← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
The Museum Building, A Condominium
9 MERCER STREET · BIN 1003002
💬 Discuss this project
1870Year Built
5Stories
RMBuilding Class
M1-5/R7XZoning
22,513 sfGross Floor Area
8Units
Rent Stabilized5 Open Violations ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: THE MUSEUM BUILDING, A CONDOMINIUM · 5,675 sf lot · 3.97 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof11p · 3 filings · 20 docs
Floor 332p · 4 filings · 20 docs
Floor 2
Floor 114p · 2 filings · 17 docs
Mezzanine15p · 1 filing · 12 docs
Cellar2p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JULIAN A. GOMEZ1403/21/2026
METROPOLIS GROUP INC603/21/2026
FRANKLYN ESTRELLA ARCHITECT PLLC503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
METRO PROJECTS CONST INCGeneral Contractor407/08/2026
SHAWMUT WOODWORKING & SUPPLYGeneral Contractor307/08/2026
LORENZOS GENERAL CONTRACTGeneral Contractor203/21/2026
TMS PLUMBING & HTG CORPFire Protection107/08/2026
QMB PLUMBING & HTG INCFire Protection107/08/2026
QMB PLUMBING & HEATING INCPlumbing107/08/2026
TMS PLMBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RAND ENGINEERING & ARCHIT266708/05/2024
CHARLES G MICHEL ENGINEER2871305/12/2023
PSI AGENCY INC.254209/23/2021
Building Lifecycle
All (132)Filed (15)Permit Issued (9)Signed Off (2)Violation (58)Inspection (14)Objection (4)Special Inspection (30)
05/07/2026
Violation issued (HPD, open)
A
06/12/2025
Violation issued (HPD, closed)
A
11/22/2024
Violation issued (HPD, closed)
I
08/06/2024
Signed off — Alteration
General construction in conjunction with Sprinkler System Upgrade including construction of Sprinkler Booster Pump Room & roof repairs as needed due to removal of existing roof tanks .
M00639509-I1
08/06/2024
Signed off — Alteration
Installation of new sprinkler booster pump system for residential building. No change to use, egress or occupancy.
M00639968-I1
08/06/2024
Special inspection requirement — Final
Raymond Locicero
08/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Peter Varsalona
08/05/2024
Filed — Alteration
General construction in conjunction with Sprinkler System Upgrade including construction of Sprinkler Booster Pump Room & roof repairs as needed due to removal of existing roof tanks .
M00639509-P2
04/16/2024
Violation issued (HPD, closed)
A
02/12/2024
Violation issued (FDNY_NOV, closed)
02/02/2024
Special inspection requirement — Sprinkler Systems
Peter Varsalona
02/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Peter Varsalona
02/01/2024
Filed — Alteration
Installation of new sprinkler booster pump system for residential building. No change to use, egress or occupancy.
M00639968-P3
01/10/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/15/2023
Violation issued (HPD, closed)
I
10/12/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/18/2023
Special inspection requirement — Sprinkler Systems
Peter Varsalona
08/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Peter Varsalona
07/31/2023
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/2023
Violation issued (ECB, closed)
Construction
05/12/2023
Filed — Alteration
M00736613-P1
05/12/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/09/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/09/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/09/2023
Special inspection requirement — Sprinkler Systems
Charles Michel
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/30/2023
Violation issued (HPD, closed)
A
02/07/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/30/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/28/2022
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
12/28/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/28/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/21/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/02/2022
Violation issued (HPD, closed)
I
10/06/2022
Permit issued — General Construction
M00639509-I1-GC
10/04/2022
Filed — Alteration
Installation of new sprinkler booster pump system for residential building. No change to use, egress or occupancy.
M00639968-P2
09/19/2022
Permit issued — Sprinklers
M00736613-I1-EW-SP
09/19/2022
Permit issued — Plumbing
M00737495-I1-PL
09/16/2022
Permit issued — Mechanical Systems
M00738045-I1-MS
09/15/2022
Permit issued — General Construction
M00736052-I1-GC
09/09/2022
Permit issued — Sprinklers
M00639968-I1-EW-SP
09/09/2022
Permit issued — Plumbing
M00639968-I1-PL
09/06/2022
Filed — Alteration
General construction in conjunction with Sprinkler System Upgrade including construction of Sprinkler Booster Pump Room & roof repairs as needed due to removal of existing roof tanks .
M00639509-P1
09/06/2022
Filed — Alteration
Installation of new sprinkler booster pump system for residential building. No change to use, egress or occupancy.
M00639968-P1
08/31/2022
Special inspection requirement — Sprinkler Systems
Peter Varsalona
08/31/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Peter Varsalona
08/31/2022
Special inspection requirement — Final
Raymond Locicero
08/31/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Peter Varsalona
08/26/2022
Filed — Alteration
The installation of new fixtures, piping system for sanitary drainage and venting of all new fixtures including piping drains, pump, vents Refer to App # M00736052-I1
M00737495-I1
08/26/2022
Filed — Alteration
M00736613-I1
08/25/2022
Filed — Alteration
M00736052-I1
08/25/2022
Filed — Alteration
NEW AIR CONDITIONING SYSTEM TO SERVE THE APARTMENT INCLUDING NEW AIR COOLED VARIABLE SPEED HEAT PUMP, EQUIPMENT, REFRIGERANT, PIPING, CONDESATE DRAIN.. ALL AS PER PLANS. REFER TO JOB # M00736052-I1
M00738045-I1
08/08/2022
Special inspection requirement — Maintenance information
Charles Michel
08/08/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Charles Michel
08/08/2022
Special inspection requirement — HVAC-R and service water heating equipment
Charles Michel
08/08/2022
Special inspection requirement — HVAC-R and service water heating system controls
Charles Michel
05/13/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Charles Michel
Latest 60 of 132 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offLORENZOS GENERAL CONTRACT10/06/2022
DOB NOWSprinklersPermit IssuedQMB PLUMBING & HTG INC09/19/2022
DOB NOWPlumbingPermit IssuedQMB PLUMBING & HEATING INC09/19/2022
DOB NOWMechanical SystemsPermit IssuedMETRO PROJECTS CONST INC09/16/2022
DOB NOWGeneral ConstructionPermit IssuedMETRO PROJECTS CONST INC09/15/2022
DOB NOWSprinklersSigned-offTMS PLUMBING & HTG CORP09/09/2022
DOB NOWPlumbingSigned-offTMS PLMBG & HTG CORP09/09/2022
DOB NOWGeneral ConstructionPermit IssuedSHAWMUT WOODWORKING & SUPPLY02/20/2022
DOB NOWGeneral ConstructionPermit IssuedSHAWMUT WOODWORKING & SUPPLY09/10/2021
BISEQISSUEDROCKLEDGE SCAFFOLD CORP04/10/2012
BISEQISSUEDROCKLEDGE SCAFFOLD CORP04/10/2012
BISPLISSUEDCALRAY GAS HT CORP08/27/2003
BISBLISSUEDCALRAY GAS HT CORP08/27/2003
BISEQISSUEDJAMES LEE CONSTRUCTION INC12/12/2002
BISOTISSUEDJAMES LEE CONSTRUCTION INC12/12/2002
BISMHISSUEDWEISS, WOLF & ASSOCIATES12/08/1998
BISPLISSUEDZARA PLUMBING CORP12/08/1998
BISPLISSUEDBENT MECHANICAL CORP10/08/1998
BISMHISSUEDWEISS, WOLF & ASSOCIATE, INC.10/02/1998
BISOTISSUEDPRECISION ELEVATOR04/23/1996
BISPLISSUEDAVON PLBG & HTG INC02/13/1996
BIS—ISSUEDKIYYA OWNERS OF 9 - 13 MERCER ST01/02/1996
BIS—ISSUEDKIYYA OWNERS OF 9 - 13 MERCER ST12/08/1994
BIS—ISSUEDKIYYA OWNERS OF 9 - 13 MERCER ST12/15/1993
1 project · most recent 08/25/2022
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/25/2022Permit IssuedMETRO PROJECTS CONST INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PEFY-P12NMAU-E4 12,000 BTU · Vrf Indoor ×2
PEFY-P36NMAU-E4 36,000 BTU · Vrf Indoor ×1
PEFY-P72NMHSU-E 72,000 BTU · Vrf Indoor ×1
PUHY-EP120TNU-A 10 tons · Vrf Outdoor ×1
Ventilation
Panasonic FV-10NLF1 50 CFM · Exhaust Fan ×3
1 project · most recent 08/26/2022
Gas Water/Sanitary
FiledStatusContractorScope
08/26/2022Permit IssuedQMB PLUMBING & HEATING INGas, Water/Sanitary
3 projects · most recent 07/23/2023
General Wiring
FiledStatusContractorScope
07/23/2023CompleteFIRST STAR ELECTRIC INCGeneral Wiring
12/05/2022CompleteBIG CITY ELECL SOLUTIONSGeneral Wiring
09/20/2021Permit IssuedC.FALCO ELETL CONT CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
01/10/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/12/2023Pass-Final CND-Occupancy InspectionPassView ↗
07/31/2023No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
05/12/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/09/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/09/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/07/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/30/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/28/2022Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
12/28/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/28/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/21/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
08/06/2024FinalRaymond Lociceroprogress
08/06/2024Fire-Resistant Penetrations and JointsPeter Varsalonaspecial
02/02/2024Sprinkler SystemsPeter Varsalonaspecial
02/02/2024Fire-Resistant Penetrations and JointsPeter Varsalonaspecial
08/18/2023Sprinkler SystemsPeter Varsalonaspecial
08/18/2023Fire-Resistant Penetrations and JointsPeter Varsalonaspecial
05/09/2023Sprinkler SystemsCharles Michelspecial
08/31/2022Sprinkler SystemsPeter Varsalonaspecial
08/31/2022Fire-Resistant Penetrations and JointsPeter Varsalonaspecial
08/31/2022FinalRaymond Lociceroprogress
08/31/2022Fire-Resistant Penetrations and JointsPeter Varsalonaspecial
08/08/2022Maintenance informationCharles Michelenergy_progress
08/08/2022HVAC-R and service water piping design and insulationCharles Michelenergy_progress
08/08/2022HVAC-R and service water heating equipmentCharles Michelenergy_progress
08/08/2022HVAC-R and service water heating system controlsCharles Michelenergy_progress
05/13/2022Fire-Resistant Penetrations and JointsCharles Michelspecial
05/13/2022Mechanical SystemsCharles Michelspecial
05/13/2022Energy Code Compliance InspectionsCharles Michelprogress
05/13/2022FinalCharles Michelprogress
05/13/2022Heating SystemsCharles Michelspecial
05/11/2022Energy Code Compliance InspectionsLinna Huntprogress
05/11/2022Lighting in dwelling unitsLinna Huntenergy_progress
05/11/2022FinalLinna Huntprogress
09/24/2021Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
09/24/2021Fire-Resistance Rated ConstructionMAURICIO ANDRADEprogress
Latest 25 of 30.
▾Documents — 132 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
09/03/2026M00563788-I1Request digital key ↗
09/03/2026M00563788-P1Request digital key ↗
09/02/2026M00563918-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits23
▸DOB NOWLPC Approval/Permit16
09/02/2026M00639509-P1Open ↗
08/13/2026M00563788-I1Open ↗
08/13/2026M00563788-P1Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
07/30/2013121674125Open ↗
06/26/2013121674125Open ↗
04/13/2012121044743Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION2
04/13/2012121044743Open ↗
04/13/2012121044734Open ↗
▸Seals & Professional Certifications54
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/03/2026M00563788-I1Open ↗
09/03/2026M00563788-P1Open ↗
09/02/2026M00563918-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/02/2026M00738045-P1Open ↗
09/02/2026M00738045-P1Open ↗
09/01/2026M00563918-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/02/2026M00738045-P1Open ↗
09/02/2026M00738045-P1Open ↗
09/02/2026M00639968-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
04/13/2012121044743Open ↗
04/13/2012121044734Open ↗
08/08/2008110214679Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/13/2012121044743Open ↗
04/13/2012121044734Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
04/13/2012121044743Open ↗
04/13/2012121044734Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
09/03/2026M00563788-I1Open ↗
09/03/2026M00563788-P1Open ↗
09/02/2026M00563918-I1Open ↗
Showing 3 of 18 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
04/13/2012121044743Open ↗
06/26/2008110214679Open ↗
▸Approvals, Objections & Sign-offs6
▸BISADMINISTRATIVE OBJECTIONS4
06/26/2013121674125Open ↗
04/13/2012121044743Open ↗
04/13/2012121044734Open ↗
Showing 3 of 4 on file for this type
▸BISLANDMARKS APPROVAL2
08/08/2008110214679Open ↗
08/07/2008110214679Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
06/26/2013121674125Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET3
06/26/2013121674125Open ↗
04/13/2012121044743Open ↗
04/13/2012121044734Open ↗
▸Other Documents7
▸DOB NOWProof of Historic Building7
09/02/2026M00639509-P1Open ↗
08/13/2026M00639509-I1Open ↗
08/13/2026M00639509-P2Open ↗
Showing 3 of 7 on file for this type