| Owner | Filings | Most Recent |
|---|---|---|
| COHEN BROTHER REALTY AS AGENT FOR | 45 | 07/08/2026 |
| COHEN BROTHERS REALTY | 125 | 07/08/2026 |
| CB2 | 9 | 07/08/2026 |
| PARK CONTRACTING GROUP | 4 | 04/09/2026 |
| ANDAMIO SCAFFORDING LLC | 10 | 04/09/2026 |
| D D BUILDINGS COMPANY | 806 | 03/22/2026 |
| 206 E 59TH ST GARAGE, COR | 5 | 03/22/2026 |
| 206 EAST 59TH STREET GARA | 2 | 03/22/2026 |
| COHEN BROS REALTY | 4 | 03/22/2026 |
| EATWELL ENTERPRISES LLP | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| ALWAYS FAST SERVICES CORP | 1 | 01/02/2026 |
| ANZ CONSULTING ENGINEERING, PLLC | 3 | 12/17/2025 |
| NAZZARENO CALLIPO P.E. | 2 | 12/16/2025 |
| RYAN MIN ARCHITECT PLLC | 2 | 05/22/2025 |
| PAPER PLANE ARCHITECTURE, PLLC | 1 | 02/28/2025 |
| JACK GREEN ASSOCIATES | 22 | 02/20/2025 |
| MEYERS+ ENGINEERS | 4 | 01/22/2025 |
| GRACE SPACE ARCHITECT, LLC | 1 | 01/17/2025 |
| OFFICE OF JAMES RUDERMAN | 2 | 01/14/2025 |
| PLAN ARCHITECTURE PLLC | 4 | 10/10/2024 |
| STUDIO HUJI | 2 | 10/07/2024 |
| STEVEN O'NEIL | 1 | 06/19/2024 |
| THE EIPEL ENGINEERING GROUP, D.P.C. | 1 | 06/19/2024 |
| S.M. BERGER ARCHITECTURE PC | 1 | 11/01/2023 |
| MARCO GIARDINA ARCHITECTURE, PLLC | 3 | 08/31/2023 |
| ARBORE ARCHITECTURAL DESIGN PLLC | 1 | 04/20/2023 |
| JP ENGINEERING | 1 | 11/02/2022 |
| ENTHINK ENGINEERS LLC | 2 | 07/01/2022 |
| GENSLER | 2 | 04/07/2022 |
| SPACE 4 ARCHITECTURE | 1 | 03/21/2022 |
| TAS ENGINEERING, PC | 2 | 12/14/2021 |
| ALLEN STRASEN ARCHITECT PC | 1 | 05/05/2021 |
| KOSSAR + GARRY ARCHITECTS, LLP | 1 | — |
| Representative | Filings | Most Recent |
|---|---|---|
| DOMANI CONSULTING | 8 | 03/21/2026 |
| GZ NC CODE PLANNING ENGINEERING | 5 | 03/21/2026 |
| LOUIS STRIAR | 4 | 03/21/2026 |
| METROPOLIS GROUP INC | 20 | 03/21/2026 |
| RETHY ASSOCIATES | 8 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 6 | 03/21/2026 |
| ALLEN STRASEN ARCHITECT | 10 | 03/21/2026 |
| KOSSAR + GARRY ARCHITECTS, LLP | 8 | 03/21/2026 |
| KIT MIDDLETON ARCHITECT P C | 6 | 03/21/2026 |
| S M EXPEDITING | 8 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| WILTON CONSTRUCTION MNGRS | General Contractor | 15 | 07/08/2026 |
| VICI INTERIORS INC | General Contractor | 8 | 07/08/2026 |
| CAPITAL IMPROVEMENT SERVICES | General Contractor | 6 | 07/08/2026 |
| MOREAIR MECHANICAL SERVIC | General Contractor | 5 | 04/09/2026 |
| ANDAMIO SCAFFOLDING LLC | General Contractor | 5 | 07/08/2026 |
| TMG CONSTRUCTION CORP | General Contractor | 5 | 07/08/2026 |
| THREE PARK AVE. BLDNG CO | General Contractor | 4 | 03/21/2026 |
| SALVATORE ANELLI | Electrical | 4 | 03/21/2026 |
| EVEREST SCAFFOLDING INC | General Contractor | 4 | 03/21/2026 |
| RARE BREED RESTORATION IN | General Contractor | 4 | 07/08/2026 |
| G&A CONTRACTING LLC | General Contractor | 3 | 03/21/2026 |
| RAIKOS ELECTRIC LLC | Electrical | 3 | 03/22/2026 |
| UNIVERSAL FIRE SPR LLC | Fire Protection | 3 | 07/08/2026 |
| INTERSTATE INTERIORS INC | General Contractor | 3 | 07/08/2026 |
| METFLOW FIRE CONTROL LLC | Fire Protection | 2 | 07/08/2026 |
| COHEN BROTHERS RLTY CORP | General Contractor | 2 | 03/21/2026 |
| MICHILLI INC | General Contractor | 2 | 03/21/2026 |
| ALLSTATE SPRINKLER LLC | Fire Protection | 2 | 07/08/2026 |
| BROOK PLUMBING & HTG CORP | Fire Protection | 2 | 07/08/2026 |
| A&A PLUMBING CORP | Plumbing | 1 | 07/08/2026 |
| ABE HIMELFARB | Electrical | 1 | 03/21/2026 |
| METROTECH MECHANICAL CORP | Plumbing | 1 | 07/08/2026 |
| EXECUTIVE ELECTL SER INC | Electrical | 1 | 03/22/2026 |
| FREEDOM ELECTL & DATA INC | Electrical | 1 | 03/22/2026 |
| GREGORY BOWMAN | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| ANZ CONSULTING ENGINEERIN | 3946 | 3 | 12/17/2025 |
| GZ & NC CODE CONSULTING P | 7492 | 2 | 12/16/2025 |
| PAPER PLANE ARCHITECTURE, | 7155 | 1 | 02/28/2025 |
| JACK GREEN ASSOCIATES | 422 | 19 | 02/20/2025 |
| QUALITY TESTING, LLC | 7344 | 5 | 01/22/2025 |
| DELTA TESTING LABS | 687 | 2 | 01/14/2025 |
| CNS INSPECTION SERVICES | 7566 | 4 | 08/31/2023 |
| HAWA ENGINEERING PC | 7982 | 1 | 11/17/2022 |
| CUSTODIO CONSULTING, LLC | 1835 | 2 | 11/17/2022 |
| SE INSPECTIONS | 7486 | 4 | 04/07/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | BUILDOPS INC | 01/06/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | PARK CONTRACTING GROUP | 01/02/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | MOREAIR MECHANICAL SERVIC | 10/29/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | ANDAMIO SCAFFOLDING LLC | 06/17/2025 |
| DOB NOW | General Construction | Signed-off | WILTON CONSTRUCTION MNGRS | 04/21/2025 |
| DOB NOW | General Construction | Signed-off | G&A CONTRACTING LLC | 03/31/2025 |
| DOB NOW | General Construction | Signed-off | WILTON CONSTRUCTION MNGRS | 03/26/2025 |
| DOB NOW | Sprinklers | Permit Issued | SHARP PLUMBING CORP | 03/12/2025 |
| DOB NOW | Structural | Permit Issued | COHEN BROTHERS RLTY CORP | 01/21/2025 |
| DOB NOW | Sprinklers | Signed-off | NEPTUNE MECHANICAL INC | 10/04/2024 |
| DOB NOW | Plumbing | Permit Issued | A&A PLUMBING CORP | 09/19/2024 |
| DOB NOW | Sprinklers | Signed-off | CAPITOL FIRE SPRINKLER CO | 09/18/2024 |
| DOB NOW | General Construction | Permit Issued | TMG CONSTRUCTION CORP | 08/27/2024 |
| DOB NOW | Structural | Signed-off | TMG CONSTRUCTION CORP | 08/27/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | TMG CONSTRUCTION CORP | 08/27/2024 |
| DOB NOW | Mechanical Systems | Signed-off | RARE BREED RESTORATION IN | 08/16/2024 |
| DOB NOW | General Construction | Signed-off | RARE BREED RESTORATION IN | 08/16/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | ANDAMIO SCAFFOLDING LLC | 06/18/2024 |
| DOB NOW | Sprinklers | Signed-off | SHARP PLUMBING CORP | 06/11/2024 |
| DOB NOW | Structural | Signed-off | THREE PARK AVE. BLDNG CO | 12/11/2023 |
| DOB NOW | General Construction | Signed-off | THREE PARK AVE. BLDNG CO | 12/11/2023 |
| DOB NOW | General Construction | Signed-off | CAPITAL IMPROVEMENT SERVI | 10/19/2023 |
| DOB NOW | Sprinklers | Permit Issued | UNIVERSAL FIRE SPR LLC | 09/20/2023 |
| DOB NOW | Plumbing | Signed-off | METROTECH MECHANICAL CORP | 08/17/2023 |
| DOB NOW | Mechanical Systems | Permit Issued | MOREAIR MECHANICAL SERVIC | 08/14/2023 |
| DOB NOW | Sprinklers | Signed-off | ALLSTATE SPRINKLER LLC | 07/19/2023 |
| DOB NOW | General Construction | Signed-off | CAPITAL IMPROVEMENT SERVI | 06/27/2023 |
| DOB NOW | Sidewalk Shed | Signed-off | ANDAMIO SCAFFOLDING LLC | 06/26/2023 |
| DOB NOW | General Construction | Signed-off | INTERSTATE INTERIORS INC | 06/23/2023 |
| DOB NOW | General Construction | Signed-off | CAPITAL IMPROVEMENT SERVI | 06/08/2023 |
| DOB NOW | Sprinklers | Signed-off | UNIVERSAL FIRE SPR LLC | 04/26/2023 |
| DOB NOW | Mechanical Systems | Signed-off | WILTON CONSTRUCTION MNGRS | 04/05/2023 |
| DOB NOW | General Construction | Signed-off | WILTON CONSTRUCTION MNGRS | 02/17/2023 |
| DOB NOW | Sprinklers | Signed-off | FULL CAPACITY FIRE CORP | 01/26/2023 |
| DOB NOW | General Construction | Signed-off | INTERSTATE INTERIORS INC | 01/23/2023 |
| DOB NOW | General Construction | Signed-off | INTERSTATE INTERIORS INC | 11/10/2022 |
| DOB NOW | General Construction | Signed-off | WILTON CONSTRUCTION MNGRS | 11/03/2022 |
| DOB NOW | Sidewalk Shed | Signed-off | ANDAMIO SCAFFOLDING LLC | 07/01/2022 |
| DOB NOW | General Construction | Permit Issued | MICHILLI INC | 05/11/2022 |
| DOB NOW | Mechanical Systems | Signed-off | WILTON CONSTRUCTION MNGRS | 01/26/2022 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 11/17/2022 | Permit Issued | MOREAIR MECHANICAL SERVIC | Associated Ducts and Piping | Ducts & Piping N/A NA Ductwork ×1 |
| 10/23/2019 | Permit Issued | VICI INTERIORS INC | Air Conditioning Systems | — |
| 10/04/2019 | Permit Issued | CAPITAL IMPROVEMENT SERVI | Associated Ducts and Piping | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/17/2025 | — | — | Sprinkler System |
| 01/22/2025 | Signed-off | CAPITOL FIRE SPRINKLER CO | 57 heads |
| 10/11/2024 | Permit Issued | BROOK PLUMBING & HTG CORP | — |
| 11/17/2022 | Permit Issued | UNIVERSAL FIRE SPR LLC | — |
| 09/14/2020 | Permit Issued | METFLOW FIRE CONTROL LLC | 48 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/17/2025 | — | — | Water/Sanitary |
| 06/19/2024 | Permit Issued | A&A PLUMBING CORP | Water/Sanitary |
| 11/17/2022 | Signed-off | METROTECH MECHANICAL CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/02/2026 | Permit Issued | RICHARD NEU | — |
| 05/13/2025 | Complete | EXECUTIVE ELECTL SER INC | General Wiring |
| 09/30/2024 | Permit Issued | CRESCO ELECTRICAL CORP | General Wiring |
| 03/13/2024 | Permit Issued | OMD ELECTRICAL CORP | 1 meters, 1 new_meters |
| 06/23/2023 | Permit Issued | WARREN OSTROFF ELEC., INC | General Wiring |
| 01/10/2023 | Permit Issued | CONDUCTOR ELECL SVCS INC | General Wiring |
| 12/09/2022 | Permit Issued | AMBER ELECTL CONTNG INC | 2 meters, 1 new_meters |
| 12/01/2022 | Permit Issued | POWER SURGE ELECTRIC, INC | 1 meters, 1 new_meters |
| 04/06/2021 | Complete | VALLEY ELECTRIC OF NY INC | General Wiring |
| 11/19/2020 | Complete | MICHAEL BROS. ELECT. CORP | General Wiring |
| 11/05/2020 | Permit Issued | RAIKOS ELECTRIC LLC | General Wiring |
| 11/05/2020 | Complete | RAIKOS ELECTRIC LLC | General Wiring |
| 06/08/2020 | Complete | WESTSIDE ELECTRIC INC | General Wiring |
| 01/20/2020 | Complete | PREMIUM ELECTRIC INC | General Wiring |
| 01/07/2020 | Permit Issued | JUMPER ELECTRIC CORP | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/14/2025 | Permit Issued | COHEN BROTHERS RLTY CORP | Steel, Concrete |
| 06/19/2024 | Signed-off | TMG CONSTRUCTION CORP | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/02/2026 | Permit Issued | PARK CONTRACTING GROUP | Sidewalk Shed |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/04/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/21/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/19/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/18/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/13/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/13/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/23/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/21/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/21/2024 | Certified Sprinkler - SP - Roughing | Certified | View ↗ |
| 08/16/2024 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 08/16/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/07/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/17/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/01/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/26/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/26/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 12/27/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/17/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/12/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/04/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/29/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/27/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/24/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/19/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/19/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 01/05/2026 | Final | Nazzareno Callipo | progress |
| 01/05/2026 | Fire-Resistant Penetrations and Joints | Nazzareno Callipo | special |
| 01/05/2026 | Fire-Resistance Rated Construction | Nazzareno Callipo | progress |
| 11/25/2025 | Fire-Resistance Rated Construction | Nazzareno Callipo | progress |
| 11/25/2025 | Fire-Resistant Penetrations and Joints | Nazzareno Callipo | special |
| 11/25/2025 | Final | Nazzareno Callipo | progress |
| 06/12/2025 | Final | Ryan Min | progress |
| 06/12/2025 | Final | ALBERT ZIRINO | progress |
| 06/12/2025 | Mechanical Systems | ALBERT ZIRINO | special |
| 04/22/2025 | Final | Ryan Min | progress |
| 02/25/2025 | Fire-Resistant Penetrations and Joints | Janiel Collaqi | special |
| 02/25/2025 | Fire-Resistance Rated Construction | Janiel Collaqi | progress |
| 02/25/2025 | Final | Janiel Collaqi | progress |
| 02/25/2025 | Post-installed Anchors | Janiel Collaqi | special |
| 02/05/2025 | Sprinkler Systems | KEVIN SNEDEKER | special |
| 01/30/2025 | HVAC-R and service water piping design and insulation | JACK GREEN | energy_progress |
| 01/30/2025 | Shutoff dampers | JACK GREEN | energy_progress |
| 01/29/2025 | Mechanical Systems | JACK GREEN | special |
| 01/29/2025 | Final | JACK GREEN | progress |
| 01/15/2025 | Final | — | progress |
| 10/10/2024 | HVAC-R and service water piping design and insulation | JACK GREEN | energy_progress |
| 10/07/2024 | Final | Ryan Hung | progress |
| 10/07/2024 | Final | Ryan Hung | progress |
| 08/21/2024 | Final | Anthony Caserma | progress |
| 08/21/2024 | Sprinkler Systems | JACK GREEN | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Hunter Douglas | Office | Ground, Floor 1 | Project M01111755 Project M01062722 Project M01062791 Project M01062811 |
| ARTE USA | Office | Floor 9 | Project M00961062 |
| Nobilis | Office | Floor 5 | Project M00817877 Project M00817920 |
| Sanderson Design Group | Office | Floor 9 | Project M00786371 Project M00786362 |
| Loro Piana Interiors | Office | Floor 8 | Project M00699712 |
| Cowtan & Tout | Office | Floor 10 | Project M00595543 Project M00595546 |
| Zimmer Rohde | Retail | Floor 8 | Project M00520509 Project M00520676 |
| Thibaut | Office | Floor 9 | Project M00368454 |
| Phillip Jeffries | Office | Floor 11 | Project M00193143 Project M00193146 |