RoofUnder Construction21p · 8 filings · 20 docs
ArchitectureEquipmentMechanicalStructural
Issued Permit Scope
General Construction · Structural
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
8 documents · 1 drawing sheet
55th Street Plaza bulkhead roof replacement, as per plans. No change to use, egress, or occupancy.
On file for this project
6 documents · 2 drawing sheets
Main roof replacement and traffic coating, as per plans. Work scope includes guardrail replacement and steel dunnage refurbishment. No change to use, egress, or occupancy.
On file for this project
12 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Bulkhead2p · 1 filing · 2 docs
GeneralStructural
No filed description on record for this project.
On file for this project
2 documents · 2 drawing sheets
Floor 47Under Construction35p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Standpipe
Modifications to the existing sprinkler system on the 47th Floor, as per plans. No change to use, egress, or occupancy.
On file for this project
3 documents
Modifications to the existing standpipe system on the 47th Floor, as per plans. No change to use, egress, or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modifications, replacements, and additions to the existing plumbing fixtures and piping on the 47th Floor, as per plans. No change to use, egress, or occupancy.
On file for this project
9 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 46Under Construction21p · 9 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Sprinklers · Standpipe · Structural
Modifications to the existing sprinkler system on the 46th Floor, as per plans. No change to use, egress, or occupancy.
On file for this project
3 documents · 1 drawing sheet
Modifications to the existing standpipe system on the 46th Floor, as per plans. No change to use, egress, or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modifications, replacements, and additions to the existing plumbing fixtures and piping on the 46th Floor, as per plans. No change to use, egress, or occupancy.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 45Under Construction54p · 10 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Modifications, replacements, and additions to the existing plumbing fixtures and piping on the 45th Floor, as per plans. No change to use, egress, or occupancy.
On file for this project
4 documents · 2 drawing sheets
Interior renovation of existing office space with minor interior demolition, and work on partitions, doors, ceilings and finishes on the 45th Floor, as per plans. No change to use, egress, or occupancy.
On file for this project
5 documents · 1 drawing sheet
Project M01322267Permit Issued · 01/27/2026
Modifications of the existing HVAC system and associated ducts & piping on the 45th Floor, as per plans. No change to use, egress, or occupancy.
On file for this project
6 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 447p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Removal of existing plumbing fixtures and associated piping on the 35th, 42nd through 44th floors as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Slab infill and reinforcement on the 36th and 42nd through 45th floors as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Modifications to the existing HVAC system on the 35th and 41st through 44th floors as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 438p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Removal of existing plumbing fixtures and associated piping on the 35th, 42nd through 44th floors as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Slab infill and reinforcement on the 36th and 42nd through 45th floors as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Modifications to the existing HVAC system on the 35th and 41st through 44th floors as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 4210p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Removal of existing plumbing fixtures and associated piping on the 35th, 42nd through 44th floors as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Slab infill and reinforcement on the 36th and 42nd through 45th floors as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Modifications to the existing HVAC system on the 35th and 41st through 44th floors as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 4115p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Modifications to the existing HVAC system on the 35th and 41st through 44th floors as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Modifications to the existing plumbing system on the 41st floors as per plans. No change to use, egress or occupancy.
On file for this project
7 documents · 2 drawing sheets
Removal and disposal of interior partitions, doors, suspended ceilings and finishes with patching of walls, interior columns, floors and fireproofing of exposed steel on the 41st floors as per plans. No change to use, egress or occupancy.
On file for this project
10 documents · 3 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 4022p · 18 filings · 20 docs
ArchitectureCivilDMFire ProtectionMechanicalPlumbingStructural
Modifications to the existing standpipe system on the 40th floor (Suite 4020) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modifications to the existing plumbing system on the 40th floor (Bluerock) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Minor demolition with installation of new partitions, doors, ceilings and finishes on the 40th floor (Bluerock) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 3911p · 4 filings · 20 docs
Fire ProtectionPlumbingStructural
Modifications to the existing sprinkler system with installation of temporary loops (LL Work) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Structural modifications for new stair and modernfold partition (Mintz) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Modifications to the existing plumbing system (LL Work) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 3811p · 4 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Modifications to the existing sprinkler system with installation of temporary loops (LL Work) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Modifications to the existing plumbing system (LL Work) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Removal and disposal of interior partitions, doors, suspended ceiling and finishes with patch, repair and replacement of walls, doors and columns (LL Work) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 3711p · 7 filings · 20 docs
Fire ProtectionPlumbingStructural
PLUMBING MODIFICAITONS ON THE 29TH FLOOR (30TH FLOOR MAKERTING) PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
PLUMBING MODIFICATIONS ON THE 27TH AND 28TH (28TH AND 29TH MKTG) FLOORS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
PLUMBING MODIFICATIONS ON THE 31ST - 32ND (32ND AND 33RD MARKETING) FLOORS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 369p · 3 filings · 20 docs
Structural
Slab infill and reinforcement on the 36th and 42nd through 45th floors as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Stair removal and infill on the 28th through 33rd floors as per plans. No change to use, egress or occupancy.
On file for this project
9 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
22 documents · 7 drawing sheets
Floor 3513p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Removal of existing plumbing fixtures and associated piping on the 35th, 42nd through 44th floors as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Modifications to the existing HVAC system on the 35th and 41st through 44th floors as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Modifications to the existing sprinkler system with installation of temporary loops on the 35th and 42nd through 45th floors as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 3430p · 15 filings · 20 docs
ArchitectureCivilDMFire ProtectionLandscapeMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems
Installation of new plumbing fixtures and associated piping on the 34th floor (Cohen- Suite 3400) as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Installation of new fire hose cabinet and associated piping on the 34th floor (Cohen- Suite 3400) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Installation of new partitions, doors, suspended ceilings and finishes on the 34th floor (Cohen- Suite 3400) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 3317p · 6 filings · 20 docs
DMFire ProtectionMechanicalPlumbingStructural
STRUCTURAL MODIFICATIONS ON FLOORS 31-32 (32-33 MARKETING) PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
23 documents · 4 drawing sheets
STRUCTURAL MODIFICATIONS INCLUDING SLAB REMOVAL AND FRAMING FOR INTERIOR CONVENIENCE STAIRS ON FLOORS 17 (18 MKTG) AND 27-32 (28-33 MKTG) PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 2 drawing sheets
Removal of existing plumbing fixtures and associated piping on the 28th through 33rd floors as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 3241p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction
ALT-CO FILED HEREWITH TO CHANGE OCCUPANCY ON 30TH FLOOR (31 MKTG,) REMOVAL OF PUBLIC ASSEMBLY SPACE ON 3RD FLOOR, REMOVAL OF CAFETERIA ON 32ND FLOOR (33RD MKTG.) GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON 30TH FLOOR (31 MKTG) PER PLANS.
On file for this project
18 documents
STRUCTURAL MODIFICATIONS ON FLOORS 31-32 (32-33 MARKETING) PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
23 documents · 1 drawing sheet
GENERAL CONSTRUCTION MODIFICATIONS RELATED TO CONVENIENCE STAIR ON FLOORS 31 AND 32 (32 AND 33 MKTG) PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 3114p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
PLUMBING MODIFICAITONS ON THE 29TH FLOOR (30TH FLOOR MAKERTING) PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
STRUCTURAL MODIFICATIONS ON THE 30TH FLOOR (31 MARKETING) PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 2 drawing sheets
STRUCTURAL MODIFICATIONS INCLUDING SLAB REMOVAL AND FRAMING FOR INTERIOR CONVENIENCE STAIRS ON FLOORS 17 (18 MKTG) AND 27-32 (28-33 MKTG) PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 3039p · 7 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction
ALT-CO FILED HEREWITH TO CHANGE OCCUPANCY ON 30TH FLOOR (31 MKTG,) REMOVAL OF PUBLIC ASSEMBLY SPACE ON 3RD FLOOR, REMOVAL OF CAFETERIA ON 32ND FLOOR (33RD MKTG.) GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON 30TH FLOOR (31 MKTG) PER PLANS.
On file for this project
18 documents
STRUCTURAL MODIFICATIONS ON THE 29TH (30 MKTG) FLOOR PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
9 documents · 4 drawing sheets
GENERAL CONSTRUCTION MODIFICATIONS RELATED TO CONVENIENCE STAIR ON FLOORS 31 AND 32 (32 AND 33 MKTG) PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 2912p · 4 filings · 20 docs
Fire ProtectionPlumbingStructural
STRUCTURAL MODIFICATIONS INCLUDING SLAB REMOVAL AND FRAMING FOR INTERIOR CONVENIENCE STAIRS ON FLOORS 17 (18 MKTG) AND 27-32 (28-33 MKTG) PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Removal of existing plumbing fixtures and associated piping on the 28th through 33rd floors as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Removal of existing sprinkler heads and associated piping with installation of temporary loops on the 28th through 33rd floors as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 28Under Construction56p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
SPRINKLER AND STANDPIPE SYSTEMS MODIFICATIONS ON THE 27TH AND 28TH (28TH AND 29TH MKTG) FLOORS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents
GENERAL CONSTRUCTION MODIFICATIONS ON THE 27TH AND 28TH (28TH AND 29TH MKTG) FLOORS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents
MECHANICAL SYSTEMS MODIFICATIONS ON THE 27TH AND 28TH (28TH AND 29TH MKTG) FLOORS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
Latest 3 of 8 filings on this floor.
Floor 27Under Construction52p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
SPRINKLER AND STANDPIPE SYSTEMS MODIFICATIONS ON THE 27TH AND 28TH (28TH AND 29TH MKTG) FLOORS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents
GENERAL CONSTRUCTION MODIFICATIONS ON THE 27TH AND 28TH (28TH AND 29TH MKTG) FLOORS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents
MECHANICAL SYSTEMS MODIFICATIONS ON THE 27TH AND 28TH (28TH AND 29TH MKTG) FLOORS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
Latest 3 of 4 filings on this floor.
Floor 269p · 1 filing · 20 docs
Structural
No filed description on record for this project.
On file for this project
22 documents · 9 drawing sheets
Floor 259p · 1 filing · 20 docs
Structural
No filed description on record for this project.
On file for this project
22 documents · 9 drawing sheets
Floor 249p · 1 filing · 20 docs
Structural
No filed description on record for this project.
On file for this project
22 documents · 9 drawing sheets
Floor 239p · 2 filings · 20 docs
GeneralStructural
Sprinkler modifications taking place on the 1st floor (warming pantry) per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents
No filed description on record for this project.
On file for this project
22 documents · 9 drawing sheets
Floor 229p · 1 filing · 20 docs
Structural
No filed description on record for this project.
On file for this project
22 documents · 9 drawing sheets
Floor 219p · 1 filing · 20 docs
Structural
No filed description on record for this project.
On file for this project
22 documents · 9 drawing sheets
Floor 209p · 1 filing · 20 docs
Structural
No filed description on record for this project.
On file for this project
22 documents · 9 drawing sheets
Floor 199p · 1 filing · 20 docs
Structural
No filed description on record for this project.
On file for this project
22 documents · 9 drawing sheets
Floor 1810p · 3 filings · 20 docs
Structural
STRUCTURAL MODIFICATIONS ON FLOORS 31-32 (32-33 MARKETING) PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
23 documents · 1 drawing sheet
STRUCTURAL MODIFICATIONS INCLUDING SLAB REMOVAL AND FRAMING FOR INTERIOR CONVENIENCE STAIRS ON FLOORS 17 (18 MKTG) AND 27-32 (28-33 MKTG) PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
22 documents · 9 drawing sheets
Floor 1710p · 2 filings · 20 docs
CivilStructural
GENERAL CONSTRUCTION MODIFICATIONS ON THE 31ST, AND 32ND (32ND AND 33RD MARKETING) FLOORS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
9 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
22 documents · 9 drawing sheets
Floor 169p · 1 filing · 20 docs
Structural
No filed description on record for this project.
On file for this project
22 documents · 9 drawing sheets
Floor 1512p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
modification to existing sprinkler system as per plans filed herewith.
On file for this project
3 documents · 1 drawing sheet
Modification to existing plumbing fixtures
On file for this project
9 documents · 2 drawing sheets
No filed description on record for this project.
On file for this project
22 documents · 9 drawing sheets
Floor 14Under Construction37p · 3 filings · 20 docs
ArchitectureMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems
GENERAL CONSTRUCTION MODIFICATIONS ON THE 14TH (CONSTRUCTION) 15TH (MARKETING) FLOOR PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents
MECHANICAL SYSTEMS MODIFICATIONS ON THE 14TH (CONSTRUCTION) 15TH (MARKETING) FLOOR PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents
No filed description on record for this project.
On file for this project
22 documents · 9 drawing sheets
Floor 139p · 1 filing · 20 docs
Structural
No filed description on record for this project.
On file for this project
22 documents · 9 drawing sheets
Floor 129p · 1 filing · 20 docs
Structural
No filed description on record for this project.
On file for this project
22 documents · 9 drawing sheets
Floor 1119p · 8 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Standpipe Modifications taking place on the 7th & 11th floors as indicated on the drawings.
On file for this project
3 documents · 1 drawing sheet
Sprinkler modification on floors 2, 7, 10, and 11 as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
8 documents · 2 drawing sheets
Construction of an accessory stair on the 9th - 11th floors as indicated on the drawings.
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 1014p · 4 filings · 20 docs
Fire ProtectionMechanicalStructural
Sprinkler modification on floors 2, 7, 10, and 11 as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
8 documents · 2 drawing sheets
Construction of an accessory stair on the 9th - 11th floors as indicated on the drawings.
On file for this project
5 documents · 2 drawing sheets
Mechanical modification on floors 2, 7, 10, and 11 as per plan filed herewith. No change in use, egress, or occupancy.
On file for this project
7 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 919p · 8 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Standpipe modifications taking place on the 8th & 9th floors as indicated on the drawings. No change in use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Sprinkler modifications on floors 8 to 9 as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
7 documents · 1 drawing sheet
Installation of a temporary sprinkler loop on the 8th & 9th floors as indicated on the drawings.
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 818p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction
Standpipe modifications taking place on the 8th & 9th floors as indicated on the drawings. No change in use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Sprinkler modifications on floors 8 to 9 as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
7 documents · 1 drawing sheet
Installation of a temporary sprinkler loop on the 8th & 9th floors as indicated on the drawings.
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 731p · 19 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Structural · Supported Scaffold
Plumbing modifications on floors 8 and 9 as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents · 1 drawing sheet
Sprinkler modification on floors 2, 7, 10, and 11 as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
8 documents · 1 drawing sheet
Structural modification on floors 4 through 11 to construct a new tenant convenience stair. No change in use, egress, or occupancy.
On file for this project
10 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 6Under Construction18p · 9 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Supported Scaffold
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
8 documents
Sprinkler modifications taking place on the 1st floor and 4th - 6th floors per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
8 documents · 1 drawing sheet
Structural modification on floors 4 through 11 to construct a new tenant convenience stair. No change in use, egress, or occupancy.
On file for this project
10 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 520p · 10 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Supported Scaffold
Standpipe modifications taking place on the 4-6th floors per plans filed herewith. Relocation of 6 hose cabinets. No change in use, egress, or occupancy.
On file for this project
4 documents · 1 drawing sheet
Sprinkler modifications taking place on the 1st floor and 4th - 6th floors per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
8 documents · 1 drawing sheet
Structural modification on floors 4 through 11 to construct a new tenant convenience stair. No change in use, egress, or occupancy.
On file for this project
10 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 4Under Construction14p · 6 filings · 20 docs
Fire ProtectionMechanicalStructural
Issued Permit Scope
Supported Scaffold
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
8 documents
STRUCTURAL MODIFICATIONS ON FLOORS 31-32 (32-33 MARKETING) PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
23 documents · 1 drawing sheet
Sprinkler modifications taking place on the 1st floor and 4th - 6th floors per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 3Under Construction39p · 7 filings · 20 docs
ArchitectureGeneralMechanicalStructural
Issued Permit Scope
General Construction · Supported Scaffold
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
8 documents
ALT-CO FILED HEREWITH TO CHANGE OCCUPANCY ON 30TH FLOOR (31 MKTG,) REMOVAL OF PUBLIC ASSEMBLY SPACE ON 3RD FLOOR, REMOVAL OF CAFETERIA ON 32ND FLOOR (33RD MKTG.) GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON 30TH FLOOR (31 MKTG) PER PLANS.
On file for this project
18 documents
STRUCTURAL MODIFICATIONS ON FLOORS 31-32 (32-33 MARKETING) PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
23 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 2Under Construction14p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Supported Scaffold
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
8 documents
Filing to change occupancy from theater without restrictions (use group 8) to medical offices (use group 6) on the first floor and related partition work.
On file for this project
6 documents
Sprinkler modification on floors 2, 7, 10, and 11 as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 156p · 12 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Structural
Interior and exterior architectural modifications on the 1st floor (Lobby Renovation) as per plans. No change to use, egress or occupancy.
On file for this project
23 documents · 10 drawing sheets
Filing to change occupancy from theater without restrictions (use group 8) to medical offices (use group 6) on the first floor and related partition work.
On file for this project
6 documents
Sprinkler modifications taking place on the 1st floor and 4th - 6th floors per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Cellar15p · 10 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Structural
Modifications to the existing sprinkler system for ADA bathroom in the cellar as per plans. No change to use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
HVAC REPLACEMENT AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
12 documents · 1 drawing sheet
Filing to change occupancy from theater without restrictions (use group 8) to medical offices (use group 6) on the first floor and related partition work.
On file for this project
6 documents
Latest 3 of 8 filings on this floor.
Sub-CellarUnder Construction30p · 4 filings · 20 docs
ArchitectureMechanicalStructural
Issued Permit Scope
General Construction · Structural
Structural modifications for LL26 Cycle 1A REM repairs as per plans. No change in use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
ALT-CO FILED HEREWITH TO CHANGE OCCUPANCY ON 30TH FLOOR (31 MKTG,) REMOVAL OF PUBLIC ASSEMBLY SPACE ON 3RD FLOOR, REMOVAL OF CAFETERIA ON 32ND FLOOR (33RD MKTG.) GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON 30TH FLOOR (31 MKTG) PER PLANS.
On file for this project
18 documents
Filing to change occupancy from theater without restrictions (use group 8) to medical offices (use group 6) on the first floor and related partition work.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.