RoofUnder Construction4p · 3 filings · 20 docs
ArchitecturePlumbingStructural
CD5 RENEWAL
On file for this project
6 documents · 1 drawing sheet
FACADE RESTORATION AS PER PLANS
On file for this project
15 documents · 1 drawing sheet
Interior renovation only. No change to use, egress or occupancy.
On file for this project
27 documents · 2 drawing sheets
Floor 1210p · 4 filings · 20 docs
ArchitectureDMMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Plumbing application filed as per plan provided
On file for this project
22 documents
Apt. 12G Capping of gas line and removing the sink, dishwasher, and gas range. No change in use, egress and occupancy
On file for this project
10 documents
Combining apartment 12G and 12EF into one apartment 12GEF: the work includes creating an opening between the two apartments, removal of existing kitchen, and minor layout changes in apartment 12G.
On file for this project
7 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 11Under Construction65p · 2 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Plumbing modifications as per plans. New fixtures and fittings.
On file for this project
42 documents · 3 drawing sheets
Select interior renovation of apartment unit 11B. No Change in Use Egress or Occupancy
On file for this project
16 documents · 4 drawing sheets
Floor 108p · 1 filing · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
INSTALLATION OF NEW GAS LINES ON THE 10TH FLOOR FOR I, J, & K APARTMENTS. NO CHANGE IN EGRESS OR OCCUPANCY.
On file for this project
37 documents · 1 drawing sheet
Floor 9
Floor 8
Floor 7
Floor 69p · 2 filings · 18 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Proposed modifications to apartment 6D for the bathroom in Replacing of three bathroom fixtures , Washing and Dryer and one gas Stove in kitchen , No change in Use , Egress or occupancy.
On file for this project
14 documents
INTERIOR RENOVATION TO EXISTING APARTMENT AS SHOWN ON ATTACHED DRAWINGS. NO CHANGE TO EXISTING USE, EGRESS OR OCCUPANCY IS PROPOSED WITH THIS APPLICATION.
On file for this project
4 documents
Floor 5Under Construction8p · 1 filing · 8 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
REPLACE EXISTING BATHROOM FIXTURES, REMOVE GAS STOVE AND METER, REPLACE AND RELOCATE KITCHEN SINK AND DISHWASHER, RELOCATE EXISTING WASHER. PROPOSED WORK INVOLVES NO CHANGE IN BUILDING BULK, USE, OCCUPANCY, OR EGRESS.
On file for this project
8 documents
Floor 41p · 1 filing · 5 docs
Architecture
Issued Permit Scope
General Construction
Respectfully request to file for combination of apartments 4EF. New non load bearing partitions and repairs to flooring. Remove electric stove. Existing plumbing work to remain with no change. No change in use, egress, or occupancy.
On file for this project
5 documents
Floor 33p · 1 filing · 20 docs
DM
Interior renovation only. No change to use, egress or occupancy.
On file for this project
27 documents · 3 drawing sheets
Floor 215p · 1 filing · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Interior renovation only. No change to use, egress or occupancy.
On file for this project
27 documents
Floor 1
Cellar5p · 1 filing · 20 docs
ArchitectureDM
Interior renovation only. No change to use, egress or occupancy.
On file for this project
27 documents · 5 drawing sheets
Basement1p · 1 filing · 8 docs
Plumbing
CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT DOMESTIC GAS-FIRED HOT WATER BOILER AND INSTALL TWO (2) NEW HOT WATER STORAGE TANKS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents · 1 drawing sheet
Sub-Basement6p · 2 filings · 13 docs
MechanicalPlumbing
Issued Permit Scope
Boiler Equipment · Plumbing
CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT DOMESTIC GAS-FIRED HOT WATER BOILER AND INSTALL TWO (2) NEW HOT WATER STORAGE TANKS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents
REPLACE DOMESTIC GAS-FIRED HOT WATER HEATER AND INSTALL TWO (2) NEW HOT WATER STORAGE TANKS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents
Site & exterior15p · 3 filings · 19 docs
ArchitectureEquipmentGeneralStructural
Issued Permit Scope
General Construction · Sidewalk Shed
FACADE RESTORATION AS PER PLANS
On file for this project
15 documents · 12 drawing sheets
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC
On file for this project
2 documents · 3 drawing sheets
INSTALLATION OF SIDEWALK SHED
On file for this project
2 documents · 3 drawing sheets
Filed — no permit issued6p · 1 filing · 8 docs
ArchitectureGeneralPlumbing
NEW AND RELOCATED PLUMBING FIXTURES AND PIPING AS PER DRAWINGS. NEW GAS PIPING TO BE INSTALLED DOWNSTREAM FROM THE EXISTING GAS METER IN THE APARTMENT,
On file for this project
8 documents · 6 drawing sheets