← Back
BuildNYC
Elevator apt, semi-fireproof without stores
Bali
98-23 HORACE HARDING EXPRESSWAY · Name © OpenStreetMap contributors · Corona · BIN 4047328
💬 Discuss this project
1966Year Built
16Stories
D1Building Class
R6Zoning
232,000 sfGross Floor Area
233Units
LL97 CoveredRent Stabilized17 Active Violations ▸FISP: SAFE
Elevator apt, semi-fireproof without stores · Owner of record: Shalimar Leasing Limited Partnership · 56,569 sf lot · 4.1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofFacade Restoration and BrickworkUnder Construction3p · 1 filing · 15 docs
Floor 13Unit 15K11p · 2 filings · 15 docs
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Site & exteriorHeavy duty sidewalk shedUnder Construction19p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Shalimar Leasing803/22/2026
Uess Leasing303/21/2026
Ceylon Leasing203/21/2026
Argentine Leasing203/21/2026
Sydney Leasing203/21/2026
Singapore Leasing203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rigid Structural Design205/07/2024
Seth P. Roye Architect111/15/2023
Bauer Dermel Architect304/26/2023
Mohammad Ahead, PE103/07/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants303/21/2026
Prat Enterprises403/21/2026
Arsenal Building Consultants203/21/2026
Rigid Structural Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Prat EnterprisesScaffold603/21/2026
Kings Group NYScaffold407/08/2026
Riconda MaintenanceGeneral Contractor303/21/2026
Prat EnterprisesGeneral Contractor303/21/2026
CMP ContractingGeneral Contractor203/21/2026
Everest ScaffoldingGeneral Contractor203/21/2026
Sea Bright SolarGeneral Contractor103/21/2026
Wasserman-Triefler PLG HeatingPlumbing103/21/2026
Riconda MaintenanceGeneral Contractor103/21/2026
Prime Piping & HeatingPlumbing107/08/2026
Arsenal ScaffoldGeneral Contractor109/08/2017
Foremost ConstructionGeneral Contractor106/19/2017
Jorich ConstructionGeneral Contractor112/11/2017
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KZ Engineering4665203/11/2024
Seth P Roye Architect8554111/15/2023
Trolydia Testing & Inspec4422111/15/2023
Richard H. Balser Engineering3028110/15/2022
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
10/27/2026
Signed off — Alteration
FACADE RESTORATION/INSPECTION
Q00856210-I1
10/16/2026
ECB violation issued for failure to file a final inspection or signed off permitted work with DOB. Atoi observed, balcony slab edge restoration and…
ECB violation · open
04/07/2026
§ 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL .. IN THE 1st BATHROOM FROM EAST LOCATED AT APT 16D,…
HPD violation · closed
04/07/2026
§ 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING LIGHT FIXTURE IN THE 2nd ROOM FROM EAST AT…
HPD violation · closed
260 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offPrat Enterprises12/19/2024
DOB NOWSuspended ScaffoldPermit IssuedPratt Construction04/02/2024
DOB NOWGeneral ConstructionSigned-offPrat Enterprises02/08/2024
DOB NOWSidewalk ShedSigned-offKings Group NY02/08/2024
DOB NOWSuspended ScaffoldSigned-offPratt Construction01/09/2024
DOB NOWSidewalk ShedSigned-offPrat Enterprises12/19/2023
DOB NOWPlumbingSigned-offPrime Piping & Heating03/22/2023
DOB NOWSidewalk ShedSigned-offKings Group NY03/07/2023
DOB NOWGeneral ConstructionSigned-offCMP Contracting02/10/2023
BISOTISSUEDJorich Construction12/11/2017
BISEQISSUEDArsenal Scaffold09/08/2017
BIS—ISSUEDForemost Construction06/19/2017
BISOTISSUEDRiconda Maintenance02/16/2016
BISOTISSUEDRiconda Maintenance01/25/2016
BISOTISSUEDRiconda Maintenance09/14/2015
BISEQISSUEDEverest Scaffolding05/19/2015
BISOTISSUEDRiconda Maintenance06/27/2013
BISOTISSUEDSea Bright Solar02/03/2012
BISEQISSUEDEverest Scaffolding03/11/2011
BISOTISSUEDRiconda Maintenance01/12/2011
BISOTISSUEDRiconda Maintenance09/14/2010
BISEQISSUEDEverest Scaffolding06/22/2010
BISEQISSUEDEverest Scaffolding02/15/2008
BISOTISSUEDRiconda Maintenance04/12/2007
BISPLISSUEDWasserman-Triefler P & H04/04/2005
BISPLISSUEDWasserman-Triefler P & H10/18/2002
BIS—ISSUEDCanifield Construction08/31/2001
4 projects · most recent 01/09/2024
General Wiring
FiledStatusContractorScope
01/09/2024Permit IssuedAurora Electrical Contg—
04/26/2023CancelledN.Z. Pilgrim Electric—
03/07/2023CompleteHigh Quality Electric—
02/22/2023CompleteN.Z. Pilgrim ElectricGeneral Wiring
1 project · most recent 03/11/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
03/11/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/19/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
03/07/2024Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
03/07/2024Post-installed AnchorsKarol Zdancewiczspecial
04/06/2023MasonrySeth Royespecial
04/06/2023FinalSeth Royeprogress
04/06/2023Energy Code Compliance InspectionsSeth Royeprogress
04/06/2023Tenant Protection Plan ComplianceEDWARD TOROSSIANspecial
04/06/2023Fire-Resistant Penetrations and JointsSeth Royespecial
10/15/2022Lighting controlsBAUER DERMELenergy_progress
10/15/2022Lighting in dwelling unitsBAUER DERMELenergy_progress
09/21/2022Fire-Resistant Penetrations and JointsBalser Richardspecial
09/21/2022Energy Code Compliance InspectionsBAUER DERMELprogress
09/21/2022Fire-Resistance Rated ConstructionBAUER DERMELprogress
09/09/2022FinalBAUER DERMELprogress
320 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account