RoofKBS TrustUnder Construction42p · 6 filings · 20 docs
ArchitectureCivilElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Supported Scaffold
Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
2 documents · 3 drawing sheets
REPLACEMENT OF BRICK MASONRY AT NORTH ELEVATION FOR FISP CYCLE 9C COMPLIANCE
On file for this project
4 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Latest 3 of 6 filings on this floor.
Floor 15Unit 15A, Unit 15BUnder Construction47p · 4 filings · 20 docs
ArchitectureDMElectricalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
RENOVATION OF AN EXISTING APARTMENT 15B. DEMOLITION AND CONSTRUCTION OF PARTITIONS, INTERIOR RENOVATION OF KITCHEN, AND BATHROOM. ALL WORK IS INTERIOR. PLUMBING WORK FILED UNDER SEPARATE APP. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
13 documents · 7 drawing sheets
REINFORMECENT OF BATHROOM SLAB IN APT. 14AB AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
19 documents
PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION AND COMBINATION OF APARTMENT 14A/15A WITH 14B. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
26 documents
Latest 3 of 4 filings on this floor.
Floor 14Unit 14A, Unit 14AB28p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
REINFORMECENT OF BATHROOM SLAB IN APT. 14AB AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
19 documents
PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION AND COMBINATION OF APARTMENT 14A/15A WITH 14B. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
26 documents
REPAIR/REPLACE FACADE AS NECESSARY TO INCLUDE POINTING AND REPAIR/REPLACEMENT OF LIMESTONE PANELS AS PER PLANS. REPLACE TERRACE ROOF MEMBRANES AS PER PLANS. SIDEWALK SHED AND PIPE SCAFFOLDING TO BE FILED UNDER A SEPARATE APPLICATION
On file for this project
8 documents
Floor 13Facade and roof repair with sidewalk shed10p · 1 filing · 8 docs
Architecture
Issued Permit Scope
General Construction
REPAIR/REPLACE FACADE AS NECESSARY TO INCLUDE POINTING AND REPAIR/REPLACEMENT OF LIMESTONE PANELS AS PER PLANS. REPLACE TERRACE ROOF MEMBRANES AS PER PLANS. SIDEWALK SHED AND PIPE SCAFFOLDING TO BE FILED UNDER A SEPARATE APPLICATION
On file for this project
8 documents
Floor 12Unit 12C, Unit 12D, Unit PH1Under Construction53p · 4 filings · 20 docs
ArchitectureGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
Modifications to existing Plumbing Fixtures as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
27 documents · 6 drawing sheets
Structural work as shown on plans filed herewith
On file for this project
19 documents · 3 drawing sheets
Modifications to existing plumbing system including installation of plumbing fixtures at apartments 12C & 12D on the 12th fl with associated piping as per plans filed herewith. No change in use, egress of occupancy.
On file for this project
23 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 11Unit 11AUnder Construction16p · 2 filings · 17 docs
Architecture
Issued Permit Scope
General Construction
Proposed interior renovation of Kitchen and Pantry. Work includes replacement of existing appliances and plumbing fixtures with new; replacement of cabinets and countertops with new; replacement of ceiling, wall, and floor finishes with new.
On file for this project
9 documents
REPAIR/REPLACE FACADE AS NECESSARY TO INCLUDE POINTING AND REPAIR/REPLACEMENT OF LIMESTONE PANELS AS PER PLANS. REPLACE TERRACE ROOF MEMBRANES AS PER PLANS. SIDEWALK SHED AND PIPE SCAFFOLDING TO BE FILED UNDER A SEPARATE APPLICATION
On file for this project
8 documents
Floor 10Unit 10AUnder Construction68p · 6 filings · 20 docs
ArchitectureDMMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
REPAIR/REPLACE FACADE AS NECESSARY TO INCLUDE POINTING AND REPAIR/REPLACEMENT OF LIMESTONE PANELS AS PER PLANS. REPLACE TERRACE ROOF MEMBRANES AS PER PLANS. SIDEWALK SHED AND PIPE SCAFFOLDING TO BE FILED UNDER A SEPARATE APPLICATION
On file for this project
8 documents
Exterior renovation of existing apartment on floor 010. Architectural work. There is to be no change of use, occupancy, or egress.
On file for this project
29 documents
Installation of new mechanical VRF system at existing residence on floor 010. Mechanical work. There is to be no change of use, occupancy or egress.
On file for this project
14 documents · 7 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 9Unit 9B, Unit 9C, Unit 9D +1Under Construction30p · 4 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Modification of plumbing fixtures in apt. 9C/D as shown on submitted plans. No change in occupancy, use or egress.
On file for this project
12 documents
Herewith filing removal and installation of plumbing fixtures, as per plans submitted.
On file for this project
8 documents
Herewith filing interior alterations to existing apartment 9B, as per plans submitted. There is no change to use, egress or occupancy under this application.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 8Unit 8B1p · 1 filing · 13 docs
Architecture
Issued Permit Scope
General Construction
Installation of thru-wall ac units and associated GC work, as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
13 documents · 1 drawing sheet
Floor 7
Floor 6Unit 6A2p · 1 filing · 9 docs
Mechanical
Issued Permit Scope
Mechanical Systems
INSTALLATION OF 20 TON CAPACITY CHILLER ON THE 6TH FLOOR APARTMENT # 6A, AC ROOM. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
On file for this project
9 documents · 1 drawing sheet
Floor 5Unit 5A71p · 7 filings · 20 docs
ArchitectureDMMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
INTERIOR RENOVATION OF APARTMENT #5A (5TH FLOOR) AND STAFF ROOMS (4TH FLOOR). NO CHANGE TO USE, OCCUPANCY, EGRESS, OR ZONING.
On file for this project
15 documents · 5 drawing sheets
STRUCTURAL WORK ASSOCIATED WITH NEW AND ENLARGED MASONRY OPENINGS AND NEW LOUVER AT THE 5TH AND 4TH FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
10 documents
STRUCTURAL WORK ASSOCIATED WITH NEW AND ENLARGED MASONRY OPENINGS AT THE 5TH FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
6 documents
Latest 3 of 7 filings on this floor.
Floor 468p · 6 filings · 20 docs
ArchitectureGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
INTERIOR RENOVATION OF APARTMENT #5A (5TH FLOOR) AND STAFF ROOMS (4TH FLOOR). NO CHANGE TO USE, OCCUPANCY, EGRESS, OR ZONING.
On file for this project
15 documents · 2 drawing sheets
STRUCTURAL WORK ASSOCIATED WITH NEW AND ENLARGED MASONRY OPENINGS AND NEW LOUVER AT THE 5TH AND 4TH FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
10 documents · 1 drawing sheet
RENOVATION OF ENTIRE APARTMENT 5A ON 005 FLOOR AND STAFF ROOM ON 004 FLOOR. NO CHANGE TO USE, OCCUPANCY, EGRESS, OR ZONING.
On file for this project
7 documents
Latest 3 of 6 filings on this floor.
Floor 38p · 1 filing · 9 docs
Structural
Issued Permit Scope
Structural
STRUCTURAL WORK ON 3RD FLOOR OF EXISTING RESIDENTIAL BUILDING. NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
On file for this project
9 documents · 2 drawing sheets
Floor 2Unit 2B36p · 1 filing · 20 docs
ArchitectureDMMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Plumbing work for renovation of Apt 1B/2B as shown on plans
On file for this project
31 documents · 9 drawing sheets
Floor 1Unit 1B, Unit 1CUnder Construction119p · 9 filings · 20 docs
ArchitectureDMEquipmentGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
INSTALL TWO SPLIT HEAT PUMP SYSTEMS. CONDENSER OUTSIDE THE BUILDING AND AIR HANDLERS IN KITCHEN WITH A COIL INSTALLED IN THE EXISTING MAKEUP AIR UNIT
On file for this project
8 documents
Plumbing work for renovation of Apt 1B/2B as shown on plans
On file for this project
31 documents · 6 drawing sheets
RENOVATION OF APARTMENT 1C ON THE 001 FLOOR. ARCHITECTURAL WORK. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
11 documents
Latest 3 of 9 filings on this floor.
CellarKitchen renovation60p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Modification of High Pressure Steam Distribution and Installation of Pressure Reducing Valves.
On file for this project
8 documents · 2 drawing sheets
Plumbing work for renovation of Apt 1B/2B as shown on plans
On file for this project
31 documents
Replace existing Kitchen Hood Exhaust Fan in Cellar with new Fan on Roof, and Replace existing Makeup Air Unit in Cellar in-kind, with related ductwork modifications for each no change to use or egress under this application.
On file for this project
50 documents · 5 drawing sheets
Latest 3 of 4 filings on this floor.
BasementFirst floor kitchen and cellar storage renovation3p · 1 filing · 20 docs
ArchitecturePlumbing
Replace existing Kitchen Hood Exhaust Fan in Cellar with new Fan on Roof, and Replace existing Makeup Air Unit in Cellar in-kind, with related ductwork modifications for each no change to use or egress under this application.
On file for this project
50 documents · 3 drawing sheets
Site & exteriorKBS TrustUnder Construction98p · 21 filings · 20 docs
ArchitectureCivilElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · General Construction · Protection and Mechanical Methods · Sidewalk Shed · Supported Scaffold
Installation of temporary material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
2 documents · 2 drawing sheets
Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
2 documents · 3 drawing sheets
REPLACEMENT OF BRICK MASONRY AT NORTH ELEVATION FOR FISP CYCLE 9C COMPLIANCE
On file for this project
4 documents · 5 drawing sheets
Latest 3 of 21 filings on this floor.
Filed — no permit issuedExcavations for planter repairs4p · 1 filing · 4 docs
ArchitectureGeneralStructural
Shoring of excavation for planter repairs in conjunction with job filing M00663956.
On file for this project
4 documents · 4 drawing sheets