Hospital, sanitarium, mental institution
NH Lenox Hill Hospital Campus
855 PARK AVENUE · BIN 1082184
💬 Discuss this project
1930Year Built
14Stories
I1Building Class
C1-8Zoning
775,241 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized14 Open Violations 6 unresolved · 8 paperwork only ▸FISP: SWARMP
Hospital, sanitarium, mental institution · Owner of record: LENOX HILL HOSPITAL · 81,503 sf lot · 9.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire ProtectionGeneral
Roof1p · 1 filing · 3 docs
Cellar7p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NORTHWELL HEALTH1307/08/2026
LENOX HILL HOSPITAL2807/08/2026
MNK ENTERPRISES NY INC703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEON SKVIRSKY PE101/05/2026
ENTHINK ENGINEERS LLC110/24/2023
LIZARDOS ENGINEERING408/29/2023
GILSANZ MURRAY STEFICEK LLP110/17/2022
PAMELA A. SMITH210/13/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUPPORT BUILDINGS OF NEW YORK703/21/2026
RIGGINING CONSULTANTS103/21/2026
LOUIS STRIAR203/21/2026
SUPPORT BUILDINGS703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MNK ENTERPRISES NY INCGeneral Contractor603/21/2026
CENTRAL CONSULTING & CONTGeneral Contractor407/08/2026
CAPITAL CONTR P&H CORPPlumbing307/08/2026
PATTERSON, BRIANElectrical203/21/2026
GELLMAN, IRVINGElectrical203/21/2026
CONNOLLY & SON CONSTRUCTIElectrical203/21/2026
FM95 NYScaffold107/08/2026
LELIS, ARILSONElectrical103/21/2026
NEU, RICHARDElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
SERGIO GIANNACHIElectrical103/21/2026
CAPITAL CONTR P & H CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CC@A ENGINEERING P.C1854508/29/2023
GILSANZ MURRAY STEFICEK240110/17/2022
Building Lifecycle
All (70)Filed (10)Permit Issued (9)Signed Off (8)Facade (FISP) (12)Violation (9)Inspection (5)Special Inspection (17)
02/09/2026
Signed off — Alteration
M01333902-I1
01/30/2026
Permit issued — Sign
M01333902-I1-SG
01/05/2026
Filed — Alteration
M01333902-I1
11/15/2024
Signed off — Alteration
M00951470-I1
10/23/2024
Permit issued — Sidewalk Shed
M00951470-I1-SH
08/26/2024
Signed off — Alteration
M01003834-I1
03/20/2024
Cycle 9 facade report submitted
03/19/2024
Cycle 9 facade report signed — SWARMP
03/18/2024
Cycle 9 facade inspection completed
03/08/2024
Permit issued — Suspended Scaffold
M01003834-I1-SC
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/16/2024
Filed — Alteration
M01003834-I1
01/31/2024
Signed off — Alteration
Pluming work associated with Linear Accelerator Equipment Replacement No change in use or egress.
M08011747-I1
10/24/2023
Filed — Alteration
M00951470-I1
10/24/2023
Permit issued — Sidewalk Shed
M00951470-I1-SH
10/13/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/30/2023
Special inspection requirement — Post-installed Anchors
CHAROULIS CHARALAMBOUS
08/29/2023
Signed off — Alteration
Relocate 4 sprinkler heads within therapy vault. No change in use or egress
M08011716-I1
08/29/2023
Filed — Alteration
Pluming work associated with Linear Accelerator Equipment Replacement No change in use or egress.
M08011747-P1
08/14/2023
Special inspection requirement — Post-installed Anchors
CHAROULIS CHARALAMBOUS
08/12/2023
Signed off — Alteration
General construction work associated with LINAC Replacement. No change in use egress or occupancy MH, ST an PL SP work associated with the LINAC Replacement filed separately
M08011154-I1
07/06/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/06/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/05/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/05/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/29/2023
Signed off — Alteration
M08011173-I1
06/27/2023
Signed off — Alteration
M08011695-I1
11/09/2022
Permit issued — Structural
M08011173-I1-ST
10/31/2022
Permit issued — Mechanical Systems
M08011695-I1-MS
10/26/2022
Permit issued — General Construction
M08011154-I1-GC
10/20/2022
Permit issued — Plumbing
M08011747-I1-PL
10/20/2022
Permit issued — Sprinklers
M08011716-I1-EW-SP
10/17/2022
Filed — Alteration
M08011173-I1
10/17/2022
Special inspection requirement — Fire-Resistance Rated Construction
CHAROULIS CHARALAMBOUS
10/17/2022
Special inspection requirement — Energy Code Compliance Inspections
CHAROULIS CHARALAMBOUS
10/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHAROULIS CHARALAMBOUS
10/17/2022
Special inspection requirement — Final
Pamela Smith
10/17/2022
Special inspection requirement — Structural Steel - Welding
Philip Murray
10/17/2022
Special inspection requirement — Structural Steel - Details
Philip Murray
10/17/2022
Special inspection requirement — Concrete - Cast-In-Place
Philip Murray
10/17/2022
Special inspection requirement — Post-installed Anchors
Philip Murray
10/14/2022
Filed — Alteration
M08011695-I1
10/13/2022
Filed — Alteration
Pluming work associated with Linear Accelerator Equipment Replacement No change in use or egress.
M08011747-I1
10/13/2022
Filed — Alteration
Relocate 4 sprinkler heads within therapy vault. No change in use or egress
M08011716-I1
10/13/2022
Filed — Alteration
General construction work associated with LINAC Replacement. No change in use egress or occupancy MH, ST an PL SP work associated with the LINAC Replacement filed separately
M08011154-P1
10/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/11/2022
Special inspection requirement — Final
10/11/2022
Special inspection requirement — Fire-Resistance Rated Construction
10/11/2022
Special inspection requirement — Post-installed Anchors
CHAROULIS CHARALAMBOUS
10/11/2022
Special inspection requirement — Energy Code Compliance Inspections
10/04/2022
Filed — Alteration
General construction work associated with LINAC Replacement. No change in use egress or occupancy MH, ST an PL SP work associated with the LINAC Replacement filed separately
M08011154-I1
09/28/2022
Special inspection requirement — Sprinkler Systems
CHAROULIS CHARALAMBOUS
09/27/2022
Special inspection requirement — Final
Philip Murray
05/26/2017
Cycle 8 facade report signed — SAFE
05/11/2017
Cycle 8 facade report submitted
05/01/2017
Cycle 8 facade inspection completed
01/04/2016
Violation issued (ECB, closed)
Construction
03/20/2015
Violation issued (ECB, closed)
Local Law
02/13/2015
Cycle 7 facade report submitted
02/10/2015
Cycle 7 facade report signed — SWARMP
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offRED HOOK SIGN AND ELECT01/30/2026
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES NY INC10/23/2024
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM03/08/2024
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES NY INC10/24/2023
DOB NOWStructuralSigned-offCENTRAL CONSULTING & CONT11/09/2022
DOB NOWMechanical SystemsSigned-offCENTRAL CONSULTING & CONT10/31/2022
DOB NOWGeneral ConstructionSigned-offCENTRAL CONSULTING & CONT10/26/2022
DOB NOWPlumbingSigned-offCAPITAL CONTR P&H CORP10/20/2022
DOB NOWSprinklersSigned-offCAPITAL CONTR P & H CORP10/20/2022
BISEQISSUEDSPRING SCAFFOLDING LLC03/01/2016
BISOTISSUEDB & A RESTORATION CONTRA11/12/2015
BISEQISSUEDSPRING SCAFFOLDING LLC03/17/2015
BISSPISSUEDPACE PLUMBING CORP09/15/2014
BIS—ISSUEDAXIS CONSTRUCTION CORP08/05/2014
BISSPISSUEDSIRINA FIRE PROT CORP05/29/2014
BISSPISSUEDSIRINA FIRE PROT CORP02/26/2014
BISSDISSUEDAPPROVED FIRE PREV. CORP01/23/2014
BISPLISSUEDMAC FELDER INC11/18/2013
BISOTISSUEDAXIS CONSTRUCTION CORP11/07/2013
BISOTISSUEDAXIS CONSTRUCTION CORP10/17/2013
BISOTISSUEDAXIS CONSTRUCTION CORP10/10/2013
BISMHISSUEDAXIS CONSTRUCTION CORP10/10/2013
BISSPISSUEDSIRINA FIRE PROT CORP09/24/2013
BISMHISSUEDAXIS CONSTRUCTION CORP04/19/2013
BISOTISSUEDAXIS CONSTRUCTION CORP04/19/2013
BISMHISSUEDAXIS CONSTRUCTION CORP03/12/2013
BISOTISSUEDAXIS CONSTRUCTION CORP03/12/2013
BISSDISSUEDAPPROVED FIRE PREV. CORP01/14/2013
BISOTISSUEDAXIS CONSTRUCTION CORP02/21/2012
BISMHISSUEDAXIS CONSTRUCTION CORP02/21/2012
BISSPISSUEDSIRINA FIRE PROT CORP10/27/2011
BISPLISSUEDPAR PLUMBING CO., INC10/21/2011
BISOTISSUEDAXIS CONSTRUCTION CORP10/20/2011
BISMHISSUEDAXIS CONSTRUCTION CORP10/20/2011
BISPLISSUEDALJER PLBG & HTG CORP10/08/2009
BISOTISSUEDB & A RESTORATION CONTRA07/17/2006
BISEQISSUEDCENTRAL CONSULTING & CONT06/12/2006
BISOTISSUEDCENTRAL CONSULTING & CONT06/12/2006
BISEQISSUEDPERIMETER BRIDGE & SCAFFOLD05/25/2006
BISEQISSUEDCENTRAL CONSULTING & CONT12/30/2005
+ 12 more permits on file
1 project · most recent 10/24/2023
FiledStatusContractorScope
10/24/2023Permit IssuedRICHARD NEU—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/13/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/06/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/06/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/05/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
08/30/2023Post-installed AnchorsCHAROULIS CHARALAMBOUSspecial
08/14/2023Post-installed AnchorsCHAROULIS CHARALAMBOUSspecial
10/17/2022Fire-Resistance Rated ConstructionCHAROULIS CHARALAMBOUSprogress
10/17/2022Energy Code Compliance InspectionsCHAROULIS CHARALAMBOUSprogress
10/17/2022Fire-Resistant Penetrations and JointsCHAROULIS CHARALAMBOUSspecial
10/17/2022FinalPamela Smithprogress
10/17/2022Structural Steel - WeldingPhilip Murrayspecial
10/17/2022Structural Steel - DetailsPhilip Murrayspecial
10/17/2022Concrete - Cast-In-PlacePhilip Murrayspecial
10/17/2022Post-installed AnchorsPhilip Murrayspecial
10/11/2022Fire-Resistant Penetrations and Joints—special
10/11/2022Final—progress
10/11/2022Fire-Resistance Rated Construction—progress
10/11/2022Post-installed AnchorsCHAROULIS CHARALAMBOUSspecial
10/11/2022Energy Code Compliance Inspections—progress
09/28/2022Sprinkler SystemsCHAROULIS CHARALAMBOUSspecial
09/27/2022FinalPhilip Murrayprogress
▾Documents — 304 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/01/2026M08011716-I1Request digital key ↗
09/01/2026M08011154-P1Request digital key ↗
09/01/2026M08011154-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits64
▸BISPLAN / WORK APPROVAL APPLICATION35
02/19/2016121720085Open ↗
02/19/2016121718230Open ↗
12/02/2015121971517Open ↗
Showing 3 of 35 on file for this type
▸BISWORK PERMIT APPLICATION27
03/18/2016122338078Open ↗
12/02/2015121971517Open ↗
03/23/2015122338078Open ↗
Showing 3 of 27 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
08/16/2014121185047Open ↗
08/16/2014121185047Open ↗
▸Seals & Professional Certifications71
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION40
05/17/2017121971517Open ↗
01/12/2016121718230Open ↗
12/05/2014121543311Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/01/2026M08011154-P1Open ↗
09/01/2026M08011154-I1Open ↗
09/01/2026M08011695-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026M08011154-I1Open ↗
09/02/2026M08011716-I1Open ↗
09/02/2026M08011716-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
03/19/2015122338078Open ↗
11/08/2013121824687Open ↗
02/21/2013121508314Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026M08011154-I1Open ↗
09/02/2026M08011154-I1Open ↗
09/02/2026M08011154-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
02/21/2013121508314Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
03/19/2015122338078Open ↗
11/08/2013121824687Open ↗
▸Trade Schedules & Equipment31
▸BISSELF-CERT PLUMBING NOTICE16
09/26/2014121543311Open ↗
09/11/2014121543295Open ↗
09/05/2014121543295Open ↗
Showing 3 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING10
11/05/2013121543302Open ↗
07/26/2013121718230Open ↗
04/15/2013121543311Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
08/25/2014121543295Open ↗
05/16/2014121563414Open ↗
▸BISSPRINKLER INSP REPORT : FP-852
03/17/2014121543311Open ↗
03/17/2014120798654Open ↗
▸BISSTANDPIPE INSP REPORT : FP-841
09/05/2014121543295Open ↗
▸Safety & Tenant Protection1
▸BISST-1 Street Tree Checklist1
05/22/2014121185047Open ↗
▸Environmental & Asbestos23
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/01/2026M08011154-P1Open ↗
09/01/2026M08011154-I1Open ↗
09/01/2026M08011695-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
10/23/2015121971517Open ↗
08/05/2014121185047Open ↗
11/11/2013121824687Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)4
09/13/2013121543311Open ↗
07/26/2013121718230Open ↗
07/23/2013121543295Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
05/17/2017121971517Open ↗
09/26/2014121185047Open ↗
08/16/2014121185047Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
05/17/2017121971517Open ↗
09/26/2014121185047Open ↗
▸BISTR8: Energy Code Progress Inspections2
01/21/2015121971517Open ↗
08/25/2014121508314Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports1
▸BISHYDRO FLOW TEST LETTER1
05/01/2014121543295Open ↗
▸Approvals, Objections & Sign-offs37
▸BISADMINISTRATIVE OBJECTIONS11
04/15/2013121512602Open ↗
04/15/2013121543295Open ↗
04/15/2013121543311Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
05/17/2017121971517Open ↗
10/03/2016122338078Open ↗
07/21/2016122338078Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
09/01/2026M08011695-I1Open ↗
08/13/2026M08011154-I1Open ↗
08/13/2026M08011173-I1Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
05/17/2017121971517Open ↗
07/21/2016122338078Open ↗
08/27/2014121718230Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - APPRVD FAB CERT-COMPLIANCE1
10/03/2016122338078Open ↗
▸BISSHED LETTER1
03/18/2016122338078Open ↗
▸Cost, Insurance & Ownership22
▸BISCOST AFFIDAVIT22
05/17/2017121971517Open ↗
12/02/2015121971517Open ↗
09/15/2015121971517Open ↗
Showing 3 of 22 on file for this type
▸Filing & Intake Forms29
▸BISEFILING COVER SHEET18
03/19/2015122338078Open ↗
11/08/2013121824687Open ↗
07/30/2013121720085Open ↗
Showing 3 of 18 on file for this type
▸BISADDITIONAL INFORMATION9
01/21/2015121971517Open ↗
09/03/2014121185047Open ↗
08/06/2014121508314Open ↗
Showing 3 of 9 on file for this type
▸BISeFiling Job Application Cover Sheet2
01/21/2015121971517Open ↗
Showing 1 of 2 on file for this type
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
12/02/2014121971517Open ↗
11/09/2013121824687Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01003834-I1Open ↗