| Owner | Filings | Most Recent |
|---|---|---|
| BRP Development | 178 | 09/24/2026 |
| Jamaica Tower | 20 | 04/09/2026 |
| Archer Tower Development | 16 | 03/22/2026 |
| Gertz Plaza Acquisition | 5 | 03/21/2026 |
| Windsor Place | 1 | 03/21/2026 |
| Lane Bryant | 1 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 01/11/2018 | $20.0M | — | JAMAICA PROPERTY HOLDIINGS LLC → ARCHER TOWERS DEVELOPMENT LLC | — not available |
| 09/23/2014 | $11.0M | — | GERTZ PLAZA ACQUISITION 5, LLC → JAMAICA TOWER, LLC | — not available |
| Firm | Filings | Most Recent |
|---|---|---|
| Sullivan Group Design | 2 | 07/31/2026 |
| G & T Consulting Co | 6 | 07/17/2026 |
| Self Employed | 2 | 06/25/2026 |
| McHenery Testing Lab | 3 | 04/01/2026 |
| Cosentini Associates | 21 | 02/10/2026 |
| Boris Balkhiyev, PE | 3 | 02/02/2026 |
| Iaa Architects | 4 | 01/26/2026 |
| Richard Wainer Architect | 2 | 01/05/2026 |
| Jema | 2 | 09/29/2025 |
| Langan Engineering | 4 | 07/10/2025 |
| CNY Engineering | 1 | 02/26/2025 |
| Mohammad Ahead, PE | 1 | 01/30/2025 |
| AM Architect's Studio | 3 | 01/28/2025 |
| Charles Mallea Architect | 2 | 01/03/2025 |
| NYC Department of Housing Preservation and Development | 1 | 01/24/2024 |
| Paul Perdek, Prof. Engineering | 8 | 01/18/2024 |
| PCS Engineering | 4 | 10/02/2023 |
| Kendall Engineering | 1 | 11/04/2022 |
| WSP | 2 | 10/04/2022 |
| KN3 Engineering | 2 | 12/02/2021 |
| Doka USA | 1 | 09/07/2021 |
| A&B Engineering and Land Surveying | 1 | 03/07/2020 |
| Age Engineering | 2 | 09/26/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| BRP Construction Group | 18 | 03/21/2026 |
| Premier Expediting Services | 1 | 03/21/2026 |
| Municipal Building Consultants | 7 | 03/21/2026 |
| S M Expediting | 6 | 03/21/2026 |
| William Vitacco Associates | 20 | 03/21/2026 |
| PCS Engineering | 4 | 03/21/2026 |
| AE Design Solution | 20 | 03/21/2026 |
| Lombardo Building Consultants | 1 | 03/21/2026 |
| Design Communication MK | 3 | 03/21/2026 |
| Tasheed Building Consultants | 4 | 03/21/2026 |
| Louis Striar | 6 | 03/21/2026 |
| Smep Design & Consultation | 2 | 03/21/2026 |
| Russo Development Enterprises | 2 | 03/21/2026 |
| Vmarchdesign | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Core Scaffold Systems | Scaffold | 20 | 07/08/2026 |
| Skycore Builders | General Contractor | 13 | 07/08/2026 |
| Aspro Plumbing | Plumbing | 9 | 07/08/2026 |
| Pace Plumbing | Fire Protection | 8 | 07/08/2026 |
| BRP Construction Group | Scaffold | 6 | 07/08/2026 |
| Walsh Glass & Metal | Scaffold | 6 | 03/21/2026 |
| Metflow Fire Control | Fire Protection | 5 | 07/08/2026 |
| John Evan Contracting | General Contractor | 3 | 04/09/2026 |
| HM Build and Uplift | General Contractor | 2 | 07/08/2026 |
| All Pro Plumbing & Heating | Plumbing | 2 | 07/08/2026 |
| Horsepower Electric | Electrical | 2 | 03/22/2026 |
| Carlyle Construction Co | General Contractor | 2 | 07/08/2026 |
| L.S. Sign Co | Sign hanger | 2 | 07/08/2026 |
| A1 Specialized | Sign hanger | 1 | 07/08/2026 |
| Sant-Tec Electric | Electrical | 1 | 03/22/2026 |
| Urban Construction & Design | General Contractor | 1 | 04/09/2026 |
| Highbury Concrete | Scaffold | 1 | 07/08/2026 |
| Adam Electrical Contrng | Electrical | 1 | 03/22/2026 |
| Signstar NYC | Sign hanger | 1 | 07/08/2026 |
| Anaktora Mechanical | Plumbing | 1 | 09/24/2026 |
| Arco Plumbing and Heating | Fire Protection | 1 | 08/12/2026 |
| DPH Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Expert Fire Sprinkler | Fire Protection | 1 | 07/08/2026 |
| Fulton Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| G.M.A. Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Concrete Solutions Lab Co | 5344 | 4 | 07/31/2026 |
| Metric Consulting and Ins | 1803 | 7 | 07/17/2026 |
| McHenery Testing Lab | 9181 | 3 | 04/01/2026 |
| Ikra Consulting | 7032 | 4 | 01/26/2026 |
| AA Building & Inspection | 1519 | 4 | 01/26/2026 |
| CNY Engineering | 3304 | 1 | 02/26/2025 |
| AM Design Studio | 4413 | 3 | 01/28/2025 |
| Domani Inspection Service | 843 | 20 | 01/17/2025 |
| PCS Engineering | 3745 | 4 | 10/02/2023 |
| Kendall Engineering | 4154 | 1 | 11/04/2022 |
| WSP USA | 1848 | 2 | 10/04/2022 |
| Simpson Gumpertz & Heger | 2315 | 1 | 04/15/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | Anaktora Mechanical | 09/23/2026 |
| DOB NOW | Sprinklers | Signed-off | Arco Plumbing and Heating | 08/11/2026 |
| DOB NOW | Plumbing | Permit Issued | All Pro Plumbing & Heating | 05/07/2026 |
| DOB NOW | Suspended Scaffold | Signed-off | Structural Preservation System | 04/30/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | John Evan Contracting | 04/07/2026 |
| DOB NOW | General Construction | Permit Issued | John Evan Contracting | 04/07/2026 |
| DOB NOW | Plumbing | Signed-off | G.M.A. Plumbing & Heating | 01/22/2026 |
| DOB NOW | Sign | Signed-off | Weinfeld, Elliot | 01/09/2026 |
| DOB NOW | Sign | Signed-off | Weinfeld, Elliot | 01/09/2026 |
| DOB NOW | General Construction | Signed-off | John Evan Contracting | 10/23/2025 |
| DOB NOW | Sprinklers | Signed-off | Metflow Fire Control | 10/07/2025 |
| DOB NOW | Plumbing | Signed-off | Fulton Plumbing & Heating | 09/19/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Carlyle Construction Co | 09/09/2025 |
| DOB NOW | General Construction | Signed-off | Carlyle Construction Co | 07/21/2025 |
| DOB NOW | Plumbing | Signed-off | All Pro Plumbing & Heating | 05/02/2025 |
| DOB NOW | Sprinklers | Signed-off | Expert Fire Sprinkler | 04/16/2025 |
| DOB NOW | General Construction | Signed-off | Urban Construction & Design | 04/14/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | Structural Preservation System | 02/24/2025 |
| DOB NOW | Plumbing | Signed-off | DPH Plumbing & Heating | 02/13/2025 |
| DOB NOW | Mechanical Systems | Signed-off | HM Build Uplift | 02/10/2025 |
| DOB NOW | General Construction | Signed-off | HM Build Uplift | 02/07/2025 |
| DOB NOW | Sign | Signed-off | Signstar NYC | 01/31/2025 |
| DOB NOW | Sign | Signed-off | Mad Signs | 10/24/2024 |
| DOB NOW | Plumbing | Signed-off | Aspro Plumbing | 06/21/2024 |
| DOB NOW | General Construction | Signed-off | Skycore Builders | 06/21/2024 |
| DOB NOW | General Construction | Signed-off | Skycore Builders | 05/23/2024 |
| DOB NOW | Sprinklers | Signed-off | Manengeering Bureau | 04/01/2024 |
| DOB NOW | General Construction | Signed-off | Skycore Builders | 03/28/2024 |
| DOB NOW | Construction Fence | Signed-off | Core Scaffold Systems | 01/25/2024 |
| DOB NOW | Plumbing | Signed-off | Aspro Plumbing | 09/18/2023 |
| DOB NOW | Sidewalk Shed | Signed-off | Core Scaffold Systems | 09/15/2023 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Walsh Glass & Metal | 07/06/2023 |
| DOB NOW | Plumbing | Signed-off | Aspro Plumbing | 06/20/2023 |
| DOB NOW | Boiler Equipment | Signed-off | Aspro Plumbing | 06/20/2023 |
| DOB NOW | Plumbing | Signed-off | Aspro Plumbing | 05/23/2023 |
| DOB NOW | Boiler Equipment | Signed-off | Aspro Plumbing | 04/28/2023 |
| DOB NOW | Supported Scaffold | Signed-off | Core Scaffold Systems | 04/07/2023 |
| DOB NOW | Sprinklers | Signed-off | Manengeering Bureau | 04/01/2023 |
| DOB NOW | Standpipe | Signed-off | Manengeering Bureau | 03/30/2023 |
| DOB NOW | Standpipe | Signed-off | Manengeering Bureau | 03/30/2023 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/17/2026 | Signed-off | Carlyle Construction Co | Heating and Air Conditioning Systems, Others | Heat / Cool Daikin W.SC.H.030.F.1.F.LE.C.B 35,300 BTU · Heat Pump Outdoor ×2 W.SC.H.019.E.1.F.LE.C.B 24,100 BTU · Heat Pump Outdoor ×1 W.SC.H.036.F.1.F.LE.C.B 34,500 BTU · Heat Pump Outdoor ×1 Climatemaster WSCH030 35,300 BTU · Heat Pump Outdoor ×4 WSCH019 24,100 BTU · Heat Pump Outdoor ×2 WSCH036 34,500 BTU · Heat Pump Outdoor ×2 Other Daikin VAM470GVJU 390 CFM · Erv ×3 Loren Cook GC-146 75 CFM · Exhaust Fan ×3 |
| 04/01/2026 | Permit Issued | John Evan Contracting | Ventilation Systems | — |
| 05/02/2024 | Signed-off | Skycore Builders | Air Conditioning Systems, Heating Systems | Cooling — GZS02B2XLM4BSSHSA0VBA0ASA1S 930 CFM ×1 __Junk__ ×1 Daikin WCCW5024 930 CFM · Chiller ×24 WCCW5036 1,390 CFM · Wshp ×24 WCCW2096 3,200 CFM · Chiller ×18 WCCW5070 1,900 CFM · Wshp ×18 RZR48TAVJU 49,000 BTU · Vrf Outdoor ×12 WCCW4015 430 CFM · Wshp ×12 WCCW5019 630 CFM · Heat Pump Outdoor ×12 DPS025A 5,500 CFM · Erv ×6 DPSA052 14,500 CFM · Erv ×6 WCCW2072 2,000 CFM ×6 WCCW2120 3,800 CFM · Chiller ×6 WCCW5042 1,230 CFM · Chiller ×6 Baltimore Aircoil S3E-1222-07Q 159,860 CFM · Cooling Tower ×6 Heating Aerco BMK-6000 600,000 BTU · Boiler ×24 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/17/2026 | Signed-off | Metflow Fire Control | 22 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/31/2026 | Permit Issued | Anaktora Mechanical | Water/Sanitary |
| 07/17/2026 | Signed-off | Fulton Plumbing & Heating | Water/Sanitary |
| 04/01/2026 | Permit Issued | All Pro Plumbing & Heating | Water/Sanitary |
| 02/10/2026 | Signed-off | Zara Plumbing | Water/Sanitary |
| 01/06/2025 | Signed-off | All Pro Plumbing & Heating | Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/10/2026 | Permit Issued | Live Wire Electric 1 | General Wiring |
| 05/11/2026 | Permit Issued | WCK Electric | General Wiring |
| 01/29/2026 | Permit Issued | Live Wire Electric 1 | 6 meters, 4 new_meters |
| 01/21/2026 | Complete | Adam Electrical Contrng | — |
| 05/12/2025 | Pending Payment | Sant-Tec Electric | General Wiring |
| 03/03/2025 | Complete | First Quality Electrical | General Wiring |
| 02/05/2025 | Complete | Proff Electrical | — |
| 01/09/2024 | Complete | Tuxedo Electrical Contracting | — |
| 12/05/2023 | Permit Issued | Horsepower Electric | General Wiring |
| 01/25/2022 | Complete | Tuxedo Electrical Contracting | — |
| 10/21/2021 | Complete | V. Vass Electric | — |
| 10/01/2021 | Complete | V. Vass Electric | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/31/2026 | Permit Issued | Anaktora Mechanical | 2 scope_items |
| 10/04/2022 | Permit Issued | Skycore Builders | Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/17/2026 | Signed-off | Metflow Fire Control | Tenant Protection Plan 72 Hour |
| Date | Type | Result | Report |
|---|---|---|---|
| 04/23/2026 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 04/06/2026 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 03/22/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/22/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/18/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/13/2026 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 01/30/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/28/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/31/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/21/2025 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 10/24/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/26/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 09/25/2025 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 09/19/2025 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 06/18/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 06/18/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/07/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/01/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/18/2025 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 03/17/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/10/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/25/2025 | Pass-Final Sign Permit Inspection | Pass | View ↗ |
| 12/11/2024 | Fail-Final Sign Permit Inspection | Fail | View ↗ |
| 03/21/2024 | Certified Storm Drainage-ST-Fixtures-Finish | Certified | View ↗ |
| 12/07/2023 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/17/2026 | Shutoff dampers | SAMI HAJJAR P.E | energy_progress |
| 07/17/2026 | Tenant Protection Plan Compliance | SAMI HAJJAR P.E | special |
| 07/17/2026 | Mechanical Systems | SAMI HAJJAR P.E | special |
| 07/17/2026 | Final | SAMI HAJJAR P.E | progress |
| 07/17/2026 | Energy Code Compliance Inspections | SAMI HAJJAR P.E | progress |
| 07/17/2026 | Duct leakage testing, insulation and design | SAMI HAJJAR P.E | energy_progress |
| 07/17/2026 | Interior lighting power | SAMI HAJJAR P.E | energy_progress |
| 07/17/2026 | Electrical motors and elevators | SAMI HAJJAR P.E | energy_progress |
| 07/17/2026 | Lighting controls | SAMI HAJJAR P.E | energy_progress |
| 07/17/2026 | HVAC-R and service water piping design and insulation | SAMI HAJJAR P.E | energy_progress |
| 07/01/2026 | Fire-Resistant Penetrations and Joints | Younes Abouyaala | special |
| 07/01/2026 | Tenant Protection Plan Compliance | Younes Abouyaala | special |
| 07/01/2026 | Sprinkler Systems | Younes Abouyaala | special |
| 06/16/2026 | Tenant Protection Plan Compliance | — | special |
| 06/16/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 06/16/2026 | Sprinkler Systems | — | special |
| 06/15/2026 | Shutoff dampers | SAMI HAJJAR P.E | energy_progress |
| 06/15/2026 | Final | SAMI HAJJAR P.E | progress |
| 06/15/2026 | Energy Code Compliance Inspections | SAMI HAJJAR P.E | progress |
| 06/15/2026 | Tenant Protection Plan Compliance | — | special |
| 06/15/2026 | Mechanical Systems | SAMI HAJJAR P.E | special |
| 06/15/2026 | Lighting controls | SAMI HAJJAR P.E | energy_progress |
| 06/15/2026 | Electrical motors and elevators | SAMI HAJJAR P.E | energy_progress |
| 06/15/2026 | HVAC-R and service water piping design and insulation | SAMI HAJJAR P.E | energy_progress |
| 06/15/2026 | Duct leakage testing, insulation and design | SAMI HAJJAR P.E | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Fidelis Care | Office | — | Project Q01327929 Project Q01327930 |
| Centene | Office | Floor 1 | Project Q01185846 |
| H&R Block | Retail | Floor 1 | Project Q01127317 Project Q01158328 Project Q01158332 |