Predominantly retail with other uses
80 VERNON AVENUE
BROOKLYN · Bedford-Stuyvesant (West) · BIN 3048815
💬 Discuss this project
1931Year Built
2Stories
K4Building Class
R6AZoning
4,320 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: 80 VERNON GARDENS LLC · 3,000 sf lot · 1.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction174p · 4 filings · 20 docs
Floor 7Under Construction36p · 2 filings · 20 docs
Floor 6Under Construction172p · 3 filings · 20 docs
Floor 5Under Construction173p · 3 filings · 20 docs
Floor 4Under Construction173p · 3 filings · 20 docs
Floor 3Under Construction172p · 3 filings · 20 docs
Floor 2Under Construction175p · 4 filings · 20 docs
Floor 1Under Construction176p · 5 filings · 20 docs
Mezzanine1p · 1 filing · 17 docs
CellarUnder Construction161p · 2 filings · 20 docs
Site & exteriorUnder Construction54p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WATERFRONT PROPERTY MANAGEMENT3708/29/2026
OWNERS REP806/27/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/09/2025$4.1M—80 VERNON HOLDING CORP. → 80 VERNON GARDENS LLC$955/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION603/21/2026
XPDITE GROUP LLC (104)1203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
XPDITE GROUP LLC 105703/21/2026
XPDITE GROUP LLC 104403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WATERFRONT PROPERTY MGMTGeneral Contractor1307/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor306/27/2026
NESS MECHANICAL P & H INCPlumbing207/08/2026
QUALITY PIPING, INCFire Protection106/27/2026
STAR COMPANIESS LLCGeneral Contractor104/09/2026
PLUMBING NYC INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161506/18/2026
SOUTH BAY ENGINEERING PLL6682205/16/2025
Building Lifecycle
All (173)Filed (25)Permit Issued (19)Signed Off (11)Violation (15)Inspection (19)Objection (54)Special Inspection (30)
09/10/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/27/2026
Signed off — New Building
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO NB APPLICATION B01179777-I1
B01179777-S5
08/19/2026
Signed off — New Building
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO NB APPLICATION B01179777-I1
B01179777-S4
08/19/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/12/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/10/2026
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
08/10/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/05/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/03/2026
Signed off — Alteration
CURB CUT APPLICATION FILED IN CONJUNCTION TO NB APPLICATION # B01179777-I1
B01231399-I1
07/31/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/22/2026
Objection raised — Other
07/22/2026
Objection resolved — Resolved
07/22/2026
Objection raised — Other
07/21/2026
Objection resolved — Addressed
07/21/2026
Objection resolved — Addressed
07/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
07/21/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
07/21/2026
Special inspection requirement — Heating Systems
SHAHRIAR QUAYYUM
07/20/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
07/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
07/20/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
07/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
07/20/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SHAHRIAR QUAYYUM
07/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
07/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
07/15/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/13/2026
Objection resolved — Addressed
07/09/2026
Objection resolved — Addressed
07/08/2026
Signed off — New Building
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO NB APPLICATION B01179777-I1
B01179777-S2
07/08/2026
Signed off — New Building
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO NB APPLICATION B01179777-I1
B01179777-S1
07/08/2026
Objection raised — Admin
07/08/2026
Objection raised — Other
07/08/2026
Objection raised — Other
07/08/2026
Objection raised — Other
07/07/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/07/2026
Objection resolved — Addressed
07/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/02/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/02/2026
Objection resolved — Resolved
07/01/2026
Objection raised — Energy
06/27/2026
Objection raised — Other
06/26/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/26/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/26/2026
Special inspection requirement — Fenestration air leakage
SHAHRIAR QUAYYUM
06/26/2026
Special inspection requirement — Air barrier — testing
SHAHRIAR QUAYYUM
06/26/2026
Special inspection requirement — Fenestration areas
SHAHRIAR QUAYYUM
06/26/2026
Special inspection requirement — Lighting controls
SHAHRIAR QUAYYUM
06/26/2026
Special inspection requirement — Metering
SHAHRIAR QUAYYUM
06/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
SHAHRIAR QUAYYUM
06/26/2026
Special inspection requirement — Protection of exposed foundation insulation
SHAHRIAR QUAYYUM
06/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
06/26/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SHAHRIAR QUAYYUM
06/26/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
06/26/2026
Special inspection requirement — Exterior lighting power
SHAHRIAR QUAYYUM
06/26/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHRIAR QUAYYUM
06/26/2026
Special inspection requirement — Lighting in dwelling units
SHAHRIAR QUAYYUM
06/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
06/26/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
Latest 60 of 173 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPLUMBING NYC INC05/20/2026
DOB NOWCurb CutSigned-offWATERFRONT PROPERTY MGMT05/15/2026
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC.05/12/2026
DOB NOWGeneral ConstructionPermit IssuedWATERFRONT PROPERTY MGMT05/01/2026
DOB NOWConstruction FenceSigned-offWATERFRONT PROPERTY MGMT04/10/2026
DOB NOWMechanical SystemsSigned-offWATERFRONT PROPERTY MGMT03/06/2026
DOB NOWBoiler EquipmentPermit IssuedNESS MECHANICAL P & H INC02/18/2026
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC02/13/2026
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC02/13/2026
DOB NOWGeneral ConstructionPermit IssuedWATERFRONT PROPERTY MGMT12/24/2025
DOB NOWFoundationSigned-offWATERFRONT PROPERTY MGMT11/28/2025
DOB NOWGeneral ConstructionPermit IssuedWATERFRONT PROPERTY MGMT11/21/2025
DOB NOWPlumbingPermit IssuedNESS MECHANICAL P & H INC11/21/2025
DOB NOWFoundationSigned-offWATERFRONT PROPERTY MGMT11/06/2025
DOB NOWSupport of ExcavationSigned-offWATERFRONT PROPERTY MGMT11/06/2025
DOB NOWStructuralSigned-offWATERFRONT PROPERTY MGMT11/06/2025
DOB NOWSprinklersSigned-offQUALITY PIPING, INC11/05/2025
DOB NOWFull DemolitionSigned-offSTAR COMPANIESS LLC09/15/2025
DOB NOWConstruction FenceSigned-offWATERFRONT PROPERTY MGMT04/11/2025
1 project · most recent 06/18/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/18/2026Permit IssuedWATERFRONT PROPERTY MGMTHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM60NAM2 66,000 BTU · Heat Pump Outdoor ×6
MXZ-SM120TAM-U1 135,000 BTU · Heat Pump Outdoor ×5
MXZ-SM72NAM2 80,000 BTU · Heat Pump Outdoor ×2
MUY-GL09NA 9,000 BTU · Heat Pump Outdoor ×1
PUHY-P192TSNU-A 216,000 BTU · Vrf Outdoor ×1
1 project · most recent 06/18/2026
Sprinkler System
FiledStatusContractorScope
06/18/2026Signed-offQUALITY PIPING, INCSprinkler System
1 project · most recent 06/18/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/18/2026Permit IssuedQUALITY PIPING, INCGas, Storm, Water/Sanitary
2 projects · most recent 01/13/2026
FiledStatusContractorScope
01/13/2026CompleteSOLAS ELECTRICAL CORP—
11/26/2025CompleteDENALI ELECTRIC CORP—
1 project · most recent 06/18/2026
Steel Concrete
FiledStatusContractorScope
06/18/2026Permit IssuedWATERFRONT PROPERTY MGMTSteel, Concrete
3 projects · most recent 04/16/2026
Scaffold Sidewalk Shed Fence
FiledStatusContractorScope
04/16/2026Signed-offCORE SCAFFOLD SYSTEMS INCScaffold
02/17/2026Signed-offCORE SCAFFOLD SYSTEMS INCSidewalk Shed
04/09/2025Signed-offWATERFRONT PROPERTY MGMTFence
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
09/10/2026Pass-Final General Construction Non-Directive 14PassView ↗
08/19/2026Fail-Final General Construction Non-Directive 14FailView ↗
08/12/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/10/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
08/10/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/05/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/31/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
07/15/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/07/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/02/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/26/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/26/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/02/2026Pass-Final PL - UndergroundPassView ↗
05/19/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/19/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/19/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/29/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/15/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/15/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 101
DateRequirementInspectorRole
07/21/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
07/21/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
07/21/2026Heating SystemsSHAHRIAR QUAYYUMspecial
07/20/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
07/20/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSHAHRIAR QUAYYUMspecial
07/20/2026HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
07/20/2026HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
07/20/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
07/20/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
07/20/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
07/07/2026HVAC-R and service water piping design and insulation—energy_progress
07/07/2026HVAC-R and service water heating system controls—energy_progress
07/07/2026HVAC-R and service water heating equipment—energy_progress
06/26/2026Fenestration areasSHAHRIAR QUAYYUMenergy_progress
06/26/2026Insulation placement and R valuesSHAHRIAR QUAYYUMenergy_progress
06/26/2026Fenestration air leakageSHAHRIAR QUAYYUMenergy_progress
06/26/2026Lighting controlsSHAHRIAR QUAYYUMenergy_progress
06/26/2026Exterior lighting powerSHAHRIAR QUAYYUMenergy_progress
06/26/2026Lighting in dwelling unitsSHAHRIAR QUAYYUMenergy_progress
06/26/2026Fenestration and door U-factor and product ratingsSHAHRIAR QUAYYUMenergy_progress
06/26/2026Electrical motors and elevatorsSHAHRIAR QUAYYUMenergy_progress
06/26/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
06/26/2026MeteringSHAHRIAR QUAYYUMenergy_progress
06/26/2026Protection of exposed foundation insulationSHAHRIAR QUAYYUMenergy_progress
06/26/2026Air barrier - visual inspectionSHAHRIAR QUAYYUMenergy_progress
Latest 25 of 101.
▾Documents — 139 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch25
08/22/2026B01177490-P1Request digital key ↗
08/22/2026B01177490-I1Request digital key ↗
08/22/2026B01205318-I1Request digital key ↗
Showing 3 of 25 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
12/08/2025340916370Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
12/08/2025340916370Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram4
08/16/2026B01179777-I1Open ↗
08/16/2026B01179777-P4Open ↗
08/13/2026B01179777-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B01179777-P4Open ↗
08/13/2026B01179777-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B01179777-P4Open ↗
08/13/2026B01179777-I1Open ↗
▸Seals & Professional Certifications61
▸DOB NOWDPL-1: Design Professional Seal & Signature26
08/22/2026B01177490-I1Open ↗
08/22/2026B01177490-P1Open ↗
08/21/2026B01231399-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/28/2026B01177490-P1Open ↗
09/07/2026B01179777-P4Open ↗
09/07/2026B01179777-P4Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/07/2026B01179777-P4Open ↗
09/07/2026B01179777-P4Open ↗
09/07/2026B01179777-P4Open ↗
Showing 3 of 14 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/08/2025340916370Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026B01179777-P4Open ↗
08/13/2026B01179777-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B01177490-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026B01177490-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B01177490-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026B01177490-I1Open ↗
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST2
12/08/2025340916370Open ↗
12/08/2025340916370Open ↗
▸DOB NOWStreet Tree Checklist2
08/13/2026B01179777-P4Open ↗
08/13/2026B01179777-I1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
12/08/2025340916370Open ↗
▸DOB NOWStreet Tree Sign Off1
08/16/2026B01179777-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01179777-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/16/2026B01179777-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWRodent Control1
08/13/2026B01177490-I1Open ↗
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
08/16/2026B01179777-S4Open ↗
08/15/2026B01179777-Z2Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/13/2026B01179777-S7Open ↗
08/13/2026B01179777-P2Open ↗
08/13/2026B01179777-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01179777-S7Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWDEP Variance (V5) letter1
08/13/2026B01177490-I1Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION1
12/08/2025340916370Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
12/08/2025340916370Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/08/2025340916370Open ↗
▸Other Documents18
▸DOB NOWProperty Ownership Certification4
08/22/2026B01177490-I1Open ↗
08/22/2026B01177490-P1Open ↗
08/16/2026B01179777-I1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
12/08/2025340916370Open ↗
12/08/2025340916370Open ↗
12/08/2025340916370Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B01179777-P4Open ↗
08/13/2026B01179777-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026B01179777-P4Open ↗
08/13/2026B01179777-I1Open ↗
▸DOB NOWStructure Photographs2
08/13/2026B01177490-P1Open ↗
08/13/2026B01177490-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B01179777-S1Open ↗
08/13/2026B01179777-S7Open ↗
▸DOB NOWFinal Survey1
08/16/2026B01179777-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B01177490-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B01177490-I1Open ↗