Elevator apt, semi-fireproof with stores
92-33 GUY R BREWER BOULEVARD
QUEENS · Jamaica · BIN 4623723
💬 Discuss this project
2021Year Built
25Stories
D7Building Class
C6-3Zoning
535,495 sfGross Floor Area
606Units
LL97 CoveredRent Stabilized12 Active Violations ▸
Elevator apt, semi-fireproof with stores · Owner of record: Archer Towers Phase I Development · 53,348 sf lot · 10.04 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsBrp Development CORP7 filings
RoofBrp Development CORP3p · 4 filings · 2 docs
Floor 25Temporary pipe scaffold installation1 filing
Floor 24Temporary pipe scaffold installation1 filing
Floor 23Temporary pipe scaffold installation1 filing
Floor 22Temporary pipe scaffold installation1 filing
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12Unit 12201p · 1 filing
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2Brp Archer Tower Development LLC4p · 2 filings · 9 docs
Floor 1Centene, H&R BlockUnder Construction10p · 12 filings · 20 docs
CellarBrp Archer Tower Development LLC1p · 2 filings · 4 docs
Site & exteriorFidelis Care, H&R BlockUnder Construction12 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRP Development17809/24/2026
Jamaica Tower2004/09/2026
Archer Tower Development1603/22/2026
Gertz Plaza Acquisition503/21/2026
Windsor Place103/21/2026
Lane Bryant103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/11/2018$20.0M—JAMAICA PROPERTY HOLDIINGS LLC → ARCHER TOWERS DEVELOPMENT LLC— not available
09/23/2014$11.0M—GERTZ PLAZA ACQUISITION 5, LLC → JAMAICA TOWER, LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Core Scaffold SystemsScaffold2007/08/2026
Skycore BuildersGeneral Contractor1307/08/2026
Aspro PlumbingPlumbing907/08/2026
Pace PlumbingFire Protection807/08/2026
BRP Construction GroupScaffold607/08/2026
Walsh Glass & MetalScaffold603/21/2026
Metflow Fire ControlFire Protection507/08/2026
John Evan ContractingGeneral Contractor304/09/2026
HM Build and UpliftGeneral Contractor207/08/2026
All Pro Plumbing & HeatingPlumbing207/08/2026
Horsepower ElectricElectrical203/22/2026
Carlyle Construction CoGeneral Contractor207/08/2026
L.S. Sign CoSign hanger207/08/2026
A1 SpecializedSign hanger107/08/2026
Sant-Tec ElectricElectrical103/22/2026
Urban Construction & DesignGeneral Contractor104/09/2026
Highbury ConcreteScaffold107/08/2026
Adam Electrical ContrngElectrical103/22/2026
Signstar NYCSign hanger107/08/2026
Anaktora MechanicalPlumbing109/24/2026
Arco Plumbing and HeatingFire Protection108/12/2026
DPH Plumbing & HeatingPlumbing107/08/2026
Expert Fire SprinklerFire Protection107/08/2026
Fulton Plumbing & HeatingPlumbing107/08/2026
G.M.A. Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Concrete Solutions Lab Co5344407/31/2026
Metric Consulting and Ins1803707/17/2026
McHenery Testing Lab9181304/01/2026
Ikra Consulting7032401/26/2026
AA Building & Inspection1519401/26/2026
CNY Engineering3304102/26/2025
AM Design Studio4413301/28/2025
Domani Inspection Service8432001/17/2025
PCS Engineering3745410/02/2023
Kendall Engineering4154111/04/2022
WSP USA1848210/04/2022
Simpson Gumpertz & Heger2315104/15/2020
Building Lifecycle
All (300)Filed (63)Permit Issued (61)Signed Off (31)Violation (39)Inspection (38)Objection (38)Special Inspection (30)
09/24/2026
Signed off — Alteration
Q01334951-I1
09/23/2026
Permit issued — Plumbing
Q01379624-S1-PL
09/01/2026
Signed off — Alteration
Mechanical work for interior office renovation for Fidelis Care as per plans filed herewith. No change in Use, Egress or Occupancy.
Q01185846-I1
08/21/2026
Signed off — Alteration
Mechanical work for interior office renovation for Fidelis Care as per plans filed herewith. No change in Use, Egress or Occupancy.
Q01185846-S2
08/21/2026
Signed off — Alteration
Mechanical work for interior office renovation for Fidelis Care as per plans filed herewith. No change in Use, Egress or Occupancy.
Q01185846-S1
08/21/2026
Signed off — Alteration
Mechanical work for interior office renovation for Fidelis Care as per plans filed herewith. No change in Use, Egress or Occupancy.
Q01185846-S3
08/11/2026
Permit issued — Sprinklers
Q01334951-I1-EW-SP
07/31/2026
Filed — Alteration
Installation of Sanitary private line for adjacent lot. DEP Site connection and civil misc. work on grade.
Q01379624-I1
07/31/2026
Filed — Alteration
Installation of Sanitary private line for adjacent lot. DEP Site connection and civil misc. work on grade.
Q01379624-S1
07/17/2026
Filed — Alteration
Mechanical work for interior office renovation for Fidelis Care as per plans filed herewith. No change in Use, Egress or Occupancy.
Q01185846-P4
07/17/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
07/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
07/17/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
07/17/2026
Special inspection requirement — Shutoff dampers
SAMI HAJJAR P.E
07/17/2026
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
07/17/2026
Special inspection requirement — Electrical motors and elevators
SAMI HAJJAR P.E
07/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
07/17/2026
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
07/17/2026
Special inspection requirement — Duct leakage testing, insulation and design
SAMI HAJJAR P.E
07/17/2026
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
07/01/2026
Special inspection requirement — Sprinkler Systems
Younes Abouyaala
07/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
07/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
06/25/2026
Filed — Alteration
Q01334951-P1
06/18/2026
Violation issued (HPD, open)
B
06/16/2026
Special inspection requirement — Sprinkler Systems
06/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/15/2026
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
06/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
06/15/2026
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
06/15/2026
Special inspection requirement — Shutoff dampers
SAMI HAJJAR P.E
06/15/2026
Special inspection requirement — Electrical motors and elevators
SAMI HAJJAR P.E
06/15/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
06/15/2026
Special inspection requirement — Duct leakage testing, insulation and design
SAMI HAJJAR P.E
06/15/2026
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
06/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/15/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
05/14/2026
Violation issued (HPD, open)
A
05/14/2026
Violation issued (HPD, open)
A
05/11/2026
Signed off — Alteration
FILING FOR INTERIOR MODELING OF THE EXISTING RETAIL "A -HOUSE OF WINGS", CARPENTRY, MILL WORK AND FINISHING, COMMERCIAL HOOD INSTALLATION AND RELATED VENTILATION. IN CONJUNCTION WITH NB #420666176
Q01159331-I1
05/11/2026
Signed off — Alteration
FLING PLUMBING WORK FOR THE RETAIL SPACE "A" COMMERCIAL GAS EQUIPMENTS FOR COOKING, SINKS AND RELATED PIPING IN CONJUNCTION WITH APPLICATION NB # 420666176 AND LAT # Q01159331
Q01159849-I1
05/07/2026
Permit issued — Plumbing
Q01367472-S2-PL
04/30/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
Q01181460-I1
04/30/2026
Permit issued — Suspended Scaffold
Q01181460-I1-SC
04/23/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/20/2026
Violation issued (HPD, closed)
C
04/07/2026
Permit issued — Mechanical Systems
Q01367472-S1-MS
04/07/2026
Permit issued — General Construction
Q01367472-I1-GC
04/06/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/06/2026
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
MINA HANNA
04/01/2026
Filed — Alteration
Interior renovation to install new ductwork system and install a new hood system.
Q01367472-S1
03/27/2026
Special inspection requirement — Final
MINA HANNA
03/26/2026
Filed — Alteration
Interior renovation to install new ductwork system and install a new hood system.
Q01367472-I1
03/26/2026
Filed — Alteration
Interior renovation to install new ductwork system and install a new hood system.
Q01367472-S2
03/22/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/22/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/18/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
TREVOR O. FLOWERS
03/04/2026
Special inspection requirement — Final
TREVOR O. FLOWERS
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAnaktora Mechanical09/23/2026
DOB NOWSprinklersSigned-offArco Plumbing and Heating08/11/2026
DOB NOWPlumbingPermit IssuedAll Pro Plumbing & Heating05/07/2026
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System04/30/2026
DOB NOWMechanical SystemsPermit IssuedJohn Evan Contracting04/07/2026
DOB NOWGeneral ConstructionPermit IssuedJohn Evan Contracting04/07/2026
DOB NOWPlumbingSigned-offG.M.A. Plumbing & Heating01/22/2026
DOB NOWSignSigned-offWeinfeld, Elliot01/09/2026
DOB NOWSignSigned-offWeinfeld, Elliot01/09/2026
DOB NOWGeneral ConstructionSigned-offJohn Evan Contracting10/23/2025
DOB NOWSprinklersSigned-offMetflow Fire Control10/07/2025
DOB NOWPlumbingSigned-offFulton Plumbing & Heating09/19/2025
DOB NOWMechanical SystemsSigned-offCarlyle Construction Co09/09/2025
DOB NOWGeneral ConstructionSigned-offCarlyle Construction Co07/21/2025
DOB NOWPlumbingSigned-offAll Pro Plumbing & Heating05/02/2025
DOB NOWSprinklersSigned-offExpert Fire Sprinkler04/16/2025
DOB NOWGeneral ConstructionSigned-offUrban Construction & Design04/14/2025
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System02/24/2025
DOB NOWPlumbingSigned-offDPH Plumbing & Heating02/13/2025
DOB NOWMechanical SystemsSigned-offHM Build Uplift02/10/2025
DOB NOWGeneral ConstructionSigned-offHM Build Uplift02/07/2025
DOB NOWSignSigned-offSignstar NYC01/31/2025
DOB NOWSignSigned-offMad Signs10/24/2024
DOB NOWPlumbingSigned-offAspro Plumbing06/21/2024
DOB NOWGeneral ConstructionSigned-offSkycore Builders06/21/2024
DOB NOWGeneral ConstructionSigned-offSkycore Builders05/23/2024
DOB NOWSprinklersSigned-offManengeering Bureau04/01/2024
DOB NOWGeneral ConstructionSigned-offSkycore Builders03/28/2024
DOB NOWConstruction FenceSigned-offCore Scaffold Systems01/25/2024
DOB NOWPlumbingSigned-offAspro Plumbing09/18/2023
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems09/15/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedWalsh Glass & Metal07/06/2023
DOB NOWPlumbingSigned-offAspro Plumbing06/20/2023
DOB NOWBoiler EquipmentSigned-offAspro Plumbing06/20/2023
DOB NOWPlumbingSigned-offAspro Plumbing05/23/2023
DOB NOWBoiler EquipmentSigned-offAspro Plumbing04/28/2023
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems04/07/2023
DOB NOWSprinklersSigned-offManengeering Bureau04/01/2023
DOB NOWStandpipeSigned-offManengeering Bureau03/30/2023
DOB NOWStandpipeSigned-offManengeering Bureau03/30/2023
+ 51 more permits on file
3 projects · most recent 07/17/2026
Heating and Air Conditioning Systems Others Ventilation Systems Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
07/17/2026Signed-offCarlyle Construction CoHeating and Air Conditioning Systems, Others
Heat / Cool
Daikin W.SC.H.030.F.1.F.LE.C.B 35,300 BTU · Heat Pump Outdoor ×2
W.SC.H.019.E.1.F.LE.C.B 24,100 BTU · Heat Pump Outdoor ×1
W.SC.H.036.F.1.F.LE.C.B 34,500 BTU · Heat Pump Outdoor ×1
Climatemaster WSCH030 35,300 BTU · Heat Pump Outdoor ×4
WSCH019 24,100 BTU · Heat Pump Outdoor ×2
WSCH036 34,500 BTU · Heat Pump Outdoor ×2
Other
Daikin VAM470GVJU 390 CFM · Erv ×3
Loren Cook GC-146 75 CFM · Exhaust Fan ×3
04/01/2026Permit IssuedJohn Evan ContractingVentilation Systems—
05/02/2024Signed-offSkycore BuildersAir Conditioning Systems, Heating Systems
Cooling
— GZS02B2XLM4BSSHSA0VBA0ASA1S 930 CFM ×1
Daikin WCCW5024 930 CFM · Chiller ×24
WCCW5036 1,390 CFM · Wshp ×24
WCCW2096 3,200 CFM · Chiller ×18
WCCW5070 1,900 CFM · Wshp ×18
RZR48TAVJU 49,000 BTU · Vrf Outdoor ×12
WCCW4015 430 CFM · Wshp ×12
WCCW5019 630 CFM · Heat Pump Outdoor ×12
DPS025A 5,500 CFM · Erv ×6
DPSA052 14,500 CFM · Erv ×6
WCCW2072 2,000 CFM ×6
WCCW2120 3,800 CFM · Chiller ×6
WCCW5042 1,230 CFM · Chiller ×6
York J18ZFC00P2B1BCA3E1 5,200 CFM ×6
ZT061E20P2B2BCA3A1 1,300 CFM · Rooftop Unit ×6
Baltimore Aircoil S3E-1222-07Q 159,860 CFM · Cooling Tower ×6
Heating
Aerco BMK-6000 600,000 BTU · Boiler ×24
1 project · most recent 07/17/2026
FiledStatusContractorScope
07/17/2026Signed-offMetflow Fire Control22 heads
5 projects · most recent 07/31/2026
Water/Sanitary Gas
FiledStatusContractorScope
07/31/2026Permit IssuedAnaktora MechanicalWater/Sanitary
07/17/2026Signed-offFulton Plumbing & HeatingWater/Sanitary
04/01/2026Permit IssuedAll Pro Plumbing & HeatingWater/Sanitary
02/10/2026Signed-offZara PlumbingWater/Sanitary
01/06/2025Signed-offAll Pro Plumbing & HeatingGas, Water/Sanitary
12 projects · most recent 06/10/2026
General Wiring
FiledStatusContractorScope
06/10/2026Permit IssuedLive Wire Electric 1General Wiring
05/11/2026Permit IssuedWCK ElectricGeneral Wiring
01/29/2026Permit IssuedLive Wire Electric 16 meters, 4 new_meters
01/21/2026CompleteAdam Electrical Contrng—
05/12/2025Pending PaymentSant-Tec ElectricGeneral Wiring
03/03/2025CompleteFirst Quality ElectricalGeneral Wiring
02/05/2025CompleteProff Electrical—
01/09/2024CompleteTuxedo Electrical Contracting—
12/05/2023Permit IssuedHorsepower ElectricGeneral Wiring
01/25/2022CompleteTuxedo Electrical Contracting—
10/21/2021CompleteV. Vass Electric—
10/01/2021CompleteV. Vass Electric—
2 projects · most recent 07/31/2026
Concrete
FiledStatusContractorScope
07/31/2026Permit IssuedAnaktora Mechanical2 scope_items
10/04/2022Permit IssuedSkycore BuildersConcrete
1 project · most recent 07/17/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
07/17/2026Signed-offMetflow Fire ControlTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 39
DateTypeResultReport
04/23/2026Pass-Final General Construction Non-Directive 14PassView ↗
04/06/2026Fail-Final General Construction Non-Directive 14FailView ↗
03/22/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/22/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/18/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/13/2026Fail-Final General Construction Non-Directive 14FailView ↗
01/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/28/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/31/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/21/2025Fail-Final General Construction Non-Directive 14FailView ↗
10/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/26/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/25/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
09/19/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/18/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/07/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/01/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/18/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/25/2025Pass-Final Sign Permit InspectionPassView ↗
12/11/2024Fail-Final Sign Permit InspectionFailView ↗
03/21/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/07/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
Latest 25 of 39.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/17/2026Shutoff dampersSAMI HAJJAR P.Eenergy_progress
07/17/2026Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
07/17/2026Mechanical SystemsSAMI HAJJAR P.Especial
07/17/2026FinalSAMI HAJJAR P.Eprogress
07/17/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
07/17/2026Duct leakage testing, insulation and designSAMI HAJJAR P.Eenergy_progress
07/17/2026Interior lighting powerSAMI HAJJAR P.Eenergy_progress
07/17/2026Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
07/17/2026Lighting controlsSAMI HAJJAR P.Eenergy_progress
07/17/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
07/01/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/01/2026Tenant Protection Plan ComplianceYounes Abouyaalaspecial
07/01/2026Sprinkler SystemsYounes Abouyaalaspecial
06/16/2026Tenant Protection Plan Compliance—special
06/16/2026Fire-Resistant Penetrations and Joints—special
06/16/2026Sprinkler Systems—special
06/15/2026Shutoff dampersSAMI HAJJAR P.Eenergy_progress
06/15/2026FinalSAMI HAJJAR P.Eprogress
06/15/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
06/15/2026Tenant Protection Plan Compliance—special
06/15/2026Mechanical SystemsSAMI HAJJAR P.Especial
06/15/2026Lighting controlsSAMI HAJJAR P.Eenergy_progress
06/15/2026Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
06/15/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
06/15/2026Duct leakage testing, insulation and designSAMI HAJJAR P.Eenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Fidelis CareOffice—
Project Q01327929 Alteration · LOC Issued · 01/05/2026
Project Q01327930 Alteration · LOC Issued · 01/05/2026
CenteneOfficeFloor 1
Project Q01185846 Alteration · LOC Issued · 05/05/2025
H&R BlockRetailFloor 1
Project Q01127317 Alteration · LOC Issued · 01/30/2025
Project Q01158328 Alteration · LOC Issued · 01/13/2025
Project Q01158332 Alteration · LOC Issued · 01/13/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 500 on file (BIS + DOB NOW)
▸Plans & Drawings83
▸DOB NOWPlans/Sketch54
08/28/2026Q00044044-I1Request digital key ↗
08/28/2026Q00044044-P1Request digital key ↗
08/27/2026Q00617459-P1Request digital key ↗
Showing 3 of 54 on file for this type
▸DOB NOWPlans/Sketch - Standpipe6
08/23/2026Q00222594-P4Request digital key ↗
08/23/2026Q00222594-P1Request digital key ↗
08/23/2026Q00222594-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
08/21/2026Q00221970-P6Request digital key ↗
08/21/2026Q00221970-P7Request digital key ↗
08/21/2026Q00221970-P5Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
08/23/2026Q00222594-P4Request digital key ↗
08/23/2026Q00222594-P1Request digital key ↗
08/23/2026Q00222594-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
08/25/2026Q00221962-I1Request digital key ↗
08/25/2026Q00221962-P1Request digital key ↗
08/25/2026Q00221962-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence3
08/28/2026Q00319764-I1Request digital key ↗
08/27/2026Q00471081-I1Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - Structural2
08/25/2026Q00221957-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Curb Cut2
08/28/2026Q00219629-I1Request digital key ↗
08/28/2026Q00219629-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Applications & Permits29
▸BISPLAN / WORK APPROVAL APPLICATION16
01/27/2026440579241Open ↗
12/14/2023440579241Open ↗
09/14/2023440579241Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION9
10/20/2021440691805Open ↗
10/06/2021440690281Open ↗
10/06/2021440690263Open ↗
Showing 3 of 9 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
09/21/2023440579241Open ↗
09/06/2023440579241Open ↗
01/15/2020440579241Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
05/02/2016421045737Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISZONING DIAGRAM1
03/04/2015421045737Open ↗
▸Seals & Professional Certifications212
▸DOB NOWDPL-1: Design Professional Seal & Signature77
08/28/2026Q00044044-I1Open ↗
08/28/2026Q00222600-I1Open ↗
08/28/2026Q00319764-I1Open ↗
Showing 3 of 77 on file for this type
▸DOB NOWProgress Inspector Seal & Signature58
10/08/2026Q01327930-I1Open ↗
09/25/2026Q00993201-I1Open ↗
09/23/2026Q01185846-S1Open ↗
Showing 3 of 58 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature55
10/18/2026Q00221970-P5Open ↗
09/23/2026Q01185846-S1Open ↗
09/23/2026Q01185846-S1Open ↗
Showing 3 of 55 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
04/19/2016421045737Open ↗
12/31/2015421020978Open ↗
06/20/2015421020978Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
10/14/2021440691805Open ↗
09/29/2021440690263Open ↗
09/29/2021440690281Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
10/14/2021440691805Open ↗
09/29/2021440690263Open ↗
09/29/2021440690281Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
10/14/2021440691805Open ↗
09/29/2021440690263Open ↗
09/29/2021440690281Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
05/02/2015421020978Open ↗
11/06/2014421044989Open ↗
▸BISProfessional and Owner Certification (POC3)1
05/02/2015421020978Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/15/2020440579241Open ↗
▸Trade Schedules & Equipment22
▸BISEQUIPMENT USE APPLICATION/PERMIT5
05/02/2016421045737Open ↗
05/02/2016421045737Open ↗
05/02/2016421045737Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS5
05/02/2016421045737Open ↗
05/02/2016421045737Open ↗
05/02/2016421045737Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
07/27/2015421045737Open ↗
06/11/2015421020978Open ↗
05/02/2015421020978Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
09/29/2015421020978Open ↗
09/29/2015421045737Open ↗
09/24/2015421045737Open ↗
Showing 3 of 4 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
09/15/2015421056001Open ↗
▸BISGAS CUT-OFF1
11/14/2018421625334Open ↗
▸BISELECTRIC CUT-OFF1
11/14/2018421625334Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
11/14/2018421625334Open ↗
▸Safety & Tenant Protection6
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
11/14/2018421625334Open ↗
03/26/2015421045737Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
11/14/2018421625334Open ↗
03/31/2015421045737Open ↗
▸BISSTREET TREE CHECKLIST1
03/21/2015421045737Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
11/13/2018421625334Open ↗
▸Environmental & Asbestos67
▸DOB NOWOER: Notice to Proceed39
08/28/2026Q00044044-I1Open ↗
08/21/2026Q00221970-P6Open ↗
08/21/2026Q00221970-P5Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWOER: Notice of Satisfaction15
08/21/2026Q01159849-I1Open ↗
Showing 1 of 15 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
11/13/2018421625334Open ↗
05/02/2015421020978Open ↗
05/02/2015421056001Open ↗
Showing 3 of 5 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED4
10/14/2021440691805Open ↗
09/29/2021440690263Open ↗
09/29/2021440690281Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION3
05/24/2022440690263Open ↗
05/24/2022440690281Open ↗
05/18/2022440691805Open ↗
▸BISRODENT CONTROL1
11/14/2018421625334Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
04/19/2016421045737Open ↗
06/20/2015421020978Open ↗
03/26/2015421045737Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
04/19/2016421045737Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports3
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)3
10/14/2021440691805Open ↗
09/29/2021440690263Open ↗
09/29/2021440690281Open ↗
▸Approvals, Objections & Sign-offs19
▸BISLETTERS - SUPPORTING DOCUMENTATION5
09/29/2020440579241Open ↗
09/29/2020440579241Open ↗
11/14/2018421625334Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
05/25/2022440690263Open ↗
05/25/2022440690281Open ↗
05/23/2022440691805Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
05/02/2015421020978Open ↗
05/02/2015421056001Open ↗
01/07/2015421045737Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL3
05/24/2022440690263Open ↗
05/24/2022440690281Open ↗
05/18/2022440691805Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
11/14/2018421625334Open ↗
▸BISLANDMARKS APPROVAL1
11/14/2018421625334Open ↗
▸Cost, Insurance & Ownership25
▸BISCOST AFFIDAVIT11
10/14/2021440691805Open ↗
09/29/2021440690263Open ↗
09/29/2021440690281Open ↗
Showing 3 of 11 on file for this type
▸BISINSURANCE: DISABILITY3
10/20/2021440691805Open ↗
10/06/2021440690281Open ↗
10/06/2021440690263Open ↗
▸BISINSURANCE: LIABILITY3
10/20/2021440691805Open ↗
10/06/2021440690281Open ↗
10/06/2021440690263Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW33
05/24/2022440690263Open ↗
05/24/2022440690281Open ↗
05/18/2022440691805Open ↗
▸BISINSURANCE: WORKERS' COMPENSATION3
10/20/2021440691805Open ↗
10/06/2021440690281Open ↗
10/06/2021440690263Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE2
11/14/2018421625334Open ↗
03/31/2015421045737Open ↗
▸Filing & Intake Forms19
▸BISADDITIONAL INFORMATION9
02/18/2026440579241Open ↗
01/04/2024440579241Open ↗
09/21/2023440579241Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET5
04/26/2018421625334Open ↗
05/02/2015421020978Open ↗
05/02/2015421056001Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
10/14/2021440691805Open ↗
09/29/2021440690263Open ↗
09/29/2021440690281Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
01/15/2020440579241Open ↗
▸Other Documents6
▸BISBPP - SUPPORTING DOCUMENTATION1
01/04/2024440579241Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/21/2023440579241Open ↗
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS1
09/29/2015421045737Open ↗
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProof of Historic Building1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type