← Back
Elevator cooperative
911 PARK AVENUE
MANHATTAN · BIN 1047495
💬 Discuss this project
1926Year Built
14Stories
D4Building Class
R10Zoning
173,873 sfGross Floor Area
40Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: SAFE
Elevator cooperative · Owner of record: NINE ELEVEN PARK INC · 15,069 sf lot · 11.54 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Roof1p · 1 filing · 7 docs
Floor 122p · 1 filing · 5 docs
Floor 11
Floor 10
Floor 9
Floor 89p · 1 filing · 20 docs
Floor 78p · 1 filing · 20 docs
Floor 62p · 1 filing · 20 docs
Floor 5
Floor 4
Floor 3
Floor 21p · 1 filing · 12 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NINE ELEVEN PARK INC DOUG103/22/2026
DOUGLAS ELLIMAN PROPERTY MANAG1403/22/2026
983 TENANT103/22/2026
911 PARK OWNERS DOUG ELL PROP MG203/21/2026
911 PARK AVENUE INC C-O DEPM203/21/2026
NINE ELEVEN PARK INC C O DOUGLA203/21/2026
911 PARK INC %DOUGLAS ELLI103/21/2026
RUDCO - 275303/21/2026
911PARK603/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LMS-ACE SERVICES403/21/2026
GREEN LIGHT EXPEDITING LLC1803/21/2026
METROPOLIS GROUP INC403/21/2026
CLARKE CONSTRUCTION CONSULTANTS703/21/2026
PRAXIS WORKSHOP603/21/2026
WILLIAM VITACCO ASSOCIATES603/21/2026
DOMANI CONSULTING103/21/2026
KUSHNER STUDIOS103/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
K & K RENOVATION INCGeneral Contractor1307/08/2026
HANJO CONTRACTORS INCGeneral Contractor607/08/2026
DONATO PLUMBING, INCPlumbing607/08/2026
HAMILTON AIR COMPANY, INC.General Contractor307/08/2026
EVEREST SCAFFOLDING INCGeneral Contractor207/08/2026
FANUKA INCGeneral Contractor207/08/2026
BENT MECHANICAL CORPPlumbing207/08/2026
LTB MECHANICAL CORPGeneral Contractor203/21/2026
NYC IRONWORKERS LOCAL 40Electrical103/21/2026
ROBERT SILVERMANElectrical103/21/2026
SILVERMAN ROBERTElectrical103/21/2026
STUART MOSKOWITZElectrical103/21/2026
AIRCON HTNG & COOLING CORGeneral Contractor109/10/2026
BENJAMIN DREBINElectrical103/21/2026
COMFORT TECH MECHANICAL CGeneral Contractor107/08/2026
TCS HOME IMPROVEMENTS INCGeneral Contractor104/09/2026
ZACCO BUILDING CORPGeneral Contractor107/08/2026
A.M.N. CORPORATIONPlumbing107/08/2026
CAULDWELL WINGATE CO LLCGeneral Contractor107/08/2026
CARL WEISSElectrical103/21/2026
EINSTEIN ELEC'L CORPElectrical103/22/2026
FRED GELLER ELEC'L INC.Electrical103/22/2026
KONTOROUHAS, VASILIOSElectrical103/21/2026
LEONARD KRITZElectrical103/21/2026
MOLLER, GEORGEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
COMPLY BUILDING GROUP8622301/06/2026
MEP INSPECTIONS, INC1102508/04/2025
INTEGRITY CONSULTING SERV666312/22/2023
PIRO STUDIO LLC7503312/22/2023
PIER, FINE ASSOCIATES1069206/20/2023
ALAN MARGOLIN & ASSOC423206/20/2023
CHARLES G MICHEL ENGINEER2871101/27/2023
JACK GREEN ASSOCIATES422107/07/2022
WINTON GROUP ARCHITECTURE4343105/23/2022
PSI AGENCY INC.254102/25/2022
Building Lifecycle
All (219)Filed (30)Permit Issued (34)Signed Off (13)Facade (FISP) (12)Violation (46)Inspection (18)Objection (36)Special Inspection (30)
09/09/2026
Permit issued — Mechanical Systems
M01238686-S2-MS
02/10/2026
Objection resolved — Addressed
02/10/2026
Objection resolved — Addressed
01/29/2026
Objection raised — Other
01/29/2026
Objection raised — Scope
01/15/2026
Objection resolved — Addressed
01/09/2026
Objection raised — Scope
01/06/2026
Filed — Alteration
Plumbing work in conjunction with GC DOB# M01147526-I1 for the renovation of apartment unit 6 B. No change in use or occupancy under this application.
M01238686-S1
01/06/2026
Filed — Alteration
Plumbing work in conjunction with GC DOB# M01147526-I1 for the renovation of apartment unit 6 B. No change in use or occupancy under this application.
M01238686-S2
12/31/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
12/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANA ACCETTA
12/15/2025
Permit issued — General Construction
M01238686-I1-GC
10/23/2025
Filed — Alteration
Plumbing work in conjunction with GC DOB# M01147526-I1 for the renovation of apartment unit 6 B. No change in use or occupancy under this application.
M01238686-I1
10/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
ANA ACCETTA
10/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANA ACCETTA
10/18/2025
Special inspection requirement — Post-installed Anchors
ANA ACCETTA
10/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
ANA ACCETTA
10/18/2025
Special inspection requirement — Energy Code Compliance Inspections
ANA ACCETTA
10/18/2025
Special inspection requirement — Interior lighting power
ANA ACCETTA
10/18/2025
Special inspection requirement — Lighting in dwelling units
ANA ACCETTA
10/18/2025
Special inspection requirement — Fenestration air leakage
ANA ACCETTA
10/18/2025
Special inspection requirement — Air barrier - visual inspection
ANA ACCETTA
09/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/21/2025
Signed off — Alteration
PERFORM MECHANICAL WORK INCONJUNCTION WITH APT#8A RENOVATION. INSTALL NEW CENTRAL A/C SYSTEM CONSISTING OF THREE SPLIT SYSTEMS AND TWO PACKAGED UNITS. AND NO CHANGE TO USE, EGRESS, OCCUPANCY OR FIRE PROTECTION.
M00972291-I1
08/06/2025
Signed off — Alteration
PERFORM MECHANICAL WORK INCONJUNCTION WITH APT#8A RENOVATION. INSTALL NEW CENTRAL A/C SYSTEM CONSISTING OF THREE SPLIT SYSTEMS AND TWO PACKAGED UNITS. AND NO CHANGE TO USE, EGRESS, OCCUPANCY OR FIRE PROTECTION.
M00972291-S1
08/04/2025
Filed — Alteration
Filing Plumbing modification as per plans. No change in use, egress, or occupancy under this application.
M01059264-P3
08/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Crosetto
07/31/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/21/2025
Signed off — Alteration
Filing Plumbing modification as per plans. No change in use, egress, or occupancy under this application.
M01059264-I1
07/03/2025
Signed off — Alteration
Filing interior renovations in Apt 3b as per plan. No change in use, egress, or occupancy under this application.
M01105934-I1
06/10/2025
Special inspection requirement — Final
ANA ACCETTA
05/05/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/05/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/22/2025
Filed — Alteration
Filing Plumbing modification as per plans. No change in use, egress, or occupancy under this application.
M01059264-P2
03/21/2025
Permit issued — Plumbing
M00972291-S1-PL
03/04/2025
Permit issued — Mechanical Systems
M00972291-S2-MS
03/04/2025
Permit issued — General Construction
M00972291-I1-GC
01/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/10/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/02/2025
Permit issued — General Construction
M01105934-I1-GC
12/18/2024
Filed — Alteration
Filing interior renovations in Apt 3b as per plan. No change in use, egress, or occupancy under this application.
M01105934-I1
12/17/2024
Signed off — Alteration
PLUMBING FIXTURES IN APT 7B FILED IN CONJUNCTION WITH DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00804643-S1
12/17/2024
Signed off — Alteration
PLUMBING FIXTURES IN APT 7B FILED IN CONJUNCTION WITH DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00804643-S2
12/11/2024
Signed off — Alteration
PLUMBING FIXTURES IN APT 7B FILED IN CONJUNCTION WITH DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00804643-I1
10/23/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/04/2024
Special inspection requirement — Final
Frankie Campione
09/03/2024
Filed — Alteration
Filing Plumbing modification as per plans. No change in use, egress, or occupancy under this application.
M01059264-P1
08/27/2024
Permit issued — Plumbing
M01059264-S2-PL
08/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Crosetto
08/26/2024
Permit issued — Mechanical Systems
M01059264-S1-MS
08/23/2024
Permit issued — General Construction
M01059264-I1-GC
07/26/2024
Filed — Alteration
Filing Plumbing modification as per plans. No change in use, egress, or occupancy under this application.
M01059264-S2
07/26/2024
Filed — Alteration
Filing Plumbing modification as per plans. No change in use, egress, or occupancy under this application.
M01059264-S1
07/18/2024
Filed — Alteration
Filing Plumbing modification as per plans. No change in use, egress, or occupancy under this application.
M01059264-I1
07/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicolas Crosetto
07/17/2024
Special inspection requirement — HVAC-R and service water heating system controls
Nicolas Crosetto
Latest 60 of 219 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAIRCON HTNG & COOLING COR09/09/2026
DOB NOWGeneral ConstructionSigned-offTCS HOME IMPROVEMENTS INC12/15/2025
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC03/21/2025
DOB NOWMechanical SystemsPermit IssuedHANJO CONTRACTORS03/04/2025
DOB NOWGeneral ConstructionSigned-offHANJO CONTRACTORS03/04/2025
DOB NOWGeneral ConstructionSigned-offZACCO BUILDING CORP01/02/2025
DOB NOWPlumbingSigned-offA.M.N. CORPORATION08/27/2024
DOB NOWMechanical SystemsSigned-offK K RENOVATION08/26/2024
DOB NOWGeneral ConstructionSigned-offK K RENOVATION08/23/2024
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC03/26/2024
DOB NOWGeneral ConstructionSigned-offHANJO CONTRACTORS03/04/2024
DOB NOWMechanical SystemsPermit IssuedHANJO CONTRACTORS03/04/2024
DOB NOWPlumbingSigned-offBENT MECHANICAL CORP02/15/2024
DOB NOWGeneral ConstructionSigned-offK K RENOVATION08/28/2023
DOB NOWMechanical SystemsSigned-offK K RENOVATION08/17/2023
DOB NOWGeneral ConstructionSigned-offK K RENOVATION06/09/2023
DOB NOWMechanical SystemsSigned-offK K RENOVATION06/09/2023
DOB NOWMechanical SystemsSigned-offK K RENOVATION04/03/2023
DOB NOWGeneral ConstructionSigned-offK K RENOVATION02/27/2023
DOB NOWPlumbingSigned-offBENT MECHANICAL CORP02/11/2023
DOB NOWGeneral ConstructionSigned-offK K RENOVATION02/09/2023
DOB NOWGeneral ConstructionSigned-offHAMILTON AIR COMPANY, INC.10/14/2022
DOB NOWMechanical SystemsPermit IssuedHAMILTON AIR COMPANY, INC.09/27/2022
DOB NOWGeneral ConstructionPermit IssuedCAULDWELL WINGATE CO LLC05/10/2022
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC08/03/2021
DOB NOWMechanical SystemsSigned-offCOMFORT TECH MECHANICAL C05/17/2021
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC02/08/2021
DOB NOWMechanical SystemsSigned-offLTB MECHANICAL01/07/2021
DOB NOWMechanical SystemsSigned-offFANUKA11/23/2020
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC11/02/2020
DOB NOWMechanical SystemsSigned-offFANUKA08/07/2020
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC08/04/2020
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC02/11/2020
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC11/09/2019
BISOTISSUEDINTERIOR MANAGEMENT LLC02/24/2021
BISOTISSUEDFANUKA INC11/17/2020
BISOTISSUEDJC CONTRACTING.MGMT LLC08/07/2020
BISOTISSUEDFANUKA INC08/05/2020
BISOTISSUEDINTERIOR MANAGEMENT LLC04/08/2020
BISMHISSUEDEDMUND LEWIS LTD01/02/2020
+ 44 more permits on file
5 projects · most recent 01/06/2026
Air Conditioning Systems Ventilation Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/06/2026Signed-offAIRCON HTNG & COOLING CORAir Conditioning Systems, Ventilation Systems
Cooling
Islandaire EZ07 7,000 BTU · Ptac ×16
EZ15 14,500 BTU · Ptac ×12
EX09 9,200 BTU · Ptac ×4
EZ12 12,000 BTU · Ptac ×4
Ventilation
Loren Cook GN-840 760 CFM · Exhaust Fan ×4
08/04/2025Signed-offK & K RENOVATION INCAir Conditioning Systems
Cooling
First Company 25HXX 24,000 BTU · Fan Coil Indoor ×1
12/22/2023Permit IssuedHANJO CONTRACTORS INCHeating and Air Conditioning Systems
Heat / Cool
Magic-Aire MODEL#DHB - 10 30,000 BTU · Fan Coil Indoor ×6
Task TGC-021TW-30K-3620 30,000 BTU · Condensing Unit ×6
07/07/2022Signed-offHAMILTON AIR COMPANY, INCAir Conditioning Systems
Cooling
Ice Air 5RSAN13 12,200 BTU · Ptac ×2
8RSAN13 12,700 BTU · Ptac ×1
8RSMK13 11,500 BTU · Ptac ×1
05/15/2020Signed-offFANUKA INCAir Conditioning Systems
Cooling
Iec CPY-03 9,000 BTU ×2
CPY-04 12,000 BTU ×2
CPY-02 24,000 BTU ×1
CPY-08 24,000 BTU ×1
CPY-10 12,000 BTU ×1
CPY-6 18,000 BTU ×1
3 projects · most recent 01/06/2026
Water/Sanitary Gas
FiledStatusContractorScope
01/06/2026——Gas, Water/Sanitary
08/04/2025Signed-offK.O.S. PLUMBING&HEATING,IGas, Water/Sanitary
12/22/2023Signed-offDONATO PLUMBING, INCWater/Sanitary
20 projects · most recent 03/16/2026
General Wiring
FiledStatusContractorScope
03/16/2026Permit IssuedAMSTERDAM ELECTRIC CORPGeneral Wiring
12/19/2025Permit IssuedA.C. MORGAN ELECTRICGeneral Wiring
07/30/2025CompleteGAUGE TECH ELECTRIC INCGeneral Wiring
06/13/2025CompleteM & M CONTROL WIRING &General Wiring
12/19/2024CompleteMKU ELECTRIC CORP—
06/05/2024Permit IssuedEINSTEIN ELEC'L CORP—
06/05/2024Permit IssuedEINSTEIN ELEC'L CORPGeneral Wiring
05/13/2024CompleteFRED GELLER ELEC'L INC.General Wiring
03/20/2024CompleteGAUGE TECH ELECTRIC INCGeneral Wiring
06/01/2023CompleteJAM ELECTRICAL CORP—
05/02/2023CompleteJAM ELECTRICAL CORP—
08/15/2022CompleteMARTIN DORKINGeneral Wiring
11/17/2021CompleteSUPER CHARGED ELEC. INC.General Wiring
07/13/2021CompleteEINSTEIN ELEC'L CORPGeneral Wiring
03/05/2021CompleteDECECK & LEONARD,INCGeneral Wiring
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
12/31/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
10/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/31/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/10/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/19/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/03/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/06/2022Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
12/16/2025Fire-Resistant Penetrations and JointsANA ACCETTAspecial
10/18/2025Fire-Resistance Rated ConstructionANA ACCETTAprogress
10/18/2025Fire-Resistant Penetrations and JointsANA ACCETTAspecial
10/18/2025Post-installed AnchorsANA ACCETTAspecial
10/18/2025Tenant Protection Plan ComplianceANA ACCETTAspecial
10/18/2025Energy Code Compliance InspectionsANA ACCETTAprogress
10/18/2025Interior lighting powerANA ACCETTAenergy_progress
10/18/2025Lighting in dwelling unitsANA ACCETTAenergy_progress
10/18/2025Fenestration air leakageANA ACCETTAenergy_progress
10/18/2025Air barrier - visual inspectionANA ACCETTAenergy_progress
08/01/2025Fire-Resistant Penetrations and JointsNicolas Crosettospecial
06/10/2025FinalANA ACCETTAprogress
09/04/2024FinalFrankie Campioneprogress
08/27/2024Fire-Resistant Penetrations and JointsNicolas Crosettospecial
07/17/2024HVAC-R and service water piping design and insulationNicolas Crosettoenergy_progress
07/17/2024HVAC-R and service water heating system controlsNicolas Crosettoenergy_progress
07/17/2024HVAC-R and service water heating equipmentNicolas Crosettoenergy_progress
05/30/2024FinalNicolas Crosettoprogress
05/30/2024Mechanical SystemsNicolas Crosettospecial
12/15/2023Post-installed AnchorsPIETRO ROSATOspecial
12/05/2023Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
12/05/2023Tenant Protection Plan ComplianceALEKSANDR LEVINspecial
12/05/2023Fire-Resistance Rated ConstructionRUSSELL RICCARDIprogress
12/05/2023FinalRUSSELL RICCARDIprogress
12/05/2023Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
Latest 25 of 44.
▾Documents — 1,029 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch22
09/03/2026M00515262-I1Request digital key ↗
09/02/2026M00721007-S1Request digital key ↗
08/30/2026M00804643-S1Request digital key ↗
Showing 3 of 22 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/03/2026M00216803-I1Request digital key ↗
09/02/2026M00328951-I1Request digital key ↗
09/02/2026M00328951-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/04/2026M00300414-I1Request digital key ↗
08/15/2026M00216771-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00312200-I1Request digital key ↗
▸Applications & Permits225
▸BISWORK PERMIT APPLICATION101
08/07/2020123857638Open ↗
08/05/2020123832932Open ↗
04/13/2020123815979Open ↗
Showing 3 of 101 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION95
11/10/2021123857638Open ↗
10/20/2021123857638Open ↗
10/04/2021123857638Open ↗
Showing 3 of 95 on file for this type
▸DOB NOWLPC Approval/Permit29
09/03/2026M00216803-I1Open ↗
09/02/2026M00328951-I1Open ↗
09/02/2026M00328951-P1Open ↗
Showing 3 of 29 on file for this type
▸Seals & Professional Certifications231
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION138
04/10/2020122129231Open ↗
04/10/2020122129231Open ↗
04/10/2020122129231Open ↗
Showing 3 of 138 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature30
09/05/2026M00312200-I1Open ↗
09/03/2026M00216803-P1Open ↗
09/03/2026M00216803-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/23/2026M00721007-S1Open ↗
09/01/2026M00972291-S2Open ↗
08/27/2026M01238686-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/23/2026M00721007-S1Open ↗
09/01/2026M01059264-P3Open ↗
09/01/2026M00972291-S2Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
02/07/2020123857638Open ↗
07/11/2018123474604Open ↗
Showing 2 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
02/07/2020123857638Open ↗
07/11/2018123474604Open ↗
07/11/2018123474604Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment80
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE34
04/16/2019123131477Open ↗
06/21/2018123574854Open ↗
06/06/2018123587644Open ↗
Showing 3 of 34 on file for this type
▸BISSELF-CERT PLUMBING NOTICE23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISSCHEDULE B - PLUMBING9
09/14/2021123131477Open ↗
Showing 1 of 9 on file for this type
▸BISEQUIPMENT USE PERMITS6
08/22/2018123474604Open ↗
08/22/2018123474604Open ↗
08/22/2018123474604Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
08/22/2018123474604Open ↗
08/22/2018123474604Open ↗
08/22/2018123474604Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
07/26/2018121998561Open ↗
Showing 1 of 2 on file for this type
▸Safety & Tenant Protection24
▸BISTenant Protection Plan and Notes11
03/16/2020123832932Open ↗
10/11/2019123815979Open ↗
09/18/2019123815979Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWTenant Protection Plan8
09/03/2026M00216803-I1Open ↗
09/02/2026M00328951-I1Open ↗
09/02/2026M00328951-P1Open ↗
Showing 3 of 8 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM4
01/10/2020123815979Open ↗
12/16/2019123815979Open ↗
Showing 2 of 4 on file for this type
▸BISTenant Protection Plan and NotesTenant Protection Plan and Notes1
06/06/2018123587644Open ↗
▸Environmental & Asbestos67
▸DOB NOWDEP ACP-5: Asbestos Assessment Report23
09/02/2026M00721007-S1Open ↗
08/30/2026M00804643-P1Open ↗
08/30/2026M00804643-S1Open ↗
Showing 3 of 23 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)21
07/30/2020123832932Open ↗
02/07/2020123857638Open ↗
Showing 2 of 21 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)6
08/13/2018123587644Open ↗
Showing 1 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
09/03/2026M00216803-I1Open ↗
09/02/2026M00328951-I1Open ↗
08/13/2026M00216771-I1Open ↗
Showing 3 of 4 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
11/04/2019123815979Open ↗
08/17/2018123574854Open ↗
▸Energy Compliance58
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS33
03/16/2020123832932Open ↗
08/22/2018123474604Open ↗
08/17/2018123574854Open ↗
Showing 3 of 33 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
09/14/2021123832932Open ↗
08/22/2018123474604Open ↗
04/26/2018123075144Open ↗
Showing 3 of 12 on file for this type
▸BISTR8: Energy Code Progress Inspections5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/14/2021123832932Open ↗
07/24/2020122054374Open ↗
▸BISENERGY CODE 1ST REVIEW COMPLETE2
02/07/2020123857638Open ↗
Showing 1 of 2 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/24/2020122054374Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00515262-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00804643-S2Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY14
12/02/2021123857638Open ↗
12/02/2021123857638Open ↗
12/02/2021123857638Open ↗
Showing 3 of 14 on file for this type
▸BISPOST-INSTALLED ANCHORS2
12/15/2021123815979Open ↗
12/01/2021123857638Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS2
12/15/2021123815979Open ↗
12/01/2021123857638Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/15/2021123815979Open ↗
▸BISMASONRY1
12/01/2021123857638Open ↗
▸BISFINAL INSPECTION1
12/21/2021123815979Open ↗
▸Approvals, Objections & Sign-offs88
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST33
12/21/2021123815979Open ↗
12/02/2021123857638Open ↗
11/04/2021123131477Open ↗
Showing 3 of 33 on file for this type
▸BISLANDMARKS APPROVAL29
04/21/2020123832932Open ↗
04/10/2020122129231Open ↗
04/03/2020122129231Open ↗
Showing 3 of 29 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
02/14/2019121998561Open ↗
02/12/2019123131477Open ↗
04/26/2018123075144Open ↗
Showing 3 of 11 on file for this type
▸BISLANDMARKS SIGNOFF3
12/15/2021123815979Open ↗
12/02/2021123857638Open ↗
07/24/2020122054374Open ↗
▸BISFINAL1
12/01/2021123857638Open ↗
▸Cost, Insurance & Ownership79
▸BISCOST AFFIDAVIT74
10/04/2021123857638Open ↗
09/14/2021123832932Open ↗
04/10/2020122129231Open ↗
Showing 3 of 74 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
12/01/2021123857638Open ↗
11/23/2021123815979Open ↗
11/01/2021123131477Open ↗
Showing 3 of 4 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms111
▸BISADDITIONAL INFORMATION45
11/10/2021123857638Open ↗
09/21/2021123131477Open ↗
01/10/2020123815979Open ↗
Showing 3 of 45 on file for this type
▸BISEFILING COVER SHEET41
03/16/2020123832932Open ↗
02/07/2020123857638Open ↗
09/18/2019123815979Open ↗
Showing 3 of 41 on file for this type
▸BISBOROUGH INTAKE FORM20
08/07/2020123857638Open ↗
08/05/2020123832932Open ↗
04/10/2020122129231Open ↗
Showing 3 of 20 on file for this type
▸BISeFiling Job Application Cover Sheet3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISHPD-3 - SRO MD ANTI-HARASSEMENT CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents14
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWProof of Historic Building2
08/13/2026M00972291-I1Open ↗
08/13/2026M00671160-I1Open ↗
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type