| Owner | Filings | Most Recent |
|---|---|---|
| 80 Pine | 142 | 03/21/2026 |
| 345 Park A | 25 | 03/21/2026 |
| Rudin Management Aaf 80 Pine | 23 | 03/21/2026 |
| 110 Wall Street | 17 | 07/08/2026 |
| 345 Park Avenue L P Rudin Management | 16 | 03/21/2026 |
| 80 Pine Inc Rudin Management | 6 | 03/21/2026 |
| American Internation Realty | 5 | 03/21/2026 |
| Time Equities | 4 | 03/21/2026 |
| Best | 2 | 03/21/2026 |
| Pump Holdings | 2 | 03/21/2026 |
| Pine RE | 1 | 03/22/2026 |
| Whitestone | 1 | 03/22/2026 |
| Jasa | 1 | 03/21/2026 |
| Rudin Mngmnt Co Inc As Agent | 1 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 09/06/2024 | $160.0M | — | 80 PINE LLC → PINE RE LLC | $145/sf building |
| Representative | Filings | Most Recent |
|---|---|---|
| DVA Advisors | 49 | 03/21/2026 |
| William Vitacco Associates | 20 | 03/21/2026 |
| Green Light Expediting | 68 | 03/21/2026 |
| JM Zoning | 32 | 03/21/2026 |
| AE Design Solution | 6 | 03/21/2026 |
| United Safety Consultants | 1 | 03/21/2026 |
| Codegreen | 8 | 03/21/2026 |
| Louis Striar | 12 | 03/21/2026 |
| William Vittaco Associates | 11 | 03/21/2026 |
| J.A.M. Associates | 12 | 03/21/2026 |
| A1 Expediting Service | 4 | 03/21/2026 |
| Bohler Engineering | 2 | 03/21/2026 |
| Green Studio | 6 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| JRM Construction Management | General Contractor | 46 | 07/08/2026 |
| James E Fitzgerald | General Contractor | 16 | 07/08/2026 |
| Target Construction | General Contractor | 14 | 07/08/2026 |
| Safway Atlantic | Scaffold | 8 | 07/08/2026 |
| Retail Project Mangement | General Contractor | 7 | 07/08/2026 |
| Cogen Electrical Services | Electrical | 7 | 03/22/2026 |
| Tower Fire Protection | Fire Protection | 7 | 07/08/2026 |
| A Plus Plumbing | Plumbing | 6 | 07/08/2026 |
| Core Scaffold Systems | Scaffold | 6 | 09/01/2026 |
| A + Sprinkler | Fire Protection | 6 | 07/08/2026 |
| Clune Construction Co | General Contractor | 6 | 07/08/2026 |
| Hunter Roberts Construction | General Contractor | 4 | 07/08/2026 |
| Benchmark Builders | General Contractor | 4 | 04/09/2026 |
| Safety Fire Sprinkler | Fire Protection | 4 | 07/17/2026 |
| A & M Warshaw Plumbing & Heating | Plumbing | 4 | 07/08/2026 |
| On-Trac Construction Associates | General Contractor | 4 | 04/09/2026 |
| Sirina Fire Protection | Fire Protection | 3 | 07/08/2026 |
| Team Electric | Electrical | 3 | 03/22/2026 |
| Tristate Plumbing Services | Plumbing | 3 | 07/08/2026 |
| Trico Electrl Construction | Electrical | 3 | 03/21/2026 |
| Spring Scaffolding | Scaffold | 3 | 07/08/2026 |
| Target Construction | Scaffold | 3 | 07/08/2026 |
| Par Plumbing Co | Plumbing | 3 | 07/08/2026 |
| Corporate Electric Group | Electrical | 2 | 03/21/2026 |
| Thompson Michael | Electrical | 2 | 03/21/2026 |
| Atlantic Construction Services | General Contractor | 2 | 04/09/2026 |
| Cooper Works | General Contractor | 2 | 10/14/2026 |
| Marlin Mechanical | specialty_contractor | 2 | 03/21/2026 |
| Star Companiess | General Contractor | 2 | 07/08/2026 |
| Theodore Williams Construction | General Contractor | 2 | 03/21/2026 |
| GWT Enterprises | Scaffold | 2 | 04/09/2026 |
| Cad Signs NYC | Sign hanger | 2 | 07/08/2026 |
| Red Hook Sign and Electric | Sign hanger | 2 | 07/08/2026 |
| Tru-Art Sign Co | Sign hanger | 2 | 07/08/2026 |
| A&A Plumbing | Plumbing | 2 | 07/08/2026 |
| Allstate Sprinkler | Fire Protection | 2 | 07/08/2026 |
| Capitol Fire Sprinkler Co | Fire Protection | 2 | 07/08/2026 |
| Go Pro Fire Protection | Fire Protection | 2 | 07/08/2026 |
| Mpi Plumbing | Plumbing | 2 | 07/08/2026 |
| RRP Plumbing | Fire Protection | 2 | 07/08/2026 |
| RRP Plumbing | Plumbing | 2 | 07/08/2026 |
| Par Plumbing Co., Inc.o | Fire Protection | 1 | 03/21/2026 |
| AL Electrical Group | Electrical | 1 | 03/21/2026 |
| Soh Par Sprinkler | Fire Protection | 1 | 07/08/2026 |
| Enobrac Plumbing | Plumbing | 1 | 07/08/2026 |
| Enobrac Plumbing | Fire Protection | 1 | 07/08/2026 |
| Standard Fire Protection | Fire Protection | 1 | 07/08/2026 |
| Mac Felder | Plumbing | 1 | 07/08/2026 |
| Metro Fire Protection | Fire Protection | 1 | 07/08/2026 |
| Mmi Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Corporate Electrical Contracting | Electrical | 1 | 03/22/2026 |
| NYC Fire Sprinkler | Fire Protection | 1 | 07/08/2026 |
| Ferrandino & Son | General Contractor | 1 | 04/09/2026 |
| Allstate Electrical Cont | Electrical | 1 | 03/22/2026 |
| Neptune Signs & Awnings | Sign hanger | 1 | 08/25/2026 |
| Bigman Brothers | Electrical | 1 | 03/21/2026 |
| Tristate Plumbing Services | Fire Protection | 1 | 07/08/2026 |
| Hig Electric Assc NYC | Electrical | 1 | 03/22/2026 |
| Accurate Mechanical | Plumbing | 1 | 10/10/2026 |
| Accurate Mechanical | Fire Protection | 1 | 10/10/2026 |
| R.M.F. Electric | Electrical | 1 | 03/21/2026 |
| Desimone Builders | General Contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Socotec Engineering | 4983 | 5 | 09/24/2026 |
| Big Apple Group NY A Rma | 9168 | 16 | 07/10/2026 |
| You Gao | 9407 | 2 | 07/10/2026 |
| Project Tactical Solution | 5859 | 1 | 05/28/2026 |
| Big Apple Group NY | 1258 | 2 | 05/08/2025 |
| Crosscheck Inspection Services | 544 | 110 | 10/03/2023 |
| Eti Consultants | 7694 | 2 | 02/01/2022 |
| Loring Consulting Engineering | 3311 | 5 | 09/01/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Mechanical Systems | Permit Issued | Alchemy Development | 10/20/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | Structural Preservation System | 10/19/2026 |
| DOB NOW | General Construction | Permit Issued | Cooper Works | 10/13/2026 |
| DOB NOW | Plumbing | Permit Issued | Accurate Mechanical | 10/09/2026 |
| DOB NOW | Sprinklers | Permit Issued | Accurate Mechanical | 10/09/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Cooper Works | 10/09/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Core Scaffold Systems | 08/31/2026 |
| DOB NOW | Sign | Permit Issued | Neptune Signs & Awnings | 08/24/2026 |
| DOB NOW | Sprinklers | Permit Issued | Safety Fire Sprinkler | 07/16/2026 |
| DOB NOW | General Construction | Permit Issued | Target Construction | 06/24/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Core Scaffold Systems | 06/08/2026 |
| DOB NOW | General Construction | Permit Issued | Desimone Builders | 06/01/2026 |
| DOB NOW | Construction Fence | Permit Issued | Target Construction | 05/26/2026 |
| DOB NOW | Structural | Permit Issued | Target Construction | 05/15/2026 |
| DOB NOW | Sprinklers | Permit Issued | Safety Fire Sprinkler | 05/05/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Target Construction | 04/29/2026 |
| DOB NOW | General Construction | Permit Issued | Target Construction | 04/01/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Core Scaffold Systems | 03/10/2026 |
| DOB NOW | General Construction | Permit Issued | Target Construction | 02/11/2026 |
| DOB NOW | Plumbing | Signed-off | YG Services | 02/09/2026 |
| DOB NOW | General Construction | Permit Issued | Target Construction | 06/26/2025 |
| DOB NOW | Structural | Permit Issued | Target Construction | 05/30/2025 |
| DOB NOW | Sprinklers | Permit Issued | Safety Fire Sprinkler | 05/12/2025 |
| DOB NOW | General Construction | Permit Issued | Target Construction | 05/05/2025 |
| DOB NOW | Construction Fence | Permit Issued | Target Construction | 04/09/2025 |
| DOB NOW | Plumbing | Permit Issued | YG Services | 03/18/2025 |
| DOB NOW | General Construction | Permit Issued | Target Construction | 03/14/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | Core Scaffold Systems | 03/11/2025 |
| DOB NOW | Sprinklers | Permit Issued | Safety Fire Sprinkler | 03/06/2025 |
| DOB NOW | Structural | Permit Issued | Target Construction | 03/05/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | Target Construction | 03/04/2025 |
| DOB NOW | General Construction | Permit Issued | Target Construction | 02/28/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | Target Construction | 02/18/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | GWT Enterprises | 01/21/2025 |
| DOB NOW | Construction Fence | Permit Issued | GWT Enterprises | 01/21/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Star Companiess | 11/18/2024 |
| DOB NOW | General Construction | Signed-off | Star Companiess | 11/18/2024 |
| DOB NOW | Plumbing | Signed-off | Michael Itskovich | 11/15/2024 |
| DOB NOW | General Construction | Permit Issued | Atlantic Construction Services | 06/10/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | Atlantic Construction Services | 06/07/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 09/30/2026 | Permit Issued | Alchemy Development | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Thermolec MSCO-10SL-1102-000 3,600 CFM · Electric Heater ×1 MSCO-10SL-1102-0000 1,575 CFM · Electric Heater ×1 Ventilation |
| 07/10/2026 | Permit Issued | Target Construction | Heating and Air Conditioning Systems | Heat / Cool Mitsubishi Electric PQRY-P120YLMU-A2 135,000 BTU · Vrf Outdoor ×1 PQRY-P144YLMU-A2 160,000 BTU · Vrf Outdoor ×1 PQRY-P96YLMU-A2 108,000 BTU · Vrf Outdoor ×1 |
| 01/16/2025 | Permit Issued | Target Construction | Air Conditioning Systems | Cooling Trane GEVK0604 50,250 BTU · Wshp ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/30/2026 | Permit Issued | Accurate Mechanical | Sprinkler System |
| 07/10/2026 | Permit Issued | Safety Fire Sprinkler | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/30/2026 | Permit Issued | QPR Mechanical | Water/Sanitary |
| 07/10/2026 | Permit Issued | Mpi Plumbing | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/13/2026 | Permit Issued | Green Apple Electrical Services | General Wiring |
| 09/23/2026 | Permit Issued | TFK Electric | General Wiring |
| 05/04/2026 | Complete | Green Apple Electrical Services | — |
| 05/01/2026 | Complete | Green Apple Electrical Services | — |
| 04/24/2026 | Permit Issued | Nee Electrical | — |
| 11/26/2025 | Permit Issued | TFK Electric | General Wiring |
| 11/24/2025 | Permit Issued | TFK Electric | General Wiring |
| 11/24/2025 | Permit Issued | Man Power Electric | — |
| 04/17/2025 | Permit Issued | Solas Electrical | — |
| 03/06/2025 | Permit Issued | Man Power Electric | — |
| 01/21/2025 | Permit Issued | Richard Neu | — |
| 06/07/2024 | Complete | Bigman Brothers | General Wiring |
| 02/27/2024 | Complete | Cogen Electrical Services | — |
| 02/01/2024 | Complete | Cogen Electrical Services | General Wiring |
| 12/20/2023 | Complete | Cogen Electrical Services | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/10/2026 | Permit Issued | Safety Fire Sprinkler | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/14/2025 | Permit Issued | Core Scaffold Systems | Sidewalk Shed |
| 01/21/2025 | Permit Issued | GWT Enterprises | Fence, Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/18/2026 | Permit Issued | Structural Preservation System | — |
| Date | Type | Result | Report |
|---|---|---|---|
| 05/06/2026 | Pass CND-Occupancy Inspection | Pass | View ↗ |
| 02/10/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/10/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/03/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/29/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 01/06/2026 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 12/04/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 12/01/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/22/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/06/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 11/20/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/23/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 10/17/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/27/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/26/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/02/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/01/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/27/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/25/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/21/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/21/2023 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 04/14/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/14/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/16/2023 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 02/13/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 10/02/2026 | Energy Code Compliance Inspections | ALEXIS SCHLESSINGERMAN | progress |
| 10/02/2026 | Lighting controls | ALEXIS SCHLESSINGERMAN | energy_progress |
| 10/02/2026 | Interior lighting power | ALEXIS SCHLESSINGERMAN | energy_progress |
| 10/02/2026 | Tenant Protection Plan Compliance | ALEXIS SCHLESSINGERMAN | special |
| 10/02/2026 | Final | ALEXIS SCHLESSINGERMAN | progress |
| 09/24/2026 | Post-installed Anchors | ALEXIS SCHLESSINGERMAN | special |
| 09/24/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 09/22/2026 | Interior lighting power | — | energy_progress |
| 09/22/2026 | Tenant Protection Plan Compliance | — | special |
| 09/22/2026 | Lighting controls | — | energy_progress |
| 09/22/2026 | Energy Code Compliance Inspections | — | progress |
| 09/22/2026 | Final | — | progress |
| 09/21/2026 | Tenant Protection Plan Compliance | ALEXIS SCHLESSINGERMAN | special |
| 09/21/2026 | HVAC-R and service water heating system controls | ALEXIS SCHLESSINGERMAN | energy_progress |
| 09/21/2026 | Ventilation and air distribution system | ALEXIS SCHLESSINGERMAN | energy_progress |
| 09/21/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 09/21/2026 | Tenant Protection Plan Compliance | ALEXIS SCHLESSINGERMAN | special |
| 09/21/2026 | Energy Code Compliance Inspections | ALEXIS SCHLESSINGERMAN | progress |
| 09/21/2026 | Tenant Protection Plan Compliance | ALEXIS SCHLESSINGERMAN | special |
| 09/21/2026 | Permanent certificate | ALEXIS SCHLESSINGERMAN | energy_progress |
| 09/18/2026 | HVAC-R and service water piping design and insulation | ALEXIS SCHLESSINGERMAN | energy_progress |
| 09/18/2026 | Duct leakage testing, insulation and design | ALEXIS SCHLESSINGERMAN | energy_progress |
| 09/18/2026 | HVAC-R and service water heating equipment | ALEXIS SCHLESSINGERMAN | energy_progress |
| 09/18/2026 | Maintenance information | ALEXIS SCHLESSINGERMAN | energy_progress |
| 09/02/2026 | Mechanical Systems | ALEXIS SCHLESSINGERMAN | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Avocaderia | Restaurant / Food Service | Floor 1 | Project M01454138 |
| You Rock Gao | Office | — | Project M01428411 |
| New York Property Insurance Underwriting Association (NYPIUA) | Office | Floor 31 | Project M01398143 Project M00690703 Project M00690693 Project M00690708 Project M00690716 |
| Vibrant | Office | Floors 18, 19 | Project M00822929 Project M00823018 Project M00826137 Project M00822918 Project M00822937 |
| TB Alliance | Office | Floor 20 | Project M08046978 Project M08046982 Project M08047078 Project M08047090 Project M08047081 Project M08047086 Project M08047088 |
| Elefterakis, Elefterakis & Panek | Office | Floors 36, 38, 39 | Project M08009174 Project M08009168 Project M00466343 Project M00481512 Project M00481553 Project M00484836 |
| Amazon Go | Retail | Floors 1–5 | Project M00763126 Project M00763125 |
| CureMD & Infopro | Office | Floors 21, 22 | Project M00736843 |
| AccuWeather | Office | Floor 26 | Project M00706592 Project M00706640 Project M00706621 |
| Cure MD | Office | Floor 21 | Project M00646721 Project M00646724 Project M00646623 |
| January Digital | Office | Floor 30 | Project M00667907 Project M00667849 Project M00277471 |
| Pranary Digital | Office | Floor 30 | Project M00669044 |
| Lactalis American Group | Office | Floor 35 | Project M00499293 Project M00499295 Project M00499290 Project M00499287 |
| Starbucks | Restaurant / Food Service | Floor 1 | Project M00418181 Project M00269756 |
| Gair & Gair | Office | Floor 34 | Project M00372708 Project M00372719 |
| Dig Inn | Restaurant / Food Service | Floors 1–5 | Project M00002004 Project M00002012 |