Parochial school, yeshiva
920 PARK PLACE
BROOKLYN · BIN 3330798
💬 Discuss this project
1889Year Built
3Stories
W2Building Class
R6Zoning
57,586 sfGross Floor Area
0Units
LL97 Covered97 Open Violations 94 unresolved · 3 paperwork only ▸FDNY Report ↗
Parochial school, yeshiva · 52,987 sf lot · 1.09 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire ProtectionGeneral
Roof6p · 3 filings · 20 docs
Floor 521p · 2 filings · 17 docs
Floor 422p · 3 filings · 20 docs
Floor 322p · 4 filings · 20 docs
Floor 220p · 2 filings · 17 docs
Floor 123p · 3 filings · 20 docs
Cellar21p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NORTHEASTERN CONFERENCE OF SDA1307/08/2026
NE CONF 7TH DAY ADVTS103/22/2026
OWNER OF PREMISES 920 PAR103/22/2026
HEBRON 7 DAY ADVANTIST ELE SC503/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES1203/21/2026
CONVERSANO ASSOCIATES, INC.203/21/2026
ARUP103/21/2026
SYNERGY BUILDING CONSULTANTS203/21/2026
SPRING SCAFFOLDING LLC403/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CS BRIDGE CORPGeneral Contractor1007/08/2026
E.D. MECHANICAL INCPlumbing703/22/2026
TITAN INDUSTRIAL SVC CORPGeneral Contractor707/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor407/08/2026
WILLIAM C. GERAKARIS P&HPlumbing307/08/2026
SKYLINE RESTORATION INCGeneral Contractor207/08/2026
JJ MATTHEWS INCGeneral Contractor203/21/2026
KELTIC KROSS INCGeneral Contractor107/08/2026
WINSON CONSTRUCTION INCGeneral Contractor104/09/2026
DEMAR PLUMBING CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STUDIO NYANDAK ARCHITECTU8378102/13/2026
SPECIAL TESTING & CONSULT1688602/19/2025
KN3 ENGINEERING LLC9238110/14/2024
Building Lifecycle
All (166)Filed (14)Permit Issued (18)Signed Off (9)Violation (60)Inspection (3)Objection (36)Special Inspection (26)
04/15/2026
Signed off — Alteration
B01340490-I1
03/23/2026
Permit issued — Structural
B01340490-I1-ST
02/13/2026
Filed — Alteration
B01340490-I1
12/22/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/19/2025
Violation issued (ECB, open)
Construction
12/19/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/08/2025
Special inspection requirement — Post-installed Anchors
SEBASTIAN SETTEDUCATE JR., P.E
07/08/2025
Special inspection requirement — Masonry
SEBASTIAN SETTEDUCATE JR., P.E
07/08/2025
Special inspection requirement — Final
SEBASTIAN SETTEDUCATE JR., P.E
07/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
SEBASTIAN SETTEDUCATE JR., P.E
07/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SEBASTIAN SETTEDUCATE JR., P.E
07/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
06/25/2025
Objection resolved — Addressed
06/24/2025
Objection raised — Cost
06/13/2025
Objection resolved — Addressed
06/13/2025
Special inspection requirement — Post-installed Anchors
SEBASTIAN SETTEDUCATE JR., P.E
02/24/2025
Objection raised — Scope
02/19/2025
Signed off — Alteration
EMERGENCY ROOFING REPLACEMENT OF HISTORICBUILDING AND ISOLATED STRUCTURAL ROOF FRAMING REPAIRS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01117977-I1
02/19/2025
Filed — Alteration
Removal and repair of masonry and infill construction, removal of doors and frame, trims and finishes, and provide new windows, cast stone coping and flashing as shown on plans herewith. Means and methods for demo of south wing filed under B00615474.
B00597418-P1
12/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/25/2024
Permit issued — General Construction
B01117977-I1-GC-CX
11/22/2024
Special inspection requirement — Fire-Resistance Rated Construction
SEBASTIAN SETTEDUCATE JR., P.E
11/22/2024
Special inspection requirement — Masonry
SEBASTIAN SETTEDUCATE JR., P.E
11/22/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
SEBASTIAN SETTEDUCATE JR., P.E
11/22/2024
Special inspection requirement — Final
SEBASTIAN SETTEDUCATE JR., P.E
11/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
11/21/2024
Objection resolved — Addressed
11/12/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
B00908497-I1
11/01/2024
Objection resolved — Addressed
11/01/2024
Objection resolved — Addressed
11/01/2024
Objection resolved — Addressed
11/01/2024
Objection resolved — Addressed
11/01/2024
Objection resolved — Addressed
11/01/2024
Objection resolved — Addressed
11/01/2024
Objection resolved — Addressed
10/21/2024
Objection raised — Structural
10/21/2024
Objection raised — Structural
10/21/2024
Objection raised — Structural
10/21/2024
Objection raised — Structural
10/21/2024
Objection raised — Structural
10/21/2024
Objection raised — Structural
10/21/2024
Objection raised — Structural
10/21/2024
Objection raised — Structural
10/14/2024
Filed — Alteration
EMERGENCY ROOFING REPLACEMENT OF HISTORICBUILDING AND ISOLATED STRUCTURAL ROOF FRAMING REPAIRS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01117977-I1
10/11/2024
Special inspection requirement — Post-installed Anchors
KUNAL BAKHTARWALA
10/11/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
KUNAL BAKHTARWALA
10/11/2024
Special inspection requirement — Structural Steel - Welding
KUNAL BAKHTARWALA
09/26/2024
Special inspection requirement — Final
KUNAL BAKHTARWALA
08/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/24/2024
Permit issued — Supported Scaffold
B00908497-I1-SF
06/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/08/2024
Permit issued — General Construction
B00597418-I1-GC
05/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/30/2023
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
B00908497-P1
08/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/24/2023
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
B00908497-I1
07/24/2023
Permit issued — Supported Scaffold
B00908497-I1-SF
Latest 60 of 166 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offWINSON CONSTRUCTION INC03/23/2026
DOB NOWGeneral ConstructionSigned-offSKYLINE RESTORATION INC11/25/2024
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC07/24/2024
DOB NOWGeneral ConstructionPermit IssuedSKYLINE RESTORATION INC05/08/2024
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC07/24/2023
DOB NOWSprinklersPermit IssuedDEMAR PLUMBING CORP08/30/2022
DOB NOWGeneral ConstructionPermit IssuedTITAN INDUSTRIAL SVC CORP05/05/2022
DOB NOWGeneral ConstructionSigned-offTITAN INDUSTRIAL SVC CORP05/05/2022
DOB NOWGeneral ConstructionSigned-offTITAN INDUSTRIAL SVC CORP05/05/2022
DOB NOWPlumbingSigned-offWILLIAM C. GERAKARIS P&H05/05/2022
DOB NOWGeneral ConstructionSigned-offJJ MATTHEWS08/19/2021
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP06/01/2021
DOB NOWSupported ScaffoldSigned-offCS BRIDGE CORP05/25/2021
DOB NOWGeneral ConstructionSigned-offKELTIC KROSS05/04/2021
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP06/22/2020
DOB NOWSupported ScaffoldSigned-offCS BRIDGE CORP06/22/2020
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP07/01/2019
DOB NOWSupported ScaffoldSigned-offCS BRIDGE CORP07/01/2019
BISBLISSUEDANGELO & CARLOS, INC04/19/2010
BISPLISSUEDANGELO & CARLOS, INC04/19/2010
BISBLISSUEDANGELO & CARLOS, INC01/30/2009
BISPLISSUEDANGELO & CARLOS, INC01/30/2009
1 project · most recent 06/03/2019
FiledStatusContractorScope
06/03/2019CompleteNASH ELECTRIC SERVICES IN—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/14/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/31/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/16/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
07/08/2025Post-installed AnchorsSEBASTIAN SETTEDUCATE JR., P.Especial
07/08/2025MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
07/08/2025FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
07/08/2025Fire-Resistance Rated ConstructionSEBASTIAN SETTEDUCATE JR., P.Eprogress
07/08/2025Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
07/08/2025Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
06/13/2025Post-installed AnchorsSEBASTIAN SETTEDUCATE JR., P.Especial
11/22/2024Fire-Resistance Rated ConstructionSEBASTIAN SETTEDUCATE JR., P.Eprogress
11/22/2024MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
11/22/2024Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
11/22/2024FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
11/22/2024Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
10/11/2024Post-installed AnchorsKUNAL BAKHTARWALAspecial
10/11/2024Structural Stability – Alterations of existing buildingsKUNAL BAKHTARWALAspecial
10/11/2024Structural Steel - WeldingKUNAL BAKHTARWALAspecial
09/26/2024FinalKUNAL BAKHTARWALAprogress
07/15/2022DemolitionSEBASTIAN SETTEDUCATE JR., P.Especial
07/15/2022FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
07/15/2022Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
06/02/2022DemolitionSEBASTIAN SETTEDUCATE JR., P.Especial
06/02/2022FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
06/02/2022Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
02/04/2021Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
02/04/2021Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
02/04/2021Fire-Resistance Rated ConstructionSEBASTIAN SETTEDUCATE JR., P.Eprogress
Latest 25 of 26.
▾Documents — 119 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch11
09/01/2026B00492432-I1Request digital key ↗
08/31/2026B00615474-P1Request digital key ↗
08/31/2026B00617497-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00175260-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00175267-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/14/2026B00458641-I1Request digital key ↗
▸Applications & Permits23
▸BISPLAN / WORK APPROVAL APPLICATION11
06/24/2022321386399Open ↗
06/22/2022321386399Open ↗
06/17/2022321386399Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWLPC Approval/Permit8
08/31/2026B00615474-P1Open ↗
08/14/2026B00615474-I1Open ↗
08/13/2026B01117977-I1Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION4
04/19/2010310240744Open ↗
04/19/2010310240744Open ↗
01/30/2009310240744Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records6
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
06/09/2021321600040Open ↗
08/26/2019321386399Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION2
06/09/2021321600040Open ↗
08/01/2019321386399Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
06/09/2021321600040Open ↗
08/01/2019321386399Open ↗
▸Seals & Professional Certifications29
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/02/2026B00175260-I1Open ↗
09/01/2026B00492432-I1Open ↗
08/31/2026B00615474-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026B00597418-P1Open ↗
08/30/2026B00597418-I1Open ↗
08/26/2026B00615474-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B00597418-P1Open ↗
08/30/2026B00597418-I1Open ↗
08/26/2026B00615474-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
05/07/2019321991724Open ↗
05/07/2019321991724Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/06/2009310240744Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING1
01/06/2009310240744Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
01/06/2009310240744Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
06/14/2010310240744Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
05/24/2010310240744Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
06/13/2019321386399Open ↗
01/06/2009310240744Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/31/2026B00617497-I1Open ↗
08/31/2026B00617499-I1Open ↗
08/15/2026B00597418-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT2
06/01/2009310240744Open ↗
01/06/2009310240744Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/02/2026B00175260-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/11/2019321386399Open ↗
▸Approvals, Objections & Sign-offs21
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
09/02/2026B00175260-I1Open ↗
09/01/2026B00492432-I1Open ↗
08/31/2026B00615474-P1Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
06/24/2022321386399Open ↗
06/24/2022321386399Open ↗
06/17/2022321386399Open ↗
Showing 3 of 6 on file for this type
▸BISLANDMARKS APPROVAL2
09/25/2019321386399Open ↗
08/30/2019321991724Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
01/06/2009310240744Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/19/2010310240744Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/04/2019321386399Open ↗
01/06/2009310240744Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
06/29/2021321600040Open ↗
06/29/2021321600040Open ↗
▸BISEFILING COVER SHEET1
05/07/2019321991724Open ↗
▸Other Documents6
▸BISPLOT DIAGRAM2
06/09/2021321600040Open ↗
06/13/2019321386399Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice2
08/18/2026B01340490-I1Open ↗
08/14/2026B00615474-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
06/09/2021321600040Open ↗
▸BISAI-1 ACCEPTED1
08/26/2019321386399Open ↗