Elevator cooperative
Shore Ridge
9425 SHORE ROAD · BIN 3155519
💬 Discuss this project
1953Year Built
6Stories
D4Building Class
R7AZoning
70,458 sfGross Floor Area
54Units
LL97 CoveredRent Stabilized5 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: SHORE RIDGE APARTMENT CORP · 15,500 sf lot · 4.55 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof4p · 1 filing · 15 docs
Floor 62p · 4 filings · 20 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 11p · 1 filing · 4 docs
Basement1p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PHOENIX SUTTON STR INC503/22/2026
SHORE RIDGE APARTMENT2303/22/2026
JAL MANAGEMENT403/22/2026
EBMG403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KAMEN TALL ARCHITECTS P.C.306/25/2025
SEBASTIAN M D'ALESSANDRO410/22/2024
GANNETT FLEMING411/22/2023
ENTHINK ENGINEERS LLC109/14/2022
GREEN DESIGN101/25/2021
ROYAL ENGINEERING, P.C106/18/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC603/21/2026
CORNERSTONE CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKYLINE RESTORATION INCGeneral Contractor707/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor507/08/2026
VARSITY PLBG AND HTG INCPlumbing307/08/2026
ZAIM CONTRACTOR CORPGeneral Contractor203/21/2026
PHOENIX SUTTON STR INCGeneral Contractor203/21/2026
EVEREST SCAFFOLDING INCGeneral Contractor203/21/2026
DEAN COElectrical103/21/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
JNR PLUMBING INC DBAPlumbing107/08/2026
HALPERN, SElectrical103/21/2026
ALVARADO, JUANElectrical103/21/2026
JUAN RAMIREZElectrical103/21/2026
WALD, STUARTElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KAMEN TALL ARCHITECTS P.C3606306/25/2025
SEBASTIAN M. D'ALESSANDRO1127410/22/2024
DELTA TESTING LABS687102/01/2024
GREGORY V. PEROTTO, P.E.947211/22/2023
Building Lifecycle
All (131)Filed (14)Permit Issued (13)Signed Off (6)Facade (FISP) (21)Violation (54)Inspection (5)Special Inspection (18)
08/10/2026
Signed off — Alteration
SEPARATE PREVIOUSLY COMBINED APARTMENTS # 6F AND # 6E AS PER PLANS. RESTORE GAS STOVE AT APT. # 6E. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01123270-I1
08/10/2026
Signed off — Alteration
SEPARATE PREVIOUSLY COMBINED APARTMENTS # 6F AND # 6E AS PER PLANS. RESTORE GAS STOVE AT APT. # 6E. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01123231-I1
12/08/2025
Violation issued (HPD, closed)
B
12/08/2025
Violation issued (HPD, closed)
B
07/01/2025
Signed off — Alteration
B00507288-I1
06/27/2025
Special inspection requirement — Post-installed Anchors
Scott Kamen
06/27/2025
Special inspection requirement — Masonry
Scott Kamen
06/27/2025
Special inspection requirement — Energy Code Compliance Inspections
Scott Kamen
06/27/2025
Special inspection requirement — Final
Scott Kamen
06/25/2025
Filed — Alteration
B00507288-P2
06/16/2025
Special inspection requirement — Masonry
Scott Kamen
06/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Scott Kamen
06/16/2025
Special inspection requirement — Final
Scott Kamen
06/16/2025
Special inspection requirement — Post-installed Anchors
Scott Kamen
03/21/2025
Permit issued — General Construction
B01123231-I1-GC
01/30/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
01/15/2025
Permit issued — Plumbing
B01123270-I1-PL
10/22/2024
Filed — Alteration
SEPARATE PREVIOUSLY COMBINED APARTMENTS # 6F AND # 6E AS PER PLANS. RESTORE GAS STOVE AT APT. # 6E. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01123270-I1
10/21/2024
Filed — Alteration
SEPARATE PREVIOUSLY COMBINED APARTMENTS # 6F AND # 6E AS PER PLANS. RESTORE GAS STOVE AT APT. # 6E. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01123231-I1
10/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sebastian D'Alessandro
10/07/2024
Special inspection requirement — Tenant Protection Plan Compliance
Sebastian D'Alessandro
10/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sebastian D'Alessandro
10/07/2024
Special inspection requirement — Final
Sebastian D'Alessandro
10/07/2024
Special inspection requirement — Tenant Protection Plan Compliance
Sebastian D'Alessandro
07/26/2024
Filed — Alteration
SEPARATE PREVIOUSLY COMBINED APARTMENTS # 6F AND # 6E AS PER PLANS. RESTORE GAS STOVE AT APT. # 6E. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01081718-I1
07/26/2024
Filed — Alteration
SEPARATE PREVIOUSLY COMBINED APARTMENTS # 6F AND # 6E AS PER PLANS. RESTORE GAS STOVE AT APT. # 6E. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01081816-I1
07/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sebastian D'Alessandro
07/16/2024
Special inspection requirement — Final
Sebastian D'Alessandro
03/29/2024
Violation issued (HPD, closed)
C
03/29/2024
Violation issued (HPD, open)
A
02/01/2024
Filed — Alteration
B00507288-P1
12/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
11/29/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B08003120-I1
11/22/2023
Filed — Alteration
HEREBY FILING MINOR PLUMBING WORK TO EXISTING BASEMENT LAUNDRY ROOM AS PER PLANS. NOCHANGE IN USE, EGRESS, OR OCCUPANCY
B00424958-P2
10/24/2023
Cycle 9 facade report submitted
10/24/2023
Cycle 9 facade report signed — SAFE
10/16/2023
Cycle 9 facade inspection completed
10/03/2023
Violation issued (ECB, closed)
Unknown
08/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/17/2023
Signed off — Alteration
B00053989-I1
04/14/2023
Cycle 9 facade report signed — UNSAFE
04/13/2023
Cycle 9 facade report submitted
03/29/2023
Cycle 9 facade inspection completed
03/01/2023
Permit issued — General Construction
B00507288-I1-GC
02/23/2023
Violation issued (ECB, closed)
Unknown
02/14/2023
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
02/14/2023
Inspection — Certified Sprinkler (PL) - SP - Roughing
Certified
View inspection ↗
02/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/03/2023
Permit issued — General Construction
B00507288-I1-GC
02/02/2023
Violation issued (ECB, closed)
Construction
02/02/2023
Violation issued (ECB, closed)
Plumbing
02/02/2023
Violation issued (ECB, closed)
Construction
11/10/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/17/2022
Cycle 9 facade report submitted
10/13/2022
Cycle 9 facade report signed — UNSAFE
10/12/2022
Cycle 9 facade inspection completed
09/30/2022
Permit issued — Plumbing
B00424958-I1-PL
09/22/2022
Signed off — Alteration
B00459307-I1
Latest 60 of 131 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSUFFOLK CONSTRUCT CO. INC03/21/2025
DOB NOWPlumbingSigned-offJNR PLUMBING INC DBA01/15/2025
DOB NOWGeneral ConstructionSigned-offSKYLINE RESTORATION INC03/01/2023
DOB NOWGeneral ConstructionSigned-offSKYLINE RESTORATION INC02/03/2023
DOB NOWPlumbingSigned-offVARSITY PLBG AND HTG INC09/30/2022
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC09/14/2022
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC09/08/2022
DOB NOWGeneral ConstructionSigned-offSKYLINE RESTORATION INC02/18/2022
DOB NOWGeneral ConstructionSigned-offSKYLINE RESTORATION INC11/08/2021
DOB NOWPlumbingSigned-offVARSITY PLBG AND HTG INC09/24/2021
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC09/17/2021
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC01/29/2021
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC06/18/2018
BISOTISSUEDSATO CONSTRUCTION CO.INC03/07/2014
BISEQISSUEDSIGNATURE SCAFFOLDING COR05/15/2013
BISOTISSUEDSATO CONSTRUCTION CO.INC03/13/2013
BISOTISSUEDSATO CONSTRUCTION CO.INC10/12/2012
BISEQISSUEDSIGNATURE SCAFFOLDING COR07/17/2012
BISOTISSUEDLIBERTY CONSTRUCTION & RE08/18/2011
BISPLISSUEDJOSEPH FERRIGNO P&H CO12/27/2006
BISFSISSUEDSTAR INDUSTRIAL SERVICE12/27/2006
BISOTISSUEDALONSO HALL CONTRACTING11/14/2006
BISEQISSUEDCLARK&WILKINS INDUSTRIES INC07/12/2004
BISOTISSUEDPANORAMA INTERNATIONAL CO04/06/2004
BISEQISSUEDSPRING SCAFFOLDING03/23/2004
BISOTISSUEDPANORAMA INTERNATIONAL CO12/15/2003
BISBLISSUEDBETA STEAM AND PWER10/17/1991
1 project · most recent 11/22/2023
FiledStatusContractorScope
11/22/2023——1 heads
3 projects · most recent 10/22/2024
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
10/22/2024Signed-offJNR PLUMBING INC DBAGas
07/26/2024——Gas
11/22/2023Signed-offVARSITY PLBG AND HTG INCGas, Plumbing-Sprinkler, Water/Sanitary
5 projects · most recent 02/03/2026
General Wiring
FiledStatusContractorScope
02/03/2026Permit IssuedA+ ELECTRIC OF GREATER NYGeneral Wiring
01/28/2026Permit IssuedDENALI ELECTRIC CORP—
12/19/2021Permit IssuedJTE ELECTRICAL SERVICES—
01/27/2021CompleteBOROWIDE ELECT'L CONTR'S—
06/14/2018Permit IssuedELPO ELECTRICAL CONTG INC—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/30/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/14/2023Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
02/14/2023Certified Sprinkler (PL) - SP - RoughingCertifiedView ↗
02/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/10/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
06/27/2025Post-installed AnchorsScott Kamenspecial
06/27/2025MasonryScott Kamenspecial
06/27/2025Energy Code Compliance InspectionsScott Kamenprogress
06/27/2025FinalScott Kamenprogress
06/16/2025MasonryScott Kamenspecial
06/16/2025Energy Code Compliance InspectionsScott Kamenprogress
06/16/2025FinalScott Kamenprogress
06/16/2025Post-installed AnchorsScott Kamenspecial
10/07/2024Fire-Resistant Penetrations and JointsSebastian D'Alessandrospecial
10/07/2024Tenant Protection Plan ComplianceSebastian D'Alessandrospecial
10/07/2024Fire-Resistant Penetrations and JointsSebastian D'Alessandrospecial
10/07/2024FinalSebastian D'Alessandroprogress
10/07/2024Tenant Protection Plan ComplianceSebastian D'Alessandrospecial
07/26/2024Fire-Resistant Penetrations and JointsSebastian D'Alessandrospecial
07/16/2024FinalSebastian D'Alessandroprogress
12/14/2023Fire-Resistant Penetrations and JointsGregory Perottospecial
11/12/2020Mechanical Systems—special
11/12/2020Final—progress
▾Documents — 115 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch9
09/03/2026B00053989-I1Request digital key ↗
09/01/2026B00507288-I1Request digital key ↗
09/01/2026B00507288-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/02/2026B00424958-P1Request digital key ↗
09/02/2026B00424958-P2Request digital key ↗
09/02/2026B00424958-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00427363-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/01/2026B00459307-I1Request digital key ↗
▸Applications & Permits13
▸BISWORK PERMIT APPLICATION8
06/07/2014320560077Open ↗
05/20/2013320509721Open ↗
03/15/2013320560077Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
08/19/2014320509721Open ↗
10/15/2012320560077Open ↗
07/18/2012320509721Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications43
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/03/2026B00053989-I1Open ↗
09/02/2026B00427363-I1Open ↗
09/02/2026B00424958-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/02/2026B00507288-I1Open ↗
09/02/2026B00507288-I1Open ↗
08/31/2026B01081816-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
02/03/2017320560077Open ↗
02/03/2017320560077Open ↗
01/18/2017320560077Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026B00507288-I1Open ↗
09/02/2026B00507288-I1Open ↗
08/31/2026B01081816-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
10/27/2012320560077Open ↗
07/18/2012320509721Open ↗
09/13/2011320349994Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
10/15/2012320560077Open ↗
07/18/2012320509721Open ↗
09/13/2011320349994Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
09/01/2009320059315Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
02/08/2010320059315Open ↗
▸Safety & Tenant Protection4
▸DOB NOWTenant Protection Plan4
09/02/2026B00427363-I1Open ↗
09/02/2026B00424958-P1Open ↗
09/02/2026B00424958-P2Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/02/2026B00427363-I1Open ↗
09/02/2026B00424958-P2Open ↗
09/02/2026B00424958-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
09/13/2011320349994Open ↗
09/01/2009320059315Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/15/2012320560077Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/01/2026B00507288-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY2
03/06/2012320349994Open ↗
09/13/2011320349994Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/15/2012320560077Open ↗
▸Approvals, Objections & Sign-offs8
▸BISADMINISTRATIVE OBJECTIONS4
10/15/2012320560077Open ↗
07/18/2012320509721Open ↗
09/13/2011320349994Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
02/03/2017320560077Open ↗
02/03/2017320560077Open ↗
05/22/2012320349994Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
01/18/2017320560077Open ↗
10/15/2012320560077Open ↗
03/06/2012320349994Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET4
10/14/2012320560077Open ↗
07/18/2012320509721Open ↗
09/13/2011320349994Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION2
08/21/2014320509721Open ↗
08/19/2014320509721Open ↗
▸Other Documents5
▸DOB NOWDHCR Document2
09/02/2026B00424958-I1Open ↗
09/02/2026B00424958-P2Open ↗
▸DOB NOWPro Cert Restriction Exception (LL158/17)2
08/13/2026B01081718-I1Open ↗
08/13/2026B01081816-I1Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026B00053989-I1Open ↗