Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsGas piping and riser installation2 filings
Installation of new gas header in the cellar, and one new gas riser on the rear exterior of the building.
On file for this project
17 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
RoofSupported scaffold installation2p · 2 filings · 10 docs
MechanicalStructural
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
2 documents · 1 drawing sheet
Replace HVAC system and kitchen exhaust fan at apartment 11A with new equipment; no change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Floor 11Unit 11A1 filing · 3 docs
EquipmentGeneralMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Supported Scaffold
Replace HVAC system and kitchen exhaust fan at apartment 11A with new equipment; no change to use, egress or occupancy.
On file for this project
8 documents
Floor 10Unit 10A, Unit 10BUnder Construction3p · 4 filings · 20 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural · Supported Scaffold
The scope of work is limited to the construction of a closet above an existing closet within a duplex apartment (area of work is 50 sf). S1 document filed for structural work in conjunction with the general construction.
On file for this project
11 documents
Renovation of existing duplex apartment 9/10A on 9th & 10th floors, work includes general construction, removal and installation of interior non load bearing partitions and related finishes, PL, MS and ST applications to filed as subsequent applications
On file for this project
40 documents · 3 drawing sheets
Interior renovation to include construction of new partitions and finishes as shown on plans. No change in use, egress or occupancy under this application. (Apt 10B)
On file for this project
16 documents
Latest 3 of 4 filings on this floor.
Floor 9Unit 9, Unit 9B3p · 2 filings · 20 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural · Supported Scaffold
Renovation of existing duplex apartment 9/10A on 9th & 10th floors, work includes general construction, removal and installation of interior non load bearing partitions and related finishes, PL, MS and ST applications to filed as subsequent applications
On file for this project
40 documents · 3 drawing sheets
Herewith file plumbing plans for Apt. 9B, filed in conjunction with general construction.
On file for this project
16 documents
Floor 8
Floor 7
Floor 6Unit 6A2 filings · 3 docs
ArchitectureEquipmentGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Supported Scaffold
Minor partition and demolition work.
On file for this project
7 documents
Replacing existing through the wall condensing and fan coil units.
On file for this project
5 documents
Floor 5Unit 5A2 filings · 3 docs
ArchitectureEquipmentGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Supported Scaffold
Minor partition and demolition work.
On file for this project
7 documents
Replacing existing through the wall condensing and fan coil units.
On file for this project
5 documents
Floor 4
Floor 3Unit 3B2p · 2 filings · 3 docs
ArchitectureEquipmentGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Supported Scaffold
Replace window and drop ceiling in existing laundry room for installation of mechanical equipment.
On file for this project
5 documents · 2 drawing sheets
INSTALL NEW AC SPLIT SYSTEM IN EXISTING LAUNDRY ROOM. NEW CONDENSER AND AIR HANDLER.
On file for this project
8 documents
Floor 2
Floor 1
Site & exteriorSupported scaffold installation2 filings · 5 docs
CivilEquipmentGeneralPlumbing
Issued Permit Scope
Sidewalk Shed · Supported Scaffold
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
2 documents · 6 drawing sheets
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 3 drawing sheets