← Back
Adult care facility
932 KELLY STREET
BRONX · Longwood · BIN 2005622
💬 Discuss this project
1909Year Built
4Stories
I7Building Class
R7-1Zoning
8,256 sfGross Floor Area
11Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Adult care facility · 4,960 sf lot · 1.66 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof2p · 2 filings · 20 docs
Bulkhead1p · 1 filing · 11 docs
Floor 31p · 1 filing · 20 docs
Floor 2
Floor 1
Cellar2p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ALPHA GROUP NY1107/08/2026
ACACIA NETWORK2607/08/2026
INDER CONSTRUCTION INC503/22/2026
PROMESA803/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSELOW & ASSOCIATES, LLC1006/10/2026
MCHENERY TESTING LAB104/30/2026
NEW AGE ENGINEERING PLLC106/04/2024
INDRAJEET VAGHA PE105/11/2023
PETER FRANZESE, PE108/03/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE CORP.1003/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RIGGS CONSTRUCTION CO.INCGeneral Contractor1107/08/2026
E H FIRE SUPPRESSION CO IPlumbing703/22/2026
HAY MECHANICAL SOLUTIONSPlumbing707/08/2026
E H FIRE SUPPRESSION CO IFire Protection406/27/2026
INDER CONSTRUCTION INCGeneral Contractor303/21/2026
GUARANTEED HOME IMPROVEMEGeneral Contractor303/21/2026
ALPHA GROUP NY1 CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VIBRANALYSIS INC., DBA VT6864906/10/2026
NEW AGE ENGINEERING PLLC7746206/04/2024
Building Lifecycle
All (187)Filed (14)Permit Issued (22)Signed Off (7)Violation (54)Inspection (8)Objection (52)Special Inspection (30)
07/29/2026
Signed off — Alteration
Plmg & sprinkler work throughout building. Primarily fixtures to be replaced on extg roughing. New fixtures to be installed in kitchen on first floor, new RPZ, one new bathroom. New Sprinkler system utilizes extg svc. New Ansul System in 1st fl kitchen.
X00437886-I1
06/25/2026
Signed off — Alteration
Replace existing gas hot water boiler with new.
X00437912-S3
06/25/2026
Special inspection requirement — Sprinkler Systems
JUAN GOMEZ
06/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
06/18/2026
Signed off — Alteration
Install new HVAC units throughout building per plans filed herewith. Condensing units to be installed on the roof.
X00437845-I1
06/10/2026
Filed — Alteration
Plmg & sprinkler work throughout building. Primarily fixtures to be replaced on extg roughing. New fixtures to be installed in kitchen on first floor, new RPZ, one new bathroom. New Sprinkler system utilizes extg svc. New Ansul System in 1st fl kitchen.
X00437886-P4
05/01/2026
Signed off — Alteration
X01395089-I1
05/01/2026
Permit issued — Sidewalk Shed
X01395089-I1-SH
04/30/2026
Filed — Alteration
X01395089-I1
03/19/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/10/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/17/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/17/2025
Filed — Alteration
Replace existing gas hot water boiler with new.
X00437912-P2
10/01/2025
Permit issued — Boiler Equipment
X00437912-S3-BE
09/19/2025
Filed — Alteration
Replace existing gas hot water boiler with new.
X00437912-S3
08/27/2025
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
08/15/2025
Special inspection requirement — Maintenance information
JUAN GOMEZ
08/15/2025
Special inspection requirement — HVAC and service water heating system controls
JUAN GOMEZ
08/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JUAN GOMEZ
08/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
JUAN GOMEZ
08/15/2025
Special inspection requirement — HVAC insulation and sealing
JUAN GOMEZ
08/15/2025
Special inspection requirement — Heating Systems
JUAN GOMEZ
08/15/2025
Special inspection requirement — HVAC and service water heating equipment
JUAN GOMEZ
08/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
JUAN GOMEZ
07/30/2025
Filed — Alteration
Replace existing gas hot water boiler with new.
X00437912-P1
06/06/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/05/2025
Violation issued (HPD, closed)
A
05/14/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/12/2025
Permit issued — Sprinklers
X00437886-I1-PL
05/07/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/09/2025
Objection resolved — Addressed
04/03/2025
Permit issued — Mechanical Systems
X00437845-I1-MS
03/12/2025
Objection raised — Scope
03/10/2025
Special inspection requirement — HVAC and service water heating system controls
JUAN GOMEZ
03/10/2025
Special inspection requirement — Shutoff dampers
JUAN GOMEZ
03/10/2025
Special inspection requirement — Mechanical Systems
JUAN GOMEZ
03/10/2025
Special inspection requirement — Final
JUAN GOMEZ
03/10/2025
Special inspection requirement — HVAC and service water heating equipment
JUAN GOMEZ
03/04/2025
Filed — Alteration
Plmg & sprinkler work throughout building. Primarily fixtures to be replaced on extg roughing. New fixtures to be installed in kitchen on first floor, new RPZ, one new bathroom. New Sprinkler system utilizes extg svc. New Ansul System in 1st fl kitchen.
X00437886-P2
03/03/2025
Filed — Alteration
Install new HVAC units throughout building per plans filed herewith. Condensing units to be installed on the roof.
X00437845-P1
03/03/2025
Special inspection requirement — Shutoff dampers
JUAN GOMEZ
03/03/2025
Special inspection requirement — HVAC and service water heating system controls
JUAN GOMEZ
03/03/2025
Special inspection requirement — Final
JUAN GOMEZ
03/03/2025
Special inspection requirement — Mechanical Systems
JUAN GOMEZ
03/03/2025
Special inspection requirement — HVAC and service water heating equipment
JUAN GOMEZ
01/23/2025
Signed off — Alteration
Install new fire escape stair at rear of building, from cellar level to roof, replacing existing fire escape, as required by OMH. Install new dunnage on roof to support HVAC equipment. Replace concrete arches in cellar below existing kitchen as needed.
X00437796-I1
12/11/2024
Signed off — Alteration
INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
X01055402-I1
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/01/2024
Permit issued — Plumbing
X00437886-I1-PL
07/03/2024
Permit issued — Mechanical Systems
X00437845-I1-MS
07/03/2024
Permit issued — Structural
X00437796-I1-ST
06/28/2024
Filed — Alteration
Plmg & sprinkler work throughout building. Primarily fixtures to be replaced on extg roughing. New fixtures to be installed in kitchen on first floor, new RPZ, one new bathroom. New Sprinkler system utilizes extg svc. New Ansul System in 1st fl kitchen.
X00437886-P1
06/28/2024
Special inspection requirement — Sprinkler Systems
JUAN GOMEZ
06/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
06/04/2024
Filed — Alteration
INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
X01055402-I1
06/04/2024
Permit issued — Mechanical Systems
X01055402-I1-MS
06/04/2024
Special inspection requirement — Chimneys and vents
Stephen Shishko
Latest 60 of 187 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offALPHA GROUP NY1 CORP05/01/2026
DOB NOWBoiler EquipmentSigned-offHAY MECHANICAL SOLUTIONS10/01/2025
DOB NOWSprinklersSigned-offHAY MECHANICAL SOLUTIONS05/12/2025
DOB NOWMechanical SystemsSigned-offRIGGS CONSTRUCTION CO.INC04/03/2025
DOB NOWPlumbingSigned-offHAY MECHANICAL SOLUTIONS08/01/2024
DOB NOWMechanical SystemsSigned-offRIGGS CONSTRUCTION CO.INC07/03/2024
DOB NOWStructuralSigned-offRIGGS CONSTRUCTION CO.INC07/03/2024
DOB NOWMechanical SystemsSigned-offGUARANTEED HOME IMPROVEME06/04/2024
DOB NOWSprinklersSigned-offYA MALLIKU INC04/29/2024
DOB NOWSprinklersSigned-offYA MALLIKU INC04/12/2024
DOB NOWBoiler EquipmentSigned-offHAY MECHANICAL SOLUTIONS02/20/2024
DOB NOWPlumbingSigned-offHAY MECHANICAL SOLUTIONS08/03/2023
DOB NOWStructuralSigned-offRIGGS CONSTRUCTION CO.INC07/05/2023
DOB NOWMechanical SystemsSigned-offRIGGS CONSTRUCTION CO.INC07/05/2023
DOB NOWStructuralSigned-offRIGGS CONSTRUCTION CO.INC05/31/2023
DOB NOWMechanical SystemsSigned-offRIGGS CONSTRUCTION CO.INC05/31/2023
DOB NOWSidewalk ShedSigned-offINDER CONSTRUCTION INC05/11/2023
DOB NOWSprinklersSigned-offYA MALLIKU INC05/02/2023
DOB NOWStructuralSigned-offRIGGS CONSTRUCTION CO.INC04/25/2023
DOB NOWPlumbingSigned-offYA MALLIKU INC03/30/2023
DOB NOWMechanical SystemsSigned-offRIGGS CONSTRUCTION CO.INC03/28/2023
DOB NOWPlumbingSigned-offHAY MECHANICAL SOLUTIONS03/24/2023
BISOTISSUEDRIGGS CONSTRUCTION CO.INC04/01/2025
BISOTISSUEDRIGGS CONSTRUCTION CO.INC04/01/2025
BISOTISSUEDRIGGS CONSTRUCTION CO.INC05/29/2024
BISOTISSUEDRIGGS CONSTRUCTION CO.INC06/01/2023
BISOTISSUEDRIGGS CONSTRUCTION CO.INC03/23/2023
BISPLISSUEDCASA MECHANICAL CO. INC09/13/2011
BISFPISSUEDGEBHARDT INC02/22/2010
BISSPISSUEDJ. CAIAZZO PLBG & HTG CORP02/15/1994
BISPLISSUEDJ. CAIAZZO PLBG & HTG COR12/21/1993
BIS—ISSUEDCMA ENTERPRISES LTD11/17/1993
1 project · most recent 03/03/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/03/2025Signed-offRIGGS CONSTRUCTION CO.INCAir Conditioning Systems
Cooling
Mitsubishi Electric 7 units -- MXZ-SM60NAM (-- Units 1S, 2S, 3S, 4S, 2N, 3N & 4Na 66,000 BTU · Condensing Unit ×7
MXZ-SM60NAM - Units 1S, 2S, 3S, 4S, 2N, 3N, 4N 60,000 BTU · Condensing Unit ×7
PUZ-A30NHA7 - CN 48,000 BTU · Condensing Unit ×2
MXZ-SM48NAM - CS 48,000 BTU · Condensing Unit ×1
MXZ-SM48NAM - UNIT 1N 54,000 BTU · Condensing Unit ×1
MXZ-SM48NAMHZ - CS 54,000 BTU · Condensing Unit ×1
MXZSM48NAM - Unit 1N 30,000 BTU · Condensing Unit ×1
MXZ-SM60NAM 66,000 BTU · Condensing Unit ×14
MXZ-SM48NAM 54,000 BTU · Condensing Unit ×2
PUZ-A30NHA7 32,000 BTU · Condensing Unit ×2
PUMY-P46NKMU2 54,000 BTU · Vrf Outdoor ×1
PUMY-P48NKMU2 48,000 BTU · Vrf Outdoor ×1
1 project · most recent 06/10/2026
FiledStatusContractorScope
06/10/2026Signed-offE H FIRE SUPPRESSION CO I275 heads
1 project · most recent 06/10/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/10/2026Signed-offHAY MECHANICAL SOLUTIONSGas, Water/Sanitary
2 projects · most recent 04/30/2026
General Wiring
FiledStatusContractorScope
04/30/2026Permit IssuedRICHARD NEU—
12/23/2024CompleteHI-RITE ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/19/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/10/2026Pass-Final Boiler Equipment InspectionPassView ↗
08/27/2025Fail-Final Boiler Equipment InspectionFailView ↗
06/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/14/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/07/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/04/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/04/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
06/25/2026Sprinkler SystemsJUAN GOMEZspecial
06/25/2026Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
08/15/2025Maintenance informationJUAN GOMEZenergy_progress
08/15/2025HVAC and service water heating system controls JUAN GOMEZenergy_progress
08/15/2025HVAC-R and service water piping design and insulationJUAN GOMEZenergy_progress
08/15/2025HVAC-R and service water heating system controlsJUAN GOMEZenergy_progress
08/15/2025HVAC insulation and sealing JUAN GOMEZenergy_progress
08/15/2025Heating SystemsJUAN GOMEZspecial
08/15/2025HVAC and service water heating equipment JUAN GOMEZenergy_progress
08/15/2025HVAC-R and service water heating equipmentJUAN GOMEZenergy_progress
03/10/2025HVAC and service water heating system controls JUAN GOMEZenergy_progress
03/10/2025Shutoff dampersJUAN GOMEZenergy_progress
03/10/2025Mechanical SystemsJUAN GOMEZspecial
03/10/2025FinalJUAN GOMEZprogress
03/10/2025HVAC and service water heating equipment JUAN GOMEZenergy_progress
03/03/2025Shutoff dampersJUAN GOMEZenergy_progress
03/03/2025HVAC and service water heating system controls JUAN GOMEZenergy_progress
03/03/2025FinalJUAN GOMEZprogress
03/03/2025Mechanical SystemsJUAN GOMEZspecial
03/03/2025HVAC and service water heating equipment JUAN GOMEZenergy_progress
06/28/2024Sprinkler SystemsJUAN GOMEZspecial
06/28/2024Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
06/04/2024Chimneys and ventsStephen Shishkospecial
05/22/2024Mechanical SystemsStephen Shishkospecial
05/22/2024FinalStephen Shishkoprogress
Latest 25 of 32.
▾Documents — 131 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch5
08/23/2026X00873363-I1Request digital key ↗
08/22/2026X00437912-S3Request digital key ↗
08/22/2026X00437912-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
08/16/2026X00437886-P1Request digital key ↗
08/16/2026X00437886-P4Request digital key ↗
08/14/2026X00437886-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/16/2026X00437886-P4Request digital key ↗
08/15/2026X00437886-P1Request digital key ↗
08/14/2026X00437886-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/20/2026X00437845-P1Request digital key ↗
08/20/2026X00437845-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment2
08/22/2026X00437912-I1Request digital key ↗
08/22/2026X00437912-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/14/2026X00437796-I1Request digital key ↗
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION4
06/01/2023240291108Open ↗
03/23/2023240291108Open ↗
09/15/2011220138606Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
03/07/2025240291108Open ↗
09/09/2011220138606Open ↗
08/17/2009220023597Open ↗
▸Seals & Professional Certifications51
▸DOB NOWProgress Inspector Seal & Signature15
09/23/2026X00437912-I1Open ↗
09/23/2026X00437912-I1Open ↗
09/23/2026X00437912-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/23/2026X00437912-I1Open ↗
08/26/2026X01055402-I1Open ↗
08/26/2026X01055402-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/25/2026X00437796-I1Open ↗
08/23/2026X00873363-I1Open ↗
08/22/2026X00437912-S3Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
09/09/2011220138606Open ↗
09/09/2011220138606Open ↗
08/17/2009220023597Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/30/2020240291108Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/13/2011220138606Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/09/2011220138606Open ↗
▸Trade Schedules & Equipment4
▸BISSELF-CERT PLUMBING NOTICE2
12/28/2011220138606Open ↗
09/27/2011220138606Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
01/05/2012220138606Open ↗
12/28/2011220138606Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/22/2026X00437912-S3Open ↗
08/22/2026X00437912-I1Open ↗
08/14/2026X00437796-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
09/09/2011220138606Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
08/17/2009220023597Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
03/23/2023240291108Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X01055402-I1Open ↗
▸Energy Compliance8
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/30/2025240291108Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/25/2021240291108Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
01/16/2025240291108Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/16/2025240291108Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
01/16/2025240291108Open ↗
▸BISFENESTRATION AIR LEAKAGE1
01/16/2025240291108Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/22/2026X00437912-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00437845-I1Open ↗
▸Inspections & Test Reports9
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
01/16/2025240291108Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/16/2025240291108Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
03/23/2023240291108Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
01/16/2025240291108Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/25/2021240291108Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
01/16/2025240291108Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
01/16/2025240291108Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
07/03/2025240291108Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
01/16/2025240291108Open ↗
▸Approvals, Objections & Sign-offs17
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
08/16/2026X01395089-I1Open ↗
08/16/2026X00437886-P4Open ↗
08/16/2026X00437886-P1Open ↗
Showing 3 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
09/09/2011220138606Open ↗
08/17/2009220023597Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/22/2025240291108Open ↗
▸BISFINAL1
08/20/2025240291108Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
02/23/2021240291108Open ↗
08/17/2009220023597Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/17/2025240291108Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET2
09/09/2011220138606Open ↗
08/17/2009220023597Open ↗
▸BISADDITIONAL INFORMATION2
07/03/2025240291108Open ↗
03/25/2021240291108Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/30/2020240291108Open ↗