955 RUTLAND ROAD · BIN 3099358
💬 Discuss this project
1963Year Built
6Stories
D1Building Class
R6Zoning
56,352 sfGross Floor Area
60Units
LL97 CoveredRent Stabilized12 Open Violations 10 unresolved · 2 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: NYC PACT PRESERVATION PARTNERS LLC · 21,325 sf lot · 2.64 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof5p · 5 filings · 20 docs
Bulkhead1p · 1 filing · 8 docs
Floor 63p · 1 filing · 8 docs
Floor 53p · 1 filing · 8 docs
Floor 43p · 1 filing · 8 docs
Floor 33p · 1 filing · 8 docs
Floor 23p · 1 filing · 8 docs
Floor 15p · 3 filings · 20 docs
CellarUnder Construction13p · 8 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC PACT PRESERVATION PARTNERS409/13/2026
NYCHA1607/08/2026
MERIDIAN CONSTRUCTION GROUP407/08/2026
NEW YORK CITY HOUSING AUTHORITY907/08/2026
NYCHA 99503/22/2026
NEW YORK CITY HOUS. AUTHO103/22/2026
S N BUILDERS403/21/2026
NYC HOUSING AUTHORITY703/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES203/21/2026
KD DESIGNS303/21/2026
DANICO SERVICES203/21/2026
BK CONSTRUCTIONDBA SRT CONSTRUCTION403/21/2026
METROPOLIS GROUP INC2803/21/2026
HIERARCH-E203/21/2026
RYBAK DEVELOPMENT203/21/2026
CONVERSANO ASSOCIATES, INC.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROMA SCAFFOLDING INCGeneral Contractor707/08/2026
PYRAMID ETC COMPANIES, LLGeneral Contractor704/09/2026
FSC D&C LLCGeneral Contractor607/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor407/08/2026
DUAL FUEL COMPANY LLCGeneral Contractor407/08/2026
BK CONSTRUCTION SVCS INCGeneral Contractor307/08/2026
DUAL FUEL PLUBING & HTINGPlumbing207/08/2026
A & E PLUMBING CORPPlumbing207/08/2026
NASH ELECTRIC SERVICES INElectrical103/22/2026
LADIKOS, DIMITRIOSElectrical103/21/2026
FRANK FODERAElectrical103/21/2026
MERIDIAN CONSTRUCTION GRPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS18031603/05/2026
SOCOTEC, INC.301205/13/2024
Building Lifecycle
All (219)Filed (28)Permit Issued (30)Signed Off (13)Facade (FISP) (18)Violation (60)Inspection (9)Objection (31)Special Inspection (30)
09/19/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/27/2026
Objection resolved — Addressed
07/27/2026
Objection resolved — Addressed
07/27/2026
Objection resolved — Addressed
07/27/2026
Objection resolved — Addressed
07/27/2026
Objection resolved — Open
07/27/2026
Objection resolved — Open
07/24/2026
Objection raised — Other
07/16/2026
Objection raised — Other
07/16/2026
Objection raised — Other
07/16/2026
Objection raised — Other
07/16/2026
Objection raised — Other
07/16/2026
Objection raised — Other
07/13/2026
Signed off — Alteration
WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES AS PER PLANS. EXTENDED CELLAR JOB DESCRIPTION IN WORK ON FLOORS SECTION. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00918315-I1
07/13/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
07/13/2026
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
07/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
07/13/2026
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
07/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
07/13/2026
Special inspection requirement — Structural Steel - High Strength Bolting
SAMI HAJJAR P.E
07/13/2026
Special inspection requirement — Structural Steel - Welding
SAMI HAJJAR P.E
07/13/2026
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
06/29/2026
Filed — Alteration
INSTALLATION OF BATTERY SYSTEM AT LOWEST LEVEL OF DISCHARGE. NO CHANGE TO USE, OCCUPANCY, FIRE PROTECTION OR EGRESS.
B01369418-I1
06/19/2026
Filed — Alteration
FUEL OIL STORAGE AS PER PLANS
B00998213-I1
06/15/2026
Violation issued (HPD, open)
C
06/15/2026
Violation issued (HPD, open)
C
06/15/2026
Violation issued (HPD, open)
C
05/27/2026
Signed off — Alteration
Scope of work includes the repair and/or replacement of heating, ventilation, and air condition systems of existing building.
B00951967-I1
05/22/2026
Signed off — Alteration
SCOPE OF WORK INCLUDES THE REPLACEMENT OF GAS BOILERS AND ASSOCIATED PIPING AND DUCTWORK.
B01017892-I1
04/16/2026
Signed off — Alteration
Installation of plumbing fixtures along with related piping. 2 duplex booster pumps, 2 duplex sewage ejector pumps.
B00946344-I1
03/30/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/25/2026
Permit issued — Plumbing
B01031050-I1-PL
03/20/2026
Signed off — Alteration
Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as needed.
B00951971-I1
03/18/2026
Permit issued — General Construction
B00918315-I1-GC
03/16/2026
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01013901-I1
03/11/2026
Filed — Alteration
Installation of plumbing fixtures along with related piping. Gas riser line from meter in meter room to new boiler.
B01366554-I1
03/11/2026
Filed — Alteration
Installation of plumbing fixtures along with related piping. 2 duplex booster pumps, 2 duplex sewage ejector pumps.
B00946344-P1
03/11/2026
Signed off — Alteration
Installation of plumbing fixtures along with related piping. 67 lavs, 67 bath tubs, 67 water closets, 61 kitchen sinks.
B00946313-I1
03/11/2026
Special inspection requirement — Electrical motors and elevators
SAMI HAJJAR P.E
03/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
03/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
03/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
03/11/2026
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
03/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
03/05/2026
Filed — Alteration
Installation of plumbing fixtures along with related piping.1 meter, 3 lavs, 3 water closets, 3 kitchen sinks, 2 duplex booster pumps, 6 pressure reducing valves.
B01031050-I1
03/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/03/2026
Special inspection requirement — Electrical motors and elevators
03/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/03/2026
Special inspection requirement — Maintenance information
02/17/2026
Cycle 10 facade inspection completed
02/11/2026
Violation issued (FDNY_ORDER, closed)
02/11/2026
Violation issued (FDNY_NOV, closed)
02/10/2026
Cycle 10 facade report signed — SAFE
02/10/2026
Special inspection requirement — Tenant Protection Plan Compliance
02/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
02/09/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
02/09/2026
Special inspection requirement — Electrical motors and elevators
SAMI HAJJAR P.E
02/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
Latest 60 of 219 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedA & E PLUMBING CORP03/25/2026
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC03/18/2026
DOB NOWStructuralSigned-offFSC D&C LLC11/20/2025
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLBG & HTG CORP06/26/2025
DOB NOWMechanical SystemsSigned-offDUAL FUEL COMPANY LLC06/25/2025
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC06/25/2025
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING06/24/2025
DOB NOWGeneral ConstructionSigned-offPYRAMID ETC COMPANIES, LL06/10/2025
DOB NOWSupported ScaffoldPermit IssuedMERIDIAN CONSTRUCTION GRP05/13/2025
DOB NOWSidewalk ShedSigned-offBK CONSTRUCTION SVCS INC05/05/2025
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC03/05/2025
DOB NOWConstruction FenceSigned-offBK CONSTRUCTION SVCS INC11/21/2024
DOB NOWStructuralSigned-offFSC D&C LLC10/17/2024
DOB NOWStructuralSigned-offFSC D&C LLC10/17/2024
DOB NOWPlumbingSigned-offA & E PLUMBING CORP07/05/2024
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC07/05/2024
DOB NOWMechanical SystemsSigned-offPYRAMID ETC COMPANIES, LL07/05/2024
DOB NOWGeneral ConstructionSigned-offPYRAMID ETC COMPANIES, LL05/22/2024
DOB NOWMechanical SystemsSigned-offDUAL FUEL COMPANY LLC05/03/2024
DOB NOWBoiler EquipmentSigned-offAMERICAN BOILER & WELDING05/02/2024
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING05/01/2024
DOB NOWSidewalk ShedSigned-offBK CONSTRUCTION SVCS INC04/29/2024
DOB NOWSuspended ScaffoldPermit IssuedPREMIER CONSTRUCTION INC04/10/2024
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC03/06/2024
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC12/21/2023
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC11/22/2023
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC01/24/2023
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC02/22/2022
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC02/04/2021
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC06/05/2020
BISEQISSUEDROMA SCAFFOLDING INC11/17/2023
BISEQISSUEDROMA SCAFFOLDING INC11/04/2022
BISEQISSUEDROMA SCAFFOLDING INC11/01/2021
BISEQISSUEDROMA SCAFFOLDING INC10/27/2021
BISEQISSUEDROMA SCAFFOLDING INC10/06/2020
BISEQISSUEDROMA SCAFFOLDING INC10/28/2017
BISEQISSUEDS & N BUILDERS INC06/02/2017
BISEQISSUEDS & N BUILDERS INC06/02/2017
BISOTISSUEDS & N BUILDERS INC06/02/2017
BISEQISSUEDS & N BUILDERS INC06/02/2017
+ 15 more permits on file
1 project · most recent 04/17/2024
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/17/2024Signed-offDUAL FUEL COMPANY LLCVentilation Systems
Ventilation
N/A n/a 1 BTU ×1
2 projects · most recent 03/11/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/11/2026——Gas
03/05/2026Permit IssuedLEEMA PLBNG & HEATING INCGas, Water/Sanitary
11 projects · most recent 08/11/2025
General Wiring Boiler Controls
FiledStatusContractorScope
08/11/2025CompleteANGLER ELECTRICGeneral Wiring
04/17/2025CompleteATLAS-ACON ELEC. SERVICEGeneral Wiring
10/03/2024CompleteDENALI ELECTRIC CORP—
06/13/2024Permit IssuedITKIN ELECTRIC CORP.Boiler Controls
04/25/2024Permit IssuedHIGH QUALITY ELECTRIC OF—
04/22/2024Permit IssuedZENA ELECTRIC INC—
12/15/2023CompleteLAURA ELEC'L LIGHTING &—
12/04/2023CompleteNASH ELECTRIC SERVICES IN—
11/12/2019Permit IssuedN.Y.C. HOUSING AUTHORITYBoiler Controls
04/22/2019Permit IssuedN.Y.C. HOUSING AUTHORITYBoiler Controls
08/06/2018CompleteMAC FHIONNGHAILE & SONSGeneral Wiring
2 projects · most recent 06/29/2026
Steel Concrete
FiledStatusContractorScope
06/29/2026——1 scope_items
12/02/2025Signed-offFSC D&C LLCSteel, Concrete
1 project · most recent 05/08/2025
Scaffold
FiledStatusContractorScope
05/08/2025Signed-offPYRAMID ETC COMPANIES, LLScaffold
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
03/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/24/2025Pass-Final Boiler Equipment InspectionPassView ↗
12/19/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/01/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/10/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/30/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 101
DateRequirementInspectorRole
07/13/2026Structural Steel - High Strength BoltingSAMI HAJJAR P.Especial
07/13/2026Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
07/13/2026FinalSAMI HAJJAR P.Eprogress
07/13/2026Structural Steel - WeldingSAMI HAJJAR P.Especial
07/13/2026Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
07/13/2026Structural Steel - DetailsSAMI HAJJAR P.Especial
07/13/2026Post-installed AnchorsSAMI HAJJAR P.Especial
07/13/2026Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
03/11/2026HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
03/11/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
03/11/2026Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
03/11/2026HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
03/11/2026Maintenance informationSAMI HAJJAR P.Eenergy_progress
03/11/2026Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
03/03/2026HVAC-R and service water heating equipment—energy_progress
03/03/2026HVAC-R and service water heating system controls—energy_progress
03/03/2026Tenant Protection Plan Compliance—special
03/03/2026Electrical motors and elevators—energy_progress
03/03/2026Maintenance information—energy_progress
03/03/2026HVAC-R and service water piping design and insulation—energy_progress
02/10/2026Tenant Protection Plan Compliance—special
02/09/2026Maintenance informationSAMI HAJJAR P.Eenergy_progress
02/09/2026Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
02/09/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
02/09/2026HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
Latest 25 of 101.
▾Documents — 291 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch27
08/26/2026B00965049-I1Request digital key ↗
08/25/2026B00918315-I1Request digital key ↗
08/25/2026B01019005-I1Request digital key ↗
Showing 3 of 27 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00353110-I1Request digital key ↗
▸Applications & Permits35
▸BISWORK PERMIT APPLICATION18
11/21/2023340554402Open ↗
11/30/2022340554402Open ↗
11/02/2021340554402Open ↗
Showing 3 of 18 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION17
01/16/2020340713641Open ↗
02/26/2019340655570Open ↗
01/22/2019340655570Open ↗
Showing 3 of 17 on file for this type
▸Seals & Professional Certifications89
▸DOB NOWDPL-1: Design Professional Seal & Signature27
08/26/2026B00965049-I1Open ↗
08/25/2026B00946344-P1Open ↗
08/25/2026B00946344-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/23/2026B01017892-I1Open ↗
08/31/2026B00946313-I1Open ↗
08/29/2026B00918315-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/23/2026B01017892-I1Open ↗
08/31/2026B00946313-I1Open ↗
08/29/2026B00918315-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
01/04/2018340340606Open ↗
01/04/2018340364206Open ↗
01/04/2018340364206Open ↗
Showing 3 of 10 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
01/16/2020340713641Open ↗
10/24/2017340554402Open ↗
03/23/2016340364206Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
01/16/2020340713641Open ↗
10/24/2017340554402Open ↗
03/23/2016340364206Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
01/16/2020340713641Open ↗
10/24/2017340554402Open ↗
03/23/2016340364206Open ↗
Showing 3 of 6 on file for this type
▸BISProfessional and Owner Certification (POC3)1
04/25/2017340340606Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/22/2019340655570Open ↗
▸Safety & Tenant Protection4
▸BISTENANT PROTECTION PLAN AND NOTES3
01/16/2020340713641Open ↗
05/10/2019340655570Open ↗
10/24/2017340554402Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00353110-I1Open ↗
▸Environmental & Asbestos21
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/25/2026B00930795-P1Open ↗
08/25/2026B00930795-I1Open ↗
08/24/2026B00922581-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/25/2026B01017892-I1Open ↗
08/14/2026B01369418-I1Open ↗
08/13/2026B00951967-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
01/16/2020340713641Open ↗
01/04/2018340364206Open ↗
04/18/2017340340606Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
01/04/2018340340606Open ↗
03/23/2016340364206Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
01/16/2020340713641Open ↗
04/21/2017340340606Open ↗
04/21/2017340340606Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification3
08/25/2026B00951967-I1Open ↗
08/25/2026B01017892-I1Open ↗
08/18/2026B01031050-I1Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
10/24/2017340554402Open ↗
07/20/2015340281402Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
01/16/2020340713641Open ↗
01/26/2016340340606Open ↗
▸BISNYCECC ANALYSIS2
01/16/2020340713641Open ↗
01/26/2016340340606Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
04/25/2017340340606Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/04/2018340340606Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY11
04/22/2024300518535Open ↗
04/22/2024300518535Open ↗
01/16/2020340713641Open ↗
Showing 3 of 11 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)5
10/24/2017340554402Open ↗
03/23/2016340364206Open ↗
01/26/2016340340606Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
01/04/2018340340606Open ↗
▸Approvals, Objections & Sign-offs42
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter22
08/24/2026B00922581-P1Open ↗
08/23/2026B01013901-I1Open ↗
08/23/2026B01013901-P1Open ↗
Showing 3 of 22 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
12/19/2023340554402Open ↗
02/15/2018340364206Open ↗
01/12/2018340340606Open ↗
Showing 3 of 9 on file for this type
▸BISSHED LETTER4
11/30/2022340554402Open ↗
10/12/2018340554402Open ↗
06/07/2017340281402Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP Variance (V5) letter2
08/13/2026B00918315-I1Open ↗
08/13/2026B00946313-I1Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
05/10/2019340655570Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/21/2023340554402Open ↗
▸BISSUPERSEDING LETTER1
10/12/2021340554402Open ↗
▸BISFINAL1
12/14/2023340554402Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026B00353110-I1Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
01/16/2020340713641Open ↗
01/22/2019340655570Open ↗
01/12/2018340340606Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms25
▸BISADDITIONAL INFORMATION10
05/13/2019340655570Open ↗
05/10/2019340655570Open ↗
05/10/2019340655570Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM8
02/15/2018340364206Open ↗
01/12/2018340340606Open ↗
01/09/2018340340606Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
01/16/2020340713641Open ↗
01/22/2019340655570Open ↗
10/24/2017340554402Open ↗
Showing 3 of 7 on file for this type
▸Other Documents8
▸BISFEE EXEMPTION DOCUMENTATION3
03/23/2016340364206Open ↗
07/30/2015340284864Open ↗
07/20/2015340281402Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
02/26/2019340655570Open ↗
02/14/2019340655570Open ↗
01/22/2019340655570Open ↗
▸DOB NOWCalculations1
08/13/2026B01019005-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01019005-I1Open ↗