08/25/2025
DOB NOWPlumbingSigned-offKORDUN CONSTRUCTION CORP07/29/2025
DOB NOWStructuralSigned-offKORDUN CONSTRUCTION CORP06/12/2025
DOB NOWGeneral ConstructionSigned-offKORDUN CONSTRUCTION CORP06/12/2025
DOB NOWPlumbingPermit IssuedKORDUN CONSTRUCTION CORP05/05/2025
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP04/23/2025
DOB NOWConstruction FenceSigned-offKORDUN CONSTRUCTION CORP04/16/2025
DOB NOWSuspended ScaffoldPermit IssuedJ&N CONSTRUCTION GRP CORP03/28/2025
DOB NOWSupported ScaffoldPermit IssuedJ & N CONSTRUCTION GROUP02/04/2025
DOB NOWGeneral ConstructionPermit IssuedJ & N CONSTRUCTION GROUP01/24/2025
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP12/04/2024
DOB NOWGeneral ConstructionPermit IssuedJ & N CONSTRUCTION GROUP10/31/2024
DOB NOWSuspended ScaffoldPermit IssuedJ&N CONSTRUCTION GRP CORP10/04/2024
DOB NOWBoiler EquipmentPermit IssuedKORDUN CONSTRUCTION CORP09/24/2024
DOB NOWSidewalk ShedPermit IssuedJ & N CONSTRUCTION GROUP09/10/2024
DOB NOWConstruction FencePermit IssuedJ & N CONSTRUCTION GROUP09/09/2024
DOB NOWPlumbingSigned-offKORDUN CONSTRUCTION CORP07/17/2024
DOB NOWStructuralSigned-offKORDUN CONSTRUCTION CORP05/29/2024
DOB NOWGeneral ConstructionSigned-offKORDUN CONSTRUCTION CORP05/13/2024
DOB NOWPlumbingPermit IssuedKORDUN CONSTRUCTION CORP04/22/2024
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP04/22/2024
DOB NOWConstruction FenceSigned-offKORDUN CONSTRUCTION CORP04/16/2024
DOB NOWSuspended ScaffoldSigned-offSKYLINE RESTORATION INC02/27/2024
DOB NOWGeneral ConstructionSigned-offKORDUN CONSTRUCTION CORP02/06/2024
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC01/31/2024
+ 36 more permits on file
1 project · most recent 03/14/2024
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/14/2024Signed-offKORDUN CONSTRUCTION CORPHeating Systems, Ventilation Systems
Heating
Trane UHEC-25 25 kW · Electric Heater ×2
Ventilation
Greenheck QEID-27-40 9,000 CFM · Exhaust Fan ×4
4 projects · most recent 09/01/2026
Gas Water/Sanitary Storm
FiledStatusContractorScope
09/01/2026Permit IssuedKORDUN CONSTRUCTION CORPGas, Water/Sanitary
05/06/2026Signed-offD.D.S. MECH PBG&HTG CORPGas
08/13/2024——Storm
06/20/2023Signed-offKORDUN CONSTRUCTION CORPGas
14 projects · most recent 08/14/2025
General Wiring Boiler Controls
FiledStatusContractorScope
08/14/2025Permit IssuedLIT MODE ELECL CONTG INC—
09/02/2024Permit IssuedAUJLA ELECTRIC CORP—
05/23/2024CompleteA.T.J. ELECTRICAL CO.INC.—
04/26/2024Permit IssuedA.T.J. ELECTRICAL CO.INC.General Wiring
08/10/2023Permit IssuedMECO ELECTRIC CO. INC.—
06/23/2023Permit IssuedMECO ELECTRIC CO. INC.General Wiring
11/19/2022Permit IssuedN.Y.C. HOUSING AUTHORITY—
09/16/2021Permit IssuedN.Y.C. HOUSING AUTHORITYBoiler Controls
04/25/2021CompleteCITY GRID ELECTRIC CORPGeneral Wiring
11/10/2020Permit IssuedN.Y.C. HOUSING AUTHORITYBoiler Controls
01/27/2020Permit IssuedRAIDEN ELECTRIC LLC—
11/15/2019Permit IssuedN.Y.C. HOUSING AUTHORITYBoiler Controls
08/16/2018CompleteJEMCO ELECT. CONTRS INCGeneral Wiring
07/25/2018CompleteZENA ELECTRIC INC—
1 project · most recent 05/15/2024
Steel Concrete
FiledStatusContractorScope
05/15/2024Signed-offKORDUN CONSTRUCTION CORPSteel, Concrete
5 projects · most recent 07/20/2026
Scaffold Fence Sidewalk Shed
FiledStatusContractorScope
07/20/2026Permit IssuedJ & N CONSTRUCTION GROUPScaffold
04/09/2026Permit IssuedJ & N CONSTRUCTION GROUPSidewalk Shed
09/03/2024Permit IssuedJ & N CONSTRUCTION GROUPScaffold
09/03/2024Permit IssuedJ & N CONSTRUCTION GROUPFence
06/01/2023Signed-offKORDUN CONSTRUCTION CORPFence
2 projects · most recent 09/28/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
09/28/2025Permit Issued—Suspended Scaffold (SC)
03/25/2025Permit IssuedJ&N CONSTRUCTION GRP CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 28
DateTypeResultReport
06/30/2026Pass-Final PL - More than 10 Requested FloorsPassView ↗
04/14/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/13/2026Pass-Final Boiler Equipment InspectionPassView ↗
04/08/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/13/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/13/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/12/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/27/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/15/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/15/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/24/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/24/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/04/2025Fail-Final Boiler Equipment InspectionFailView ↗
11/21/2025No Access-Final Boiler Equipment InspectionNo AccessView ↗
08/11/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/11/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/01/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
07/28/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
05/30/2025Fail-Final PL - Up to 9 Requested FloorsFailView ↗
04/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/19/2025Pass-Final PL - UndergroundPassView ↗
12/04/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/01/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
Latest 25 of 28.
▾Special Inspection Requirements (DOB NOW) — 76
DateRequirementInspectorRole
07/14/2026Post-installed AnchorsMd Istiaque Hasanspecial
05/21/2026Structural Stability – Alterations of existing buildingsALEXIS SCHLESSINGERMANspecial
05/21/2026FinalALEXIS SCHLESSINGERMANprogress
05/21/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
05/21/2026MasonryALEXIS SCHLESSINGERMANspecial
05/12/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
05/12/2026FinalALEXIS SCHLESSINGERMANprogress
05/12/2026Structural Stability – Alterations of existing buildingsALEXIS SCHLESSINGERMANspecial
05/12/2026MasonryALEXIS SCHLESSINGERMANspecial
05/01/2026Tenant Protection Plan Compliance—special
05/01/2026Post-installed AnchorsIBRAHIM MOURADspecial
05/01/2026Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
11/21/2025Heating SystemsIBRAHIM MOURADspecial
11/21/2025Tenant Protection Plan ComplianceIBRAHIM MOURADspecial
11/21/2025Heating SystemsIBRAHIM MOURADspecial
11/21/2025Tenant Protection Plan ComplianceIBRAHIM MOURADspecial
10/03/2025Post-installed AnchorsMD ISLAMspecial
07/18/2025Post-installed AnchorsIBRAHIM MOURADspecial
07/18/2025Tenant Protection Plan Compliance—special
07/18/2025Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
04/30/2025Post-installed Anchors—special
04/30/2025Fire-Resistant Penetrations and Joints—special
04/30/2025Tenant Protection Plan Compliance—special
03/05/2025Fire-Resistant Penetrations and Joints—special
03/05/2025Post-installed Anchors—special
Latest 25 of 76.
▾Documents — 304 on file (BIS + DOB NOW)
▸Plans & Drawings38
▸DOB NOWPlans/Sketch25
08/27/2026B00782720-P1Request digital key ↗
08/27/2026B00782720-S1Request digital key ↗
08/27/2026B00873653-I1Request digital key ↗
Showing 3 of 25 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/25/2026B00463350-P3Request digital key ↗
08/25/2026B00463350-P1Request digital key ↗
08/25/2026B00463350-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural3
08/25/2026B00460597-P1Request digital key ↗
08/25/2026B00460597-I1Request digital key ↗
08/15/2026B00460597-P2Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
08/25/2026B00456789-I1Request digital key ↗
08/14/2026B00456789-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/25/2026B00462732-I1Request digital key ↗
08/15/2026B00462732-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00307725-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00307754-I1Request digital key ↗
▸Applications & Permits29
▸BISWORK PERMIT APPLICATION16
10/22/2015340317678Open ↗
08/31/2015340297789Open ↗
08/28/2015340297681Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION13
10/22/2015340317678Open ↗
08/31/2015340297789Open ↗
08/28/2015340297681Open ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications96
▸DOB NOWDPL-1: Design Professional Seal & Signature34
09/02/2026B00307725-I1Open ↗
08/27/2026B00782720-S1Open ↗
08/27/2026B00782720-P1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/23/2026B01097247-I1Open ↗
09/23/2026B01323006-S1Open ↗
09/23/2026B01323006-S1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026B00460597-I1Open ↗
09/01/2026B01133031-I1Open ↗
08/28/2026B00456789-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
01/04/2013320695850Open ↗
04/24/2012320462735Open ↗
03/29/2012320440171Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
01/04/2013320695850Open ↗
04/24/2012320462735Open ↗
03/29/2012320440171Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
11/14/2014320331397Open ↗
01/04/2013320695850Open ↗
03/29/2012320440171Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
10/22/2015340317678Open ↗
08/31/2015340297789Open ↗
08/28/2015340297681Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
10/22/2015340317678Open ↗
08/31/2015340297789Open ↗
08/28/2015340297681Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
10/22/2015340317678Open ↗
08/31/2015340297789Open ↗
08/28/2015340297681Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWTenant Protection Plan2
08/13/2026B00307754-I1Open ↗
08/13/2026B00307725-I1Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026B00460597-I1Open ↗
08/25/2026B00460597-P2Open ↗
08/17/2026B08025780-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
09/01/2026B00462732-I1Open ↗
08/25/2026B00456789-I1Open ↗
08/19/2026B01323006-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
08/28/2015340297681Open ↗
01/04/2013320695850Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
10/13/2009320078143Open ↗
09/04/2009320068207Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
07/09/2015340272403Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/06/2012320440643Open ↗
▸Energy Compliance4
▸BISAS-BUILT ENERGY ANALYSIS1
08/13/2013320440643Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/31/2015340297789Open ↗
▸BISTECHNICAL REPORT: ENERGY1
03/06/2012320440643Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/25/2026B00456789-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
10/22/2015340317678Open ↗
08/31/2015340297789Open ↗
08/28/2015340297681Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs85
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter38
09/02/2026B00307725-I1Open ↗
08/27/2026B00782720-S1Open ↗
08/27/2026B00782720-P1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)21
08/25/2026B00463350-P3Open ↗
08/17/2026B08025780-P4Open ↗
08/17/2026B01133031-P1Open ↗
Showing 3 of 21 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
01/04/2013320695850Open ↗
04/24/2012320462735Open ↗
03/29/2012320440171Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)7
08/25/2026B00456789-I1Open ↗
08/25/2026B00462732-I1Open ↗
08/25/2026B00463350-I1Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
08/19/2015340272403Open ↗
02/25/2014320331397Open ↗
02/25/2014320331397Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP Variance (V5) letter4
08/25/2026B00462732-I1Open ↗
08/25/2026B00463350-I1Open ↗
08/14/2026B00782720-I1Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST2
11/14/2014320331397Open ↗
08/13/2013320440643Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
07/09/2015340272403Open ↗
08/13/2013320440643Open ↗
03/06/2012320440643Open ↗
▸Filing & Intake Forms14
▸BISEFILING COVER SHEET7
01/03/2013320695850Open ↗
04/24/2012320462735Open ↗
03/29/2012320440171Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
10/22/2015340317678Open ↗
08/31/2015340297789Open ↗
08/28/2015340297681Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION3
02/21/2013320695850Open ↗
02/19/2013320695850Open ↗
04/24/2012320440171Open ↗
▸Other Documents14
▸DOB NOWManufacturer's Specifications4
08/20/2026B01113390-I1Open ↗
08/13/2026B01004111-I1Open ↗
08/13/2026B01113390-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations4
08/20/2026B01113390-I1Open ↗
08/13/2026B01198454-I1Open ↗
08/13/2026B01004111-I1Open ↗
Showing 3 of 4 on file for this type
▸BISUnknown2
04/21/2010320068207Open ↗
04/21/2010320078143Open ↗
▸DOB NOWWaiver Document2
08/17/2026B01133031-P1Open ↗
08/13/2026B01133031-I1Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
10/22/2015340317678Open ↗
▸BISTENANT/OCCUPANT PROTECTION PLAN 2008 CODE1
10/22/2015340317678Open ↗