← Back
Condo, residential unit in elevator building
Love Lane Mows Condominium
9 COLLEGE PLACE · BIN 3398020
💬 Discuss this project
1923Year Built
5Stories
R4Building Class
R7-1Zoning
57,273 sfGross Floor Area
37Units
LL97 CoveredRent Stabilized4 Open Violations 2 unresolved · 2 paperwork only ▸FDNY Report ↗
Condo, residential unit in elevator building · 19,413 sf lot · 2.95 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Floor 51p · 1 filing · 7 docs
Floor 49p · 3 filings · 20 docs
Floor 35p · 1 filing · 18 docs
Floor 2
Floor 12p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROCK GROUP NY CORP503/22/2026
EEYORE103/22/2026
RED HOOK CONSTRUCTION GRO103/22/2026
LOVELANE ASSOC LLC203/22/2026
E-YSTEMS CORP103/22/2026
COLLEGE PLACE ENTERPRISES, LLC3303/21/2026
LOVE LANE MEWS LLC C O MANHATTAN203/21/2026
LOVE LANE MOWS CONDO203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WALSH ENGINEERING PLLC211/28/2025
BENDIX ENGINEERING, P.C.309/12/2025
FLORINELA MURESAN306/03/2025
O&S ASSOCIATES104/01/2025
PARKBENCH ARCHITECTS106/25/2024
HARPER ARCHITECTURE, PC106/21/2024
WAVIC ENGINEERING PLLC205/20/2021
CWB ARCHITECTS210/22/2020
YAO W GUO ARCHITECT, PC209/18/2020
ASIF JAMIL, RA103/14/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN STUDIO203/21/2026
MUNICIPAL BUILDING CONSULTANTS403/21/2026
EA DESIGN GROUP803/21/2026
PCS ENGINEERING203/21/2026
O S ASSOCIATES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARIES CONSTRUCTION CO,INCGeneral Contractor407/08/2026
AP PLUMBING & HVAC LLCPlumbing307/08/2026
ROCK GROUP NY CORPGeneral Contractor303/21/2026
B & S COOLINGGeneral Contractor303/21/2026
CESAR QUERYElectrical203/21/2026
C Q ELECTRL CONTRG CORP 002004General Contractor203/22/2026
PEAK PLUMBING SOLUTIONS LLCPlumbing207/08/2026
RAPTOR MECHANICAL,INCPlumbing207/08/2026
CONSTRUCTORS TRADES & SKIGeneral Contractor104/09/2026
DONATO, INCPlumbing107/08/2026
MARPRO CONSTRUCTION CORPGeneral Contractor107/08/2026
ACCURATE MECHANICAL INCFire Protection107/08/2026
AP PLUMBING HVACPlumbing103/22/2026
C.Q. ELECTR'L CONTRG CORPElectrical103/22/2026
AP PLUMBING HVACGeneral Contractor103/22/2026
KG SPRINKLER CORPFire Protection107/08/2026
CROSSFIELD PLBG.&HTG.CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OUTSOURCE SPECIAL INSPECT2827211/28/2025
WALSH ENGINEERING PLLC9393211/28/2025
BENDIX ENGINEERING, P.C.4293309/12/2025
AK ENGINEERING PC678306/03/2025
O&S ASSOCIATES, INC.8393104/01/2025
HARPER ARCHITECTURE, PC6851106/21/2024
WAVIC ENGINEERING PLLC1733205/20/2021
THE BROOKLYN STUDIO OF AR2684210/22/2020
YAO W GUO ARCHITECT P.C.1754209/18/2020
Building Lifecycle
All (150)Filed (18)Permit Issued (18)Signed Off (9)Violation (38)Inspection (11)Objection (26)Special Inspection (30)
12/30/2025
Signed off — Alteration
PLUMBING AND SPRINKLER SCOPE IN CONJUNCTION WITH APARTMENT RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01055313-I1
12/30/2025
Signed off — Alteration
MECHANICAL SCOPE FOR HVAC UNIT INSTALLATION IN CONJUNCTION WITH APARTMENT RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01055297-I1
12/02/2025
Permit issued — General Construction
B01298615-I1-GC-CX
12/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/01/2025
Special inspection requirement — Sprayed fire-resistant materials
Brennan Walsh
12/01/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Brennan Walsh
12/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
Brennan Walsh
12/01/2025
Special inspection requirement — Structural Steel - Welding
JONAR MADRIAGA
12/01/2025
Special inspection requirement — Masonry
Brennan Walsh
12/01/2025
Special inspection requirement — Structural Steel - Details
Brennan Walsh
12/01/2025
Special inspection requirement — Final
Brennan Walsh
12/01/2025
Special inspection requirement — Structural Cold-Formed Steel
Brennan Walsh
11/28/2025
Filed — Alteration
Garage restoration with structural steel and slab repairs as shown on plans
B01298615-P1
11/16/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/05/2025
Filed — Alteration
Garage restoration with structural steel and slab repairs as shown on plans
B01298615-I1
09/26/2025
Special inspection requirement — Sprinkler Systems
Matthew Bendix
09/26/2025
Special inspection requirement — Energy Code Compliance Inspections
Matthew Bendix
09/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Matthew Bendix
09/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
Matthew Bendix
09/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Bendix
09/12/2025
Filed — Alteration
PLUMBING AND SPRINKLER SCOPE IN CONJUNCTION WITH APARTMENT RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01055313-P1
09/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Matthew Bendix
09/05/2025
Special inspection requirement — Sprinkler Systems
Matthew Bendix
09/05/2025
Special inspection requirement — Energy Code Compliance Inspections
Matthew Bendix
09/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
Matthew Bendix
09/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Bendix
09/04/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/29/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/17/2025
Signed off — Alteration
APPLICATION FILED FOR PLUMBING MODIFICATIONS/ADDITIONS ON THE 3RD & 4TH FL (APT 3J/4D) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01064981-S1
06/26/2025
Signed off — Alteration
APPLICATION FILED FOR PLUMBING MODIFICATIONS/ADDITIONS ON THE 3RD & 4TH FL (APT 3J/4D) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01064981-I1
06/10/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/06/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
06/03/2025
Filed — Alteration
APPLICATION FILED FOR PLUMBING MODIFICATIONS/ADDITIONS ON THE 3RD & 4TH FL (APT 3J/4D) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01064981-P2
05/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
05/23/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/15/2025
Permit issued — General Construction
B01055275-I1-GC
05/15/2025
Permit issued — Mechanical Systems
B01055297-I1-MS
05/14/2025
Permit issued — Plumbing
B01055313-I1-PL
05/08/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/15/2025
Objection resolved — Addressed
04/15/2025
Objection resolved — Addressed
04/11/2025
Objection raised — Scope
04/11/2025
Objection raised — Scope
04/01/2025
Filed — Alteration
Herewith filing for repairs to this existing garage. No change to occupancy, use or egress.
B01177679-I1
03/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/06/2025
Special inspection requirement — Structural Steel - Details
Prabhu Perumalsamy
02/06/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Prabhu Perumalsamy
02/06/2025
Special inspection requirement — Concrete - Cast-In-Place
Prabhu Perumalsamy
02/06/2025
Special inspection requirement — Sprayed fire-resistant materials
Prabhu Perumalsamy
02/06/2025
Special inspection requirement — Structural Steel - Welding
Prabhu Perumalsamy
02/06/2025
Special inspection requirement — Final
Colin Swaysland
02/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
Prabhu Perumalsamy
12/17/2024
Violation issued (ECB, closed)
Construction
12/10/2024
Permit issued — Plumbing
B01064981-S1-PL
12/03/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/27/2024
Filed — Alteration
APPLICATION FILED FOR PLUMBING MODIFICATIONS/ADDITIONS ON THE 3RD & 4TH FL (APT 3J/4D) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01064981-P1
11/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
11/13/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/30/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 150 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCONSTRUCTORS TRADES & SKI12/02/2025
DOB NOWGeneral ConstructionSigned-offARIES CONSTRUCTION CO,INC05/15/2025
DOB NOWMechanical SystemsSigned-offARIES CONSTRUCTION CO,INC05/15/2025
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG05/14/2025
DOB NOWPlumbingSigned-offPEAK PLUMBING SOLUTIONS L12/10/2024
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG.CORP10/24/2024
DOB NOWSprinklersSigned-offCROSSFIELD PLBG.&HTG10/24/2024
DOB NOWMechanical SystemsSigned-offARIES CONSTRUCTION CO,INC10/15/2024
DOB NOWGeneral ConstructionSigned-offARIES CONSTRUCTION CO,INC10/11/2024
DOB NOWPlumbingSigned-offPEAK PLUMBING SOLUTIONS L08/28/2024
DOB NOWGeneral ConstructionSigned-offMARPRO CONSTRUCTION CORP08/19/2024
DOB NOWPlumbingSigned-offRAPTOR MECHANICAL, INC03/05/2021
DOB NOWSprinklersSigned-offH M SPRINKLER INC12/11/2020
DOB NOWMechanical SystemsSigned-offB & S COOLING10/09/2020
DOB NOWPlumbingSigned-offACCURATE MECHANICAL INC09/25/2020
DOB NOWPlumbingSigned-offDONATO, INC08/31/2020
DOB NOWPlumbingSigned-offRAPTOR MECHANICAL, INC08/24/2020
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP03/15/2019
BISPLISSUEDMACREDDIN PLBG & HTG INC03/17/2023
BISOTISSUEDPILASTER DEVELOPMENT LLC03/08/2021
BISOTISSUEDALFRED CONSTRUCTION INC08/13/2020
BISOTISSUEDPILASTER DEVELOPMENT LLC08/07/2020
BISSPISSUEDBUCKMILLER AUTO.SPKLR.COR06/11/2020
BISPLISSUEDS&H PLUMBING,INC03/02/2020
BISMHISSUEDMIRO BALAC INC02/25/2020
BISOTISSUEDMIRO BALAC INC02/19/2020
BISPLISSUEDVMC PLUMBING & HEATING IN10/24/2018
BISOTISSUEDMULTI CONSTRUCTION CO INC09/11/2018
BISPLISSUEDMACREDDIN PLBG & HTG INC08/20/2018
BISOTISSUEDCADENA CONSTRUCTION INC01/11/2018
BISOTISSUEDEXCEL BUILDERS & RENOVATO03/27/2017
BISPLISSUEDMACREDDIN PLBG & HTG INC02/13/2017
BISMHISSUEDEXCEL BUILDERS & RENOVATO12/16/2016
BISPLISSUEDR.J.C. MECHANICAL CORP11/30/2016
BISMHISSUEDEXCEL BUILDERS & RENOVATO10/04/2016
BISOTISSUEDEXCEL BUILDERS & RENOVATO09/29/2016
BISPLISSUEDPRACTICAL PLBG & HTG INC02/25/2016
BISOTISSUEDBZJ CONSTRUCTION LLC02/12/2016
BISPLISSUEDR.J.C. MECHANICAL CORP07/08/2015
BISMHISSUEDJ THOMAS CONSTRUCTION & F06/09/2015
+ 28 more permits on file
8 projects · most recent 01/19/2025
General Wiring HVAC Wiring
FiledStatusContractorScope
01/19/2025CompleteC.Q. ELECTR'L CONTRG CORPGeneral Wiring
09/22/2024CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
04/23/2021CompleteSUPER CHARGED ELEC. INC.General Wiring
11/02/2020CompleteROBIN ELECTRICAL CO., INCHVAC Wiring
11/02/2020CompleteROBIN ELECTRICAL CO., INCGeneral Wiring
06/07/2020CompleteAPOLLO ELECTRIC USA, INCGeneral Wiring
03/08/2019CompleteTOP SHELF ELECTRIC CORP—
09/26/2018CompleteISTRA ELEC'L CONTRS CORPGeneral Wiring
2 projects · most recent 11/28/2025
Steel Concrete
FiledStatusContractorScope
11/28/2025Permit IssuedCONSTRUCTORS TRADES & SKISteel, Concrete
04/01/2025——Steel, Concrete
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
12/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/16/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/04/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/10/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/03/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
12/01/2025Sprayed fire-resistant materialsBrennan Walshspecial
12/01/2025Structural Stability – Alterations of existing buildingsBrennan Walshspecial
12/01/2025Tenant Protection Plan ComplianceBrennan Walshspecial
12/01/2025Structural Steel - WeldingJONAR MADRIAGAspecial
12/01/2025MasonryBrennan Walshspecial
12/01/2025Structural Steel - DetailsBrennan Walshspecial
12/01/2025FinalBrennan Walshprogress
12/01/2025Structural Cold-Formed SteelBrennan Walshspecial
09/26/2025Sprinkler SystemsMatthew Bendixspecial
09/26/2025Energy Code Compliance InspectionsMatthew Bendixprogress
09/26/2025HVAC-R and service water piping design and insulationMatthew Bendixenergy_progress
09/26/2025HVAC-R and service water heating system controlsMatthew Bendixenergy_progress
09/26/2025Fire-Resistant Penetrations and JointsMatthew Bendixspecial
09/05/2025HVAC-R and service water piping design and insulationMatthew Bendixenergy_progress
09/05/2025Sprinkler SystemsMatthew Bendixspecial
09/05/2025Energy Code Compliance InspectionsMatthew Bendixprogress
09/05/2025HVAC-R and service water heating system controlsMatthew Bendixenergy_progress
09/05/2025Fire-Resistant Penetrations and JointsMatthew Bendixspecial
06/04/2025Fire-Resistant Penetrations and JointsAri Kamospecial
05/29/2025Fire-Resistant Penetrations and JointsAri Kamospecial
02/06/2025Structural Steel - DetailsPrabhu Perumalsamyspecial
02/06/2025Structural Stability – Alterations of existing buildingsPrabhu Perumalsamyspecial
02/06/2025Concrete - Cast-In-PlacePrabhu Perumalsamyspecial
02/06/2025Sprayed fire-resistant materialsPrabhu Perumalsamyspecial
02/06/2025Structural Steel - WeldingPrabhu Perumalsamyspecial
Latest 25 of 45.
▾Documents — 889 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch11
08/24/2026B01055313-P1Request digital key ↗
08/24/2026B01055313-I1Request digital key ↗
08/24/2026B01055275-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
09/02/2026B00386801-I1Request digital key ↗
09/02/2026B00432419-P1Request digital key ↗
09/02/2026B00432419-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing3
09/02/2026B00386107-I1Request digital key ↗
09/02/2026B00386801-I1Request digital key ↗
08/15/2026B00386107-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00400991-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00139676-I1Request digital key ↗
▸Applications & Permits162
▸BISPLAN / WORK APPROVAL APPLICATION72
05/17/2023321445753Open ↗
11/25/2022321445753Open ↗
03/16/2021321946962Open ↗
Showing 3 of 72 on file for this type
▸BISWORK PERMIT APPLICATION70
03/22/2023321445753Open ↗
08/13/2020340754936Open ↗
08/05/2020340749710Open ↗
Showing 3 of 70 on file for this type
▸DOB NOWLPC Approval/Permit12
08/19/2026B01298615-I1Open ↗
08/13/2026B01055275-I1Open ↗
08/13/2026B01298615-P1Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION5
03/12/2020321445753Open ↗
02/25/2020321946962Open ↗
02/25/2020321946962Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records5
▸BISZONING EXHIBIT III- DESC & OWNERSHIP STMNT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTAX LOT- TENTATIVE LOT NUMBER ISSUED2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING EXHIBIT I- CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications203
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION103
03/13/2020321946962Open ↗
02/28/2020321946962Open ↗
02/28/2020321946962Open ↗
Showing 3 of 103 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/04/2026B00386107-P1Open ↗
09/02/2026B00432419-I1Open ↗
09/02/2026B01064981-S1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/02/2026B00139676-I1Open ↗
09/02/2026B00432419-P1Open ↗
09/02/2026B00432419-I1Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST16
10/23/2017321673122Open ↗
Showing 1 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026B01055297-I1Open ↗
09/01/2026B01055297-I1Open ↗
09/01/2026B01064981-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
08/12/2020340754936Open ↗
07/30/2020340749710Open ↗
07/30/2020340749710Open ↗
Showing 3 of 6 on file for this type
▸BISPC FULL REPORT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
08/12/2020340754936Open ↗
07/30/2020340749710Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
08/12/2020340754936Open ↗
07/30/2020340749710Open ↗
Showing 2 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment92
▸BISSELF-CERT PLUMBING NOTICE31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸BISSCHEDULE B - PLUMBING25
12/17/2020321946962Open ↗
12/09/2020321946962Open ↗
Showing 2 of 25 on file for this type
▸BISSPRINKLER INSP REPORT : FP-858
08/02/2019321946962Open ↗
Showing 1 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
05/03/2019321946962Open ↗
11/05/2018321445753Open ↗
08/21/2018321802199Open ↗
Showing 3 of 6 on file for this type
▸BISRPZ/DDCV TEST REPORT : GEN215B5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISWATER METER PERMIT : DEP-METER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
05/21/2021321946962Open ↗
▸Safety & Tenant Protection15
▸BISSTREET TREE CHECKLIST5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTenant Protection Plan and Notes5
08/21/2018321802199Open ↗
10/23/2017321673122Open ↗
09/01/2016321445753Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTenant Protection Plan5
09/02/2026B00432419-P1Open ↗
09/02/2026B00432419-I1Open ↗
08/13/2026B00386107-P1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos51
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
09/02/2026B00432419-I1Open ↗
09/02/2026B00432419-P1Open ↗
08/24/2026B01055313-P1Open ↗
Showing 3 of 17 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)14
08/12/2020340754936Open ↗
07/30/2020340749710Open ↗
05/03/2019321946962Open ↗
Showing 3 of 14 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS INSPECTION REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance51
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS25
03/13/2020321946962Open ↗
02/28/2020321946962Open ↗
05/16/2019321802199Open ↗
Showing 3 of 25 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
05/10/2021340754936Open ↗
05/16/2019321802199Open ↗
04/13/2018321673122Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
05/10/2021340754936Open ↗
02/16/2021321946962Open ↗
08/12/2020340754936Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
08/12/2020340754936Open ↗
Showing 1 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY14
09/14/2021340749710Open ↗
08/04/2021321946962Open ↗
08/04/2021321946962Open ↗
Showing 3 of 14 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/25/2023321445753Open ↗
▸Approvals, Objections & Sign-offs131
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST43
09/06/2023321445753Open ↗
09/14/2021340749710Open ↗
08/04/2021321946962Open ↗
Showing 3 of 43 on file for this type
▸BISLANDMARKS APPROVAL30
08/12/2020340754936Open ↗
07/30/2020340749710Open ↗
06/27/2019321946962Open ↗
Showing 3 of 30 on file for this type
▸BISADMINISTRATIVE OBJECTIONS26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION20
07/23/2021321946962Open ↗
02/16/2021321946962Open ↗
04/13/2018321673122Open ↗
Showing 3 of 20 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISLANDMARKS SIGNOFF3
09/06/2023321445753Open ↗
09/14/2021340749710Open ↗
05/21/2021321946962Open ↗
▸BISTAP LETTER - FIRE SVC : DEP-FIRE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership56
▸BISCOST AFFIDAVIT54
09/14/2021340749710Open ↗
05/10/2021340754936Open ↗
08/12/2020340754936Open ↗
Showing 3 of 54 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
07/25/2023321445753Open ↗
05/21/2021321946962Open ↗
▸Filing & Intake Forms65
▸BISEFILING COVER SHEET33
06/04/2019321946962Open ↗
05/03/2019321946962Open ↗
05/03/2019321946962Open ↗
Showing 3 of 33 on file for this type
▸BISADDITIONAL INFORMATION24
08/14/2023321445753Open ↗
06/02/2023321445753Open ↗
05/23/2023321445753Open ↗
Showing 3 of 24 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
08/12/2020340754936Open ↗
07/30/2020340749710Open ↗
Showing 2 of 5 on file for this type
▸BISBOROUGH INTAKE FORM3
05/16/2019321802199Open ↗
07/24/2018321673122Open ↗
04/13/2018321673122Open ↗
▸Other Documents1
▸DOB NOWProof of Historic Building1
08/13/2026B01064981-I1Open ↗