← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Spring Thompson Condominium
83 THOMPSON STREET · BIN 1091755
💬 Discuss this project
2024Year Built
7Stories
RMBuilding Class
R7-2Zoning
20,959 sfGross Floor Area
9Units
0 Active Violations
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: Spring Street Owner · 4,535 sf lot · 4.62 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofThisbowlUnder Construction175p · 3 filings · 20 docs
BulkheadSk Development11p · 1 filing · 20 docs
PenthouseUnit PH313p · 1 filing · 20 docs
Floor 7Sk Development163p · 1 filing · 20 docs
Floor 6Sk Development684p · 2 filings · 20 docs
Floor 5Sk Development688p · 2 filings · 20 docs
Floor 4Sk Development685p · 2 filings · 20 docs
Floor 3Sk Development693p · 2 filings · 20 docs
Floor 2Sk Development695p · 2 filings · 20 docs
Floor 1ThisbowlUnder Construction712p · 5 filings · 20 docs
CellarThisbowlUnder Construction699p · 3 filings · 20 docs
Site & exteriorSk Development56p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SK Development5407/08/2026
City Urban Realty1110/13/2026
Spring Street Owner503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Twigcon308/19/2026
Concept Design Group207/08/2026
The Vilnits Group304/02/2026
Selldorf Architects608/13/2025
Abs Engineering1008/04/2025
Robert Silman Associates Structural Engineering507/29/2024
Ancora Engineering701/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
William Vitacco Associates5603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CM and Associates ConstructionGeneral Contractor3807/08/2026
Access PlumbingPlumbing307/08/2026
FirequestFire Protection307/08/2026
PA BuildersGeneral Contractor208/30/2026
AAA Total PlumbingFire Protection108/12/2026
KSC ContractorGeneral Contractor107/08/2026
VMC Plumbing & HeatingPlumbing108/05/2026
MPS Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CDG Architects LLC /Dba1327408/19/2026
Metrospec Sia6420308/19/2026
The Vilnits Group1223304/02/2026
Domani Inspection Service8432108/13/2025
Frank Seta & Associates3095508/13/2025
Ancora Engineering6818801/12/2024
Building Lifecycle
All (210)Filed (36)Permit Issued (30)Signed Off (11)Violation (17)Inspection (14)Objection (72)Special Inspection (30)
08/27/2026
Permit issued — Mechanical Systems
M01427626-S1-MS
08/19/2026
Filed — Alteration
Modification to existing HVAC system
M01427626-S1
08/18/2026
Special inspection requirement — Post-installed Anchors
JOSEPH YOUNG
08/18/2026
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH YOUNG
08/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH YOUNG
08/11/2026
Permit issued — Sprinklers
M01427626-S3-EW-SP
08/04/2026
Permit issued — Plumbing
M01427626-S2-PL
07/31/2026
Filed — Alteration
Modification to existing HVAC system
M01427626-S3
07/31/2026
Filed — Alteration
Modification to existing HVAC system
M01427626-S2
07/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH YOUNG
07/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOSEPH YOUNG
07/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
Yongho Kim
07/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
Yongho Kim
07/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOSEPH YOUNG
07/15/2026
Special inspection requirement — HVAC-R and service water heating system controls
JOSEPH YOUNG
07/14/2026
Permit issued — General Construction
M01427626-I1-GC
07/08/2026
Filed — Alteration
Modification to existing HVAC system
M01427626-I1
07/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOSEPH YOUNG
07/08/2026
Special inspection requirement — Tenant Protection Plan Compliance
Yongho Kim
07/08/2026
Special inspection requirement — Mechanical Systems
JOSEPH YOUNG
07/08/2026
Special inspection requirement — Shutoff dampers
JOSEPH YOUNG
07/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
JOSEPH YOUNG
07/08/2026
Special inspection requirement — Maintenance information
JOSEPH YOUNG
07/08/2026
Special inspection requirement — Sprinkler Systems
JOSEPH YOUNG
07/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOSEPH YOUNG
07/08/2026
Special inspection requirement — Final
JOSEPH YOUNG
07/07/2026
Special inspection requirement — Interior lighting power
Yongho Kim
07/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yongho Kim
07/07/2026
Special inspection requirement — Tenant Protection Plan Compliance
Yongho Kim
07/07/2026
Special inspection requirement — Final
Yongho Kim
07/07/2026
Special inspection requirement — Lighting controls
Yongho Kim
06/25/2026
Filed — Alteration
Interior renovation of existing commercial space
M01414688-I1
06/09/2026
Special inspection requirement — Interior lighting power
06/09/2026
Special inspection requirement — Final
06/09/2026
Special inspection requirement — Lighting controls
06/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/22/2026
Signed off — New Building
Sprinkler work as shown on plans filed herewith. Filing in conjunction with New Building application M00553059-I1
M00553059-I1
05/07/2026
Signed off — Alteration
Plumbing work to add new powder room to retail space. No change to use, egress or occupancy.
M01358338-I1
05/07/2026
Signed off — Alteration
Plumbing work to add new powder room to retail space. No change to use, egress or occupancy.
M01358338-S1
04/24/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/07/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ILYA VILNITS
04/02/2026
Filed — Alteration
Plumbing work to add new powder room to retail space. No change to use, egress or occupancy.
M01358338-P1
04/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ILYA VILNITS
03/30/2026
Permit issued — Plumbing
M01358338-S1-PL
03/20/2026
Permit issued — General Construction
M01358338-I1-GC
03/19/2026
Objection resolved — Addressed
03/18/2026
Objection raised — Scope
03/11/2026
Filed — Alteration
Plumbing work to add new powder room to retail space. No change to use, egress or occupancy.
M01358338-S1
03/03/2026
Objection resolved — Addressed
03/03/2026
Objection resolved — Addressed
03/02/2026
Objection raised — Scope
03/02/2026
Objection raised — Cost
02/11/2026
Filed — Alteration
Plumbing work to add new powder room to retail space. No change to use, egress or occupancy.
M01358338-I1
01/21/2026
Signed off — Alteration
Mechanical work as shown on plans filed herewith. No change in use, egress of occupancy.
M01239253-I1
01/16/2026
Signed off — New Building
Sprinkler work as shown on plans filed herewith. Filing in conjunction with New Building application M00553059-I1
M00553059-S4
01/06/2026
Signed off — New Building
Sprinkler work as shown on plans filed herewith. Filing in conjunction with New Building application M00553059-I1
M00553059-S3
11/17/2025
Permit issued — Mechanical Systems
M01239253-I1-MS
Latest 60 of 210 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedPA Builders08/27/2026
DOB NOWSprinklersPermit IssuedAAA Total Plumbing08/11/2026
DOB NOWPlumbingPermit IssuedVMC Plumbing & Heating08/04/2026
DOB NOWGeneral ConstructionPermit IssuedPA Builders07/14/2026
DOB NOWPlumbingSigned-offMPS Plumbing & Heating03/30/2026
DOB NOWGeneral ConstructionSigned-offKSC Contractor03/20/2026
DOB NOWMechanical SystemsSigned-offChristopher B. Mesbah11/17/2025
DOB NOWGeneral ConstructionPermit IssuedChristopher B. Mesbah02/25/2025
DOB NOWMechanical SystemsSigned-offChristopher B. Mesbah02/18/2025
DOB NOWGeneral ConstructionPermit IssuedChristopher B. Mesbah02/03/2025
DOB NOWSprinklersSigned-offFirequest12/10/2024
DOB NOWPlumbingSigned-offAccess Plumbing10/29/2024
DOB NOWSupport of ExcavationSigned-offChristopher B. Mesbah05/29/2024
DOB NOWFoundationSigned-offChristopher B. Mesbah05/29/2024
DOB NOWStructuralSigned-offChristopher B. Mesbah03/18/2024
DOB NOWGeneral ConstructionPermit IssuedChristopher B. Mesbah02/08/2024
DOB NOWMechanical SystemsSigned-offChristopher B. Mesbah02/05/2024
DOB NOWPlumbingSigned-offAccess Plumbing01/11/2024
DOB NOWSprinklersSigned-offFirequest01/08/2024
DOB NOWStructuralSigned-offChristopher B. Mesbah07/19/2023
DOB NOWGeneral ConstructionPermit IssuedChristopher B. Mesbah06/16/2023
DOB NOWSupport of ExcavationSigned-offChristopher B. Mesbah05/24/2023
DOB NOWFoundationSigned-offChristopher B. Mesbah05/24/2023
DOB NOWPlumbingSigned-offAccess Plumbing02/10/2023
DOB NOWSupport of ExcavationSigned-offChristopher B. Mesbah01/30/2023
DOB NOWFoundationSigned-offChristopher B. Mesbah01/30/2023
DOB NOWSprinklersSigned-offFirequest01/27/2023
DOB NOWMechanical SystemsSigned-offChristopher B. Mesbah12/20/2022
DOB NOWFoundationSigned-offChristopher B. Mesbah12/16/2022
DOB NOWSupport of ExcavationSigned-offChristopher B. Mesbah12/16/2022
3 projects · most recent 08/19/2026
Air Conditioning Systems Ventilation Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
08/19/2026Permit IssuedPA BuildersAir Conditioning Systems, Ventilation Systems
Cooling
Lg ZRUM096BTE6 8 tons · Vrf Outdoor ×1
Ventilation
Greenheck CSP-A510-VG 410 CFM · Exhaust Fan ×1
06/25/2026——Air Conditioning Systems, Ventilation Systems
Cooling
Lg ZRNU283TAAA 25 tons · Vrf Indoor ×2
ARNU123MAA4 495 CFM · Vrf Indoor ×1
ARNU183MAA4 635 CFM · Vrf Indoor ×1
ARNU423MAA4 1,260 CFM · Vrf Indoor ×1
ZRNU123SJSA 1 tons · Vrf Indoor ×1
ZRNU183TAAA 15 tons · Vrf Indoor ×1
ZRUM096BTE6 8 tons · Vrf Outdoor ×1
Ventilation
Greenheck CSP-A510-VG 410 CFM · Exhaust Fan ×1
08/13/2025Permit IssuedCM and Associates ConstructionAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Lg ARUN048GSS4 48,000 BTU · Vrf Outdoor ×8
ARUM096BTE5 96,000 BTU · Vrf Outdoor ×4
ARUM121BTE5 120,000 BTU · Vrf Outdoor ×2
ARUM144BTE5 144,000 BTU · Vrf Outdoor ×2
LSU243HLV3 22,000 BTU · Condensing Unit ×2
Heating
Addison PROA084B 88,600 BTU · Doas ×2
Ventilation
Greenheck USF-13-B3 1,200 CFM · Exhaust Fan ×4
G-095-VG 700 CFM · Exhaust Fan ×2
USF-08-B3 400 CFM · Exhaust Fan ×2
2 projects · most recent 06/25/2026
Sprinkler System
FiledStatusContractorScope
06/25/2026——Sprinkler System
08/13/2025Signed-offFirequestSprinkler System
3 projects · most recent 06/25/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
06/25/2026——Water/Sanitary
04/02/2026Signed-offMPS Plumbing & HeatingWater/Sanitary
08/13/2025Signed-offAccess PlumbingGas, Storm, Water/Sanitary
6 projects · most recent 08/26/2026
General Wiring
FiledStatusContractorScope
08/26/2026Permit IssuedGreen Apple Electrical ServicesGeneral Wiring
07/01/2026CompleteE.B.A. Electric—
03/31/2026CompleteEric & NG ElectricalGeneral Wiring
02/10/2026CompleteMacintosh ElectricGeneral Wiring
11/22/2025CompletePrudent Electric—
04/24/2025CompleteJam Electrical—
1 project · most recent 08/13/2025
Concrete Wood
FiledStatusContractorScope
08/13/2025Permit IssuedCM and Associates ConstructionConcrete, Wood
1 project · most recent 04/02/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
04/02/2026Signed-offMPS Plumbing & HeatingTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
04/24/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/07/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/03/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/01/2025Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
04/01/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/27/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/26/2025Pass-Final SD - Up to 3 Requested FloorsPassView ↗
07/31/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/19/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/22/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/18/2026Fire-Resistant Penetrations and JointsJOSEPH YOUNGspecial
08/18/2026Post-installed AnchorsJOSEPH YOUNGspecial
08/18/2026Energy Code Compliance InspectionsJOSEPH YOUNGprogress
07/15/2026HVAC-R and service water heating system controlsJOSEPH YOUNGenergy_progress
07/15/2026Tenant Protection Plan ComplianceYongho Kimspecial
07/15/2026Fire-Resistant Penetrations and JointsJOSEPH YOUNGspecial
07/15/2026Tenant Protection Plan ComplianceYongho Kimspecial
07/15/2026HVAC-R and service water heating equipmentJOSEPH YOUNGenergy_progress
07/15/2026HVAC-R and service water piping design and insulationJOSEPH YOUNGenergy_progress
07/08/2026Sprinkler SystemsJOSEPH YOUNGspecial
07/08/2026Mechanical SystemsJOSEPH YOUNGspecial
07/08/2026Tenant Protection Plan ComplianceYongho Kimspecial
07/08/2026HVAC-R and service water heating system controlsJOSEPH YOUNGenergy_progress
07/08/2026HVAC-R and service water heating equipmentJOSEPH YOUNGenergy_progress
07/08/2026Shutoff dampersJOSEPH YOUNGenergy_progress
07/08/2026Maintenance informationJOSEPH YOUNGenergy_progress
07/08/2026HVAC-R and service water piping design and insulationJOSEPH YOUNGenergy_progress
07/08/2026FinalJOSEPH YOUNGprogress
07/07/2026Lighting controlsYongho Kimenergy_progress
07/07/2026Tenant Protection Plan ComplianceYongho Kimspecial
07/07/2026Interior lighting powerYongho Kimenergy_progress
07/07/2026Fire-Resistant Penetrations and JointsYongho Kimspecial
07/07/2026FinalYongho Kimprogress
06/09/2026Interior lighting power—energy_progress
06/09/2026Tenant Protection Plan Compliance—special
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
ThisbowlRestaurant / Food ServiceCellar, Floor 1, Roof
Project M01427626 Alteration · Permit Entire · 07/08/2026
Project M01414688 Alteration · OnHold-NoGoodCheck · 06/25/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 306 on file (BIS + DOB NOW)
▸Plans & Drawings35
▸DOB NOWPlans/Sketch35
08/29/2026M00901676-P1Request digital key ↗
08/29/2026M00901676-I1Request digital key ↗
08/28/2026M00553059-A4Request digital key ↗
Showing 3 of 35 on file for this type
▸Applications & Permits34
▸DOB NOWLPC Approval/Permit31
08/16/2026M01414688-I1Open ↗
08/16/2026M01427626-S2Open ↗
08/16/2026M01427626-I1Open ↗
Showing 3 of 31 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
11/20/2025141019298Open ↗
06/07/2022141019298Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
10/19/2022141019298Open ↗
▸Zoning, Tax Lot & Property Records40
▸DOB NOWRestrictive Declaration/Easement 122
08/13/2026M00553059-A6Open ↗
Showing 1 of 22 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)6
08/13/2026M00553059-P9Open ↗
08/13/2026M00553059-A7Open ↗
Showing 2 of 6 on file for this type
▸BISZONING EXHIBIT II: CERTIFICATION1
05/05/2023121253794Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
05/05/2023121253794Open ↗
▸BISZONING EXHIBIT V: CERTIFICATION1
05/05/2023121253794Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
05/05/2023121253794Open ↗
▸BISZONING EXHIBIT IV: CERTIFICATION1
05/05/2023121253794Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications147
▸DOB NOWProgress Inspector Seal & Signature61
09/26/2026M01358338-I1Open ↗
09/23/2026M01239253-I1Open ↗
09/23/2026M01239253-I1Open ↗
Showing 3 of 61 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature49
09/26/2026M01358338-I1Open ↗
09/23/2026M01239253-I1Open ↗
09/23/2026M01239253-I1Open ↗
Showing 3 of 49 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature35
08/29/2026M00901676-I1Open ↗
08/29/2026M00901676-P1Open ↗
08/28/2026M00553059-A3Open ↗
Showing 3 of 35 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/07/2022141019298Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/07/2022141019298Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist6
08/28/2026M00553059-A4Open ↗
08/28/2026M00553059-I1Open ↗
08/28/2026M00553059-P9Open ↗
Showing 3 of 6 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
10/19/2022141019298Open ↗
▸BISSTREET TREE CHECKLIST1
10/19/2022141019298Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT4
08/13/2026M00553059-P3Open ↗
08/13/2026M00553059-S6Open ↗
08/13/2026M00553059-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTR4 Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTR5 Test Report1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs1
▸BISLANDMARKS APPROVAL1
10/19/2022141019298Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertificate of Insurance1
08/13/2026M00553059-I1Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026M00553059-I1Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
06/07/2022141019298Open ↗
▸BISADDITIONAL INFORMATION1
11/17/2022141019298Open ↗
▸Other Documents18
▸DOB NOWSite Survey: Initial6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET1
06/07/2022141019298Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
05/05/2023121253794Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026M00553059-I1Open ↗
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProof of Historic Building1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026M00553059-S6Open ↗